HomeMy WebLinkAboutX2020-2697 - MiscADU AIR BALANCE INFORMATION
To: City of Newport Beach
Project Name: 1700 16TH Street ADU
Plan Checker Inspector
Plan Check #:
From: Robert James Morales
�3
Engineers Inc.
Consulting & Design
17162 Gothard Street
Huntington Beach, CA 92647
714 465-5200 T.
714 242 9499 F.
Pages with Cover: 1
Project Address: 1700 E. 16TH. Street.
Newport Beach, CA 92663
AIR BALANCE REQUIUREMENTS FOR ADU - GENERAL NOTES REVISION-M-0.0
Per M-0.0 General Notes #14.
The Mechanical Design is based on individual balancing for the Tenant.
Each Supply Grille has its own Lever to adjust the CFM as the tenant allows
for there comfort, therefore no MVD at the supply duct are not required.
This allows adjustment as needed for there satisfaction at each area as desired.
Thank you,
R. James Morales
No. M 28203
EXP.6 30 23
Page 1 of 1
CITY OF NEWPORT BEACH
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING DIVISION
100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658-8915
www.newportbeachca.Dov ] (949) 644-3200
Structural Observation Report
Project Address:
1700 16th street, Newport Beach, CA
Report Date:
03/22/2022
CNB Inspector Name:
CNB Permit #:
2141-2020
Building Owner Name:
Omer's Mailing Address (if different from site);
Owner's Telephone #:
CNB Plan Check #:
Full Name of Structural Observer (SO):
SO E-mail Address:
SO Telephone #:
SO License / Reg. #:
Phaitoon Sarujikamjornwattana
phaitoon@g3inc.com
714A65.5200
SE4850
PLEASE INDICATE STRUCTURAL ELEMENTS AND CONNECTIONS OBSERVED (check applicable boxes)
FOUNDATIONS
SHEAR WALLS
FRAMES
DIAPHRAGMS
(FloodR000
INDICATE LOCATION(S)
OBSERVED
.DATE
OBSERVED
❑ Conventional
Footings & Slab
❑ Concrete
❑ Steel
❑ Concrete
Floor Sheathing & nailing
03/22/2022
❑ Mat Foundation,
Prestressed Concrete
❑ Masonry
❑ Concrete
❑ Steel Deck
Wall Sheathing & nailing
❑ Caissons, Piles,
Grade Beams
)!�Iwood or Manuf.
Shear Panels
❑ Masonry
Alwood
Other:
❑ Other:
❑ Other:
❑ Other:
ITEMS CHECKED ABOVE ARE APPROVED AND WITHOUT DEFICIENCIES.
❑ OBSERVED DEFICIENCIES AND COMMENTS:
No deficiencies found.
❑ REPORT CONTINUED ON ATTACHED PAGES.
❑ FINAL STRUCTURAL OBSERVATION REPORT:
The structurg generally complies with the approved construction documents, and all observed deficiencies were corrected.
I declare that the following statements are true to the best of my knowledge:
1. I am the licensed design professional retained by the owner to be in responsible
charge of the structural observation;
2. I, or another licensed design professional whom I have designated above and is under
my responsible charge, have performed the required site visits at each significant
construction stage to verify that the structure is in general conformance with the
approved construction documents;
3. 1 understand that all deficiencies which I have documented must be corrected, prior to
final acce nce of the structural systems by the City of Newport Beach, Building
Divisio .
03/22/2022
SIGI L�SAL OBSERVER OF RECORD DATE
�+ S Nr 11850
Exp.6/3OP2
STAMP OF STRUCTURAL
STRUCTURAL OBSERVATION DOES NOT WAIVE ANY REQUIREMENTS FOR BUILDING INSPECTION BY AUTHORIZED EMPLOYEES OF THE CITY OF NEWPORT BEACH.
Poems\SwcmrelObservetiaMepart&Iuewctions
CITY OF NEWPORT BEACH
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING DIVISION
100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658-8915
www.newportbeachca.gov 1 (949) 644-3200
Structural Observation Report
Project Address:
Report Date:
CNB Inspector Name:
CNB Permit #:
1700 16th sheet, Newport Beach, CA
1/13/2022
2141-2020.
Building Owner Name:
Owner's Mailing Address (if different from site);
Owner's Telephone #:
CNB Plan Check #:
Full Name of Structural Observer (SO):
SO E-mail Address:
SO Telephone A
SO License / Reg. #:
Phaitoon Sarujikamjornwattana
phaitoon@g3inacom
714.465.5200
SE4850
PLEASE INDICATE STRUCTURAL ELEMENTS AND CONNECTIONS OBSERVED !check annlicahle hoxasl
FOUNDATIONS
SHEAR WALLS
FRAMES
DIAPHRAGMS
(Floor/Roof)
INDICATE LOCATION(S)
OBSERVED
DATE
OBSERVED
❑ Conventional
Footings & Slab
❑ Concrete
d Steel
❑ Concrete
SW nailing and Hold-downs
1/13/2022
❑ Mat Foundation,
Prestressed Concrete
❑ Masonry
❑ Concrete
❑ Steel Deck
Floor diaphargm and bloclliP
SW connectors/ straps
❑ Caissons, Piles,
Grade Beams
Wood or Manuf.
Shear Panels
❑ Masonry
Wood
❑ Other:
❑Other:
❑ Other:
❑ Other:
ITEMS CHECKED ABOVE ARE APPROVED AND WITHOUT DEFICIENCIES.
❑ OBSERVED DEFICIENCIES AND COMMENTS:
No deficiencies found.
❑ REPORT CONTINUED ON ATTACHED PAGES.
❑ FINAL STRUCTURAL OBSERVATION REPORT:
The structure generally complies with the. approved construction documents,and all observed deficiencies were corrected.
I declare that the following statements are true. to the best of my knowledge:
I am the licensed design professional retained by the owner to be in responsible
charge of the structural observation;
I, or another licensed design professional whom I have designated above and is under
my responsible charge, have performed the required site visits at each significant
construction stage to verify that the structure is in general conformance with the
approved construction documents;
I understand that all deficiencies which I have documented must be corrected,. prior to
final acceopnce of the structural systems by the City of Newport Beach, Building
STAMP OF STRUCTURAL OBSERVER
STRUCTURAL OBSERVATION DOES NOT WAIVE ANY REQUIREMENTS FOR BUILDING INSPECTION BY AUTHORIZED EMPLOYEES OF THE CITY OF NEWPORT BEACH.
FomsStMOw ObservuimRepon&Nstmetiom
CITY OF NEWPORT BEACH
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING DIVISION
100 Civic Center Drive i P.O. Box 1768 1 Newport Beach, CA 92658-8915
www.newr)ortbeachca.gov 1 (949) 644-3200
I TEMPORARY CERTIFICATE OF OCCUPANCY APPLICATION I
Obtain approval from the Chief Building Official.
2. Pay $236.00 processing fee.
3. Obtain Electrical Inspector approval or final inspection
4. Obtain Fire Department's approval or final inspection. (Insp. Initials)
5. Obtain Structural Inspector approval. (Insp. Initials)
(Insp. Initials)
NOTE: if a Temporary Certificate of Occupancy expires and additional time is
granted (by the Chief Building Official) an extension fee of $125.00 will be charged.
TO $E COMPLETED
BY APPLICANT
To: Chief Building Official
City of Newport Beach
100 Civic Center Drive, P.O. Box 1768
Newport Beach, CA 92658-8915
Job Address: 17ou � 57t
Building Permit Number: X zco:� L3fr x 0OO -,C; - zC,Q-7
State reason for requesting the Temporary Certificate of Occupancy:
%`i51411C,;4*� 04 fevi, red c to c u•� L n z ea7 h�l vl v� cf zJ
ra�
How much time will you need to complete the project: A
Who will take responsibility to handle this matter to conclusion and will call for the final
inspection?
r-Aci;s
(Name of Responsible (Job Title) (Telephone Number)
ePParty)
>
(Signature of person who completed this form) (Date)
Fou,nMemporary CeRificate of Occupancy Application 07/08/2022
CITY OF NEWPORT BEACH
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING DIVISION
100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658-8915
www.newportbeachca.gov1(949)644-3200
Structural Observation Report
Project Address:
1700 16th street, Newport Beach, CA
Report Date:
10/27/2021
CNB Inspector Name:
CNB Permit #:
2141-2020
Building Owner Name:
Owner's Mailing Address (if different from site);
Owners Telephone #:
CNB Plan Check #:
Full Name of Structural Observer (SO):
SO E-mail Address:
SO Telephone #:
SO License / Reg. #:
Phaitoon Sarujikamjornwattma
phaitoonog3inccom
714.465.5200
SE4850
PLEASE INDICATE STRUCTURAL ELEMENTS AND CONNECTIONS OBSERVED (check applicable boxes)
FOUNDATIONS
SHEAR WALLS
FRAMES
DIAPHRAGMS
(Floor/Roof)
INDICATE LOCATION(S)
OBSERVED
DATE
OBSERVED
Conventional
Footin s & Slab
El Concrete
❑ Steel
El Concrete
Rebar; Embeds; Anchor bolts
10/26/2021
❑ Mat Foundation,
Prestressed Concrete
❑ Masonry
❑ Concrete
❑ Steel Deck
Hold-down Anchors
❑ Caissons, Piles,
Grade Beams
❑ Wood or Manuf.
