HomeMy WebLinkAbout13 - Balboa Pier Parking Lot ResurfacingDecember 11. 2001 CITY COUNCIL AGENDA ITEM NO. 13 TO: Mayor and Members of the City Council FROM: Public Works Department SUBJECT: BALBOA PIER PARKING LOT RESURFACING RECOMMENDATIONS: 1. Authorize the resurfacing of the Balboa Pier Parking Lot to be included within the scope of work for the Balboa Village Improvement project (Contract No. 3333). 2. Authorize the City Manager to execute Change Order No. 1 with GCI Construction, Inc., in the amount of $195,135 for this work. DISCUSSION: The Balboa Village Improvement project, currently under construction by GCI Construction Inc., (GCI), includes some pavement maintenance work within the Balboa Pier Parking Lot (removal and replacement of severely distressed pavement and application of a slurry seal). Harbor Resources Staff requested this pavement maintenance be upgraded to a resurfacing project using funds from the Parking Lot Facilities Maintenance Program. Public Works Staff agrees that repaving the parking lot is needed and has prepared a pavement resurfacing plan to eliminate the "bird baths" and improve the drainage within the parking lot. GCI reviewed this plan and has estimated the costs at approximatetly $190,000. GCI's unit costs for this new work are reasonable. GCI's existing contract includes many construction tasks within the Balboa Pier Parking Lot including: • Removing and replacing areas of distressed pavement • Removing and planting trees within and on the periphery of the parking lot • Removing and installing new parking lot lighting • Installing new irrigation • Applying a slurry seal over the entire area of the lot and re- striping the entire lot From a construction engineering point of view, it is highly advantageous to have GCI perform the resurfacing work as it could be integrated with other tasks GCI is performing within the Pier Parking Lot. SUBJECT: Balboa Pier Parking Lo[ Resurfacing December 11, 2001 Page 2 Our Coastal Development Permit requires the City to maintain a minimum of 240 parking spaces in the Pier Parking Lot at all times. This can only be accomplished by completing all work in one section of the parking lot, then moving the public parking to that area to free up the next section of the parking lot for improvements. If the project were to be bid separately and another contractor awarded the paving contract, it is difficult to imagine how two contractors could coordinate their activities and complete the project on time. (The Coastal Development Permit requires the Balboa Village project to be complete by Memorial Day). Staff recommends the City approve the change order with GCI to eliminate the slurry seal work and to resurface the Balboa Pier Parking Lot for an amount of $195,135. Funds for this work are available in the following account: Description Account Number Parking Lot Facilities Maintenance Program 7231- C2370610 The additional costs will be paid out of the approved contract contingency. Respectfully su itted, Pt1BLJWORKS DEPARTMENT Steen G. Badum, Director By: Robert Stein, P.E. Project Manager Attachment: Change Order No. 1 Amount $192,000 CITY OF NEWPORT BEACH a CONTRACT CHANGE ORDER CONTRACT NO. 3333 PROJECT TITLE: Balboa Village Improvements - Phase 1 CHANGE ORDER: 1 CONTRACTOR: GCI Construction PAGE: 1 OF 1 ENCUMBRANCE NO.: CCO SUMMARY COST: 195,135.00 ORIGINAL CONTRACT: $3,256,935.05 CCO TOTAL IN % 5.99% COMPLETION DATE: 31- May -02 CHANGE REQUESTED BY: City CO. TYPE: Lump Sum DESCRIPTION: Resurfacing of the Balboa Pier Parking Lot are hereby incorporated into the project plans val - Curb & 2 -foot gutter Type A val - Curb & 1 -foot Gutter rize existing 3 -inch thick AC i AC overlay (AVG 4 -inch) & Gutter Type A - 2 -foot Gutter 7 Gutter Type A -1 -foot Gutter wide PCC Gutter de Parking Lot :ed Items h Curb Type B 48: Parking Lot Digouts V Seal IN CONTRACT TIME contractor, 0- CALENDAR DAYS I INCREASE (DECREASE 17,250. 4,320. 19,182. 54,917. 2,800. SUBTOTAL 295,745. SUBTOTAL NET CHANGE $ 195,135.( to the change proposed and hereby agree, if i is approved, that we will provide all equipment, furnish all material, except as may otherwise be noted above, and perform all services necessary for the above specified work, including field and home office expense and will accept as full payment therefor the prices shown above. ACCEPTED, DATE: BY.. APPROVAL RECOMMENDED: APPROVED: CONTRACTOR: TITLE: CONSTRUCTION ENGINEER CM MANAGER GCI Construction DATE: DATE: