Loading...
HomeMy WebLinkAboutX2020-2697 - MiscADU AIR BALANCE INFORMATION To: City of Newport Beach Project Name: 1700 16TH Street ADU Plan Checker Inspector Plan Check #: From: Robert James Morales �3 Engineers Inc. Consulting & Design 17162 Gothard Street Huntington Beach, CA 92647 714 465-5200 T. 714 242 9499 F. Pages with Cover: 1 Project Address: 1700 E. 16TH. Street. Newport Beach, CA 92663 AIR BALANCE REQUIUREMENTS FOR ADU - GENERAL NOTES REVISION-M-0.0 Per M-0.0 General Notes #14. The Mechanical Design is based on individual balancing for the Tenant. Each Supply Grille has its own Lever to adjust the CFM as the tenant allows for there comfort, therefore no MVD at the supply duct are not required. This allows adjustment as needed for there satisfaction at each area as desired. Thank you, R. James Morales No. M 28203 EXP.6 30 23 Page 1 of 1 CITY OF NEWPORT BEACH COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION 100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658-8915 www.newportbeachca.Dov ] (949) 644-3200 Structural Observation Report Project Address: 1700 16th street, Newport Beach, CA Report Date: 03/22/2022 CNB Inspector Name: CNB Permit #: 2141-2020 Building Owner Name: Omer's Mailing Address (if different from site); Owner's Telephone #: CNB Plan Check #: Full Name of Structural Observer (SO): SO E-mail Address: SO Telephone #: SO License / Reg. #: Phaitoon Sarujikamjornwattana phaitoon@g3inc.com 714A65.5200 SE4850 PLEASE INDICATE STRUCTURAL ELEMENTS AND CONNECTIONS OBSERVED (check applicable boxes) FOUNDATIONS SHEAR WALLS FRAMES DIAPHRAGMS (FloodR000 INDICATE LOCATION(S) OBSERVED .DATE OBSERVED ❑ Conventional Footings & Slab ❑ Concrete ❑ Steel ❑ Concrete Floor Sheathing & nailing 03/22/2022 ❑ Mat Foundation, Prestressed Concrete ❑ Masonry ❑ Concrete ❑ Steel Deck Wall Sheathing & nailing ❑ Caissons, Piles, Grade Beams )!�Iwood or Manuf. Shear Panels ❑ Masonry Alwood Other: ❑ Other: ❑ Other: ❑ Other: ITEMS CHECKED ABOVE ARE APPROVED AND WITHOUT DEFICIENCIES. ❑ OBSERVED DEFICIENCIES AND COMMENTS: No deficiencies found. ❑ REPORT CONTINUED ON ATTACHED PAGES. ❑ FINAL STRUCTURAL OBSERVATION REPORT: The structurg generally complies with the approved construction documents, and all observed deficiencies were corrected. I declare that the following statements are true to the best of my knowledge: 1. I am the licensed design professional retained by the owner to be in responsible charge of the structural observation; 2. I, or another licensed design professional whom I have designated above and is under my responsible charge, have performed the required site visits at each significant construction stage to verify that the structure is in general conformance with the approved construction documents; 3. 1 understand that all deficiencies which I have documented must be corrected, prior to final acce nce of the structural systems by the City of Newport Beach, Building Divisio . 03/22/2022 SIGI L�SAL OBSERVER OF RECORD DATE �+ S Nr 11850 Exp.6/3OP2 STAMP OF STRUCTURAL STRUCTURAL OBSERVATION DOES NOT WAIVE ANY REQUIREMENTS FOR BUILDING INSPECTION BY AUTHORIZED EMPLOYEES OF THE CITY OF NEWPORT BEACH. Poems\SwcmrelObservetiaMepart&Iuewctions CITY OF NEWPORT BEACH COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION 100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658-8915 www.newportbeachca.gov 1 (949) 644-3200 Structural Observation Report Project Address: Report Date: CNB Inspector Name: CNB Permit #: 1700 16th sheet, Newport Beach, CA 1/13/2022 2141-2020. Building Owner Name: Owner's Mailing Address (if different from site); Owner's Telephone #: CNB Plan Check #: Full Name of Structural Observer (SO): SO E-mail Address: SO Telephone A SO License / Reg. #: Phaitoon Sarujikamjornwattana phaitoon@g3inacom 714.465.5200 SE4850 PLEASE INDICATE STRUCTURAL ELEMENTS AND CONNECTIONS OBSERVED !check annlicahle hoxasl FOUNDATIONS SHEAR WALLS FRAMES DIAPHRAGMS (Floor/Roof) INDICATE LOCATION(S) OBSERVED DATE OBSERVED ❑ Conventional Footings & Slab ❑ Concrete d Steel ❑ Concrete SW nailing and Hold-downs 1/13/2022 ❑ Mat Foundation, Prestressed Concrete ❑ Masonry ❑ Concrete ❑ Steel Deck Floor diaphargm and bloclliP SW connectors/ straps ❑ Caissons, Piles, Grade Beams Wood or Manuf. Shear Panels ❑ Masonry Wood ❑ Other: ❑Other: ❑ Other: ❑ Other: ITEMS CHECKED ABOVE ARE APPROVED AND WITHOUT DEFICIENCIES. ❑ OBSERVED DEFICIENCIES AND COMMENTS: No deficiencies found. ❑ REPORT CONTINUED ON ATTACHED PAGES. ❑ FINAL STRUCTURAL OBSERVATION REPORT: The structure generally complies with the. approved construction documents,and all observed deficiencies were corrected. I declare that the following statements are true. to the best of my knowledge: I am the licensed design professional retained by the owner to be in responsible charge of the structural observation; I, or another licensed design professional whom I have designated above and is under my responsible charge, have performed the required site visits at each significant construction stage to verify that the structure is in general conformance with the approved construction documents; I understand that all deficiencies which I have documented must be corrected,. prior to final acceopnce of the structural systems by the City of Newport Beach, Building STAMP OF STRUCTURAL OBSERVER STRUCTURAL OBSERVATION DOES NOT WAIVE ANY REQUIREMENTS FOR BUILDING INSPECTION BY AUTHORIZED EMPLOYEES OF THE CITY OF NEWPORT BEACH. FomsStMOw ObservuimRepon&Nstmetiom CITY OF NEWPORT BEACH COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION 100 Civic Center Drive i P.O. Box 1768 1 Newport Beach, CA 92658-8915 www.newr)ortbeachca.gov 1 (949) 644-3200 I TEMPORARY CERTIFICATE OF OCCUPANCY APPLICATION I Obtain approval from the Chief Building Official. 