Shear Panels
❑ Masonry
❑ Wood
❑ Other:
❑ Other:
❑ Other:
❑ Other:
ITEMS CHECKED ABOVE ARE APPROVED AND WITHOUT DEFICIENCIES.
❑ OBSERVED DEFICIENCIES AND COMMENTS:
Reviewed the conditions of the piping inside the footings; foam wrapped as well as the cover. No deficiencies found.
❑ REPORT CONTINUED ON ATTACHED PAGES.
❑ FINAL STRUCTURAL OBSERVATION REPORT:
The structure generally complies with the approved construction documents, and all observed deficiencies were corrected.
I declare that the following statements are true to the best of my knowledge:
1. I am the licensed design professional retained by the owner to be in responsible-q�i��JIKti>u
Q
charge of the structural observation;
2. I, or another licensed design professional whom I have designated above and is under'
my responsible charge, have performed the required site visits at each significant
s� o Nc 4850
a
construction stage to verify that the structure is in general conformance with the
Exp. 6/30P2
approved construction documents;
6
3. 1 understand that all deficiencies which I have documented must be corrected, prior to
final accep4nce of the structural systems by the City of Newport Beach, Building
�+
psjA IRUcT
10/27/2021
STAMP OF STRUCTURAL OBSERVER
STRUCTURAL OBSERVATION DOES NOT WAIVE ANY REQUIREMENTS FOR BUILDING INSPECTION BYAUTHORIZED EMPLOYEES OF THE CITY OF NEWPORT BEACH.
Eo=\SwcewelObservafiOERCP W&IMtMOLOM
5iBGc
INTECaRITY BIJILOERB ' ,
CONTRACT NUMBER:40027
CONTRACT TITLE: Eight 80 —Additional Dwelling Units
CONTRACTOR: Integrity Builders General Contractors
SUBJECT OF RFI: Conduit & Storm Drain in Footing
DRAWINGS:
DETAILS:
SPECIFICATION:
NA
NA
NA
Please verify if the conduits and storm drain, as per the attached images, are acceptable to be in the footing. If
acceptable, please provide a drawing/response with an engineer stamp for inspection.
ATTACHMENTS: 3
DATE RESPONSE REQUIRED BY:
DATE RFI SUBMITTED:
SIGNATURE:
ASAP
10/26/2021
CONTRACTOR RECOMMENDATION:
See above
COST EFFECT: Increase: ❑ Decrease: ❑ None: 0 Estimated Amount:
SCHEDULE EFFECT: Increase: Decrease: ❑ None: Estimated Calendar Days:
RESPONSE:
Pipes & conduits are acceptable to be in the footing provided they are provided with foam wrapped and adequate
concrete cover ( a min of 3"). The as -built conditions are reviewed and acceptable.
PhaitoonS.
Q3 Inc
10/27/2021
Q�OGESSlpp
��
O®��JIKAM✓p
i
f
Nc 9850 M
.� Exp. 6/30/
f!g jBCCT �
C
FROM:
RESPONSE DATE:
SIGNATURE:
❑ This response is for clarification only & results in no cost or time change to the contract
❑ This response requires a modification to the contract. A formal request for proposal shall follow under separate correspondence. No work is
authorized until the modification is signed by the owner/owner's representative. Proposed Change number assigned is:
IL
CONTRACT NUMBER: 40027
CONTRACT TITLE: Eight 80 — Additional Dwelling Units
CONTRACTOR: Integrity Builders General Contractors
SUBJECT OF RFI: Simpson Strong Wall
DRAWINGS:
DETAILS:
SPECIFICATION:
NA
NA
Simpson Strong Wall
Please advise if epoxying the 1" bolts into the existing footing is needed/required?
ATTACHMENTS: 1
DATE RESPONSE REQUIRED BY:
DATE RFI SUBMITTED:
SIGNATURE:
ASAP
10/12/2021
CONTRACTOR RECOMMENDATION:
See above
COST EFFECT: Increase: ❑
Decrease: ❑ None: Estimated Amount:
SCHEDULE EFFECT: Increase: Decrease: None: E Estimated Calendar Days:
RESPONSE:
Anchor Rod
SSW Strong Wall (2)
See Recommendation Uplift Plate Pl 1/
14 Hai
for the anchor bolt
16"
embedment into (E) Footing 10"
(N) Footing
12"
Drilland Epoxy
(E) Foot' g
Phaitoon S. /
3 Inc./ 10/12/2021
FROM:
RESPONSE DATE:
SIGNATU
�9ffEES/p
This response is for clarification only & results in no cost or time change to the contract.
❑ This response requires a modification to the contract. A formal request for proposal shall follow under c8hee`535Ode ' 'nA'lil work is
authorized until the modification is signed by the owner/owner's representative. Proposed Change numbe s i f}). 6/30/
b
LUZ
pin
- -------------------------------------------- {J Z-------------
Q
e
' w
....... QSwFW a
SOUTH BUILDING FOUNDATION PLAN .,M - w m Z m s
yj Una
0 o w =
m A Z !
m�
3
5
spuTx ewmwc
fOxNpAT10N PUW $m
DEPUTY 1 INSPECTION
1-800-DEPUTYI
Gen Contr: ._.
Sub-Contr:
CITY OF NEWPORT BEACH
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING DIVISION
100 Civic Center Drive I P.O. Box 1768 Newport Beach, CA 92658
www.newoortbeachca.aov(949)644-3200
SPECIAL INSPECTION REPORT
Project Address: " r J -
Permit Number: `t
Inspection Type (s): r;x
r 1,
Inspection Date (s): ( j Periodic (.,_) Continuous
Describe -inspection, Includins Location(s):,
-
-------------
J _ f v:
-
_ �) 9C;1f V: q"F7 ri�Y, ✓-.. I�f „) 'n
t III, it ly 9 rr FA b0da l _7 om
r 3
List Tests l Mader
Total Inspection Time Each Day;
lioLISS '
l
._._.._ ..-....
r List All Items Requiring Correction (Include( Previously Listed Uncorrected Items)::,-,
Comments:
)
_ lcS ilri )ir sl r,,i�y ;>zt i I� i� t t 6Cr-al is
{ 'q
Adid ��_ '" a L�--f
To the best of my knowledge, the work inspected was in accordance with the Building Division approved design drawings,
specifications and applicable workmanship provisions of the U.B.C. exceptas noted above.
- 5pecial.inspedor Signature.,
-: Date:
'Jx 1
9 -
'' {t Print Vull Name:
. Newport Beach Registration No.:
l%
I
^^+J rni {! 't9 J Lt'• i7 �i
l '7% r"., - 0
SpeciallnspectionReport 9-2415
DEPUTY 1 INSPECTION
1-800-DEPUTY1
Gen Contr:
Sub-Contr:
CITY OF NEWPORT BEACH
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING DIVISION
100 Civic Center Drive I P.O. Box 1768 Newport Beach, CA 92658
www.newoortbeachea.gov(949)644-3200
SPECIAL INSPECTION REPORT
Project Address: — i
Permit Number:—"; ,
Inspection Type (s):
Inspection Date (s): ( ) Periodic f ) Continuous
To the best of my knowledge, the work inspected was in accordance with the Building Division approved design drawings,
specifications and applicable workmanship provisions of the U.B.C. except as noted above.
