Loading...
HomeMy WebLinkAboutF2023-0279 - Miscr o�z�wpoRCITY ®F NEWPORT BEACH F CoYOWNM DEVELOPMENT DEPARTMENT �5 m BUILDINGDIVI,S'ION 100 Civic Center Drive I P.O. Box 1768 Newport Beach, CA g2658-8915 wvwa.newportbeachca-90v1(94g)644-3200 FIRE SPRUMLER NFPA 13D SYSTEM FINIAL CHECKLIST (RESIDENTIAL) YES NO e ❑ 1, Water meter proper size 2 Fire sprinlder system mstaited per the approvedplans El 3. All construction covers removed from sprinkler heads ❑ 4. Cover plates are NOT to be installed, but shall be available on the jabsite ❑ 5. All tape and paint removed from sprinkler heads ❑ 5. Finish trim installed around sprinkler heads / ❑ 7 proper signage posted at all required bcabons ^� // ❑ ❑ 8. Flow test conducted and bell tested 9. Location of inspect ors testing valve inapproved location El SYSTEMS: W 10. Clearances around sprinkler heads and riser - no obstructions / ❑ 11. Operating pressure gauge insta@ed at riser showing proper Water pressure ❑�/ ❑ 12 Back flow preventer installed ❑ i z -q,xtp.m installed Der manufacturers specifications ❑ FIRE sPRINKI-ER NFPA 13D SYSTEM FINAL APPROVED: BY: ii PERMIT# EL023-/-!,�— DATE: /-(2-% 3 Forms\ Fire Sprinkler NFPA 131) System - FINAL Checklist RmD51 IAL 05/32/2015 CITY OF NEWPORT BEACH COXNfUNMDEVELOPMXNTDF,PARTMNT BUILDINGDIVISTON 100 Civic Center Drive f P.O. Box 17681 Newport Beach, CA 92658-8915 www.newportbeachca.gov 1 (949) 644-3200 FIRE SPRUff FR NFPA 13D SYSTEM ROUGH INSPECTION CHECKLIST 1. Riser Construction and Location Approvaf a. Drain valve b. Bactdlow device (single check) c. Bell activation device d. fnspector's test valve e. Riser sbmd per approved plans 2. Pressure Test a_ System tested at operating pressure for 2 hours b. Pressure gauge installed 9. Sprinkler Pleads shall not be installed ¢r the iNtinps onor to Psiflu cemented m pace I emoora test oivas) ffte fittings a. Instailation and spacing of temporary test plugs 4. Rwara a Material installed per plan b. Hangers Per c0des/preventupward movement c. All CPVC piping shall be installed by persons who have been serf L'd by the manufacturer for installation of CPVC piping d. Piping protected tram damage 5. Ben a- Wiring instafled per code b. Boxes installed at proper locations YES NO ❑ NOTE: CFVC plastic pipe in the garage shall not he P��. Sp^n de that are its ed as Response' or °ResidentiaC must be used. CORRECTIONS AND FIRE SPRINKLER NFPA 13D SYSTEM ROUGH INSPECTION APPROVED: T�^ PERMfT #:_EZ BY: V u; DATE ID—.7— FOm 'F'M Sprinkler NFPA UD S,s _ Baugh impe On Ch.rk 05l,4/ ,