2. Pay $236.00 processing fee. 3. Obtain Electrical Inspector approval or final inspection 4. Obtain Fire Department's approval or final inspection. (Insp. Initials) 5. Obtain Structural Inspector approval. (Insp. Initials) (Insp. Initials) NOTE: if a Temporary Certificate of Occupancy expires and additional time is granted (by the Chief Building Official) an extension fee of $125.00 will be charged. TO $E COMPLETED BY APPLICANT To: Chief Building Official City of Newport Beach 100 Civic Center Drive, P.O. Box 1768 Newport Beach, CA 92658-8915 Job Address: 17ou � 57t Building Permit Number: X zco:� L3fr x 0OO -,C; - zC,Q-7 State reason for requesting the Temporary Certificate of Occupancy: %`i51411C,;4*� 04 fevi, red c to c u•� L n z ea7 h�l vl v� cf zJ ra� How much time will you need to complete the project: A Who will take responsibility to handle this matter to conclusion and will call for the final inspection? r-Aci;s (Name of Responsible (Job Title) (Telephone Number) ePParty) > (Signature of person who completed this form) (Date) Fou,nMemporary CeRificate of Occupancy Application 07/08/2022 CITY OF NEWPORT BEACH COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION 100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658-8915 www.newportbeachca.gov1(949)644-3200 Structural Observation Report Project Address: 1700 16th street, Newport Beach, CA Report Date: 10/27/2021 CNB Inspector Name: CNB Permit #: 2141-2020 Building Owner Name: Owner's Mailing Address (if different from site); Owners Telephone #: CNB Plan Check #: Full Name of Structural Observer (SO): SO E-mail Address: SO Telephone #: SO License / Reg. #: Phaitoon Sarujikamjornwattma phaitoonog3inccom 714.465.5200 SE4850 PLEASE INDICATE STRUCTURAL ELEMENTS AND CONNECTIONS OBSERVED (check applicable boxes) FOUNDATIONS SHEAR WALLS FRAMES DIAPHRAGMS (Floor/Roof) INDICATE LOCATION(S) OBSERVED DATE OBSERVED Conventional Footin s & Slab El Concrete ❑ Steel El Concrete Rebar; Embeds; Anchor bolts 10/26/2021 ❑ Mat Foundation, Prestressed Concrete ❑ Masonry ❑ Concrete ❑ Steel Deck Hold-down Anchors ❑ Caissons, Piles, Grade Beams ❑ Wood or Manuf. Shear Panels ❑ Masonry ❑ Wood ❑ Other: ❑ Other: ❑ Other: ❑ Other: ITEMS CHECKED ABOVE ARE APPROVED AND WITHOUT DEFICIENCIES. ❑ OBSERVED DEFICIENCIES AND COMMENTS: Reviewed the conditions of the piping inside the footings; foam wrapped as well as the cover. No deficiencies found. ❑ REPORT CONTINUED ON ATTACHED PAGES. ❑ FINAL STRUCTURAL OBSERVATION REPORT: The structure generally complies with the approved construction documents, and all observed deficiencies were corrected. I declare that the following statements are true to the best of my knowledge: 1. I am the licensed design professional retained by the owner to be in responsible-q�i��JIKti>u Q charge of the structural observation; 2. I, or another licensed design professional whom I have designated above and is under' my responsible charge, have performed the required site visits at each significant s� o Nc 4850 a construction stage to verify that the structure is in general conformance with the Exp. 6/30P2 approved construction documents; 6 3. 1 understand that all deficiencies which I have documented must be corrected, prior to final accep4nce of the structural systems by the City of Newport Beach, Building �+ psjA IRUcT 10/27/2021 STAMP OF STRUCTURAL OBSERVER STRUCTURAL OBSERVATION DOES NOT WAIVE ANY REQUIREMENTS FOR BUILDING INSPECTION BYAUTHORIZED EMPLOYEES OF THE CITY OF NEWPORT BEACH. Eo=\SwcewelObservafiOERCP W&IMtMOLOM 5iBGc INTECaRITY BIJILOERB ' , CONTRACT NUMBER:40027 CONTRACT TITLE: Eight 80 —Additional Dwelling Units CONTRACTOR: Integrity Builders General Contractors SUBJECT OF RFI: Conduit & Storm Drain in Footing DRAWINGS: DETAILS: SPECIFICATION: NA NA NA Please verify if the conduits and storm drain, as per the attached images, are acceptable to be in the footing. If acceptable, please provide a drawing/response with an engineer stamp for inspection. ATTACHMENTS: 3 DATE RESPONSE REQUIRED BY: DATE RFI SUBMITTED: SIGNATURE: ASAP 10/26/2021 CONTRACTOR RECOMMENDATION: See above COST EFFECT: Increase: ❑ Decrease: ❑ None: 0 Estimated Amount: SCHEDULE EFFECT: Increase: Decrease: ❑ None: Estimated Calendar Days: RESPONSE: Pipes & conduits are acceptable to be in the footing provided they are provided with foam wrapped and adequate concrete cover ( a min of 3"). The as -built conditions are reviewed and acceptable. PhaitoonS. Q3 Inc 10/27/2021 Q�OGESSlpp �� O®��JIKAM✓p i f Nc 9850 M .� Exp. 6/30/ f!g jBCCT � C FROM: RESPONSE DATE: SIGNATURE: ❑ This response is for clarification only & results in no cost or time change to the contract ❑ This response requires a modification to the contract. A formal request for proposal shall follow under separate correspondence. No work is authorized until the modification is signed by the owner/owner's representative. Proposed Change number assigned is: IL CONTRACT NUMBER: 40027 CONTRACT TITLE: Eight 80 — Additional Dwelling Units CONTRACTOR: Integrity Builders General Contractors SUBJECT OF RFI: Simpson Strong Wall DRAWINGS: DETAILS: SPECIFICATION: NA NA Simpson Strong Wall Please advise if epoxying the 1" bolts into the existing footing is needed/required? ATTACHMENTS: 1 DATE RESPONSE REQUIRED BY: DATE RFI SUBMITTED: SIGNATURE: ASAP 10/12/2021 CONTRACTOR RECOMMENDATION: See above COST EFFECT: Increase: ❑ Decrease: ❑ None: Estimated Amount: SCHEDULE EFFECT: Increase: Decrease: None: E Estimated Calendar Days: RESPONSE: Anchor Rod SSW Strong Wall (2) See Recommendation Uplift Plate Pl 1/ 14 Hai for the anchor bolt 16" embedment into (E) Footing 10" (N) Footing 12" Drilland Epoxy (E) Foot' g Phaitoon S. / 3 Inc./ 10/12/2021 FROM: RESPONSE DATE: SIGNATU �9ffEES/p This response is for clarification only & results in no cost or time change to the contract. ❑ This response requires a modification to the contract. A formal request for proposal shall follow under c8hee`535Ode ' 'nA'lil work is authorized until the modification is signed by the owner/owner's representative. Proposed Change numbe s i f}). 6/30/ b LUZ pin - -------------------------------------------- {J Z------------- Q e ' w ....... QSwFW a SOUTH BUILDING FOUNDATION PLAN .,M - w m Z m s yj Una 0 o w = m A Z ! m� 3 5 spuTx ewmwc fOxNpAT10N PUW $m DEPUTY 1 INSPECTION 1-800-DEPUTYI Gen Contr: ._. Sub-Contr: CITY OF NEWPORT BEACH COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION 100 Civic Center Drive I P.O. Box 1768 Newport Beach, CA 92658 www.newoortbeachca.aov(949)644-3200 SPECIAL INSPECTION REPORT Project Address: " r J - Permit Number: `t Inspection Type (s): r;x r 1, Inspection Date (s): ( j Periodic (.,_) Continuous Describe -inspection, Includins Location(s):, - ------------- J _ f v: - _ �) 9C;1f V: q"F7 ri�Y, ✓-.. I�f „) 'n t III, it ly 9 rr FA b0da l _7 om r 3 List Tests l Mader Total Inspection Time Each Day; lioLISS ' l ._._.._ ..