Specialinspector Signature:
i -Date:
q
r
I
i Print Full Name: 4
NewportBeach Registration No.i
i
SpecialinspectionReport 8-24-15
CITY OF NEWPORT BEACH
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING DIVISION
100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658-8915
www.newoortbeachca.Qov 1 (949) 644-3200
Structural Observation Report
Project Address:
Report Date:
CNB Inspector Name:
CNB Permit#:
1700 16th street, Newport Beach, CA
2/15/2022
2141-2020.
Building Owner Name:
Owner's Mailing Address (if different from site);
Owner's Telephone #:
CNB Plan Check #:
Full Name of Structural Observer (SO):
SO E-mail Address:'
SO Telephone #:
SO License / Reg. #:
Phaitoon Sarojikamjornwattana
phaitoon@g3inacom
714.465.5200
SE4850
PLEASE INDICATE STRUCTURAL ELEMENTS AND CONNECTIONS OBSERVED lrhork annllrahla hnxael
FOUNDATIONS
SHEAR WALLS
FRAMES
DIAPHRAGMS
(Floor/Roof)
INDICATE LOCATION(S)
OBSERVED
- DATE
OBSERVED
❑ Conventional
Footings & Slab
❑ Concrete
❑ Steel
❑ Concrete
Trash chute Enclosure
2/1512022
❑ Mat Foundation,
Prestressed Concrete
❑ Masonry
❑ Concrete
❑ Steel Deck
Shear Wall
Hold-down
❑ Caissons, Piles,
Grade Beams
Wood or Manuf.
Shear Panels
❑ Masonry
❑ Wood
❑ Other.
❑ Other:
❑ Other:
❑ Other:
)�,iTEMS CHECKED ABOVE ARE APPROVED AND WITHOUT DEFICIENCIES.
❑ OBSERVED DEFICIENCIES AND COMMENTS:
No deficiencies found.
❑ REPORT CONTINUED ON ATTACHED PAGES.
❑ FINAL STRUCTURAL OBSERVATION REPORT:
The structure generally complies with the approved construction documents, and all observed deficiencies were corrected.
I am the licensed design professional retained by the owner to be in responsible
charge of the structural observation;
I, or another licensed design professional whom I have designated above and is under
my responsible charge, have performed the required site visits at each significant
construction stage to verify that the structure is in general conformance with the
approved construction documents;
I understand that all deficiencies which 1 have documented must be corrected, prior to
final acceg*nce of the structural systems by the City of Newport Beach, Building
STRUCTURAL OBSERVATION DOES NOT WAIVE ANY REQUIREMENTS FOR BUILDING INSPECTION BY AUTHORIZED EMPLOYEES OF THE CITY OF NEWPORT BEACH.
Forms\stmdw obsONWiCDR Pon&I t=tiors
:o
ABGC RFl
` INTEBFITY BtlILOfiFB , ,
CONTRACT NUMBER: 40027
CONTRACT TITLE: Eight 80 —Additional Dwelling Units
CONTRACTOR: Integrity Builders General Contractors
SUBJECT OF RFI: Stairs
DRAWINGS:
DETAILS:
SPECIFICATION:
S-2.1.2 & S-
NA
NA
Per structural plans:
1. The stairs shown on the plans calls for existing beams that are not existing and are just two 2x12. Are
beams required? If so, the beam will not have anything to tie -on or support it. Please provide how to
proceed with this. Refer to images and plans attached for reference. This is typical of all areas where the
stairs are to be infilled. Still need to verify basement to first floor area.
2. One of the stairs are also not shown in the drawing and would need infill details as well.
ATTACHMENTS: 1
DATE RESPONSE REQUIRED BY:
1
DATE RFI SUBMITTED:
SIGNATURE:
ASAP
11/02/2021
CONTRACTOR RECOMMENDATION:
See above
COST EFFECT: Increase: ❑
Decrease: ❑ None: Estimated Amount:
SCHEDULE EFFECT: Increase:
Decrease`. None:
Estimated Calendar Days:
RESPONSE:
See proposed framing solution.
Phaitoon S.
Q3 INC
11/8/2021
eQpaiEff(pyq
[with alt. framing option] Ink,
;850 v
Exp.E/30/
r on
/ 6
FROM:
RESPONSE DATE:
SIGNATURE:
This response is for clarification only & results In no cost or time change to the contract
This response requires a modification to the contract. A formal request. for proposal shall follow under separate correspondence. No work Is
authorized until the modification is signed by the owner/owner's representative. Proposed Change number assigned is:
NCE
SECOND FLOOR PLAN *QN,,R%W
SCNLE:1/5.-l._C.
b
H
zz
N
mmgo
Na
D
D
��
!
�F%Ili
I
I (t7 a. Fiuox aaFFrs
(E)2R
IjlLr
:_
(� 8%12 C/IFlT. FIEAtl
I
N'
\ Z,
N
q
!
$@y
6
' C
L
_
— J
_
51
m
I
@y
: F
IT:
$
W
(N)i M2 OFAM _
F�
T
III
_____ __
I
J
p
II
II
pN
t
NGi
C
u
D
Z
P4
3.m
0F r
z�122
D.
D
I r(
e3ll'(E)2AIz,
(E) 2A BOOB JOISTS
(E) 2A
nn
4n�
(r2.
A m
r(E)
Mr. BEAMI
.._ .6%12
ip
;aFF
E
C
�
b
0
r;Ol
- (N 2Al2 FJ.
-
E
—1
IL
iq
i_ li
i.
(N) U12 BEAM
—
—------'--
J
�.'
h
7
I
II
�*o
I -. (N 11xi2 B
!t
r'
I III
q
�• I
C
i
II9Vu
9
II
dab
i
fir=
_,;.
C
M0
0 y
z0
vz
N
F
1 1—J
x
•4.
a,
N) NM2
ZRNRf
N �Pa
D
Q
j
N
ql �
a
u
iRIL12N16'
iF S
�
g
u I•
K
�
I
IE)8.f1091 W�li
(q SCR JP515
I LFO J]I
I•
-
'j
y
a•
(x1 exE
N
P
F
•
x ant
u
-'-
Op
J
?
e
e
j
I � N
r"• N
Oil
N
tPR�) enz
tumEe
rt
a
Y
\
X 6%12
GAIItE
R
�q
R�.
a
�
31'=•
@
���
��
9
"' it
i U
�
I
a
•
N
!
p
j
a p
Ioi
N)6X12
`
I§
4
R xne
aa N
�_._�
I
�
(Nptl2
I'
3
2
�6
i
Im
6
5 g c
880 IRVINE APARTMENTS
1700 E. 76TH STRET ADU
CONVERSION
170016TH STREET
va I
NEWPORT BEACH, CA 92683
z_o
b
�$
. �mwam�a rom+a emir wa
r;
a
a
m
880 IRVINE APARTMENTS
1700 E. 16TH STRET ADU
CONVERSION
(
q v
v6
170016TH STREET
NEWPORT BEACH, CA 92663
CITY OF NEWPORT BEACH
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING DIVISION
100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658-8915
www.newoortbeachca.Qov 1 (949) 644-3200
Structural Observation Report
Project Address:
Report Date:
CNB Inspector Name:
CNB Permit #:
1700 16th street, Newport Beach, CA
1/13/2022
2141-2020.
Building Owner Name:
Owners Mailing Address (if different from site);
Owner's Telephone #:
CNB Plan Check #:
Full Name of Structural Observer (SO):
SO E-mail Address:
SO Telephone #i
SO License / Reg. #:
Phaitoon Sarujikamjornwatrana
phaitoon@g3inacom
714.465.5200
SE4850
PLEASE INDICATE STRIICTHRA1 FI FMFNTS AND Cr1NNFCTInIJ4 nRQ=P%t :n i,h. 1. r, ---- i
FOUNDATIONS
SHEAR WALLS
FRAMES
DIAPHRAGMS
(Floor/Roof)
INDICATE LOCATION(S)
OBSERVED
DATE
OBSERVED
❑ Conventional
Footings & Slab
❑ Concrete
❑ Steel
❑ Concrete
SW nailing and Hold-downs
1/13/2022
❑ Mat Foundation,
Prestressed Concrete
❑ Masonry
❑ Concrete
❑ Steel Deck
Floor diaphargm anockings
SWconnectors/ straps
❑ Caissons, Piles,
GradeBeams
Wood or Manuf.
Shear Panels
Li masonry
Wood
❑ Other:
❑ Other:
❑ Other:
❑ Other.
