HomeMy WebLinkAboutC-8721-1 - Contract for the Improvement of Public Work 38th Street Park and San Miguel Park Fencing Project1 r 00 AMENDMENT NO. ONE TO CONTRACT FOR THE IMPROVEMENT OF PUBLIC WORK U WITH 38TH STREET PARK AND SAN MIGUEL PARK FENCING PROJECT FOR A 2 Z CONSTRUCT, INC. THIS AMENDMENT NO. ONE ("Amendment No. One") TO CONTRACT FOR THE IMPROVEMENT OF PUBLIC WORK ("Contract") is made and entered into as of this 30th day of December, 2022 ("Effective Date"), by and between the CITY OF NEWPORT BEACH, a California municipal corporation and charter city ("City"), and A 2 Z CONSTRUCT, INC., a California corporation ("Contractor"), whose address is 63 Via Gatillo, Rancho Santa Margarita, California 92688, and is made with reference to the following: RECITALS A. On September 1, 2022, City and Contractor entered into a Contract for the improvement of Public Work to remove and replace old fencing, damaged concrete fence post, concrete sidewalk panels and install new fencing and plants at 38th Street and San Miguel Park ("Project"). B. The parties desire to enter into this Amendment No. One to extend the term of the Agreement to July 31, 2023. NOW, THEREFORE, it is mutually agreed by and between the undersigned parties as follows: 1. TERM The term of this Contract shall commence on the Effective Date and shall terminate on July 31, 2023, unless terminated earlier as provided for herein. 2. INTEGRATED CONTRACT Except as expressly modified herein, all other provisions, terms, and covenants set forth in the Agreement shall remain unchanged and shall be in full force and effect. [SIGNATURES ON NEXT PAGE] IN WITNESS WHEREOF, the parties have caused this Amendment No. One to be executed on the dates written below. APPROVED AS TO FORM: CITY ATTORNEY'S OFFICE Date: �/Ll /2-3 By: (+) a on C. Harp y-7-1-z3 wt, Qi Attorney ATTEST: Date: �. CITY OF NEWPORT BEACH, a California municipal corporation Date: 5-3 By: C\--tue C17z Grace K. Leun City Manager CONTRACTOR: A 2 Z CONSTRUCT, INC., a California corporation Date: Signed in Counterpart By: Matthew Jafari Chief Executive Officer/Chief Financial Officer Date: Signed in Counterpart Charlene Estelle Jafari Secretary [END OF SIGNATURES] A 2 Z Construct, Inc. Page 2 IN WITNESS WHEREOF, the parties have caused this Amendment No. One to be executed on the dates written below. APPROVED AS TO FORM: CITY ATTORNEY'S OFFICE Date: _�/&/23 By: a on C. Harp y Zi z wl- i y Attorney ATTEST: Date: la Leilani I. Brown City Clerk CITY OF NEWPORT BEACH, a California municipal corporation Date: By: Grace K. Leung City Manager CONTRACTOR: A 2 Z CONSTRUCT, INC., a California corporation Date:— 41Ze2_ By: d� Ai Match' � .fafari' Chief Executive Officer/Chief Financial Officer Date:_ Z Z� By:V✓l� Charle Estelle ' afan Secretary [END OF SIGNATURES] A 2 Z Construct, Inc. Page 2 1 L� 00 i V CONTRACT FOR THE IMPROVEMENT OF PUBLIC WORK 38TH STREET PARK AND SAN MIGUEL PARK FENCING PROJECT WITH A2Z CONSTRUCT, INC. THIS CONTRACT FOR THE IMPROVEMENT OF PUBLIC WORK ("Contract") is made and entered into as of this 1st day of September, 2022 ("Effective Date"), by and between the CITY OF NEWPORT BEACH, a California municipal corporation and charter city ("City"), and A2Z CONSTRUCT, INC., a California corporation ("Contractor"), whose address on file with the Secretary of State is 63 Via Gatillo, Rancho Santa Margarita, California 92688, with a local address of PO Box 80425, Rancho Santa Margarita, California 92688, and is made with reference to the following: RECITALS A. City is a municipal corporation duly organized and validly existing under the laws of the State of California with the power to carry on its business as it is now being conducted under the statutes of the State of California and the Charter of City. B. City desires to engage Contractor to remove and replace old fencing, damaged concrete fence post, concrete sidewalk panels and install new fencing and plants at 38th Street Park and San Miguel Park, as more fully described in the Contract Documents ("Project"). C. City has solicited and received a proposal from Contractor and desires to retain Contractor to render services under the terms and conditions set forth in this Contract. D. Contractor has examined the location of all proposed work, carefully reviewed and evaluated the specifications set forth by City for the Project, and is familiar with all conditions relevant to the performance of services and has committed to perform all work required for the price specified in this Contract over a period of 25 consecutive days commencing upon issuance of the "Notice to Proceed". NOW, THEREFORE, it is mutually agreed by and between the undersigned parties as follows: 1. TERM The term of this Contract shall commence on the Effective Date and shall terminate on December 31, 2022, unless terminated earlier as provided for herein. 2. SCOPE OF WORK 2.1. Contract Documents. The complete Contract for the Project includes all of the following documents: Request for Proposals/Bids, Instructions to Bidders, Proposal, and Designation of Subcontractors, attached hereto as Exhibit A; Proposal, attached hereto as Exhibit B; Insurance Requirements, attached hereto as Exhibit C; Labor and Materials Payment Bond attached hereto as Exhibit D; Faithful Performance Bond, attached hereto as Exhibit E; all Project Permits; the Standard Special Provisions and Standard Drawings; Plans and Special Provisions for Contract No. 8721-1; Standard Specifications for Public Works Construction (current adopted edition and all supplements); and this Contract, and all modifications and amendments thereto (collectively the "Contract Documents"). Exhibits A, B, C, D and E, and all other named Contract Documents, are incorporated herein by reference. The Contract Documents comprise the sole agreement between the parties as to the subject matter therein. Any representations or agreements not specifically contained in the Contract Documents are null and void. Any amendments must be made in writing, and signed by both parties in the manner specified in the Contract Documents. 2.2. Scope of Work. Contractor shall perform everything required to be performed, and shall provide and furnish all the labor, materials, necessary tools, expendable equipment and all utility and transportation services required for the Project as identified in the Contract Documents ("Work" or "Services"). 2.3. All of the Work to be performed and materials to be furnished shall be in strict accordance with the provisions of the Contract Documents. Contractor is required to perform all activities, at no extra cost to City, which are reasonably inferable from the Contract Documents as being necessary to produce the intended results. 3. TIME OF PERFORMANCE 3.1. Time is of the essence in the performance of Work under this Contract and Contractor shall complete the Work within 25 consecutive days from the date of issuance of the "Notice to Proceed." Failure to complete the Work in the time allotted may result in termination of the Contract by City and assessment of damages as outlined in Section 3.2. 3.2. The parties agree that it is extremely difficult and impractical to determine and fix the actual damages that City will sustain should Contractor fail to complete the Project within the time allowed. Should Contractor fail to complete the Work called for in this Contract within 25 consecutive days from the date of issuance of the Notice to Proceed, Contractor agrees to the deduction of liquidated damages in the sum of Seven Hundred Fifty Dollars and 00/100 ($750.00) for each calendar day beyond the date scheduled for completion. 