-.... r List All Items Requiring Correction (Include( Previously Listed Uncorrected Items)::,-, Comments: ) _ lcS ilri )ir sl r,,i�y ;>zt i I� i� t t 6Cr-al is { 'q Adid ��_ '" a L�--f To the best of my knowledge, the work inspected was in accordance with the Building Division approved design drawings, specifications and applicable workmanship provisions of the U.B.C. exceptas noted above. - 5pecial.inspedor Signature., -: Date: 'Jx 1 9 - '' {t Print Vull Name: . Newport Beach Registration No.: l% I ^^+J rni {! 't9 J Lt'• i7 �i l '7% r"., - 0 SpeciallnspectionReport 9-2415 DEPUTY 1 INSPECTION 1-800-DEPUTY1 Gen Contr: Sub-Contr: CITY OF NEWPORT BEACH COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION 100 Civic Center Drive I P.O. Box 1768 Newport Beach, CA 92658 www.newoortbeachea.gov(949)644-3200 SPECIAL INSPECTION REPORT Project Address: — i Permit Number:—"; , Inspection Type (s): Inspection Date (s): ( ) Periodic f ) Continuous To the best of my knowledge, the work inspected was in accordance with the Building Division approved design drawings, specifications and applicable workmanship provisions of the U.B.C. except as noted above. Specialinspector Signature: i -Date: q r I i Print Full Name: 4 NewportBeach Registration No.i i SpecialinspectionReport 8-24-15 CITY OF NEWPORT BEACH COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION 100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658-8915 www.newoortbeachca.Qov 1 (949) 644-3200 Structural Observation Report Project Address: Report Date: CNB Inspector Name: CNB Permit#: 1700 16th street, Newport Beach, CA 2/15/2022 2141-2020. Building Owner Name: Owner's Mailing Address (if different from site); Owner's Telephone #: CNB Plan Check #: Full Name of Structural Observer (SO): SO E-mail Address:' SO Telephone #: SO License / Reg. #: Phaitoon Sarojikamjornwattana phaitoon@g3inacom 714.465.5200 SE4850 PLEASE INDICATE STRUCTURAL ELEMENTS AND CONNECTIONS OBSERVED lrhork annllrahla hnxael FOUNDATIONS SHEAR WALLS FRAMES DIAPHRAGMS (Floor/Roof) INDICATE LOCATION(S) OBSERVED - DATE OBSERVED ❑ Conventional Footings & Slab ❑ Concrete ❑ Steel ❑ Concrete Trash chute Enclosure 2/1512022 ❑ Mat Foundation, Prestressed Concrete ❑ Masonry ❑ Concrete ❑ Steel Deck Shear Wall Hold-down ❑ Caissons, Piles, Grade Beams Wood or Manuf. Shear Panels ❑ Masonry ❑ Wood ❑ Other. ❑ Other: ❑ Other: ❑ Other: )�,iTEMS CHECKED ABOVE ARE APPROVED AND WITHOUT DEFICIENCIES. ❑ OBSERVED DEFICIENCIES AND COMMENTS: No deficiencies found. ❑ REPORT CONTINUED ON ATTACHED PAGES. ❑ FINAL STRUCTURAL OBSERVATION REPORT: The structure generally complies with the approved construction documents, and all observed deficiencies were corrected. I am the licensed design professional retained by the owner to be in responsible charge of the structural observation; I, or another licensed design professional whom I have designated above and is under my responsible charge, have performed the required site visits at each significant construction stage to verify that the structure is in general conformance with the approved construction documents; I understand that all deficiencies which 1 have documented must be corrected, prior to final acceg*nce of the structural systems by the City of Newport Beach, Building STRUCTURAL OBSERVATION DOES NOT WAIVE ANY REQUIREMENTS FOR BUILDING INSPECTION BY AUTHORIZED EMPLOYEES OF THE CITY OF NEWPORT BEACH. Forms\stmdw obsONWiCDR Pon&I t=tiors :o ABGC RFl ` INTEBFITY BtlILOfiFB , , CONTRACT NUMBER: 40027 CONTRACT TITLE: Eight 80 —Additional Dwelling Units CONTRACTOR: Integrity Builders General Contractors SUBJECT OF RFI: Stairs DRAWINGS: DETAILS: SPECIFICATION: S-2.1.2 & S- NA NA Per structural plans: 1. The stairs shown on the plans calls for existing beams that are not existing and are just two 2x12. Are beams required? If so, the beam will not have anything to tie -on or support it. Please provide how to proceed with this. Refer to images and plans attached for reference. This is typical of all areas where the stairs are to be infilled. Still need to verify basement to first floor area. 2. One of the stairs are also not shown in the drawing and would need infill details as well. ATTACHMENTS: 1 DATE RESPONSE REQUIRED BY: 1 DATE RFI SUBMITTED: SIGNATURE: ASAP 11/02/2021 CONTRACTOR RECOMMENDATION: See above COST EFFECT: Increase: ❑ Decrease: ❑ None: Estimated Amount: SCHEDULE EFFECT: Increase: Decrease`. None: Estimated Calendar Days: RESPONSE: See proposed framing solution. Phaitoon S. Q3 INC 11/8/2021 eQpaiEff(pyq [with alt. framing option] Ink, ;850 v Exp.E/30/ r on / 6 FROM: RESPONSE DATE: SIGNATURE: This response is for clarification only & results In no cost or time change to the contract This response requires a modification to the contract. A formal request. for proposal shall follow under separate correspondence. No work Is authorized until the modification is signed by the owner/owner's representative. Proposed Change number assigned is: NCE SECOND FLOOR PLAN *QN,,R%W SCNLE:1/5.-l._C. b H zz N mmgo Na D D �� ! �F%Ili I I (t7 a. Fiuox aaFFrs (E)2R IjlLr :_ (� 8%12 C/IFlT. FIEAtl I N' \ Z, N q ! $@y 6 ' C L _ — J _ 51 m I @y : F IT: $ W (N)i M2 OFAM _ F� T III _____ __ I J p II II pN t NGi C u D Z P4 3.m 0F r z�122 D. D I r( e3ll'(E)2AIz, (E) 2A BOOB JOISTS (E) 2A nn 4n� (r2. A m r(E) Mr. BEAMI .._ .6%12 ip ;aFF E C � b 0 r;Ol - (N 2Al2 FJ. - E —1 IL iq i_ li i. (N) U12 BEAM — —------'-- J �.' h 7 I II �*o I -. (N 11xi2 B !t r' I III q �• I C i II9Vu 9 II dab i fir= _,;. C M0 0 y z0 vz N F 1 1—J x •4. a, N) NM2 ZRNRf N �Pa D Q j N ql � a u iRIL12N16' iF S � g u I• K � I IE)8.f1091 W�li (q SCR JP515 I LFO J]I I• - 'j y a• (x1 exE N P F • x ant u -'- Op J ? e e j I � N r"• N Oil N tPR�) enz tumEe rt a Y \ X 6%12 GAIItE R �q R�. a � 31'=• @ ��� �� 9 "' it i U � I a • N ! p j a p Ioi N)6X12 ` I§ 4 R xne aa N �_._� I � (Nptl2 I' 3 2 �6 i Im 6 5 g c 880 IRVINE APARTMENTS 1700 E. 76TH STRET ADU CONVERSION 170016TH STREET va I NEWPORT BEACH, CA 92683 z_o b �$ . �mwam�a rom+a emir wa r; a a m 880 IRVINE APARTMENTS 1700 E. 16TH STRET ADU CONVERSION ( q v v6 170016TH STREET NEWPORT BEACH, CA 92663 CITY OF NEWPORT BEACH COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION 100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658-8915 www.newoortbeachca.Qov 1 (949) 644-3200 Structural Observation Report Project Address: Report Date: CNB Inspector Name: CNB Permit #: 1700 16th street, Newport Beach, CA 1/13/2022 2141-2020. Building Owner Name: Owners Mailing Address (if different from site); Owner's Telephone #: CNB Plan Check #: Full Name of Structural Observer (SO): SO E-mail Address: SO Telephone #i SO License / Reg. #: Phaitoon Sarujikamjornwatrana phaitoon@g3inacom 714.465.5200 SE4850 PLEASE INDICATE STRIICTHRA1 FI FMFNTS AND Cr1NNFCTInIJ4 nRQ=P%t :n i,h. 1. r, ---- i FOUNDATIONS SHEAR WALLS FRAMES DIAPHRAGMS (Floor/Roof) INDICATE LOCATION(S) OBSERVED DATE OBSERVED ❑ Conventional Footings & Slab ❑ Concrete ❑ Steel ❑ Concrete SW nailing and Hold-downs 1/13/2022 ❑ Mat Foundation, Prestressed Concrete ❑ Masonry ❑ Concrete ❑ Steel Deck Floor diaphargm anockings SWconnectors/ straps ❑ Caissons, Piles, GradeBeams Wood or Manuf. Shear Panels Li masonry Wood ❑ Other: ❑ Other: ❑ Other: ❑ Other. ITEMS CHECKED ABOVE ARE APPROVED AND WITHOUT DEFICIENCIES. ❑ OBSERVED DEFICIENCIES AND COMMENTS: No deficiencies found: ❑ REPORT CONTINUED ON ATTACHED PAGES. ❑ FINAL STRUCTURAL OBSERVATION REPORT:. The structure generally complies with the approved construction documents, and all observed deficiencies were corrected. I declare that the following statements are true to the best of my knowledge: I ma=wft. 1. I am the licensed design professional retained by the owner to be in responsible 33 KAAJ ryN charge of the structural observation;' 2. I, or another licensed design professional whom I have designated above and is under OAS my responsible charge, have performed the required site visits at each significant m Nr, 4850 construction stage to verify. that the structure is in general conformance with the Exp.6/30,42 approved construction documents;. 3. 1 understand that all deficiencies which I have documented must be corrected, prior to �r t final acne nce of the structural systems by the City of Newport Beach, Building 9 OCT Divisio C 1/13/2022 OF STRUCTURAL OBSERVATION DOES NOT WAIVE ANY REQUIREMENTS FOR BUILDING INSPECTION BY AUTHORIZED EMPLOYEES OF THE CITY OF NEWPORT BEACH. Forms\StmctwAOb mationRepon@mstmetiom tlBGC INTEGRITY BUILOERB , CONTRACT NUMBER: 40027 CONTRACT TITLE: Eight 80—Additional Dwelling Units CONTRACTOR: Integrity Builders General Contractors SUBJECT OF RFI: N. & S. BLDG HU614TF Beam Hanger DRAWINGS: DETAILS: SPECIFICATION: S-2.3 NA NA Please advise/confirm that HU614TF hanger be used for the 6x14 Beams? Please see the clouded attached plans. ATTACHMENTS: 1 DATE RESPONSE REQUIRED BY: DATE RFI SUBMITTED: SIGNATURE: ASAP 5/27/2022 CONTRACTOR RECOMMENDATION: See above COST EFFECT: Increase: ❑ Decrease: ❑ None: Estimated Amount: SCHEDULE EFFECT: Increase: Decrease: None: Estimated Calendar Days: RESPONSE: Acceptable. Provide solid blocking x 12" long with 1/2" all thread rod or stud bolt @ 9" spacing. In order for the hanger to fasten to. See attached recommendation on the Sketch. QpUTESS/o� Phaltoon S. q�D PQUJIKA M,�9�� i`, S yiz m 55/27/2022 * END.s/a0/ �l9 tgOCT g FROM: RESPONSE DATE: SIGNATURE: This response is for clarification only & results in no cost or time change to the contract ❑ This response requires a modification to the contract. A formal request for proposal shall follow under separate correspondence. No work is authorized until the modification is signed by the owner/owner's representative. Proposed Change number assigned is: -4 0 lz 0 31 0 I la He ------ -- — ----- co 880 IRVINE APARTMENTS 1700 E. 16TH STRET ADU CONVERSION 1700 16TH STREET NEWPORT BEACH, CA 92683 '. ���w ft��« T"I� 7 C1 A 2 N •a r Sl u Simpson Strong -Tie" Wood Construction Connectors Heavy -Duty and Double -Shear Top -Flange Joist Hangers See dimensions, material, loads on table pages. HUSTF has the double -shear nailing advantage — distributing the joist load through two points on each nail for greater strength. Finish: Galvanized. See Corrosion Information, pp. 12-15. Installation: • Use all specified fasteners; see General Notes • Not acceptable for nailer or welded applications; see WP, HWP, HWPH and BA hangers • HUTF — The minimum header or ledger size that can be used with this hanger Is 316" • HUSTF — With 3x carrying members, use 0.162" x 2rh" nalls Into the header and 0.162" x 3�h° nails Into the joist Options: • See Hanger Options General Notes on p. 97. • HUTF rough beam sizes are available by . special order. • HUSTF cannot be modified. Sloped and/or Skewed Seat • HUTF can be skewed to a maximum of 45" or sloped to a maximum of 450: HUTF can be skewed and sloped down only,. provided W z 2W. No skew with slope up options available. . • For skews greater than 151, uplift loads are 0.75 of the table loads. Hangers with a skew greater than 15" may have all the joist nailing on the outside angle. • For sloped and skewed combinations, the allowable loads are 0.70 of the table loads. • For sloped down only hangers, allowable load Is 0.78 of the table load. Concealed Flange • HUTF is available with one A flange concealed at 0.85 of the catalog table load. • HUTF is available with both flanges concealed provided the Wdimension is 255c" or greater, at 0.85 of the table load. Specify HUM for both flanges concealed. No skew options available. HUSTF Nailer application Is not acceptable. Fasteners cannot be installed. HU410TF k06lyrr Typical HUTF Installation Double -Shear Nailing Top View Some model configurations may differ from those shown. Production models have projected seats. Square -cut seats may be ordered. Contact Simpson Strong Tie for details. HUTF Down Top View HUTF Hanger Skewed Right 1 1 1 1 130 A IBC, 1,LA By ( 1 1 1 1 1 1 - Solid Sawn Lumber (®F/SP) - These products are available with additional Corrosion protection. por more Information, see P. 14, Joist or Partin Medal Dimensions Fasteners (In.) BF7SP Allowable Loads - Installed W H B TF Header Joist Uplift Floor Snow l oof(125 Size No. Ga. Costlndex Code Bef. (160) (100) (115) (ICI) Sawn Lumber Sizes WP66 12 We. 5% 2% 2% (4)0.148 X2% (2)0.148z3 - 2,985 2,985 2.985 SO HU66TF 12 5% 5% 2% 21h (10)0.162a 3% (4)0.162 x31h 945 2,785 ' 2,785 2;785 HWP66 12 5% 5% 3 2+h (8) 0.162 x 31h (10) 0.148 x 1 % 1.535 3,955 - 3,955 3.955 WP68 12 5%s 7K 216 2%s (4)O.148X2% (2)0.148x3 - 2,985 2,985 2,985 6x8 HU08TF 12 5+h 71A 21h 2+h (12)0.182x3% (4)0.182x31h 945 3,265 3,265 3,2fi5 HWP60 12 5% 71A 3 2S4 (9)0.162x314 (10)0.148x7+h 1,535 3,955 3,955 3,955 / WP610 12 5%s 9% .2'fi 2%s (4)0:148X2% (2)0:148 x3 - 2.966 2.985 2,988 / HU610TF 12 5% 9% 2% 216 (14)0.16283Ya 1 (6)0.162X31h 1 1.420 1 3.945,. 3,945. 3,945 1 6X10 HWPH610. 7 SVh. 9% 3% 2% 1 (12)0.182 x3% I(10)0148xiS4 1,885 5,920. 5,920: 5,920 1 H0610 10 59is ff. 3116 3 tc,v.182 Xan Ito; u.162X3% 2,075 5,395 5,315 5,395 HOLTB H.