ITEMS CHECKED ABOVE ARE APPROVED AND WITHOUT DEFICIENCIES.
❑ OBSERVED DEFICIENCIES AND COMMENTS:
No deficiencies found:
❑ REPORT CONTINUED ON ATTACHED PAGES.
❑ FINAL STRUCTURAL OBSERVATION REPORT:.
The structure generally complies with the approved construction documents, and all observed deficiencies were corrected.
I declare that the following statements are true to the best of my knowledge: I ma=wft.
1. I am the licensed design professional retained by the owner to be in responsible 33 KAAJ ryN
charge of the structural observation;'
2. I, or another licensed design professional whom I have designated above and is under OAS
my responsible charge, have performed the required site visits at each significant m Nr, 4850
construction stage to verify. that the structure is in general conformance with the Exp.6/30,42
approved construction documents;.
3. 1 understand that all deficiencies which I have documented must be corrected, prior to �r t
final acne nce of the structural systems by the City of Newport Beach, Building 9 OCT
Divisio
C
1/13/2022
OF
STRUCTURAL OBSERVATION DOES NOT WAIVE ANY REQUIREMENTS FOR BUILDING INSPECTION BY AUTHORIZED EMPLOYEES OF THE CITY OF NEWPORT BEACH.
Forms\StmctwAOb mationRepon@mstmetiom
tlBGC
INTEGRITY BUILOERB ,
CONTRACT NUMBER: 40027
CONTRACT TITLE: Eight 80—Additional Dwelling Units
CONTRACTOR: Integrity Builders General Contractors
SUBJECT OF RFI: N. & S. BLDG HU614TF Beam Hanger
DRAWINGS:
DETAILS:
SPECIFICATION:
S-2.3
NA
NA
Please advise/confirm that HU614TF hanger be used for the 6x14 Beams? Please see the clouded attached plans.
ATTACHMENTS: 1
DATE RESPONSE REQUIRED BY:
DATE RFI SUBMITTED:
SIGNATURE:
ASAP
5/27/2022
CONTRACTOR RECOMMENDATION:
See above
COST EFFECT: Increase: ❑ Decrease: ❑ None: Estimated Amount:
SCHEDULE EFFECT: Increase: Decrease: None:
Estimated Calendar Days:
RESPONSE:
Acceptable. Provide solid blocking x 12" long with 1/2" all thread rod or stud
bolt @ 9" spacing. In order for the hanger to fasten to.
See attached recommendation on the Sketch. QpUTESS/o�
Phaltoon S. q�D PQUJIKA M,�9��
i`, S yiz
m
55/27/2022 * END.s/a0/
�l9 tgOCT
g
FROM:
RESPONSE DATE:
SIGNATURE:
This response is for clarification only & results in no cost or time change to the contract
❑ This response requires a modification to the contract. A formal request for proposal shall follow under separate correspondence. No work is
authorized until the modification is signed by the owner/owner's representative. Proposed Change number assigned is:
-4
0
lz
0 31
0
I la
He
------ -- — -----
co
880 IRVINE APARTMENTS
1700 E. 16TH STRET ADU
CONVERSION
1700 16TH STREET
NEWPORT BEACH, CA 92683
'. ���w ft��« T"I�
7
C1
A
2
N
•a
r
Sl
u
Simpson Strong -Tie" Wood Construction Connectors
Heavy -Duty and Double -Shear Top -Flange Joist Hangers
See dimensions, material, loads on table pages.
HUSTF has the double -shear nailing advantage —
distributing the joist load through two points on
each nail for greater strength.
Finish: Galvanized. See Corrosion Information,
pp. 12-15.
Installation:
• Use all specified fasteners; see General Notes
• Not acceptable for nailer or welded applications;
see WP, HWP, HWPH and BA hangers
• HUTF — The minimum header or ledger size
that can be used with this hanger Is 316"
• HUSTF — With 3x carrying members,
use 0.162" x 2rh" nalls Into the header and
0.162" x 3�h° nails Into the joist
Options:
• See Hanger Options General Notes on p. 97.
• HUTF rough beam sizes are available by
. special order.
• HUSTF cannot be modified.
Sloped and/or Skewed Seat
• HUTF can be skewed to a maximum of 45"
or sloped to a maximum of 450: HUTF can
be skewed and sloped down only,. provided
W z 2W. No skew with slope up options
available.
. • For skews greater than 151, uplift loads are
0.75 of the table loads. Hangers with a skew
greater than 15" may have all the joist nailing
on the outside angle.
• For sloped and skewed combinations, the
allowable loads are 0.70 of the table loads.
• For sloped down only hangers, allowable load
Is 0.78 of the table load.
Concealed Flange
• HUTF is available with one A flange concealed
at 0.85 of the catalog table load.
• HUTF is available with both flanges concealed
provided the Wdimension is 255c" or greater,
at 0.85 of the table load. Specify HUM for
both flanges concealed. No skew options
available.
HUSTF
Nailer application Is not
acceptable. Fasteners
cannot be installed.
HU410TF
k06lyrr
Typical HUTF
Installation
Double -Shear
Nailing Top View
Some model configurations may
differ from those shown. Production models have
projected seats. Square -cut seats may be ordered.
Contact Simpson Strong Tie for details.
HUTF
Down
Top View HUTF Hanger
Skewed Right
1
1
1
1
130
A
IBC,
1,LA
By
(
1
1
1
1
1
1
- Solid Sawn Lumber (®F/SP)
- These products are available with additional Corrosion protection. por more Information, see P. 14,
Joist or
Partin
Medal
Dimensions Fasteners (In.) BF7SP Allowable Loads
-
Installed
W
H
B
TF Header
Joist Uplift
Floor
Snow l
oof(125
Size
No.
Ga.
Costlndex
Code
Bef.
(160)
(100)
(115)
(ICI)
Sawn Lumber Sizes
WP66
12 We.
5%
2%
2%
(4)0.148 X2%
(2)0.148z3
-
2,985
2,985
2.985
SO
HU66TF
12 5%
5%
2%
21h
(10)0.162a 3%
(4)0.162 x31h
945
2,785
' 2,785
2;785
HWP66
12 5%
5%
3
2+h
(8) 0.162 x 31h
(10) 0.148 x 1 %
1.535
3,955 -
3,955
3.955
WP68
12 5%s
7K
216
2%s
(4)O.148X2%
(2)0.148x3
-
2,985
2,985
2,985
6x8
HU08TF
12
5+h
71A
21h
2+h
(12)0.182x3%
(4)0.182x31h
945
3,265
3,265
3,2fi5
HWP60
12
5%
71A
3
2S4
(9)0.162x314
(10)0.148x7+h
1,535
3,955
3,955
3,955
/
WP610
12
5%s
9%
.2'fi
2%s
(4)0:148X2%
(2)0:148 x3
-
2.966
2.985
2,988
/
HU610TF
12
5%
9%
2%
216
(14)0.16283Ya
1 (6)0.162X31h
1 1.420
1 3.945,.
3,945.
3,945
1 6X10
HWPH610.
7 SVh.
9%
3%
2%
1 (12)0.182 x3%
I(10)0148xiS4
1,885
5,920.
5,920:
5,920
1
H0610
10
59is
ff.
3116
3
tc,v.182 Xan
Ito; u.162X3%
2,075
5,395
5,315
5,395
HOLTB
H.=9%
7
5%s
7%to 33
6
211
(18)H54A
(6)H54A
2.450
10,720
10,720
10.720.
HWPH612
7
51A
11%
3Ya
21h
(12)0.162 x3%
(10)0.148x I1h
1,685
5,920
5,920
51920.
+
1112
HUB12TF
12
6%
11
21h
21h
0q 0.162x 3%
(6)0.162 x31h
1.420
4,590
41590
.4.590
(
HB612
10
534e
111'A
3%
S
(22)0.162x3%
(10)0.162z3Ys
2,075
5,395
5,395
5,395
(
HGLT67
H =1111 %
5%a
71161o33
6
2%
(18) N64A
(6) N54A
2,450
10,720
10,720
10,720
l
HWPH614
7
1 &
1311e
3YX
2%
0!)0,182016
(10)0.148x1%
1.685
5,920
5,920
5,920
1
H604 `<`,12
`6K13
'214
=21h
-�iB)Of182jt81(a
(8Jti,1§x.8
FSr
""r'�1
HBB14
10
We
13
31h
fi%14
3
(22)0.16 x3Yz
(10)0.162X314
2.075
5,395
6111
5.395
IBC,
FL, LA
H6LT8
H=73%s
7
6%s
75h W33
6
21h
(i8)N54A
(6)NS4A
2,450
10,720
10,720
10;728
HWPH616
7
5%
15
3Ya
21%
(12)0,1620
(10)0.1480%
1,685
5,920
6,920
5,920
Bx18
HU616TF
12
5%
i6
21k
2%
(20)U.162x 3%
(8)0.162x 3%
1,640
4,050
4,060
4,050
N8616
10
W.
15
3%
3
(2210.162 x3%
(10)0.162 x 3+h
2,075
5,395
5,395
5,395
HGLT6
H=15
7
5%s 7%to33
6
2%
(18)N54A
(8)N54A
2,450
10,720
10,720
10,720
•
BX8
WPT.50
H =7,26
12
7% 7%to30
2%
2%s
(4)0.148 x2%
(2)0.148x3
-
2,985
2,985
2;985
8x10
HB7.50X
H=0%e
10
7%
8to 28
3Yz
3
(22)0.182x3% (10)0.182
%3%
2,075 -
5,395
5,395
5,395
•
HWPH810
7
75h
9%s
31d
2%
(12)0.162 x3'h. (ID)0.148x
11/x
1.685
5.920
5.920
5,920
8x12
HB7.50X
H=11 Ys
10
7h
81o28
3%
3
(22)0.162x3% (10)0.162x3Sh
2,075
5,385.
5,995
5,385
714
11'A
3A
2%
(12)0.162 x 3% ,(10)0.148xl%
1,685,
5,920
5,920
5,928
7+h 8
to 28
3%
3
(22) 0.162 X 31h (10)
0.162 x 3+h
2,075
5,395
5,395
5,395
M
7%
13%s
3Ya
2%
(12)0.162 x3% (10)0.146X1Yz
1,BB5
5,920
6,920
5,920
71h 8t028
3,h
3
(22,0.162x3% 11010.162x3%
2,075
5,385.
6,295
5,395
1 I InIIN Inn.In
F...... l ,
7%
., �__.. �_
15 3Yi
__ ..
21¢
(12)0.162x3% (10)0.148x1%
j,685
5.920
6.920
5,920
•
-. _�....." "'.' .,,,...... •,.•,,,. ;, ,,., .,-,yvenv mewng won no runner Increase allowed.
Fornonnal loading eppllcailons such as cantilever construction, refer to Simpson Strong -Tie°
Connector Selector' software orconservativey divide the uplift load by 1.6.
2, 1,154Afastenam are supplied with hangers.
3. Uplift loads are based on DF/SP lumber. For SPF/HF, use 0.88 x DF/Sp uplift load.
4. HGLT Informaeon can be found on pp. 170-171.
5. Hangers with en'•" do not have an Installed Cost Index,
6. Fasteners: Nail dimensions In the table are listed diameter by length.
See pp. 21-22 for fastener Information.
Codes: See p,11 for Code Reference Key Chart
i
m
W
S
"o
N
1
133
�Milli
M�An ,f
a 11.
EIBGC
INTEGRITY EUILOERB
CONTRACT NUMBER: 40027
CONTRACT TITLE: Eight 80 —Additional Dwelling Units
CONTRACTOR: Integrity Builders General Contractors
SUBJECT OF RR N. & S. BDLG Roof Platform Tie-in for Concrete slab
DRAWINGS:
DETAILS:
SPECIFICATION:
A 2.1
NA
NA
Please confirm that concrete slab is okay to stay and if the roof platforms can be built above it. If can stay and have
platforms built onto it, provide atypical tie-in detail for the platforms and screen wall.
ATTACHMENTS: 2
DATE RESPONSE REQUIRED BY:
1
DATE RFI SUBMITTED:
SIGNATURE:
ASAP
5/26/2022
CONTRACTOR RECOMMENDATION:
See above
COST EFFECT: Increase: ❑ Decrease: ❑ None:
Estimated Amount:
SCHEDULE EFFECT: Increase: Decrease:
171 None: M Estimated Calendar Days:
RESPONSE:
The (E) concrete pad is acceptable to stay. Field investigation
Shows that the roof framing in this area is very heavy duty framing 6x14 @
12" o.c, previously designed for very heavy
Equipment.
The New RTUS on this area is much lighter.
Provide attachment from from (N) pad framing by shot pin fasteners
Into (E) pad @ 16" o.c. or 3/8" EXP bolts @ 24" o.c. into concrete.
oQ,�truo�,
��ZppY 11NMi�H£An
M 950
Phaitoon S.`°"'°'�
i
Q3 �9 �Arfl
tM1N
5/27/2022
FROM:
RESPONSE DATE:
SIGNATURE:
This response is for clarification only & results in no cost or time change to the contract
❑ This response requires a modification to the contract. A formal request for proposal shall follow under separate correspondence. No work is
authorized until the modification is signed by the owner/owner's representative. Proposed Change number assigned is:
R
a
1
N
E6
{�{� tlEllrtli i1
Jill
9iEEI Ea�qi1 3ii a@(@Fj+
&tfill
ESiFj a ' flEj
� i�jgg jai F�HIM
��j,"I
e�,a ti e
BUILDING OWNER
GEMS w j ,j�l
d = p
UDR, INC € i
nusumnaomtwrt� mt j�l 7�6 'E
(7M) 9i-1116 F
STRUCTURAL OBSERVATION REPORT
Project 1700 16th street, Newport Date of Observation
Beach, CA
Project No. Date of Report
Participants Phaitoon Sarujikamjorn Report No.
Structural Observer
Construction Starve Observations / Deficiencies Notes
Roof Floor Elements Observed:
Plywood Sheathing
May 31s', 2022
May 3181 , 2022
Phaitoon Sarujikamjorn
Roof Framing :
Existing Plywood sheathing conditions at the project has been investigated.
The conditions of the existing plywood have been reviewed.
The conclusions are as follows:
Plywood:
(E) roof plywood sheathing with good condition can be reused.
Damaged plywood sheathing (see example pic
shall be replaced with new plywood.
Nailing:
The New Nails can be installed over existing plywood with good condition.
Where nails are to be installed to the edge of the plywood, they are to be
installed at least''/i' from the edge. Spacing of nails shall be per plan. The
new nails shall be installed in between the existing holes with a minimum
of edge distance.
Avoid installing new nails over existing holes. Where new nails are
installed over existing holes. Add a new nail to compensate for that nail.
Care shall be taken when installing nails on the edge of the existing
plywood. Avoid splitting the edge of plywood, otherwise, replace with new
plywood.
Blocking Underside of the Plywood :
Blocks for plywood diaphragm and future screen wall have been inspected and
they have been installed per plan.
i ";//
Plywood with outer ply layer peeled off or damaged
Shall be replaced with NEW Plywood.
Plywood with outer ply layer peeled off or damaged
Shall be replaced with NEW Plywood.
Damaged Curb shall be replaced.
Inspect the Termite condition:
Plywood and/or roof curb with termite damage shall be replaced.
Recommend investigate termite condition thoroughly
Blocking underside of the framing is inspected
And they are acceptable.
tlBGC
INTEORITV EUILDEREI CONTRACT NUMBER: 40027
CONTRACT TITLE: Eight 80—Additional Dwelling Units , '
CONTRACTOR: Integrity Builders General Contractors
SUBJECT OF RFI: N. & S. BLDG Roof 6x6 blocking in lieu of 6x14
DRAWINGS:
DETAILS:
SPECIFICATION:
S-2.3
NA
NA
Please advise/confirm that 6x6 blocking can be done in lieu of 6x14 blocking for the roof screen and platform?
ATTACHMENTS:1
DATE RESPONSE REQUIRED BY:
DATE RFI SUBMITTED:
SIGNATURE:
ASAP
5/17/2022
CONTRACTOR RECOMMENDATION:
See above
COST EFFECT: Increase: ❑ Decrease: ❑ None: 0 Estimated Amount:
SCHEDULE EFFECT: Increase: Decrease: None: Estimated Calendar Days:
RESPONSE:
6x6 blocking is acceptable.
Phaitoon S.
Q3
5/18/2022
FROM:
RESPONSE DATE:
SIGNATURE:
This response is for clarification only & results in no cost or time change to the contract
❑ This response requires a modification to the contract. A formal request for proposal shall follow under separate correspondence. No work is
authorized until the modification is signed by the owner/owner's representative. Proposed Change number assigned is:
E�DI
880 IRVINE APARTMENTS a
1700 E.16TH STRET ADU
CONVERSION � � �
€��
•"• gs
1700 i6TH STREET
�
�
NEWPORT BEACH CA 92663
N
CITY OF NEWPORT BEACH
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING DIVISION
100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658-8915
www.newoortbeachca.Qov 1 (949) 644-3200
Structural Observation Report
Project Address:
Report Date:
CNB Inspector Name:
CNB Permit#:
1700 16th street, Newport Beach, CA
06-14-2022
2141-2020
Building Owner Name:
Owner's Mailing Address (if different from site);
Owner's Telephone*
CNB Plan Check*
Full Name of Structural Observer (SO):
SO E-mail Address:
SO Telephone #:
SO License / Reg. M
Phaitoon Sarujikamjornwattana
phaitoon@q3inc.com
SE4850
y 14.4100.
PLEASE INDICATE STRUCTURAL ELEMENTS AND CONNECTIONS OBSERW8check applicable boxes
FOUNDATIONS
SHEAR WALLS
FRAMES
DIAPHRAGMS
(Floor/Roof)
INDICATE LOCATION(S)
OBSERVED
DATE
OBSERVED
❑ Conventional
Footings & Slab
❑ Concrete
❑ Steel
❑ Concrete "
Roof Framing
Retrofit PICI
06-14-202
❑ Mat Foundation,
Prestressed Concrete
❑ Masonry
❑ Concrete
❑ Steel Deck
Blocking:.,
❑ Caissons, Piles,
Grade Beams
Wood or Manuf.
Shear Panels
❑ Masonry
Alwood
❑ Other:
❑ Other:
❑ Other:
❑ Other:
ITEMS CHECKED ABOVE ARE APPROVED AND WITHOUT DEFICIENCIES.
❑ OBSERVED DEFICIENCIES AND COMMENTS:
No Deficiencies Found
❑ REPORT CONTINUED ON ATTACHED PAGES.
❑ FINAL STRUCTURAL OBSERVATION REPORT:
The structure generally complies with the approved construction documents, and all observed deficiencies were corrected.
I declare that the following statements are true to the best of my knowledge:
1. I am the licensed design professional retained by the owner to be in responsible
charge of the structural observation;
2. I, or another licensed design professional whom I have designated above and is under
my responsible charge, have performed the required site visits at each significant
construction stage to verify that the structure is in general conformance with the
approved construction documents;
3. 1 understand that all deficiencies which I have documented must be corrected, prior to
final accep1pnce of the structural systems by the City of Newport Beach, Building
06-14-2022
S I AM V Ur S I KUU l UKAL UtlAtKVLK
DOES NOT WAIVE ANY REQUIREMENTS FOR BUILDING INSPECTION BY AUTHORIZED EMPLOYEES OF THE CITY OF NEWPORT BEACH.
Foetus\Stmoure ObseNationRgco&bsuuctiom
RIFI NUMBER
�IBGC 144
INTOGIRITY EUILDERB
CONTRACT NUMBER: 40027
CONTRACTTITLE: Eight 80—Additional Dwelling Units 47
CONTRACTOR: Integrity Builders General Contractors
SUBJECT OF RFI: N. & S. BDLG Roof Platform Tie-in for Concrete slab
DRAWINGS:
DETAILS:
SPECIFICATION:
A 2.1
NA
NA
Please confirm that concrete slab is okay to stay and if the roof platforms can be built above it. If can stay and have
platforms built onto it, provide a typical tie-in detail for the platforms and screen wall.
ATTACHMENTS: 2
DATE RESPONSE REQUIRED BY:
DATE RFI SUBMITTED:
SIGNATURE:
ASAP 1
5/26/2022
CONTRACTOR RECOMMENDATION:
See above
COST EFFECT: Increase: ❑ Decrease: ❑ None: Estimated Amount:
SCHEDULE EFFECT: Increase: Decrease:
171
None: 0 Estimated Calendar Days:
RESPONSE:
The (E) concrete pad is acceptable to stay. Field investigation
Shows that the roof framing in this area is very heavy duty framing 6x14 @
12" o.c. previously designed for very heavy
Equipment.
The New RTUS on this area is much lighter.
Provide attachment from from (N) pad framing by shot pin fasteners
Into (E) pad @ 16" o.c. or 3/8" EXP bolts @ 24" o.c. into concrete. p0.orFuo�
Phaitoon S.
Q3
-ram
5/27/2022
FROM:
RESPONSE DATE:
SIGNATURE:
This response is for clarification only & results in no cost or time change to the contract
❑ This response requires a modification to the contract. A formal request for proposal shall follow under separate correspondence. No work is
authorized until the modification is signed by the owner/owner's representative. Proposed Change number assigned is:
IE1111 0f
E> E;Ep9 E iE =
i
°E
E� i"� Ewa a�'� E'
�p� m �� �i � • ` E ��
iE iE �a � �e
m
$iii4
9f
f4 I
-
�4
y 'u
------
—,
IT
If
I'
3
iig
a�gq
o va°g
\ T
{iE Q 99 g
E
yE 1 lilt
Es HT T
a
BB i if If
^ fagp a eE aili ifill
3Ei6{{{ 6�ie i i°if
e {i 8i is ��}i {lt��: ijiaiii i�di1E P:{ : i e
i6��i� iP 4� €jP� 9?ii�3ig 4Ejti 12,
E �Mill
!° �� i� f�01 loll
E�e {
Y i,P a SNPPOVBBOfpt BUILDING OWNER® �'� '•§ {,`° E m 8801RVINEAPARTMENTS 3 i 66
AOUAPRRTMENT$ A48R B"OGOR4RO%4 �� Im$ II, i� i L•1•illi�� fed Og MID
a� e
170D LOTH STREET R3UbiRWlWVN -® �� C z
)— Additional
Builders Gem
SUBJECT OF RFI: N. & S. BLDG Roof 6x6 blocking inlieu of 6x14
DRAWINGS:
DETAILS:
SPECIFICATION:
S-2.3
NA
NA
Please advise/confirm that 6x6 blocking can be done in lieu of 6x14blocking for the roof screen and platform?
ATTACHMENTS: 1
DATE RESPONSE REQUIRED BY:
DATE RFI SUBMITTED;
SIGNATURE:
ASAP
5/17/2022
CONTRACTOR RECOMMENDATION:
See above
COST EFFECT: Increase: ❑
Decrease: ❑ None: E Estimated Amount:
SCHEDULE EFFECT: Increase:
Decrease: None: Estimated Calendar Days:
RESPONSE:
6x6 blocking is acceptable.
Phaitoon S.
Q3
5/18/2022
FROM:
RESPONSE DATE:
SIGNATURE:
This response is for clarification only & results in no cost or time change to the contract
This response requires a modification to the contract. A formal request for proposal shall follow under separate correspondence. No work is
authorized until the modification is signed by the owner/owner's representative. Proposed Change number assigned is:
g �s�sPe�a
5[�[
drz
IFi
log
tl go d
Yog
x
qq !gig
u^ e
b
r'a A iE
p5�
dd
E
1 i { O F
x S
�€
i�
N z
N p
W To
mW¢n\xuzns amT'ei ervia � 4m mi sun xnert r\+a'm+\�>m yen exn uWs,ao NfwSv-uwe b. w.e ✓�.+w ws •v. m. � mT
880 IRVINE APARTMENTS a
7700 E. 16TH STRET ADU 8�
CONVERSION g
7700 76TH STREET
NEWPORT BEACH, CA 92683 �
gg
�!BGC
INTEGRITY BUILDERS
CONTRACT NUMBER: 40027
CONTRACTTITLE: Eisht 80—Additional Dwelling Units
SUBJECT OF RFI: N. & S. BLDG HU614TF Beam Hanger
DRAWINGS:
DETAILS:
SPECIFICATION:
5-2.3
NA
NA
Please advise/confirm that HU614TF hanger be used for the 6x14 Beams? Please see the clouded attached plans.
ATTACHMENTS: 1
DATE RESPONSE REQUIRED BY:
DATE RFI SUBMITTED:
SIGNATURE:
ASAP
5/27/2022
CONTRACTOR RECOMMENDATION:
See above
COST EFFECT: Increase:
❑
Decrease: ❑ None: E Estimated Amount:
SCHEDULE EFFECT: Increase: Decrease:
None: Estimated Calendar Days:
RESPONSE:
Acceptable. Provide solid blocking x 12" long with 1/2" all thread rod or stud
bolt @ 9" spacing. In order for the hanger to fasten to.
See attached recommendation on the Sketch. QaoeEss/o�q
Phaitoon S. M,�q
Q3 ���=��,IK
O
b
5/27/2022 y ENp.6/30/ a
�l9 rgaCi �
s
I
FROM:
RESPONSE DATE:
SIGNATURE:
❑ This response is for clarification only & results in no cost or time change to the contract
This response requires a modification to the contract. A formal request for proposal shall follow under separate correspondence. No work is
authorized until the modification is signed by the owner/owner's representative. Proposed Change number assigned is:
8,
6 F
et �g E
y � �§ B 11
,F
7,
§ Fa g
g yii r rjy
5 P
eF
%SI •� d� � � d� i si D
o
Fig
m
Z
a l o e 3 A v `. .. z g F �� '° ,a HN F
s
;s 1HFn�4 : 4�
��^^ 3i 99B9B99B9B p
__ __ _________F F8 •A�
i
8 Fli �eE
S� ku
eF 5P
A
680 IRVINE APARTMENTS 9
�
� 6
� + • a
1700 E.16TH STRET ADU
CONVERSION
1T0816TH STREET i � x � �'+• ,mt'
s
NEWPORT BEACH, CA 82683
Simpson Strong -Tie"' Wood Construction Connectors
Heavy -Duty and Double -Shear Top -Flange Joist Hangers
See dimensions, material, loads on table pages.
HUSTF has the double -shear nailing advantage —
distributing the Joist load through two points on
each nail for greater strength.
C
Finish: Galvanized. See Corrosion Information,
0
pp. 12-15.
Installation:
• Use all specified fasteners; see General Notes
• Not acceptable for nailer or welded applications;
ig
see WP, HWP, HWPH and BA hangers
'O.
HUTF — The minimum header or ledger size
^
that can be used with this hanger is 316"
t]j•
HUSTF — With 3x carrying members,
use 0.162" x 2Ye" nails Into the header and
0.162" x 314" nails into the Joist
Options:
• See Hanger Options General Notes on p. 97.
• HUTF rough beam sizes are available by
. special order.
• HUSTF cannot be modified.
Sloped and/or Skewed Seat
HUTF can be skewed to a maximum of 45"
or sloped to a maximum of 450: HUTF can
be skewed and sloped down only, provided
W x 2W. No skew with slope up options
available.
. • For skews greater than 15',. uplift loads are
0.75 of the table loads. Hangers with a skew
greater than 15' may have all the Joist nailing
on the outside angle.
• For sloped and skewed combinations, the
allowable loads are 070 of the table loads.
. • For sloped down only hangers, allowable load
is 0.78 of the table load.
Concealed Flange
• HUTF is available with one A flange concealed
at 0.85 of the catalog table load.
• HUTF is available with both flanges concealed
provided the W dimension is 29W or greater,
at 0.85 of the table load. Specify HUCTF for
both flanges concealed. No skew options
available.
HUSTF
Nailer application Is not
acceptable. Fasteners
cannot be installed.
HU410TF
HIJ&IY rr
Typical HUTF
Installation
Double -Shear
Nailing Top View
e
i
P
•a
HUCTF
Some model configurations may
differ from those shown. Production models have
projected seats. Square -cut seats maybe ordered.
Contact Simpson Strong Tie for details.
HUTF
Down
Top View HUTF Hanger
Skewed Right
1
1
1
I
1
1
130
.A
IBC,
i,LA
O'
) Simpson Strong TIF"Wood Con6tructlon Connectors
These products are available with additional corrosion protection. For more Information, see P. 14.
Jolst or
Madel
Dimensions
- Fasteners
DF/SP Allowable Loads
Installed.
Purlb
Size
No.
Os
Costlnoox
Code
net.
W
H
B
TF
Header
Joist
Uplift-
Floor
Snow
oof(125
1160)
(100)
(ICq
Sawn Lumber Sizes
WP6fi
12
591e
5x%
2%
24L
(4) 0.146 x 215
(2) 0.140 x 3
-
2,985
' 2.985
2,985
6x6
HU66TF
12
516
5%
216
2%
(10)0.162x3'h
(4)0:162 x3%
945
21785
2,785
2,785
HWP66
12
5%
5%
3
2'/e
(9)0.162x3%
(10)0:148x1%
1,535
3,955
- 3,955
3,955
WP68
12
51Y.s
71A
21h
2§iz
(4)0.148x2%
(2)0.148x3
-
2.985
2.985
2,955
6x8
HU68TF
12
5%
7'%
9'h
2%
(12)0.162 x 311h
(4)0.. x31h
945
3,265
3,285
3,265
HWP68
12
5%
7%
3
2%
(9) 0.162 x 316
(10) 0.148 x 1 %
1,535
3,955
3,955
3,955
WP610
12
We
911A
.21h
241s
(4)0:148X2%
(2)0:148 %3
-
2,985 ..2,986
2.985
HU610TF
12
5%
9%
2%
2%
(14)0.162x 31h
(6)0.162 x 3 %
1-,420
3,945
3,945
3,945
8x10
HWPH610
7
5%
9%
3%
2%
(12)0.162 x 31h
'(10)0.148 x 1%
1,685
5,920i
5,920
5,920
H8610
10
M
9%
3%
3
(22)0162 X314
(10)0.162 X 3%
2,075
5,395
5,395
5.395
1
HGLT6
H=945
7
We
7%to33
6
2%
(18)N54A
(6)N54A
Z450
10,720
10,720
10.720.
1
HWPH612
7
51h
11%
3V4
2%
(12)0.162 x 3%
(10)0.148 X I
1,685
5.920
5,920
5.920
1
HUB12TF
12
5%
11
2%
2%
(16)DJ62x3%
(6)0,162 x 3'h
1.420
4,590
4,690
.4.690
1 6x12
HB612
10
541e
11%
3%
3
(22)0.162x3%
(10)0182XS%
2,075
5,395
5.395
5,395
I
HGLT6
H LT6
7
5%
7%to33
6
216
18 N54A
( )
(6)N54A
2,450
10,720
10,720
10,720
HWPH614
7
5%
13He
3y4
214
02)0162 x3%
(10)OA48 x 1'h
1,605
5.920
51,920
5,920
HU614T1' , <12
6
13
, 2%
2%
6xt4 ::
(22)0.162If 31h
(10)0,162 x314
FL,LA
HB614
10
5%
13
31A
3
2,075
5,395
5,395
5,395.e
HGLT6
H=13Ha
7
54'e
7%10313
6
2%
(10)H54A
(6)N54A
2;450
10,720
10,720
10,720
HWPH616
7
5%
15
3%
2%
(12)0.162x3%.
(10)OJ48X1%
1,685
5,020
5,920
5,920
+
HU616TF
12
5%
15
21h
2h
(20)0.162 x 3%
(8)0.162x 3%
1,640
4,050
4,050
4.050
6xi6
H8616
10
54fa
15
3%
3
(22)0.162X3%
JO)0.162036
2,075
5.395
5,395
5,395
HGLT6
H =15
7
51ie 7%t033
- 6
2%
(18)N54A
(6)N54A
2,d50
10,720
10,720
10.720
8x0
H=PZ7.2
H=7.26
12
7% 7%to
30
2%
291e
4 OA48X2%
(1
(2)0.148x3
-
2,986
2,985
2;985
BX10
HB750X
H = g%e
10
7%
Bto 28
3%
3
(22) 0.162 x 31h
(10) 0.162 x 3%
2,075
5.395
5,395
5,395
HWPH810
7
7%
9%3ye
2%
(12)0.162 x3%.
(10)0.148x1'h
1,685
5,920
5,920
5,920
8X12
HB' ;�
10
7%
BIu28
3%
3 (22)0.162If
3% (10)0.162x3%
2.075
5,395
5,395
5,395
HWPH812
7
9%
11%
3Y4
2% (12)0.162x3%
(10)0.1480%
1,685 ..