4. COMPENSATION 4.1. As full compensation for the performance and completion of the Project as required by the Contract Documents, City shall pay to Contractor and Contractor accepts as full payment the sum of Ninety Three Thousand Dollars and 00/100 ($93,000.00), less any money deducted pursuant to Section 3.2. Contractor shall not receive any additional compensation unless approved in writing in advance by City's Project Administrator as defined herein. City shall make full payment to Contractor no later than thirty (30) calendar days after acceptance of the Work by City. A2Z Construct, Inc. Page 2 4.2. This compensation includes: 4.2.1. Any loss or damage arising from the nature of the Work; 4.2.2. Any loss or damage arising from any unforeseen difficulties or obstructions in the performance of the Work; and 4.2.3. Any expense incurred as a result of any suspension or discontinuance of the Work, but excludes any loss resulting from earthquakes of a magnitude in excess of 3.5 on the Richter Scale and tidal waves, including tsunamis, and which loss or expense occurs prior to acceptance of the Work by City. 5. PROJECT MANAGER Contractor shall designate a Project Manager, who shall coordinate all phases of the Project. This Project Manager shall be available to City at all reasonable times during the term of the Contract. Contractor has designated Matthew Jafari to be its Project Manager. Contractor shall not remove or reassign the Project Manager without the prior written consent of City. City's approval shall not be unreasonably withheld. 6. ADMINISTRATION This Contract shall be administered by the Public Works Department. City's Director of Public Works, or designee, shall be the Project Administrator and shall have the authority to act for City under this Contract. The Project Administrator or designee shall represent City in all matters pertaining to the Services to be rendered pursuant to this Contract. 7. TYPE AND INSTALLATION OF MATERIALS/STANDARD OF CARE 7.1. Contractor shall use only the standard materials and equipment as described in the Contract Documents in performing Work under this Contract. Any deviation from the materials or equipment described in the Contract Documents shall not be utilized unless approved in advance by the Project Administrator. 7.2. Contractor shall comply with the terms and conditions of the Contract Documents. 7.3. All of the Work shall be performed by Contractor or under Contractor's supervision. Contractor represents that it possesses the personnel required to perform the Services required by this Contract, and that it will perform all Work in a manner commensurate with community professional standards and with the ordinary degree of skill and care that would be used by other reasonably competent practitioners of the same discipline under similar circumstances. 7.4. All Services shall be performed by qualified and experienced personnel who are not employed by City, nor have any contractual relationship with City. By delivery of completed Work, Contractor certifies that the Work conforms to the A2Z Construct, Inc. Page 3 requirements of this Contract, all applicable federal, state and local laws, and legally recognized professional standards. 7.5. Contractor represents and warrants to City that it has, shall obtain, and shall keep in full force and effect during the term hereof, at its sole cost and expense, all licenses, permits, qualifications, insurance and approvals of whatsoever nature that is legally required of Contractor to practice its profession. Contractor shall maintain a City of Newport Beach business license during the term of this Contract. 7.6. Contractor shall not be responsible for delay, nor shall Contractor be responsible for damages or be in default or deemed to be in default by reason of strikes, lockouts, accidents, acts of God, or the failure of City to furnish timely information or to approve or disapprove Contractor's Work promptly, or delay or faulty performance by City, contractors, or governmental agencies. 8. CHANGE ORDERS 8.1. This Contract may be amended or modified only by mutual written agreement of the parties. 8.2. The Contractor shall only commence work covered by a change order after the change order is executed and notification to proceed has been provided by the City. 8.3. There shall be no change in the Contractor's members of the project team, as listed in the approved proposal, which is a part of this contract without prior written approval by the City. 9. RESPONSIBILITY FOR DAMAGES OR INJURY 9.1. City and its elected or appointed officers, agents, officials, employees and volunteers shall not be responsible in any manner for any loss or damage to any of the materials or other things used or employed in performing the Project or for injury to or death of any person as a result of Contractor's performance of the Work required hereunder, or for damage to property from any cause arising from the performance of the Project by Contractor, or its subcontractors, or its workers, or anyone employed by either of them. 9.2. Contractor shall be responsible for any liability imposed by law and for injuries to or death of any person or damage to property resulting from defects, obstructions or from any cause arising from Contractor's Work on the Project, or the Work of any subcontractor or supplier selected by Contractor. 9.3. To the fullest extent permitted by law, Contractor shall indemnify, defend and hold harmless City, its elected or appointed officers, agents, officials, employees and volunteers (collectively, the "Indemnified Parties") from and against any and all claims (including, without limitation, claims for bodily injury, death or damage to property), demands, obligations, damages, actions, causes of action, suits, losses, judgments, fines, penalties, liabilities, costs and expenses (including, without limitation, A2Z Construct, Inc. Page 4 attorneys' fees, disbursements and court costs) of every kind and nature whatsoever (individually, a Claim; collectively, "Claims"), which may arise from or in any manner relate (directly or indirectly) to any breach of the terms and conditions of this Contract, any Work performed or Services provided under this Contract including, without limitation, defects in workmanship or materials or Contractor's presence or activities conducted on the Project (including the negligent, reckless, and/or willful acts, errors and/or omissions of Contractor, its principals, officers, agents, employees, vendors, suppliers, subconsultants, subcontractors, anyone employed directly or indirectly by any of them or for whose acts they may be liable for any or all of them). 9.4. Notwithstanding the foregoing, nothing herein shall be construed to require Contractor to indemnify the Indemnified Parties from any Claim arising from the sole negligence or willful misconduct of the Indemnified Parties. Nothing in this indemnity shall be construed as authorizing any award of attorneys' fees in any action on or to enforce the terms of this Contract. This indemnity shall apply to all claims and liability regardless of whether any insurance policies are applicable. The policy limits do not act as a limitation upon the amount of indemnification to be provided by Contractor. 9.5. Contractor shall perform all Work in a manner to minimize public inconvenience and possible hazard, to restore other work areas to their original condition and former usefulness as soon as possible, and to protect public and private property. Contractor shall be liable for any private or public property damaged during the performance of the Project Work. 9.6. To the extent authorized by law, as much of the money due Contractor under and by virtue of the Contract as shall be considered necessary by City may be retained by it until disposition has been made of such suits or claims for damages as aforesaid. 