=9% 7 5%s 7%to 33 6 211 (18)H54A (6)H54A 2.450 10,720 10,720 10.720. HWPH612 7 51A 11% 3Ya 21h (12)0.162 x3% (10)0.148x I1h 1,685 5,920 5,920 51920. + 1112 HUB12TF 12 6% 11 21h 21h 0q 0.162x 3% (6)0.162 x31h 1.420 4,590 41590 .4.590 ( HB612 10 534e 111'A 3% S (22)0.162x3% (10)0.162z3Ys 2,075 5,395 5,395 5,395 ( HGLT67 H =1111 % 5%a 71161o33 6 2% (18) N64A (6) N54A 2,450 10,720 10,720 10,720 l HWPH614 7 1 & 1311e 3YX 2% 0!)0,182016 (10)0.148x1% 1.685 5,920 5,920 5,920 1 H604 `<`,12 `6K13 '214 =21h -�iB)Of182jt81(a (8Jti,1§x.8 FSr ""r'�1 HBB14 10 We 13 31h fi%14 3 (22)0.16 x3Yz (10)0.162X314 2.075 5,395 6111 5.395 IBC, FL, LA H6LT8 H=73%s 7 6%s 75h W33 6 21h (i8)N54A (6)NS4A 2,450 10,720 10,720 10;728 HWPH616 7 5% 15 3Ya 21% (12)0,1620 (10)0.1480% 1,685 5,920 6,920 5,920 Bx18 HU616TF 12 5% i6 21k 2% (20)U.162x 3% (8)0.162x 3% 1,640 4,050 4,060 4,050 N8616 10 W. 15 3% 3 (2210.162 x3% (10)0.162 x 3+h 2,075 5,395 5,395 5,395 HGLT6 H=15 7 5%s 7%to33 6 2% (18)N54A (8)N54A 2,450 10,720 10,720 10,720 • BX8 WPT.50 H =7,26 12 7% 7%to30 2% 2%s (4)0.148 x2% (2)0.148x3 - 2,985 2,985 2;985 8x10 HB7.50X H=0%e 10 7% 8to 28 3Yz 3 (22)0.182x3% (10)0.182 %3% 2,075 - 5,395 5,395 5,395 • HWPH810 7 75h 9%s 31d 2% (12)0.162 x3'h. (ID)0.148x 11/x 1.685 5.920 5.920 5,920 8x12 HB7.50X H=11 Ys 10 7h 81o28 3% 3 (22)0.162x3% (10)0.162x3Sh 2,075 5,385. 5,995 5,385 714 11'A 3A 2% (12)0.162 x 3% ,(10)0.148xl% 1,685, 5,920 5,920 5,928 7+h 8 to 28 3% 3 (22) 0.162 X 31h (10) 0.162 x 3+h 2,075 5,395 5,395 5,395 M 7% 13%s 3Ya 2% (12)0.162 x3% (10)0.146X1Yz 1,BB5 5,920 6,920 5,920 71h 8t028 3,h 3 (22,0.162x3% 11010.162x3% 2,075 5,385. 6,295 5,395 1 I InIIN Inn.In F...... l , 7% ., �__.. �_ 15 3Yi __ .. 21¢ (12)0.162x3% (10)0.148x1% j,685 5.920 6.920 5,920 • -. _�....." "'.' .,,,...... •,.•,,,. ;, ,,., .,-,yvenv mewng won no runner Increase allowed. Fornonnal loading eppllcailons such as cantilever construction, refer to Simpson Strong -Tie° Connector Selector' software orconservativey divide the uplift load by 1.6. 2, 1,154Afastenam are supplied with hangers. 3. Uplift loads are based on DF/SP lumber. For SPF/HF, use 0.88 x DF/Sp uplift load. 4. HGLT Informaeon can be found on pp. 170-171. 5. Hangers with en'•" do not have an Installed Cost Index, 6. Fasteners: Nail dimensions In the table are listed diameter by length. See pp. 21-22 for fastener Information. Codes: See p,11 for Code Reference Key Chart i m W S "o N 1 133 �Milli M�An ,f a 11. EIBGC INTEGRITY EUILOERB CONTRACT NUMBER: 40027 CONTRACT TITLE: Eight 80 —Additional Dwelling Units CONTRACTOR: Integrity Builders General Contractors SUBJECT OF RR N. & S. BDLG Roof Platform Tie-in for Concrete slab DRAWINGS: DETAILS: SPECIFICATION: A 2.1 NA NA Please confirm that concrete slab is okay to stay and if the roof platforms can be built above it. If can stay and have platforms built onto it, provide atypical tie-in detail for the platforms and screen wall. ATTACHMENTS: 2 DATE RESPONSE REQUIRED BY: 1 DATE RFI SUBMITTED: SIGNATURE: ASAP 5/26/2022 CONTRACTOR RECOMMENDATION: See above COST EFFECT: Increase: ❑ Decrease: ❑ None: Estimated Amount: SCHEDULE EFFECT: Increase: Decrease: 171 None: M Estimated Calendar Days: RESPONSE: The (E) concrete pad is acceptable to stay. Field investigation Shows that the roof framing in this area is very heavy duty framing 6x14 @ 12" o.c, previously designed for very heavy Equipment. The New RTUS on this area is much lighter. Provide attachment from from (N) pad framing by shot pin fasteners Into (E) pad @ 16" o.c. or 3/8" EXP bolts @ 24" o.c. into concrete. oQ,�truo�, ��ZppY 11NMi�H£An M 950 Phaitoon S.`°"'°'� i Q3 �9 �Arfl tM1N 5/27/2022 FROM: RESPONSE DATE: SIGNATURE: This response is for clarification only & results in no cost or time change to the contract ❑ This response requires a modification to the contract. A formal request for proposal shall follow under separate correspondence. No work is authorized until the modification is signed by the owner/owner's representative. Proposed Change number assigned is: R a 1 N E6 {�{� tlEllrtli i1 Jill 9iEEI Ea�qi1 3ii a@(@Fj+ &tfill ESiFj a ' flEj � i�jgg jai F�HIM ��j,"I e�,a ti e BUILDING OWNER GEMS w j ,j�l d = p UDR, INC € i nusumnaomtwrt� mt j�l 7�6 'E (7M) 9i-1116 F STRUCTURAL OBSERVATION REPORT Project 1700 16th street, Newport Date of Observation Beach, CA Project No. Date of Report Participants Phaitoon Sarujikamjorn Report No. Structural Observer Construction Starve Observations / Deficiencies Notes Roof Floor Elements Observed: Plywood Sheathing May 31s', 2022 May 3181 , 2022 Phaitoon Sarujikamjorn Roof Framing : Existing Plywood sheathing conditions at the project has been investigated. The conditions of the existing plywood have been reviewed. The conclusions are as follows: Plywood: (E) roof plywood sheathing with good condition can be reused. Damaged plywood sheathing (see example pic shall be replaced with new plywood. Nailing: The New Nails can be installed over existing plywood with good condition. Where nails are to be installed to the edge of the plywood, they are to be installed at least''/i' from the edge. Spacing of nails shall be per plan. The new nails shall be installed in between the existing holes with a minimum of edge distance. Avoid installing new nails over existing holes. Where new nails are installed over existing holes. Add a new nail to compensate for that nail. Care shall be taken when installing nails on the edge of the existing plywood. Avoid splitting the edge of plywood, otherwise, replace with new plywood. Blocking Underside of the Plywood : Blocks for plywood diaphragm and future screen wall have been inspected and they have been installed per plan. i ";// Plywood with outer ply layer peeled off or damaged Shall be replaced with NEW Plywood. Plywood with outer ply layer peeled off or damaged Shall be replaced with NEW Plywood. Damaged Curb shall be replaced. Inspect the Termite condition: Plywood and/or roof curb with termite damage shall be replaced. Recommend investigate termite condition thoroughly Blocking underside of the framing is inspected And they are acceptable. tlBGC INTEORITV EUILDEREI CONTRACT NUMBER: 40027 CONTRACT TITLE: Eight 80—Additional Dwelling Units , ' CONTRACTOR: Integrity Builders General Contractors SUBJECT OF RFI: N. & S. BLDG Roof 6x6 blocking in lieu of 6x14 DRAWINGS: DETAILS: SPECIFICATION: S-2.3 NA NA Please advise/confirm that 6x6 blocking can be done in lieu of 6x14 blocking for the roof screen and platform? ATTACHMENTS:1 DATE RESPONSE REQUIRED BY: DATE