LANDSCAPE INSTALLATION CERTIFICATE OF COMPLETION
I hereby certify that:
(1) 1 am a professional appropriately licensed in the State of California to provide
professional landscape design services.
(2) The landscape project for the property located at
1227 Berskshire Ln
(provide street
address or parcel number(s)) was installed by me or under my supervision.
(3) The landscaping for the identified property has been installed in substantial
conformance with the approved Landscape Documentation Package and complies with
the requirements of the City of Newport Beach Water Efficient Landscape Ordinance
(Municipal Code Section 14.17) and the City of Newport Beach Standards for
Implementation of the City of Newport Beach Water Efficient Landscape Ordinance for
the efficient use of water in the landscape.
(4) The following elements are attached hereto:
a. Irrigation scheduling parameters used to set the controller;
b. Landscape and irrigation maintenance schedule;
c. Irrigation audit report; and
d. Soil analysis report, if not submitted with Landscape Documentation Package,
and documentation verifying implementation of the soil report
recommendations.
(5) The site installation complies with the following:
a. The required irrigation system has been installed according to approved plans
and specifications and if applicable, any prior approved irrigation system
alternatives.
X Yes No
b. Sprinklers comply with ASABE/ICC 802-2014 Landscape Irrigation Sprinkler &
Emitter Standard.
X Yes No
(6) The information I have provided in this Landscape Installation Certificate of
Completion is true and correct and is hereby submitted in compliance with the City of
Newport Beach Design Standards for Implementation of the City of Newport Beach
Water Efficient Landscape Ordinance.
33
RYAN D. BURRESS
Print Name
Signature
PO Box 7326, Newport Beach, CA 92658
Address
714-975-1434
Telephone
Landscape Design Professional's Stamp
(If Appropriate)
1-31-24
Date
946479
License Number
RYAN@RYANDBURRESS.COM
E-mail Address
34
Irrigation Inspection Affidavit
Irrigation Plan No: Rucker Residence
Project Name: 1227 Berkshire Lane. Newport Beach CA 92660
Irrigation Plan Designer: Richard M. Garcia LA 714.538.6000
Field Inspector CILIA : Big Picture_ Landscape - Michael McMillen 714.394.6126
Date (s) of Inspection: 0111912024 and 0210212024
This project was inspected within the limits of customary access for compliance with the approved
irrigation plans on file in City Planning. At least two (2) inspections were conducted. The findings are as
follows.
Date Inspection: 0111912024
A. Inspections during construction to check mainline in open trench: Yes No
1. Location of mainline conforms to as -built plan X _
2. Size of main line conforms to plan X _
3. Depth of mainline conforms to plan X _
4. Main line conditions is undamaged X _
5. Main line pressure tested with water and meter to check for visible leaks X _
6. Specific observations attached if needed X
Date Inspection: 0210212024
B. Inspections after completion of system installation prior to sodding:
Yes No
1.
Irrigation POC has isolation valve
X _
2.
System components (i.e., controller, backflow, rain sensor, etc.)
X
3.
Drip line GPH and spacing as specified
X _
4.
System activated for observation of compliance
X _
5.
Each station complies installed per plan
X
6.
Matched precipitation rates provided by zone
X
7.
As -built plan provided to owner
X _
8.
Specific observations attached as needed
X
Summary of irrigation review: PASS. This project In Compliance as all Items listed on
punch list have been addressed.
I hereby certify that I am qualified to submit this irrigation inspection affidavit based on
the qualification indicated below:
Certified Landscape Irrigation Auditor Certified by The Irrigation Association. CLIA
California #014256 IA. 703.536.7080
Respectfully,
Michael McMillen
Certified Irrigation Auditor#014256 ���
Big Picture Landscapes "•...*•
LANDSCAPE IRRIGATION AUDIT REPORT
PROJECT: Rucker Res. 1227 Berkshire Lane Residence Newport Beach, CA
Landscape Architect: Richard M. Garcia LA#1873 714.538.6000
Installing Contractor: Lloyd Rucker 949.463.4509
CERTIFIED LANDSCAPE IRRIGATION AUDITOR (CLIA)
BIG PICTURE LANDSCAPE
Michael McMillen / 714.394.6126 / Big picturelandscape(dgmail.corn Certified Irrigation Auditor #014256
All of the hydrozones on the irrigation systems were evaluated with a visual inspection. As per your request,
we evaluated the irrigation systems in accordance with the California Model Water Efficient Landscape
Ordinance (MWELO).
SUMMARY
This audit was conducted to inspect the overall site irrigation systems within the limits of construction. The
irrigation systems are new systems utilizing POTABLE water.
IRRIGATION PLANS:
Each hydrozone identified on the plans were executed in the field, (Total valve gty.10). Each system layout,
components and functionality have met all the requirements of the Irrigation Plans.
MWELO:
The California Model Water Efficient Landscape Ordinance has been adopted bythe City as the standard for
new construction and irrigation installations based on AB1881.