9.7. Nothing in this Section or any other portion of the Contract Documents shall be construed as authorizing any award of attorneys' fees in any action to enforce the terms of this Contract, except to the extent provided for above. 9.8. The rights and obligations set forth in this Section shall survive the termination of this Contract. 10. INDEPENDENT CONTRACTOR City has retained Contractor as an independent contractor and neither Contractor nor its employees are to be considered employees of City. The manner and means of conducting the Work are under the control of Contractor, except to the extent they are limited by statute, rule or regulation and the express terms of this Contract. No civil service status or other right of employment shall accrue to Contractor or its employees. Contractor shall have the responsibility for and control over the means of performing the Work, provided that Contractor is in compliance with the terms of this Contract. Anything in this Contract that may appear to give City the right to direct Contractor as to the details of the performance or to exercise a measure of control over Contractor shall mean only that Contractor shall follow the desires of City with respect to the results of the Work. A2Z Construct, Inc. Page 5 11. COOPERATION Contractor agrees to work closely and cooperate fully with City's designated Project Administrator and any other agencies that may have jurisdiction or interest in the Work to be performed. City agrees to cooperate with Contractor on the Project. 12. CITY POLICY Contractor shall discuss and review all matters relating to policy and Project direction with City's Project Administrator in advance of all critical decision points in order to ensure the Project proceeds in a manner consistent with City goals and policies. 13. PROGRESS Contractor is responsible for keeping the Project Administrator and/or designee informed on a regular basis regarding the status and progress of the Project, activities performed and planned, and any meetings have been scheduled or are desired. 14. BONDING 14.1. Contractor shall obtain, provide and maintain at its own expense during the term of this Contract both of the following: (1) a Faithful Performance Bond in the amount of one hundred percent (100%) of the total amount to be paid Contractor as set forth in this Contract in the form attached as Exhibit E and incorporated herein by reference; and (2) a Labor and Materials Payment Bond in the amount of one hundred percent (100%) of the total amount to be paid Contractor as set forth in this Contract and in the form attached as Exhibit D and incorporated herein by reference. 14.2. The Faithful Performance Bond and Labor and Materials Payment Bond shall be issued by an insurance organization or surety (1) currently authorized by the Insurance Commissioner to transact business of insurance in the State of California, (2) listed as an acceptable surety in the latest revision of the Federal Register Circular 570, and (3) assigned a Policyholders' Rating A- (or higher) and Financial Size Category Class VII (or larger) in accordance with the latest edition of Best's Key Rating Guide: Property -Casualty. 14.3. Contractor shall deliver, concurrently with execution of this Contract, the Faithful Performance Bond and Labor and Materials Payment Bond, and a certified copy of the "Certificate of Authority" of the Insurer or Surety issued by the Insurance Commissioner, which authorizes the Insurer or Surety to transact surety insurance in the State of California. 15. INSURANCE Without limiting Contractor's indemnification of City, and prior to commencement of Work, Contractor shall obtain, provide and maintain at its own expense during the term of this Contract or for other periods as specified in this Contract, policies of insurance of the type, amounts, terms and conditions described in the Insurance Requirements attached hereto as Exhibit C and incorporated herein by reference. A2Z Construct, Inc. Page 6 16. PREVAILING WAGES 16.1. In accordance with the California Labor Code (Sections 1770 et seg.), the Pursuant to the applicable provisions of the Labor Code of the State of California, not less than the general prevailing rate of per diem wages including legal holidays and overtime Work for each craft or type of workman needed to execute the Work contemplated under the Contract shall be paid to all workmen employed on the Work to be done according to the Contract by the Contractor and any subcontractor. In accordance with the California Labor Code (Sections 1770 et seg.), the Director of Industrial Relations has ascertained the general prevailing rate of per diem wages in the locality in which the Work is to be performed for each craft, classification, or type of workman or mechanic needed to execute the Contract. A copy of said determination is available by calling the prevailing wage hotline number (415) 703-4774, and requesting one from the Department of Industrial Relations. The Contractor is required to obtain the wage determinations from the Department of Industrial Relations and post at the job site the prevailing rate or per diem wages. It shall be the obligation of the Contractor or any subcontractor under him/her to comply with all State of California labor laws, rules and regulations and the parties agree that the City shall not be liable for any violation thereof. 16.2. If both the Davis -Bacon Act and State of California prevailing wage laws apply and the federal and state prevailing rate of per diem wages differ, Contractor and subcontractor, if any, shall pay the higher of the two rates. Said prevailing rate of per diem wages are on file at the City, Office of the City Clerk, 100 Civic Center Drive, Newport Beach, California 92660, and are available to any interested party on request. 17. PROHIBITION AGAINST ASSIGNMENTS AND TRANSFERS Except as specifically authorized under this Contract, the Work to be performed under this Contract shall not be assigned, transferred contracted or subcontracted out without the prior written approval of City. Any of the following shall be construed as an assignment: The sale, assignment, transfer or other disposition of any of the issued and outstanding capital stock of Contractor, or of the interest of any general partner or joint venturer or syndicate member or co -tenant if Contractor is a partnership or joint -venture or syndicate or co -tenancy, which shall result in changing the control of Contractor. Control means fifty percent (50%) or more of the voting power or twenty-five percent (25%) or more of the assets of the corporation, partnership or joint -venture. 18. SUBCONTRACTING The subcontractors authorized by City, if any, to perform the Work on this Project are identified in the Proposal attached as Exhibit B. Contractor shall be fully responsible to City for all acts and omissions of any subcontractors. Nothing in this Contract shall create any contractual relationship between City and subcontractor, nor shall it create any obligation on the part of City to pay or to see to the payment of any monies due to any such subcontractor other than as otherwise required by law. City is an intended beneficiary of any Work performed by the subcontractor for purposes of establishing a duty of care between the subcontractor and City. Except as specifically authorized herein, A2Z Construct, Inc. Page 7 the Work to be performed under this Contract shall not be otherwise assigned, transferred, contracted or subcontracted out without the prior written approval of City. 19. OWNERSHIP OF DOCUMENTS 19.1. Each and every report, draft, map, record, plan, document and other writing produced (hereinafter "Documents"), prepared or caused to be prepared by Contractor, its officers, employees, agents and subcontractors, in the course of implementing this Contract, shall become the exclusive property of City, and City shall have the sole right to use such materials in its discretion without further compensation to Contractor or any other party. Contractor shall, at Contractor's expense, provide such Documents to City upon prior written request. 