HomeMy WebLinkAbout(2021, 09/14) - H-1 - AmendedH-1
PIER AND FLOAT EXTENSIONS BEYOND THE PIERHEAD LINE
Background
Newport Beach Municipal Code (NBMC) Section 17.35.030(A) provides that piers and
floats may not extend bayward beyond the pierhead line unless approved in compliance
with Council policy. This Policy sets forth the specific criteria, as a limited exception to the
general rule set forth in Section 17.35.030(A) of the NBMC, where a harbor development
permit and/or approval in concept for a pier or float to extend beyond the pierhead line
may be granted.
Section I of this Policy sets forth the circumstances wherein the Harbor Commission,
and/or City Council upon appeal or call for review, may approve a pier or float to extend
bayward beyond the pierhead line. Section II of this Policy sets forth the circumstances
wherein the Public Works Director, Community Development Director and/or
Harbormaster, as applicable, may approve a harbor development permit and/or approval
in concept, pursuant to this Policy.
Harbor Commission/City Council Review and Findings Required for Approval
After holding a public hearing and considering a staff report and accompanying materials
that include, but are not limited to, the application and materials supporting the staff
recommendation, the Harbor Commission, or the City Council on appeal or call for
review, may approve or conditionally approve a harbor development permit and/or
approval in concept for a pier or float to extend bayward beyond the pierhead line upon
making all of the following findings:
A. The existing pier or float is currently encroaching bayward beyond the
pierhead line;
B. The existing pier or float was previously permitted to encroach bayward
beyond the pierhead line or is in substantial conformance with the existing
City -issued permit;
C. The pier or float will not encroach any further bayward beyond the
pierhead line than the existing encroachment;
D. Any vessel utilizing the pier or float will not extend bayward beyond the
project line or the line established under the City -issued permit, whichever
is less; and
E. The pier or float will:
1. Preserve the diverse uses in Newport Harbor and the waterfront
that contribute to the charm and character of Newport Harbor;
H-1
2. Maintain or enhance public access to Newport Harbor's
waterways and waterfront areas;
3. Preserve or enhance the visual character of Newport Harbor;
4. Not negatively impact adjacent property owners, harbor views,
navigation and future harbor dredging; and
5. Be aesthetically consistent and compatible with its surroundings.
II. Staff Review and Findings Required for Approval
For those piers or floats in areas where the pierhead line does not exist or where the
bayward extension of those structures is not clearly limited by the pierhead line, the Public
Works Director, Community Development Director and/or Harbormaster, as applicable,
may approve a pier and float reconstruction project if the:
A. Existing pier or float is in substantial conformance with the existing City -
issued permit;
B. Reconstruction will utilize the same or less square footage;
C. Reconstruction is in a substantially similar configuration as the existing pier
or float; and the
D. Pier or float complies with the City of Newport Beach Waterfront Project
Guidelines and Standards Harbor Design Criteria, the California Building
Code as set forth in Title 24 of the California Code of Regulations, and other
applicable provisions of the NBMC.
Projects that do not meet the above criteria for approval shall be reviewed in accordance
with the applicable provisions of Title 17 (Harbor Code) of the NBMC.
III. General Provisions
A. Appeals and calls for review of decisions under this Policy shall be in
accordance with Chapter 17.65 (Appeals or Calls for Review).
B. Any approval granted under this Policy for piers and floats to encroach
bayward beyond the pierhead line is separate from any and all other
required permits and/or approvals.
C. Any permit issued by the City of Newport Beach before June 26, 2019 that
allows an existing pier or float to extend bayward beyond the pierhead line
is ratified by the City Council and may continue as valid until such time as
a new permit for a pier or float is approved and the pier or float is
constructed pursuant to the new permit.
4
History
Adopted H-1 - 6-1-1964
Amended H-1 -10-19-1964
Amended H-1 -10-26-1964
Amended H-1 - 4-27-65
Reaffirmed H-1 - 8-30-1966
Amended H-1 -1-9-1967
Amended H-1 - 7-24-1967
Amended H-1 - 6-24-1968
Amended H-1 - 8-19-1968
Amended H-1 -12-23-1968
Amended H-1 -1-26-1970
Reaffirmed H-1 - 3-9-1970
Reaffirmed H-1- 2-14-1972
Amended H-1 - 8-14-1972
Amended H-1 - 6-25-1973
Reaffirmed H-1 -12-10-1973
Amended H-1 -12-17-1973
Amended H-1 - 6-10-1974
Reaffirmed H-1 -11-11-1974
Amended H-1 - 3-10-1975
Amended H-1 - 4-28-1975
Amended H-1 - 5-27-1975
Amended H-1 -10-28-1975
Amended H-1 -12-8-1975
Amended H-1 - 5-10-1976
Amended H-1 -10-26-1976
Amended H-1 -11-22-1976
Reaffirmed H-1 -1-24-1977
Amended H-1 - 5-23-1977
Amended H-1 - 5-22-1978
Amended H-1 -12-11-1978
Amended H-1 - 3-12-1979
Amended H-1 - 6-25-1979
Amended H-1 - 6-9-1980
Amended H-1 - 6-23-1980
Amended H-1 -11-23-1981
Amended H-1 - 6-28-1982
K
H-1
Amended H-1 -10-12-1982
Amended H-1 -10-25-1982
Amended H-1 - 6-27-1983
Amended H-1 -1-14-1985
Amended H-1 - 3-25-1985
Amended H-1 - 6-24-1985
Amended H-1 - 6-22-1987
Amended H-1 - 6-13-1988
Amended H-1 -11-28-1988
Amended H-1 - 6-26-1989
Amended H-1 - 9-25-1989
Amended H-1 -11-27-1989
Amended H-1 - 5-14-1990
Amended H-1 - 6-25-1990
Amended H-1 - 4-8-1991
Amended H-1 - 6-24-1991
Amended H-1 -10-28-1991
Reaffirmed H-1 -1-24-1994
Amended H-1 - 6-27-1994
Amended H-1 - 6-26-1995
Amended H-1 - 3-25-1996
Amended H-1 - 06-8,1998
Amended H-1 -12-14-1998
Amended H-1 - 5-8-2001
Amended H-1 - 9-10-2002
Amended H-1 -10-28-2003
Amended H-1 - 4-13-2004
Amended H-1 -1-8-2008
Amended H-1 - 5-22-2018
Amended H-1 - 6-25-2019
Amended H-1 -11-5-2019
Amended H-1 - 9-14-2021
4
H-1