5,920
5,920
5,920
804
H 3He 10
711
8 to 28
3%
3 (22)
0,162 X 3'h (10)
0.162 x 3%
2,075
5,395
5.395
5,395
HWPH814
7
71h
139-
3%4
2% (12)0.162
X3% (10)0.148x
1%
1.685
5.920
5,920
5,920
8X18 HB7.5
X 10
7% 8
to 28
31h
3 (22)
0.162 x 3'h (10)
0,162 x 3%
2,076
5,395
5,395
5;395
HWPH816
7 1
7% 1
15 1
3144
2% (12)0.162x3%
(10)0.148x1%
1
1.685
5,920 1
5,920
5,920
-r• •• ••••••••• •••-•� ��_. ,,,..,woo.. ,�, .r,uu u, mis lyudnd,ueomg wen no runner Increase amwea.
For normal loading applications such as cantilever construction, refer to Simpson StrongTie°
Connector Selectors software or conservatively divide the uplift load by 1.6.
2. N54A fasteners are supplied with hangers.
3. Uplift bads are based an DF/SP lumber. ForSPF/HF, use 0.86 x DF/SP uplift load.
4. HGLT Information can be found on pp. 170-171.
5. Hangers with an I" do not have an Installed Cost Index,
6. Fasteners: Nall dimensions In the table sea listed diameter by length.
See pp. 21-22 for fastener Information.
Codes: See p.11 for Code Reference Key Chart
L.'
9
III
133
tlBGC
INTEGRITY ENILDER9
CONTRACT NUMBER: 40027
CONTRACT TITLE: Eight 80—Additional Dwelling Units
CONTRACTOR: Integrity Builders General Contractors
SUBJECT OF RFI: N. & S. BLDG Ceiling & Wall Penetration Sleeves
DRAWINGS:
DETAILS:
SPECIFICATION:
P-5.1
NA
NA
Please confirm that sleeves for floor ceiling and wall penetrations are not need and can just be fire caulked.
ATTACHMENTS: 1
DATE RESPONSE REQUIRED BY:
DATE RFI SUBMITTED:
SIGNATURE:
ASAP
6/21/2022
CONTRACTOR RECOMMENDATION:
See above
COSTEFFECT: Increase: ❑ Decrease: ❑ None: E Estimated Amount:
SCHEDULE EFFECT: Increase: Decrease: None: 0 Estimated Calendar Days:
RESPONSE:
NO SLEEVES ARE REQUIRED, REFER TO APPROVED/PERMITTED PLANS
DETAIL 1-B ON SHEETA-6.3 FOR
FIRE CAULKING DETAIL AT FIRE RATED PENETRATIONS
D ARCy,
A
J R FRo "
c�C0
No.
C30884
EXP 6/30/23
�f9
OF CAQF
FROM: CESAR ROMERO
RESPONSE DATE: 2022.06.27
SIGNATURE:
❑ This response is for clarification only & results in no cost or time change to the contract
❑ This response requires a modification to the contract. A formal requestfor proposal shall follow under separate correspondence. No work is
authorized until the modification is signed by the owner/owner's representative. Proposed Change number assigned is:
Uri
COM WO'HOWSS MOVAMN
It 1� I j 111 LBBVJ.S H.0 gig j
NOIS113A Eta
nav i3mis Hiv � s oul
SIN311111itlYdY 3NIAHI 098
L-1 LI
it I
if
it it I
P Ili( ijill Rif
IT 1 f ij 1
I Id
oil
4
If
IE
. %'\NkN�
It
it
on I RFI NUMBE 1150
INTEBRITY BUILOERB
CONTRACT NUMBER: 40027
CONTRACT TITLE: Eight 80—Additional Dwelling Units
CONTRACTOR: Integrity Builders General Contractors
SUBJECT OF RFI: N. & S. BLDG Fire Caulking
DRAWINGS:
DETAILS:
I
SPECIFICATION:
P-5.1
I NA
NA
Please confirm that the called -out caulking can be substitute with another caulking that is more readily available such
as 3M Red Fire Barrier CP 25WB Plus Sealant.
ATTACHMENTS: 3
DATE RESPONSE REQUIRED BY:
ASAP
DATE RFI SUBMITTED:
6/21/2022
SIGNATURE:
CONTRACTOR RECOMMENDATION:
See above
COST EFFECT: Increase: ❑ Decrease: ❑ None:
Estimated Amount:
SCHEDULE EFFECT: Increase: LJ Decrease: I I None: E Estimated Calendar Days:
RESPONSE:
substitution is acceptable, provide same fire rating as shown on approved plans
FROM: Cesar Romero
RESPONSE DATE: 2022.06.27
SIGNATURE:
This response Is for clarification only & results In no cost or time change to the contract -
❑ This response requires a modification to the contract. A formal request for proposal shall follow under separate correspondence. No work is
authorized until the modification is signed by the owner/owner's representative. Proposed Change number assigned is:
RF1 NUMBER
tlBGC 127
INTEGRITY BLIILDERB
CONTRACT NUMBER:40027
CONTRACT TITLE: Eight 80—Additional Dwelling Units
CONTRACTOR: Integrity Builders General Contractors
SUBJECT OF RFI: S. BLDG Corridor & Party Walls Screw Attachment
DRAWINGS:
DETAILS:
SPECIFICATION:
NA
NA
NA
Please see the attached images showing the resilient channel on the drywall to span the resilient channel that was
installed under the drywall on the joist. The resilient channel is tied to the drywall ceiling with an 1-1/2 inch screws.
Please confirm that it is okay to use the tek screws to tie the top track with the resilient channel shown on the
attached images below.
ATTACHMENTS: 2
DATE RESPONSE REQUIRED BY:
DATE RFI SUBMITTED:
SIGNATURE;
ASAP 1
5/2/2022
CONTRACTOR RECOMMENDATION:
See above
COST EFFECT: Increase: ❑ Decrease: ❑ None:
0 Estimated Amount:
SCHEDULE EFFECT: Increase: Decrease: None: Estimated Calendar Days:
RESPONSE:
this is acceptable
ARCy�TF
G��SED
cr
G�SPRRatf�,o
No.
C30884
EXP 6/30/23
s
T9 ��
—_
OF
CA0i
FROM: Cesar Romero
RESPONSE DATE: 2022.05.03
SIGNATURE:
This response is for clarification only & results in no cost or time change to the contract
❑ This response requires a modification to the contract. A formal request for proposal shall follow under separate correspondence. No work is
authorized until the modification is signed by the owner/owner's representative. Proposed Change number assigned is:
INTEGRITY BUILDERS
CONTRACT NUMBER: 40027
CONTRACTTITLE: Eight 80—Additional Dwelling Units
CONTRACTOR: Integrity Builders General Contractors
SUBJECT OF RFI: S. BLDG Outlet Spacing
DRAWINGS:
DETAILS:
SPECIFICATION:
A-6.2 & A-6.4
NA
NA
Please see attached plans in regards of the 2-foot min spacing between outlets on the party walls that cannot be met
due to the minimum wall length. Please advise how to proceed. -v ARCy�l�
ATTACHMENTS: 2
No.
C30884
EXP 6/30/23
`rf �
9 0�
OF CA'0\
DATE RESPONSE REQUIRED BY:
DATE RFI SUBMITTED:
SIGNATURE:
ASAP
S/2/2022
CONTRACTOR RECOMMENDATION:
See above
COST EFFECT: Increase: ❑ Decrease: ❑ None: Estimated Amount:
SCHEDULE EFFECT: Increase: Decrease: None: 0 Estimated Calendar Days:
RESPONSE:
Per 2019 CBC section 714.4.2 Membrane Penetrations in fire rated partitions exception 1.2 thru 1.5
electrical boxes can be located as follows:
1.1 By a horizontal distance of not less than 24 inches (610 mm) where the wall or partition is
constructed with individual noncommunicating stud cavities.
1.2 By a horizontal distance of not less than the depth of the wall cavity where the wall cavity is filled
with cellulose loose -fill, rockwool or slag mineral wool insulation.
1.3 By solid fireblocking in accordance with Section 718.2.1.
1.4 By protecting both outlet boxes with listed putty pads.
FROM: RESPONSE DATE: SIGNATURE:
Cesar Romero 2022.05.03
❑ This response is for clarification only & results in no cost or time change to the contract
This response requires a modification to the contract. A formal request for proposal shall follow under separate correspondence. No work is
authorized until the modification is signed by the owner/owner's representative. Proposed Change number assigned is:
.. .
`§\\\\`
.,\(\ \ �'
..1,, _