19.2. Documents, including drawings and specifications, prepared by Contractor pursuant to this Contract, are not intended or represented to be suitable for reuse by City or others on any other project. Any use of completed Documents for other projects and any use of incomplete Documents without specific written authorization from Contractor will be at City's sole risk and without liability to Contractor. Further, any and all liability arising out of changes made to Contractor's deliverables under this Contract by City or persons other than Contractor is waived against Contractor and City assumes full responsibility for such changes unless City has given Contractor prior notice and has received from Contractor written consent for such changes. 20. RECORDS Contractor shall keep records and invoices in connection with the Work to be performed under this Contract. Contractor shall maintain complete and accurate records with respect to the costs incurred under this Contract and any Services, expenditures and disbursements charged to City, for a minimum period of three (3) years, or for any longer period required by law, from the date of final payment to Contractor under this Contract. All such records and invoices shall be clearly identifiable. Contractor shall allow a representative of City to examine, audit and make transcripts or copies of such records and invoices during regular business hours. Contractor shall allow inspection of all Work, documents, proceedings and activities related to the Contract for a period of three (3) years from the date of final payment to Contractor under this Contract. 21. WITHHOLDINGS City may withhold payment to Contractor of any disputed sums until satisfaction of the dispute with respect to such payment. Such withholding shall not be deemed to constitute a failure to pay according to the terms of this Contract. Contractor shall not discontinue Work as a result of such withholding. Contractor shall have an immediate right to appeal to the City Manager or designee with respect to such disputed sums. Contractor shall be entitled to receive interest on any withheld sums at the rate of return that City earned on its investments during the time period, from the date of withholding of any amounts found to have been improperly withheld. A2Z Construct, Inc. Page 8 22. CONFLICTS OF INTEREST 22.1. Contractor or its employees may be subject to the provisions of the California Political Reform Act of 1974 (the "Act") and/or Government Code §§ 1090 et seq., which (1) require such persons to disclose any financial interest that may foreseeably be materially affected by the Work performed under this Contract, and (2) prohibit such persons from making, or participating in making, decisions that will foreseeably financially affect such interest. 22.2. If subject to the Act and/or Government Code §§ 1090 et seq., Contractor shall conform to all requirements therein. Failure to do so constitutes a material breach and is grounds for immediate termination of this Contract by City. Contractor shall indemnify and hold harmless City for any and all claims for damages resulting from Contractor's violation of this Section. 23. NOTICES 23.1. All notices, demands, requests or approvals to be given under the terms of this Contract shall be given in writing, to City by Contractor and conclusively shall be deemed served when delivered personally, or on the third business day after the deposit thereof in the United States mail, postage prepaid, first-class mail, addressed as hereinafter provided. 23.2. All notices, demands, requests or approvals from Contractor to City shall be addressed to City at- Attn: Director of Public Works Public Works Department City of Newport Beach 100 Civic Center Drive PO Box 1768 Newport Beach, CA 92658 23.3. All notices, demands, requests or approvals from City to Contractor shall be addressed to Contractor at: Attn: Matthew Jafari A2Z Construct, Inc. 63 Via Gatillo Rancho Santa Margarita, CA 92688 24. NOTICE OF CLAIMS 24.1. Unless a shorter time is specified elsewhere in this Contract, before making its final request for payment under the Contract Documents, Contractor shall submit to City, in writing, all claims for compensation under or arising out of this Contract. Contractor's acceptance of the final payment shall constitute a waiver of all claims for compensation under or arising out of this Contract, except those previously made in writing and identified by Contractor in writing as unsettled at the time of its final A2Z Construct, Inc. Page 9 request for payment. Contractor and City expressly agree that in addition to all claims filing requirements set forth in the Contract and Contract Documents, Contractor shall be required to file any claim Contractor may have against City in strict conformance with the Government Claims Act (Govt. Code §§ 900 et seg.). 24.2. To the extent that Contractor's claim is a "Claim" as defined in Public Contract Code section 9204 or any successor statute thereto, the Parties agree to follow the dispute resolution process set forth therein. Any part of such "Claim" remaining in dispute after completion of the dispute resolution process provided for in Public Contract Code section 9204 or any successor statute thereto shall be subject to the Government Claims Act requirements requiring Contractor to file a claim in strict conformance with the Government Claims Act. To the extent that Contractor's claim is not a "Claim" as defined in Public Contract Code section 9204 or any successor statute thereto, Contractor shall be required to file such claim with the City in strict conformance with the Government Claims Act (Government Code sections 900 et seg.). 25. TERMINATION 25.1. In the event that either party fails or refuses to perform any of the provisions of this Contract at the time and in the manner required, that party shall be deemed in default in the performance of this Contract. If such default is not cured within a period of two (2) calendar days, or if more than two (2) calendar days are reasonably required to cure the default and the defaulting party fails to give adequate assurance of due performance within two (2) calendar days after receipt of written notice of default, specifying the nature of such default and the steps necessary to cure such default, the non -defaulting party may terminate the Contract forthwith by giving to the defaulting party written notice thereof. 25.2. Notwithstanding the above provisions, City shall have the right, at its sole discretion and without cause, of terminating this Contract at any time by giving seven (7) calendar days prior written notice to Contractor. In the event of termination under this Section, City shall pay Contractor for Services satisfactorily performed and costs incurred up to the effective date of termination for which Contractor has not been previously paid. On the effective date of termination, Contractor shall deliver to City all materials purchased in performance of this Contract. 26. EFFECT OF CONTRACTOR'S EXECUTION Execution of this Contract and all other Contract Documents by Contractor is a representation that Contractor has visited the Project Site as defined by the Contract Documents, has become familiar with the local conditions under which the Work is to be performed, and has correlated all relevant observations with the requirements of the Contract Documents. 27. STANDARD PROVISIONS 27.1. Recitals. City and Contractor acknowledge that the above Recitals are true and correct and are hereby incorporated by reference into this Contract. A2Z Construct, Inc. Page 10 27.2. Compliance with all Laws. Contractor shall at its own cost and expense comply with all statutes, ordinances, regulations and requirements of all governmental entities, including federal, state, county or municipal, whether now in force or hereinafter enacted. In addition, all Work prepared by Contractor shall conform to applicable City, county, state and federal laws, rules, regulations and permit requirements and be subject to approval of the Project Administrator and City. 27.3. Waiver. A waiver by either party of any breach, of any term, covenant or condition contained herein shall not be deemed to be a waiver of any subsequent breach of the same or any other term, covenant or condition contained herein, whether of the same or a different character. 27.4. Integrated Contract. This Contract represents the full and complete understanding of every kind or nature whatsoever between the parties hereto, and all preliminary negotiations and agreements of whatsoever kind or nature are merged herein. No verbal agreement or implied covenant shall be held to vary the provisions herein. 27.5. Conflicts or Inconsistencies. In the event there are any conflicts or inconsistencies between this Contract and any other attachments attached hereto, the terms of this Contract shall govern. 27.6. Interpretation. The terms of this Contract shall be construed in accordance with the meaning of the language used and shall not be construed for or against either party by reason of the authorship of the Contract or any other rule of construction which might otherwise apply. 27.7. Amendments. This Contract may be modified or amended only by a written document executed by both Contractor and City and approved as to form by the City Attorney. 27.8. Severability. If any term or portion of this Contract is held to be invalid, illegal, or otherwise unenforceable by a court of competent jurisdiction, the remaining provisions of this Contract shall continue in full force and effect. 27.9. Controlling Law and Venue. The laws of the State of California shall govern this Contract and all matters relating to it and any action brought relating to this Contract shall be adjudicated in a court of competent jurisdiction in the County of Orange, State of California. 27.10. Equal Opportunity Employment. Contractor represents that it is an equal opportunity employer and it shall not discriminate against any subcontractor, employee or applicant for employment because of race, religious creed, color, national origin, ancestry, physical handicap, medical condition, marital status, sex, sexual orientation, age or any other impermissible basis under law. 27.11. No Attorney's Fees. In the event of any dispute or legal action arising under this Contractor, the prevailing party shall not be entitled to attorneys' fees. A2Z Construct, Inc. Page 11 27.12. Counterparts. This Contract may be executed in two (2) or more counterparts, each of which shall be deemed an original and all of which together shall constitute one and the same instrument. [SIGNATURES ON NEXT PAGE] A2Z Construct, Inc. Page 12 IN WITNESS WHEREOF, the parties have caused this Contract to be executed on the dates written below. APPROVED AS TO FORM: CITY ATTORNEY'S OFFICE Date: $/2,q/Z � By, J 6q I 9 ron C. Harp ly Attorney ATTEST: Date: By: Leilani I. Brown City Clerk EW F- ,u CITY OF NEWPORT BEACH, a California municipal corporation Date: 10 1 By-- (44acgX.Leung Li anager CONTRACTOR: A2Z California corporation Date: Construct, Inc., a Signed in Counterpart By: Matthew Jafari President Date: Signed in Counterpart By: Charlene Estelle Jafari Secretary [END OF SIGNATURES] Attachments: Exhibit A — Request for Proposals/Bids, etc. Exhibit B — Proposal Exhibit C — Insurance Requirements Exhibit D — Labor and Materials Payment Bond Exhibit E — Faithful Performance Bond A2Z Construct, Inc. Page 13 IN WITNESS WHEREOF, the parties have caused this Contract to be executed on the dates written below. APPROVED AS TO FORM: CITY ATT RNEY'S OFFICE Date:zK/z - By: Ah�on C. Harp Ofy Attorney ATTEST: Date: Leilani I. Brown City Clerk CITY OF NEWPORT BEACH, a California municipal corporation Date: in Grace K. Leung City Manager CONTRACTOR: A2Z Construct, Inc., a CE Dr, President Date: By. Chart ne Est le Jafari Secreta [END OF SIGNATURES] Attachments: Exhibit A — Request for Proposals/Bids, etc. Exhibit B — Proposal Exhibit C — Insurance Requirements Exhibit D — Labor and Materials Payment Bond Exhibit E — Faithful Performance Bond A2Z Construct, Inc. Page 13 EXHIBIT A (SEE ATTACHED) A2Z Construct, Inc. Page A-1 CITY OF NEWPORT BEACH NOTICE INVITING BIDS Sealed bids shall be submitted electronically via PlanetBids to office of the City Clerk, 100 Civic Center Drive, Newport Beach, CA 92660 By 10:00 AM on the 11th day of August, 2022, at which time such bids shall be opened and read for 38th Street Park and San Miguel Park Fencing Project Contract No. 8721-1 $100,000 Engineer's Estimate Approved by James M. Houlihan eputy PWD/City Engineer Prospective bidders may obtain Bid Documents, Project Specifications and Plans via PlanetBids: http://www.planetbids.com/portal/portal.cfm?CompanvlD=22078 Hard copy plans are available via Santa Ana Blue Print at (949) 756-1001 Located at 2372 Morse Avenue, Irvine, CA 92614 Contractor License Classification(s) required for this project: "A" or "C-13" For further information, call Tom Sandefur, Project Manager at (949) 644-3321 BID INFORMATION IS AVAILABLE ON THE CITY WEBSITE: http://newportbeachca goy/government/open-transr)arent/online-services/bids rfps vendor -registration City of Newport Beach 38lh Street Park and San Miguel Park Fencing Project Contract No. 8721-1 TABLE OF CONTENTS NOTICEINVITING BIDS..........................................................................................Cover INSTRUCTIONS TO BIDDERS......................................................................................3 DESIGNATION OF SUBCONTRACTOR(S)................................................................... 6 TECHNICAL ABILITY AND EXPERIENCE REFERENCES ............................................ 9 NON -COLLUSION AFFIDAVIT..................................................................... 13 DESIGNATION OF SURETIES...................................................................... 14 CONTRACTOR'S INDUSTRIAL SAFETY RECORD .................................................... 15 ACKNOWLEDGEMENT OF ADDENDA....................................................................... 15 INFORMATION REQUIRED OF BIDDER..................................................................... 16 NOTICE TO SUCCESSFUL BIDDER........................................................................... 21 CONTRACT.................................................................................................................. 22 LABOR AND MATERIALS PAYMENT BOND ............................................. Exhibit A FAITHFUL PERFORMANCE BOND........................................................... Exhibit B INSURANCE REQUIREMENTS.................................................................Exhibit C PROPOSAL.............................................................................................................. PR-1 SPECIALPROVISIONS............................................................................................ SP-1 r, City of Newport Beach 38th Street Park and San Miguel Park Fencing Project Contract No. 8721-1 INSTRUCTIONS TO BIDDERS 1. The following documents shall be completed, executed, uploaded and received by the City Clerk via PlanetBids in accordance with NOTICE INVITING BIDS: INSTRUCTIONS TO BIDDERS DESIGNATION OF SUBCONTRACTORS ACKNOWLEDGEMENT (Subcontractor information to be submitted via PlanetBids) CONTRACTOR'S INDUSTRIAL SAFETY RECORD INFORMATION REQUIRED OF BIDDER ALL ADDENDA TO PLANS AND SPECIFICATIONS AS ISSUED BY AGENCY PRIOR TO BID OPENING DATE (if any; Contractor shall confirm via PlanetBids) TECHNICAL ABILITY AND EXPERIENCE REFERENCES NON -COLLUSION AFFIDAVIT DESIGNATION OF SURETIES PROPOSAL ACKNOWLEDGEMENT (Line Items to be completed via PlanetBids) The City Clerk's Office will open and read the bid results from PlanetBids immediately following the Bid Opening Date (Bid Due Date.) The Bid Results are immediately available to the public via PlanetBids following the Bid Opening Date (Bid Due Date). Members of the public who would like to attend this reading may go to Bay E, 2"d Floor of the Civic Center (Located at 100 Civic Center Dr.) 2. Cash, certified check or cashier's check (sum not less than 10 percent of the total bid price) may be received in lieu of the BIDDER'S BOND. The title of the project and the words "Sealed Bid" shall be clearly marked on the outside of the envelope containing the documents. Original copies must be submitted to the City Clerk's Office. 3. The City of Newport Beach will not permit a substitute format for the Contract Documents listed above. Bidders are advised to review their content with bonding and legal agents prior to submission of bid. 3. BIDDER'S BOND shall be issued by an insurance organization or surety (1) currently authorized by the Insurance Commissioner to transact business of insurance in the State of California, and (2) listed as an acceptable surety in the latest revision of the Federal Register Circular 570. The successful bidder's security shall be held until the Contract is executed. Original, sealed copies must be submitted to the City Clerk's Office by the Bid Opening Date (Bid Due Date.) The title of the project, Contract Number and the words "Sealed Bid" shall be clearly marked on the outside of the envelope containing the documents. 4. The estimated quantities indicated in the PROPOSAL are approximate, and are given solely to allow the comparison of total bid prices. 5. Bids are to be computed upon the estimated quantities indicated in the PROPOSAL multiplied by unit price submitted by the bidder. In the event of discrepancy between wording and figures, 3 bid wording shall prevail over bid figures. In the event of error in the multiplication of estimated quantity by unit price, the correct multiplication will be computed and the bids will be compared with correctly multiplied totals. The City shall not be held responsible for bidder errors and omissions in the PROPOSAL. 6. The City of Newport Beach reserves the right to reject any or all bids and to waive any minor irregularity or informality in such bids. Pursuant to Public Contract Code Section 22300, at the request and expense of the Contractor, securities shall be permitted in substitution of money withheld by the City to ensure performance under the contract. The securities shall be deposited in a state or federal chartered bank in California, as the escrow agent. 7. In accordance with the California Labor Code (Sections 1770 et seq.), the Director of Industrial Relations has ascertained the general prevailing rate of per diem wages in the locality in which the work is to be performed for each craft, classification, or type of workman or mechanic needed to execute the contract. A copy of said determination is available by calling the prevailing wage hotline number (415) 703-4774, and requesting one from the Department of Industrial Relations. All parties to the contract shall be governed by all provisions of the California Labor Code — including, but not limited to, the requirement to pay prevailing wage rates (Sections 1770-7981 inclusive). A copy of the prevailing wage rates shall be posted by the Contractor at the job site. 9. The Contractor shall be responsible for insuring compliance with provisions of Section 1777.5 of the Labor Code Apprenticeship requirements and Section 4100 et seq. of the Public Contracts Code, "Subletting and Subcontracting Fair Practices Act". 10. No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. 11. No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. 12. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. 13. All documents shall bear signatures and titles of persons authorized to sign on behalf of the bidder. For corporations, the signatures shall be of a corporate officer or an individual authorized by the corporation. For partnerships, the signatures shall be of a general partner. For sole ownership, the signature shall be of the owner. 14. Pursuant to Public Contract Code section 9204, for any demand by contractor, whether on behalf of itself or a subcontractor that lacks privity of contract with the City but has requested that contractor proceed on its behalf, sent by registered mail or certified mail return receipt requested for a time extension, payment by the City for money or damages arising from work done by, or on behalf of, the contractor and payment for which is not otherwise expressly provided or to which the claimant is not otherwise entitled, or for payment of an amount that is disputed by the City, the following is a summary of the claims resolution process to be applied: A. The City shall review the claim and, within 45 days, shall provide a written statement identifying the portions of the claim that are disputed and undisputed. This time period may be extended by mutual agreement. The claimant shall furnish all reasonable documentation to support the claim. If the City needs approval from its City Council to 4 provide the written statement and the City Council does not meet within the prescribed time period, the City shall have up to 3 days following the next regular meeting of the City Council to provide the written statement. Payment of the undisputed portion of the claim shall be made within 60 days after the City issues its written statement. B. If the claimant disputes the City's written statement or if the City does not issue a written statement in the prescribed time period, the claimant may demand in writing an informal meet and confer conference, which shall be scheduled within 30 days of receipt of claimant's demand. C. Within 10 business days of the meet and confer conference, if a dispute remains, the City shall provide a written statement identifying the portion of the claim that remains in dispute and the undisputed portion. The City shall pay any remaining amount of the undisputed portion within 60 days. Any disputed portion of the claim shall be submitted to nonbinding mediation or similar nonbinding process, with the City and claimant sharing the costs equally and agreeing to a mediator within 10 business days. If the parties cannot timely agree on a mediator, each party shall select a mediator and those mediators shall select a qualified neutral third party to mediate the remaining disputed portion. If mediation is unsuccessful, any remaining disputed portion shall be addressed using procedures outside of Public Contract Code section 9204. D. Failure by the City to meet the time requirements herein shall result in the claim being rejected in its entirety and shall not constitute an adverse finding with regard to the merits of the claim or the responsibility or qualifications of the claimant. The signature below represents that the above has been revig 739539 A,B President Contractor's License No. & Classification Auth riled Sign re/Title 1000012937 06/30/2024 DIR Registration Number & Expiration Date A2Z Construct Inc Bidder 5 08/10/2022 Date City of Newport Beach 38th Street Park and San Miguel Park Fencing Project Contract No. 8721-1 DESIGNATION OF SUBCONTRACTOR(S) - AFFADAVIT State law requires the listing of all subcontractors who will