RFI SUBMITTED: SIGNATURE: ASAP 5/17/2022 CONTRACTOR RECOMMENDATION: See above COST EFFECT: Increase: ❑ Decrease: ❑ None: 0 Estimated Amount: SCHEDULE EFFECT: Increase: Decrease: None: Estimated Calendar Days: RESPONSE: 6x6 blocking is acceptable. Phaitoon S. Q3 5/18/2022 FROM: RESPONSE DATE: SIGNATURE: This response is for clarification only & results in no cost or time change to the contract ❑ This response requires a modification to the contract. A formal request for proposal shall follow under separate correspondence. No work is authorized until the modification is signed by the owner/owner's representative. Proposed Change number assigned is: E�DI 880 IRVINE APARTMENTS a 1700 E.16TH STRET ADU CONVERSION � � � €�� •"• gs 1700 i6TH STREET � � NEWPORT BEACH CA 92663 N CITY OF NEWPORT BEACH COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION 100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658-8915 www.newoortbeachca.Qov 1 (949) 644-3200 Structural Observation Report Project Address: Report Date: CNB Inspector Name: CNB Permit#: 1700 16th street, Newport Beach, CA 06-14-2022 2141-2020 Building Owner Name: Owner's Mailing Address (if different from site); Owner's Telephone* CNB Plan Check* Full Name of Structural Observer (SO): SO E-mail Address: SO Telephone #: SO License / Reg. M Phaitoon Sarujikamjornwattana phaitoon@q3inc.com SE4850 y 14.4100. PLEASE INDICATE STRUCTURAL ELEMENTS AND CONNECTIONS OBSERW8check applicable boxes FOUNDATIONS SHEAR WALLS FRAMES DIAPHRAGMS (Floor/Roof) INDICATE LOCATION(S) OBSERVED DATE OBSERVED ❑ Conventional Footings & Slab ❑ Concrete ❑ Steel ❑ Concrete " Roof Framing Retrofit PICI 06-14-202 ❑ Mat Foundation, Prestressed Concrete ❑ Masonry ❑ Concrete ❑ Steel Deck Blocking:., ❑ Caissons, Piles, Grade Beams Wood or Manuf. Shear Panels ❑ Masonry Alwood ❑ Other: ❑ Other: ❑ Other: ❑ Other: ITEMS CHECKED ABOVE ARE APPROVED AND WITHOUT DEFICIENCIES. ❑ OBSERVED DEFICIENCIES AND COMMENTS: No Deficiencies Found ❑ REPORT CONTINUED ON ATTACHED PAGES. ❑ FINAL STRUCTURAL OBSERVATION REPORT: The structure generally complies with the approved construction documents, and all observed deficiencies were corrected. I declare that the following statements are true to the best of my knowledge: 1. I am the licensed design professional retained by the owner to be in responsible charge of the structural observation; 2. I, or another licensed design professional whom I have designated above and is under my responsible charge, have performed the required site visits at each significant construction stage to verify that the structure is in general conformance with the approved construction documents; 3. 1 understand that all deficiencies which I have documented must be corrected, prior to final accep1pnce of the structural systems by the City of Newport Beach, Building 06-14-2022 S I AM V Ur S I KUU l UKAL UtlAtKVLK DOES NOT WAIVE ANY REQUIREMENTS FOR BUILDING INSPECTION BY AUTHORIZED EMPLOYEES OF THE CITY OF NEWPORT BEACH. Foetus\Stmoure ObseNationRgco&bsuuctiom RIFI NUMBER �IBGC 144 INTOGIRITY EUILDERB CONTRACT NUMBER: 40027 CONTRACTTITLE: Eight 80—Additional Dwelling Units 47 CONTRACTOR: Integrity Builders General Contractors SUBJECT OF RFI: N. & S. BDLG Roof Platform Tie-in for Concrete slab DRAWINGS: DETAILS: SPECIFICATION: A 2.1 NA NA Please confirm that concrete slab is okay to stay and if the roof platforms can be built above it. If can stay and have platforms built onto it, provide a typical tie-in detail for the platforms and screen wall. ATTACHMENTS: 2 DATE RESPONSE REQUIRED BY: DATE RFI SUBMITTED: SIGNATURE: ASAP 1 5/26/2022 CONTRACTOR RECOMMENDATION: See above COST EFFECT: Increase: ❑ Decrease: ❑ None: Estimated Amount: SCHEDULE EFFECT: Increase: Decrease: 171 None: 0 Estimated Calendar Days: RESPONSE: The (E) concrete pad is acceptable to stay. Field investigation Shows that the roof framing in this area is very heavy duty framing 6x14 @ 12" o.c. previously designed for very heavy Equipment. The New RTUS on this area is much lighter. Provide attachment from from (N) pad framing by shot pin fasteners Into (E) pad @ 16" o.c. or 3/8" EXP bolts @ 24" o.c. into concrete. p0.orFuo� Phaitoon S. Q3 -ram 5/27/2022 FROM: RESPONSE DATE: SIGNATURE: This response is for clarification only & results in no cost or time change to the contract ❑ This response requires a modification to the contract. A formal request for proposal shall follow under separate correspondence. No work is authorized until the modification is signed by the owner/owner's representative. Proposed Change number assigned is: IE1111 0f E> E;Ep9 E iE = i °E E� i"� Ewa a�'� E' �p� m �� �i � • ` E �� iE iE �a � �e m $iii4 9f f4 I - �4 y 'u ------ —, IT If I' 3 iig a�gq o va°g \ T {iE Q 99 g E yE 1 lilt Es HT T a BB i if If ^ fagp a eE aili ifill 3Ei6{{{ 6�ie i i°if e {i 8i is ��}i {lt��: ijiaiii i�di1E P:{ : i e i6��i� iP 4� €jP� 9?ii�3ig 4Ejti 12, E �Mill !° �� i� f�01 loll E�e { Y i,P a SNPPOVBBOfpt BUILDING OWNER® �'� '•§ {,`° E m 8801RVINEAPARTMENTS 3 i 66 AOUAPRRTMENT$ A48R B"OGOR4RO%4 �� Im$ II, i� i L•1•illi�� fed Og MID a� e 170D LOTH STREET R3UbiRWlWVN -® �� C z )— Additional Builders Gem SUBJECT OF RFI: N. & S. BLDG Roof 6x6 blocking inlieu of 6x14 DRAWINGS: DETAILS: SPECIFICATION: S-2.3 NA NA Please advise/confirm that 6x6 blocking can be done in lieu of 6x14blocking for the roof screen and platform? ATTACHMENTS: 1 DATE RESPONSE REQUIRED BY: DATE RFI SUBMITTED; SIGNATURE: ASAP 5/17/2022 CONTRACTOR RECOMMENDATION: See above COST EFFECT: Increase: ❑ Decrease: ❑ None: E Estimated Amount: SCHEDULE EFFECT: Increase: Decrease: None: Estimated Calendar Days: RESPONSE: 6x6 blocking is acceptable. Phaitoon S. Q3 5/18/2022 FROM: RESPONSE DATE: SIGNATURE: This response is for clarification only & results in no cost or time change to the contract This response requires a modification to the contract. A formal request for proposal shall follow under separate correspondence. No work is authorized until the modification is signed by the owner/owner's representative. Proposed Change number assigned is: g �s�sPe�a 5[�[ drz IFi log tl go d Yog x qq !gig u^ e b r'a A iE p5� dd E 1 i { O F x S �€ i� N z N p W To mW¢n\xuzns amT'ei ervia � 4m mi sun xnert r\+a'm+\�>m yen exn uWs,ao NfwSv-uwe b. w.e ✓�.