HomeMy WebLinkAboutX2022-0963 - Accessibility Hardship RequestCITY OF NEWPORT BEACH
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING DIVISION
100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658
www.newpo,L eachca.gov I (949) 644-3200
DOCUMENTATION OF UNREASONABLE HARDSHIP -
2 FINDING OF UNREASONABLE HARDSHIP FOR PROJECTS UNDER CASE NO .
$186,172* CBC 11B-202.4— EXCEPTION. 8 (FILL OUT PAGES 1 & 2) 02
H 2O22-
❑ FINDING OF UNREASONABLE HARDSHIP FOR PROJECTS OVER
$186,172* CBC 11B-202.4 — EXCEPTION: 8 (FILL OUT PAGES 1 & 2) PROJECT INFORMATION:
MUST BE ACCOMPANIED WITH RATIFICATION APPLICATION **
❑ FINDING OF TECHNICAL INFEASIBILITY FOR PROJECTS PER P/C. #. 0891-2022
CBC IIB-202.3 - EXCEPTION: 2 (FILL OUT PAGES1, 2 & 3) Permit#: X%on —Oq(03
Use:
A. JOB ADDRESS: 1811 Quail St. Stories:
SUITE NO. Verified by:
B. PROPERTYOWReceipt
NER: Mark Minyard
Address: 1811 Quail St City Newport Beach
State: CA Zip: 92660 Phone No. 949/724-1111 DISTRIBUTION:
C. APPLICANT: Carrie Wright
❑ Owner
d Petitioner CAkp—
Position/Relationship: Architect p/C Eng }�
Address: 17800 Mitchell North City Irvine V
❑Inspector 1 `
State CA zip 92614 Phone No 949/683 3984 ❑Other
An unreasonable hardship exists where the cost of providing an accessible entrance, path of travel, sanitary
facilities, public phones, drinking fountains, etc. exceeds 20% of the cost of project without these features.
The actual work of the project must comply with current code and an additional amount equal to at least 20%
of the cost of the project must be spent to improve required accessibility features that are not in compliance
with current code.
In choosing which accessible elements to provide, priority should be given to those elements that will provide
the greatest access, in the following order: 1) An accessible primary entrance; 2) An accessible route to the
altered area; 3) At least one accessible restroom for each sex; 4) Accessible public telephones (when
provided); 5) Accessible drinking fountains (when provided); 6) When possible, additional accessible
elements such as additional parking, storage and alarms.
To request an unreasonable hardship, complete the attached worksheet, and prepare a site and floor
plan of the existing and proposed accessibility improvements. This information must be submitted to
the Building Division in duplicate, prior to processing a permit application. One copy of the approval or denial
will be returned to the applicant.
For projects exceeding the valuation threshold of $186,172, a hardship approval can only be obtained
through a ratification application and hardship application.
" The $186,172 is based on $50,000 in 1981 dollars as of January 1, 2022.
** Ratification form can be obtained at: https://www.newportbeachca.gov/ratificationform
Farms\Hardship 01/25/2022
Address: 1611 Quail St
P/C #: 0691-2022
1. Total Cost of Construction contemplated (not including disabled access work) $ 69,862.00
Identify the accessibility features, which will NOT be brought into compliance if the request is granted.
Provide an estimate of the cost of compliance for each item.
❑ Path of travel to entrance (ramps, walks) ramp from public sidewalk to site $ 28,805.00
.....................
❑ Path of travel to altered area(s)............................................................... $ — — --- --- --
❑ Sanitary facilities (restrooms)................................................................. $
❑ Parking pcossandrunninRsloparngsso m,.......................... $.2_7,31500
❑ Drinking fountain(s)................................................................................ $ �— --.. --- --
❑ Accessible phone(s)............................................................................... $ ----�. —
❑ Accessible signage................................................................................. $
❑ Other Handrails fortop.portion of existing ramp,,,,,,,,,,,,,,,,, $ 500.00
Total cost of providing compliance:.....
56,610.00
Identify the accessibility features and equivalent facilities, which will be provided or brought into
compliance as required by Code. Provide an estimate of the cost of each item.
a, restripe HC parking stalls and new provide signage $ 3000.00
b, demo existing concrete, provide new curb cuUtruncated domes per current code requirements $ 13,667.00
C. provide new handrails at stairs and ramps to meet current code requirements 3500.00
d. — --------- — $ . —
e.
--- -- ---- -- $ ._.--- ---
Total: $ 20,167.00
2. Technically infeasibility — if applicable complete Page 3 of this application
3. Fill out this section if the path of travel from the disabled parking spaces to the tenant space
is not accessible. List projects (tenant improvements, additions, remodels, etc.) performed within
previous three years where no disabled access improvement was performed in conjunction with the
project. State description, date, and cost.
The applicant understands that although the City may approve this request of unreasonable hardship
and the proposed equivalent access, the City reserves the right to require additional access
compliance upon receiving a complaint of inadequate access at this location.
4. Carrie Wright
(Applicants Name
5.
AApproved ❑ Denied
By:
FOR CITY USE ONLY
9.6.22
Forms\Hardship 01/25/2022
Address: P/C #:
TECHNICALLY INFEASIBLE. An alteration of a building or a facility that has little likelihood of being
accomplished because the existing structural conditions require the removal or alteration of a load -bearing
member that is an essential part of the structural frame, or because other existing physical or site
constraints prohibit modification or addition of elements, spaces or features which are in full and strict
compliance with the minimum requirements for new construction and which are necessary to provide
accessibility.
Describe why the nature of accessibility is technically infeasible:
Describe how equivalent facilitation will be provided:
Forms\Hardship 01/25/2022 3