Loading...
HomeMy WebLinkAboutX2021-1802 - Permit ApplicationPrint Form Worksheet for Combo Building & Solar Permit Application ` City of Newport Beach - Building Division j Comm'I i�sidential11 NOTE: PLAN CHECK FEES DUE AT TIME OF SUBMITTAL wilding Grading [—Drainage r Elec (` Mech r Plum cuydCut 3�� CuYdFill C Project Address (Not mailing address) F_ Flood F- Fire F- Liq F_ Landslide -_N/A Floor Suite No 1 zc � S J ul F_ F— Description of Work i_xtZ j 1fV (; a UNiTS TC C, �t l✓IC) . Use F_ Const Type �— #Stories #Units (if Res) Valuation$ Material/Labor J Q New/Add SF9�A Remodel SF 1 Garage/New/Add ryo OWNER'S NAME Last ���, �'� First Owner's Address Owner's E-mail Address �,�0 k S 4�R_kli'rl C��qS�_ City �.l✓�I�\ G State Zip I Telephone APPLICANT'S NAME Last I(_ �� First Applicant's Address Applicant's E-mail Address r- city State Zip F— Telephoned ARCHITECT/DESIGNER'S NAME Last First F— Lic No. Architect/Designer's Address ArchitecVDesigner's E-mail Address \\\ City ��t '" � State C� Zipt#Atkj -- Telephon �� ENGINEER'S NAME Last V`. J`�„� First Lic. No.� 4A Engineer's Address Engineer's E-mail Address City State � Zip Telephone[ — CONTRACTOR'S NAME/COMPANY C�� �� l f �O, [� Lic No. Class Fff ! d Contractor's Address �r O /%j1tontractoes E-mail Address ` d 0 pj lc-�Lu� lj �n1 e,110 �nrL�Jllbdy✓�ANr> _/� �S City d State Zip % Telephone r / SETBACKS REAR l SETBACKS FRONT PERMIT No. SETBACKS LEFT SETBACKS RIGHT PLAN CHECK NO. USE ZONE _ DEVELOPMENT NO PLAN CHECK FEES $ CITY OF NE PORT BEACH COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION 100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658-8915 www.newportbeachca.gov 1 (949) 644-3200 RESIDENTIAL ELECTRICAL, MECHANICAL AND PLUMBING SUBMITTAL QUESTIONNAIRE Job Address: The above -proposed project may need electrical, mechanical or plumbing plans for plan check. These questions are directed to the new work requested for the applicable permit requested not what exists. In order for this to be accurately determined and to eliminate confusion or delays in the permitting please complete or have the design professional complete the questions below. If the answer to a question below is "YES," an electrical, mechanical or plumbing plan check is required. To expedite permit process, please submit an application, plans (2 sets) and be prepared to pay plan check fees. NOTE: The Chief Building Official may make exceptions for minor work, additions, and alterations. 1. Is the electrical service 600 amps or larger? a 2. Is there a solar photovoltaic or non -conventional system? 3. Is there an electrical standby generator or fuel cell? MECHANICAL 1. Does conditioned space exceed 7,000 square feet? 2. Does project include a basement or subterranean garage which requires mechanical ventilation in lieu of natural ventilation? Does project include enclosed standby generator system w/ mechanical exhaust venting? El3. El PLUMBING 1. Does project include a hydronic heating system? 2. Does project include a sump pump located inside structure to lift water discharge to grade level? [/ (] 3. Does project include a sewage ejector system? 4. Does project include hot water boiler exceeding 120 gallon capacity or 400,000 B.T.U. input? j] 5. Does project include a natural gas system exceeding 750,000 B.T.U.? 6. Does pnf El roject include a natural gas system w/ pressure exceeding 14 inch water column [Yi' psi] (Medium pressure or greater)? El7. Does project include a vehicle compressed natural gas [CNG] fueling system? 8. Does project include a Graywater system or Cistern rain water harvesting system? El 9. Does project include an alternate plumbing method or material which requires submittal of an alternate method and materials request? El cci Lily ❑ia[ cne above for on is true and correct. Signature: �pDate: Print Name: V '1 rWi j/ Phone ##: Fams\ RESIDENTIAL EMP Submittal Questionnaire 9-I5