+w ws •v. m. � mT 880 IRVINE APARTMENTS a 7700 E. 16TH STRET ADU 8� CONVERSION g 7700 76TH STREET NEWPORT BEACH, CA 92683 � gg �!BGC INTEGRITY BUILDERS CONTRACT NUMBER: 40027 CONTRACTTITLE: Eisht 80—Additional Dwelling Units SUBJECT OF RFI: N. & S. BLDG HU614TF Beam Hanger DRAWINGS: DETAILS: SPECIFICATION: 5-2.3 NA NA Please advise/confirm that HU614TF hanger be used for the 6x14 Beams? Please see the clouded attached plans. ATTACHMENTS: 1 DATE RESPONSE REQUIRED BY: DATE RFI SUBMITTED: SIGNATURE: ASAP 5/27/2022 CONTRACTOR RECOMMENDATION: See above COST EFFECT: Increase: ❑ Decrease: ❑ None: E Estimated Amount: SCHEDULE EFFECT: Increase: Decrease: None: Estimated Calendar Days: RESPONSE: Acceptable. Provide solid blocking x 12" long with 1/2" all thread rod or stud bolt @ 9" spacing. In order for the hanger to fasten to. See attached recommendation on the Sketch. QaoeEss/o�q Phaitoon S. M,�q Q3 ���=��,IK O b 5/27/2022 y ENp.6/30/ a �l9 rgaCi � s I FROM: RESPONSE DATE: SIGNATURE: ❑ This response is for clarification only & results in no cost or time change to the contract This response requires a modification to the contract. A formal request for proposal shall follow under separate correspondence. No work is authorized until the modification is signed by the owner/owner's representative. Proposed Change number assigned is: 8, 6 F et �g E y � �§ B 11 ,F 7, § Fa g g yii r rjy 5 P eF %SI •� d� � � d� i si D o Fig m Z a l o e 3 A v `. .. z g F �� '° ,a HN F s ;s 1HFn�4 : 4� ��^^ 3i 99B9B99B9B p __ __ _________F F8 •A� i 8 Fli �eE S� ku eF 5P A 680 IRVINE APARTMENTS 9 � � 6 � + • a 1700 E.16TH STRET ADU CONVERSION 1T0816TH STREET i � x � �'+• ,mt' s NEWPORT BEACH, CA 82683 Simpson Strong -Tie"' Wood Construction Connectors Heavy -Duty and Double -Shear Top -Flange Joist Hangers See dimensions, material, loads on table pages. HUSTF has the double -shear nailing advantage — distributing the Joist load through two points on each nail for greater strength. C Finish: Galvanized. See Corrosion Information, 0 pp. 12-15. Installation: • Use all specified fasteners; see General Notes • Not acceptable for nailer or welded applications; ig see WP, HWP, HWPH and BA hangers 'O. HUTF — The minimum header or ledger size ^ that can be used with this hanger is 316" t]j• HUSTF — With 3x carrying members, use 0.162" x 2Ye" nails Into the header and 0.162" x 314" nails into the Joist Options: • See Hanger Options General Notes on p. 97. • HUTF rough beam sizes are available by . special order. • HUSTF cannot be modified. Sloped and/or Skewed Seat HUTF can be skewed to a maximum of 45" or sloped to a maximum of 450: HUTF can be skewed and sloped down only, provided W x 2W. No skew with slope up options available. . • For skews greater than 15',. uplift loads are 0.75 of the table loads. Hangers with a skew greater than 15' may have all the Joist nailing on the outside angle. • For sloped and skewed combinations, the allowable loads are 070 of the table loads. . • For sloped down only hangers, allowable load is 0.78 of the table load. Concealed Flange • HUTF is available with one A flange concealed at 0.85 of the catalog table load. • HUTF is available with both flanges concealed provided the W dimension is 29W or greater, at 0.85 of the table load. Specify HUCTF for both flanges concealed. No skew options available. HUSTF Nailer application Is not acceptable. Fasteners cannot be installed. HU410TF HIJ&IY rr Typical HUTF Installation Double -Shear Nailing Top View e i P •a HUCTF Some model configurations may differ from those shown. Production models have projected seats. Square -cut seats maybe ordered. Contact Simpson Strong Tie for details. HUTF Down Top View HUTF Hanger Skewed Right 1 1 1 I 1 1 130 .A IBC, i,LA O' ) Simpson Strong TIF"Wood Con6tructlon Connectors These products are available with additional corrosion protection. For more Information, see P. 14. Jolst or Madel Dimensions - Fasteners DF/SP Allowable Loads Installed. Purlb Size No. Os Costlnoox Code net. W H B TF Header Joist Uplift- Floor Snow oof(125 1160) (100) (ICq Sawn Lumber Sizes WP6fi 12 591e 5x% 2% 24L (4) 0.146 x 215 (2) 0.140 x 3 - 2,985 ' 2.985 2,985 6x6 HU66TF 12 516 5% 216 2% (10)0.162x3'h (4)0:162 x3% 945 21785 2,785 2,785 HWP66 12 5% 5% 3 2'/e (9)0.162x3% (10)0:148x1% 1,535 3,955 - 3,955 3,955 WP68 12 51Y.s 71A 21h 2§iz (4)0.148x2% (2)0.148x3 - 2.985 2.985 2,955 6x8 HU68TF 12 5% 7'% 9'h 2% (12)0.162 x 311h (4)0.. x31h 945 3,265 3,285 3,265 HWP68 12 5% 7% 3 2% (9) 0.162 x 316 (10) 0.148 x 1 % 1,535 3,955 3,955 3,955 WP610 12 We 911A .21h 241s (4)0:148X2% (2)0:148 %3 - 2,985 ..2,986 2.985 HU610TF 12 5% 9% 2% 2% (14)0.162x 31h (6)0.162 x 3 % 1-,420 3,945 3,945 3,945 8x10 HWPH610 7 5% 9% 3% 2% (12)0.162 x 31h '(10)0.148 x 1% 1,685 5,920i 5,920 5,920 H8610 10 M 9% 3% 3 (22)0162 X314 (10)0.162 X 3% 2,075 5,395 5,395 5.395 1 HGLT6 H=945 7 We 7%to33 6 2% (18)N54A (6)N54A Z450 10,720 10,720 10.720. 1 HWPH612 7 51h 11% 3V4 2% (12)0.162 x 3% (10)0.148 X I 1,685 5.920 5,920 5.920 1 HUB12TF 12 5% 11 2% 2% (16)DJ62x3% (6)0,162 x 3'h 1.420 4,590 4,690 .4.690 1 6x12 HB612 10 541e 11% 3% 3 (22)0.162x3% (10)0182XS% 2,075 5,395 5.395 5,395 I HGLT6 H LT6 7 5% 7%to33 6 216 18 N54A ( ) (6)N54A 2,450 10,720 10,720 10,720 HWPH614 7 5% 13He 3y4 214 02)0162 x3% (10)OA48 x 1'h 1,605 5.920 51,920 5,920 HU614T1' , <12 6 13 , 2% 2% 6xt4 :: (22)0.162If 31h (10)0,162 x314 FL,LA HB614 10 5% 13 31A 3 2,075 5,395 5,395 5,395.e HGLT6 H=13Ha 7 54'e 7%10313 6 2% (10)H54A (6)N54A 2;450 10,720 10,720 10,720 HWPH616 7 5% 15 3% 2% (12)0.162x3%. (10)OJ48X1% 1,685 5,020 5,920 5,920 + HU616TF 12 5% 15 21h 2h (20)0.162 x 3% (8)0.162x 3% 1,640 4,050 4,050 4.050 6xi6 H8616 10 54fa 15 3% 3 (22)0.162X3% JO)0.162036 2,075 5.395 5,395 5,395 HGLT6 H =15 7 51ie 7%t033 - 6 2% (18)N54A (6)N54A 2,d50 10,720 10,720 10.720 8x0 H=PZ7.2 H=7.26 12 7% 7%to 30 2% 291e 4 OA48X2% (1 (2)0.148x3 - 2,986 2,985 2;985 BX10 HB750X H = g%e 10 7% Bto 28 3% 3 (22) 0.162 x 31h (10) 0.162 x 3% 2,075 5.395 5,395 5,395 HWPH810 7 7% 9%3ye 2% (12)0.162 x3%. (10)0.148x1'h 1,685 5,920 5,920 5,920 8X12 HB' ;� 10 7% BIu28 3% 3 (22)0.162If 3% (10)0.162x3% 2.075 5,395 5,395 5,395 HWPH812 7 9% 11% 3Y4 2% (12)0.162x3% (10)0.1480% 1,685 .. 5,920 5,920 5,920 804 H 3He 10 711 8 to 28 3% 3 (22) 0,162 X 3'h (10) 0.162 x 3% 2,075 5,395 5.395 5,395 HWPH814 7 71h 139- 3%4 2% (12)0.162 X3% (10)0.148x 1% 1.685 5.920 5,920 5,920 8X18 HB7.5 X 10 7% 8 to 28 31h 3 (22) 0.162 x 3'h (10) 0,162 x 3% 2,076 5,395 5,395 5;395 HWPH816 7 1 7% 1 15 1 3144 2% (12)0.162x3% (10)0.148x1% 1 1.685 5,920 1 5,920 5,920 -r• •• ••••••••• •••-•� ��_. ,,,..,woo.. ,�, .r,uu u, mis lyudnd,ueomg wen no runner Increase amwea. For normal loading applications such as cantilever construction, refer to Simpson StrongTie° Connector Selectors software or conservatively divide the uplift load by 1.6. 