L1LII11IT HWA
The overhead spray lawn areas were operational with the controller, low efficiency nozzles installed and a 24"
drip line buffer edge adjacent to paving. Since the dripline is subterranean and the planting material is already
installed and would be damaged if the dripline were unearthed, a drip catch can test was not performed. In
lieu of the catch can test, the standard 90% efficiency for pressure compensating drip & low -flow irrigation per
the Irrigation Assoc ation's Landscape Irrigation Auditor, 3rd edition book was used for the report.
Shrub ZONES / STATION 1-10
• Irrigated Area: Zones separated based on Full sun South/ East side of project.
• Plant Material: Shrubs - Low water
• Plant Condition: Traditional
• Microclimate: Full Sun
• Soil Category: Silty Clay Loam
• Root Depth: Approximately 6-9"
• Slope: Overall site 1%
• Compaction: yes
• Runoff: No runoff observed
• Standing Water: None observed
• Hydrozone Separation: Yes
• Mulch in Beds: Yes
• Pressure Regulation: Not required / Isolation valve installed per plan
• Controller: Rainbird TM2 controller and wireless weather sensor / rain shutoff
• Valves: RB XACZ Installed on S,E side rear corner/ future pool eq. area. S/W side of house.
• Emitter Type: RB XFS 6-12 (.6 gph @ 12" o.c. row spacing @ 12"-18" o.c.) RB 1804 SAM-MPR10,12
• Max Flow: +11 GPM (Turf)
• Distribution Uniformity: .90 /.77
• Precipitation Rate: 0.6 / 1.58
Punch list Items: 01/19/2024 (Compliance based on the following corrects during the maintenance period)
• Complete installation of Rain Sensor Devices 02/02/2024
• Contractor to provide owner with controller charts and Record Drawings. 02/02/2024
Zone Audit Conclusion: PASS, project IS within compliance to begin maintenance.
The irrigation systems were evaluated and based on the Irrigation Association Audit rules/guidelines and
MWELO requirements.
Respectfully,
Michael McMillen P
Certified Irrigation Auditor #014256 +. CIA
Big Picture Landscapes 41,•....6/
COAST GEOTECHNICAL, INC.
1200 W. Commonwealth Avenue, Fullerton, CA 92833 Ph: (714) 870-1211 Fax: (714) 870-1222 E-mail: coastgeotw@gmail.com
January 29, 2024 W.O.624221-03
Mr. Lloyd Rucker
260 Newport Center Drive, Suite 100
Newport Beach, CA 92660
Subject: Final Soils Report for New Residence at
1227 Berkshire Lane, Newport Beach,
California
References:
1. Geotechnical Engineering Investigation of Proposed New Residence at 1227 Berkshire Lane,
Newport Beach, California; by COAST GEOTECMINUCAL, Inc., W. 0. 624221-01, dated
September 27, 2021.
2. Rough Grade Compaction Report for Proposed New Residence at 1227 Berkshire Lane,
Newport Beach, California; by COAST GEOTECiiWAL, Inc., W. 0. 624221-02, dated
August 23, 2022.
Dear Mr. Rucker:
In accordance with the request of your contractor, this final soils report has been prepared to
address geotechnical observations and testing performed since completion of rough grading. This
report addresses requested observations and testing. Copies of our daily reports are maintained in
our files.
FOUNDATION EXCAVATIONS
The foundation excavations for the residence were observed on October 20, 2022. The
foundation excavations were found to be acceptable at the time of our final observations.
INTERIOR SLAB SUBGRADE AND TRENCH BACKFILLS
The interior slab subgrade was observed on October 26, 2022 and November 2, 2022. Probing
and testing of the interior residential slab area indicated acceptable geotechnical conditions for
support of the proposed slab at the time of our observation.
POOL EXCAVATION
The pool bottom foundation excavation was observed on July 6, 2023. The pool bottom was
excavated into competent native material. The foundation excavation for the pool was found to
be acceptable at the time of our observation.
COASTGEOTECHNICAL, INC.
Mr. Rucker 2 W.O.624221-03
Final Soils Report January 29 2024
HARDSCAPE
The hardscape subgrade for the front entry, garage approach, covered rear patio, and
northwestern side walkway areas were observed on October 2, 2023. Probing and testing of the
requested hardscape area subgrades indicated acceptable geotechnical conditions for support of
the proposed hardscape.
OPINION
It is opinion of COAST GEOTECHNICAL, INC. that the summarized geotechnical conditions
approved by this office are in compliance with approved geotechnical reports and Newport
Beach building codes. The final grades appear to conform to approved plans.
We appreciate this opportunity to be of service to you.
Respectfully Submitted:
COAST GEOTECHNICAL, INC.
Ming-Tarng Chen
RCE 54011
No. 540il-
Exp.12131125
sCIVIV/,
aniel E. Her
Staff Geologist