2. N54A fasteners are supplied with hangers. 3. Uplift bads are based an DF/SP lumber. ForSPF/HF, use 0.86 x DF/SP uplift load. 4. HGLT Information can be found on pp. 170-171. 5. Hangers with an I" do not have an Installed Cost Index, 6. Fasteners: Nall dimensions In the table sea listed diameter by length. See pp. 21-22 for fastener Information. Codes: See p.11 for Code Reference Key Chart L.' 9 III 133 tlBGC INTEGRITY ENILDER9 CONTRACT NUMBER: 40027 CONTRACT TITLE: Eight 80—Additional Dwelling Units CONTRACTOR: Integrity Builders General Contractors SUBJECT OF RFI: N. & S. BLDG Ceiling & Wall Penetration Sleeves DRAWINGS: DETAILS: SPECIFICATION: P-5.1 NA NA Please confirm that sleeves for floor ceiling and wall penetrations are not need and can just be fire caulked. ATTACHMENTS: 1 DATE RESPONSE REQUIRED BY: DATE RFI SUBMITTED: SIGNATURE: ASAP 6/21/2022 CONTRACTOR RECOMMENDATION: See above COSTEFFECT: Increase: ❑ Decrease: ❑ None: E Estimated Amount: SCHEDULE EFFECT: Increase: Decrease: None: 0 Estimated Calendar Days: RESPONSE: NO SLEEVES ARE REQUIRED, REFER TO APPROVED/PERMITTED PLANS DETAIL 1-B ON SHEETA-6.3 FOR FIRE CAULKING DETAIL AT FIRE RATED PENETRATIONS D ARCy, A J R FRo " c�C0 No. C30884 EXP 6/30/23 �f9 OF CAQF FROM: CESAR ROMERO RESPONSE DATE: 2022.06.27 SIGNATURE: ❑ This response is for clarification only & results in no cost or time change to the contract ❑ This response requires a modification to the contract. A formal requestfor proposal shall follow under separate correspondence. No work is authorized until the modification is signed by the owner/owner's representative. Proposed Change number assigned is: Uri COM WO'HOWSS MOVAMN It 1� I j 111 LBBVJ.S H.0 gig j NOIS113A Eta nav i3mis Hiv � s oul SIN311111itlYdY 3NIAHI 098 L-1 LI it I if it it I P Ili( ijill Rif IT 1 f ij 1 I Id oil 4 If IE . %'\NkN� It it on I RFI NUMBE 1150 INTEBRITY BUILOERB CONTRACT NUMBER: 40027 CONTRACT TITLE: Eight 80—Additional Dwelling Units CONTRACTOR: Integrity Builders General Contractors SUBJECT OF RFI: N. & S. BLDG Fire Caulking DRAWINGS: DETAILS: I SPECIFICATION: P-5.1 I NA NA Please confirm that the called -out caulking can be substitute with another caulking that is more readily available such as 3M Red Fire Barrier CP 25WB Plus Sealant. ATTACHMENTS: 3 DATE RESPONSE REQUIRED BY: ASAP DATE RFI SUBMITTED: 6/21/2022 SIGNATURE: CONTRACTOR RECOMMENDATION: See above COST EFFECT: Increase: ❑ Decrease: ❑ None: Estimated Amount: SCHEDULE EFFECT: Increase: LJ Decrease: I I None: E Estimated Calendar Days: RESPONSE: substitution is acceptable, provide same fire rating as shown on approved plans FROM: Cesar Romero RESPONSE DATE: 2022.06.27 SIGNATURE: This response Is for clarification only & results In no cost or time change to the contract - ❑ This response requires a modification to the contract. A formal request for proposal shall follow under separate correspondence. No work is authorized until the modification is signed by the owner/owner's representative. Proposed Change number assigned is: RF1 NUMBER tlBGC 127 INTEGRITY BLIILDERB CONTRACT NUMBER:40027 CONTRACT TITLE: Eight 80—Additional Dwelling Units CONTRACTOR: Integrity Builders General Contractors SUBJECT OF RFI: S. BLDG Corridor & Party Walls Screw Attachment DRAWINGS: DETAILS: SPECIFICATION: NA NA NA Please see the attached images showing the resilient channel on the drywall to span the resilient channel that was installed under the drywall on the joist. The resilient channel is tied to the drywall ceiling with an 1-1/2 inch screws. Please confirm that it is okay to use the tek screws to tie the top track with the resilient channel shown on the attached images below. ATTACHMENTS: 2 DATE RESPONSE REQUIRED BY: DATE RFI SUBMITTED: SIGNATURE; ASAP 1 5/2/2022 CONTRACTOR RECOMMENDATION: See above COST EFFECT: Increase: ❑ Decrease: ❑ None: 0 Estimated Amount: SCHEDULE EFFECT: Increase: Decrease: None: Estimated Calendar Days: RESPONSE: this is acceptable ARCy�TF G��SED cr G�SPRRatf�,o No. C30884 EXP 6/30/23 s T9 �� —_ OF CA0i FROM: Cesar Romero RESPONSE DATE: 2022.05.03 SIGNATURE: This response is for clarification only & results in no cost or time change to the contract ❑ This response requires a modification to the contract. A formal request for proposal shall follow under separate correspondence. No work is authorized until the modification is signed by the owner/owner's representative. Proposed Change number assigned is: INTEGRITY BUILDERS CONTRACT NUMBER: 40027 CONTRACTTITLE: Eight 80—Additional Dwelling Units CONTRACTOR: Integrity Builders General Contractors SUBJECT OF RFI: S. BLDG Outlet Spacing DRAWINGS: DETAILS: SPECIFICATION: A-6.2 & A-6.4 NA NA Please see attached plans in regards of the 2-foot min spacing between outlets on the party walls that cannot be met due to the minimum wall length. Please advise how to proceed. -v ARCy�l� ATTACHMENTS: 2 No. C30884 EXP 6/30/23 `rf � 9 0� OF CA'0\ DATE RESPONSE REQUIRED BY: DATE RFI SUBMITTED: SIGNATURE: ASAP S/2/2022 CONTRACTOR RECOMMENDATION: See above COST EFFECT: Increase: ❑ Decrease: ❑ None: Estimated Amount: SCHEDULE EFFECT: Increase: Decrease: None: 0 Estimated Calendar Days: RESPONSE: Per 2019 CBC section 714.4.2 Membrane Penetrations in fire rated partitions exception 1.2 thru 1.5 electrical boxes can be located as follows: 1.1 By a horizontal distance of not less than 24 inches (610 mm) where the wall or partition is constructed with individual noncommunicating stud cavities. 1.2 By a horizontal distance of not less than the depth of the wall cavity where the wall cavity is filled with cellulose loose -fill, rockwool or slag mineral wool insulation. 1.3 By solid fireblocking in accordance with Section 718.2.1. 1.4 By protecting both outlet boxes with listed putty pads. FROM: RESPONSE DATE: SIGNATURE: Cesar Romero 2022.05.03 ❑ This response is for clarification only & results in no cost or time change to the contract This response requires a modification to the contract. A formal request for proposal shall follow under separate correspondence. No work is authorized until the modification is signed by the owner/owner's representative. Proposed Change number assigned is: .. . `§\\\\` .,\(\ \ �' ..1,, _ � . all 2 � ƒ | r2a , g,(��) q � � . ,•t § k & IH #ƒm § ) /