perform work in an amount in excess of one- half of one percent of the Contractor's total bid. If a subcontractor is not listed, the Contractor represents that he/she is fully qualified to and will be responsible for performing that portion of the work. Substitution of subcontractors shall be made only in accordance with State law and/or the Standard Specifications for Public Works Construction, as applicable. Pursuant to Public Contract Code Section 22300 appropriate securities may be substituted for any monies to be withheld to ensure performance under the Contract. The Bidder, by signing this designation, certifies that bids from the subcontractors as listed in the Bidder's electronic bid have been used in formulating the bid for the project and that these subcontractors will be used subject to the approval of the Engineer and in accordance with State law. No changes may be made in these subcontractors except with prior approval of the City of Newport Beach. Bidders must also include DIR registration numbers for each subcontractor. A2Z Construct Inc Bidder 0 /President Author d ignature/Title City of Newport Beach 3811 Street Park and San Miguel Park Fencing Project Contract No. 8721-1 TECHNICAL ABILITY AND EXPERIENCE REFERENCES Contractor must use this formlll Please print or type. Bidder's Name A2Z Construct Inc FAILURE OF THE BIDDER TO PROVIDE ALL REQUIRED INFORMATION IN A COMPLETE AND ACCURATE MANNER MAY BE CONSIDERED NON -RESPONSIVE. For all public agency projects you have worked on (or are currently working on), in excess of $75,000 per project, please provide the following information: No. 1 Project Name/Number Corporation Yard Fence Replacement Project Project Description Concrete work; mow curbs; footing; installation of fence panels and gate Approximate Construction Dates: From January 2021 To: April 2021 Agency Name City of Newport Beach Contact Person Sharon Garcia Telephone (949) 644-3327 Original Contract Amount $ 220,000 Final Contract Amount $ 242,250 If final amount is different from original, please explain (change orders, extra work, etc.) Change Orders Did you file any claims against the Agency? Did the Agency file any claims against you/Contractor? If yes, briefly explain and indicate outcome of claims. [We 7 No. 2 Project Name/Number Cliff Drive Clubhouse Rehabilitation Removing existing improvements and making improvements to interior, Project Description exterior, and landscaping of the community center; concrete flatwork; retaining wall Approximate Construction Dates: From 12/2021 To: 05/2022 Agency Name City of Newport Beach Contact Person Tom Sandefur Telephone (949) 644-3327 Original Contract Amount $185,750 Final Contract Amount $ 181,378 If final amount is different from original, please explain (change orders, extra work, etc.) Change Orders Did you file any claims against the Agency? Did the Agency file any claims against you/Contractor? If yes, briefly explain and indicate outcome of claims. No No. 3 Project Name/Number Tustin Family Youth Center Courtyard Improvements Providing additional outdoor use area; patio space; new curbs; decorative bollards; Project Description painting outdoor walls and metal fencing• concrete slab work; shade structure Approximate Construction Dates: From April 2022 To: July 2022 Agency Name City of Tustin Contact Person Marilyn Buescher Telephone (714) 573-3334 Original Contract Amount $ 83,980 Final Contract Amount $ 93,980 If final amount is different from original, please explain (change orders, extra work, etc.) Change Orders Did you file any claims against the Agency? Did the Agency file any claims against you/Contractor? If yes, briefly explain and indicate outcome of claims. No No. 4 Project Name/Number N/A Project Description Approximate Construction Dates: From Agency Name Contact Person To: Telephone ( ) Original Contract Amount $ Final Contract Amount $ If final amount is different from original, please explain (change orders, extra work, etc.) Did you file any claims against the Agency? Did the Agency file any claims against you/Contractor? If yes, briefly explain and indicate outcome of claims. No. 5 Project Name/Number N/A Project Description Approximate Construction Dates: From Agency Name Contact Person To: Telephone ( ) Original Contract Amount $ Final Contract Amount $ If final amount is different from original, please explain (change orders, extra work, etc.) Did you file any claims against the Agency? Did the Agency file any claims against you/Contractor? If yes, briefly explain and indicate outcome of claims. 0 Noj 6 N/A Pro ect Name/Number Project Description Approximate Construction Dates: From To: Agency Name Contact Person Telephone ( Original Contract Amount $ Final Contract Amount If final amount is different from original, please explain (change orders, extra work, etc.) Did you file any claims against the Agency? Did the Agency file any claims against you/Contractor? If yes, briefly explain and indicate outcome of claims. Attach additional sheets if necessary. Attach to this Bid the experience resume of the person who will be designated as General Construction Superintendent or on -site Construction Manager for the Contractor. Upon request, the Contractor shall attach a financial statement and other information sufficiently comprehensive to permit an appraisal of the C ntractor's current financial conditions. A2Z Construct Inc Bidder 10 A"9,1 /President A iz Si ature/Title MAT HE W .IA.FARI A2Z Construct Inc. PO Box 80425 Rancho Santa Margarita, CA 92688 Phone: (949) 283-5179 Fax: (949) 589-4274 a2zconstrRc'J nc2Qaol a:om ]License #739539 DIR# 1000012937 ' FID: #33-0943514 Matthew Jafari is a highly accomplished General Contractor, Owner, and Construction Manager. His company is bonded and insured, and he has an exceptional work ethic. He has more than 25 years of proven experience in the construction industry in Southern California. PROFESSIONAL PROFILE Experience includes retrofitting with moment frames, anchor ties, infield, concrete fitting and grade beams; new building construction and remodeling, involving concrete block, concrete slab, rebar, foundation, and soil preparation. He is an expert with electrical, plumbing, HVAC, masonry, framing, drywall, flooring, door & hardware, fire alarm, and security systems. Few of his many responsibilities have included purchasing materials, supervision, and coordination with DSA inspectors, owners, architects, subcontractors, and suppliers. He has managed private and commercial projects, as well asfederal, schools, public works, and city agencies. EDUCATION California State University, Long Beach; Long Beach, CA B.S., Computer Management, 1989 CERTIFICATES AND LICENSES State of California General Engineering Contractor "A" License State of California General Building Contractor "B" License Department of Labor (DOL) certification for successful completion of 30 Hour Construction Industry Outreach OSHA AREAS OF EXPERTISE *Estimating/Bidding *Project plan evaluation and specification *Solicitation of sub -contractor proposals *Cost estimating *Bid preparation and presentation *Working knowledge of ADA Regulations *Effective leadership, time management, and problem solving abilities, resulting in a consistent record of on -time & on -budget project completion REFERENCES AVAILABLE UPON REQUEST City of Newport Beach 38th Street Park and San Miguel Park Fencing Project Contract No. 8721-1 NON -COLLUSION AFFIDAVIT State of California ) ) ss. County of Orange ) Matthew Jafari being first duly sworn, deposes and says that he or she is President of A2Z Construct Inc , the party making the foregoing bid; that the bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the bid is genuine and not collusive or sham; that party making the foregoing bid; that the bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the bid is genuine and not collusive or sham; that the bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid, and has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that the bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder, or to secure any advantage against the public body awarding the contract of anyone interested in the proposed contract; that all statements contained in the bid are true; and, further, that the bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay, any fee to any corporation, partnership, company association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid. declare under penalty of perjury of the laws of the Stqt9A VfT Mre,5i'4fet)6t the regoing is tru nd correct. A2Z Construct Inc Bidder thoriz nature itle Subscribed and sworn to (or affirmed) before me on this day of 2022 by , proved to me on the basis of satisfactory evidence to be the person(s) who appeared before me. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. NOTARY, A'9MCII,`�0 Notary Public [SEAL] My Commission Expires: Z 11 A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California County of Oranqe Subscribed and sworn to (or affirmed) before me on this 10th day of August , 20 22 , by Matthew lafari ------------- proved to me on the basis of satisfactory evidence to be the personKwho appeared before me. JED RUSSELL WALTERS Notary Public • California z Orange County $ Commission 4 2372527 — My Comm. Expires A,% 27. 2025 (Seal) Signature A++,c�mien-f fir- Noon— Lo.�� City of Newport Beach 38t" Street Park and San Miguel Park Fencing Project Contract No, 8721-1 DESIGNATION OF SURETIES Bidder's name A2Z Construct Inc Provide the names, addresses, and phone numbers for all brokers and sureties from whom Bidder intends to procure insurance and bonds (list by insurance/bond type): National Liability and Fire Insurance Co., Appalachian Insurance (888)376-9633 (Workers Compensation Number One Insurance, 1711 Beach Blvd., Huntington Beach, CA 92647 (714)848-4400 (Commercial Liability) Progressive Commercial, Unified Cas Co. PO Box 94739, Cleveland, OH (800)376-9633 (Commercial Auto Ins) Contractors Bonding and Insurance Co. 111 Pacifica, Ste. 350, Irvine, CA 92618 (949)341-9169 (Performance and Labor Bonds) 12 City of Newport Beach 38t' Street Park and San Miguel Park Fencing Project Contract No. 8721-1 CONTRACTOR'S INDUSTRIAL SAFETY RECORD TO ACCOMPANY PROPOSAL Bidder's Name A2Z Construct Inc Record Last Five (5) Full Years Current Year of Record Current Record I Record Record Record Record Year of for for for for for Record 2021 2020 2019 2018 2017 Total 2022 No. of contracts 5 2 2 8 5 8 30 Total dollar Amount of Contracts (in $600,000 $360,000 $148,085 $886,045 $884,95 $1,963,9 1 Thousands of $) $4,843,024 No. of fatalities 0 0 0 0 0 0 0 No. of lost Workday Cases 0 0 0 0 0 0 0 No. of lost workday cases involving permanent 0 0 0 0 0 0 0 transfer to another job or termination of employment The information required for these items is the same as required for columns 3 to 6, Code 10, Occupational Injuries, Summary --Occupational Injuries and Illnesses, OSHA No. 102. 13 Legal Business Name of Bidder A2Z Construct Inc Business Address: Business Tel. No.: State Contractor's License No. and Classification: PO Box 80425, Rancho Santa Margarita, CA 92688 949-283-5179 739539 A,B Title President The above information was compiled from the records that are available to meat this time and I declare under penalty of perjury that the information is true and accurate within the limitations of those records. Signature of / bidder Date �, 2 Title President Signature of bidder Date Title Signature of bidder Date Title Signature of bidder Date Title Signature Requirements: If bidder is an individual, name and signature of individual must be provided, if doing business under a fictitious name, the fictitious name must be set fort along with the County. If bidder is a partnership or joint venture, legal name of partnership/joint venture must be provided, followed by signatures of all of the partners/joint ventures or if fewer than all of the partners/joint ventures submit with evidence of authority to act on behalf of the partnership/joint venture. If bidder is a corporation, legal name of corporation must be provided, followed by signatures of the corporation President or Vice President or President and Secretary or Assistant Secretary, and the corporate seal, or submit with evidence of authority to act on behalf of the corporation. All must be acknowledged before a Notary Public, who must certify that such individuals, partners/joint ventures, or officers were proven on the basis of satisfactory evidence to be the persons whose name are subscribed to and acknowledged that they executed the same in their authorized capacities. [NOTARY ACKNOWLEDGMENT and CORPORATE SEAL MUST BE ATTACHEDI 14 SEE C"AL 'J 2tIOT Yo A CV-bOD ACKNOWLEDGMENT A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California County of Orange On August loth, 2022 before me, led Russell Walters, Notary Public, (insert name and title of the officer) personally appeared Matthew lafari ---------------------- who proved to me on the basis of satisfactory evidence to be the rson`(�s,) whose name Game Vrsoh scribed to the within instrument and acknowle ed to me tha he she/they executed th her/their authorized capacity(`t6Q, and that b hi her/their sign tureN on the instrument the - or the entity upon behalf of which the p rsonN ,acted, executed the instrument. certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official Signature G(,� Me -r)t -(o !_ (Seal) *my JED RU55ELL WALTEFNotary Public - CaliforniaOrange County Commission 4 2372527 Comm. Expires Aug 27, 2025 y Page 1 of 1 CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT cq 04 ADDENDUM NO. 1 38th Street Park & San Miguel Park Fencing Project CONTRACT NO 8721-1 DATE:—#VZW-2- BY: C' ngineer TO: ALL PLANHOLDERS The following changes, additions, deletions, or clarifications shall be made to the Contract Documents - all other conditions shall remain the same. Plans: Please replace the San Miguel Park Plan View sheet no. 3 of 3 with the attached dated July 14, 2022. Bidders must sign this Addendum No. 1 and attach it to the bid proposal. Bid may not be considered unless this signed Addendum No. 1 is attached. I have carefully examined this Addendum and have included full payment in my Proposal. A2Z Construct Inc Bidder's Name (Please Print) 08/02/2022 A Date )1/ /President AutKVrize"idWature & Title Attachments: - PLANS — San Miguel Park Plan View, Sheets 3 of 3 City of Newport Beach 38t" Street Park and San Miguel Park Fencing Project Contract No. 8721-1 ACKNOWLEDGEMENT OF ADDENDA Bidder's name A2Z Construct Inc The bidder shall signify receipt of all Addenda here, if any, and attach executed copy of addenda to bid documents: Addendum No. Date Received Si re 1 2 2 22 15 City of Newport Beach 3811 Street Park and San Miguel Park Fencing Project Contract No. 8721-1 INFORMATION REQUIRED OF BIDDER Bidder certifies under penalty of perjury under the laws of the State of California that the following information is true and correct: Name of individual Contractor, Company or Corporation: A2Z Construct Inc Business Address: PO Box 80425, Rancho Santa Margarita, CA 92688 Telephone and Fax Number: 949-283-5179 949-589-4274 California State Contractor's License No. and Class: (REQUIRED AT TIME OF AWARD) 739539 A,B Original Date Issued: 08/20/1997 Expiration Date: 03/31/2023 List the name and title/position of the person(s) who inspected for your firm the site of the work proposed in these contract documents: Matthew Jafari, President The following are the names, titles, addresses, and phone numbers of all individuals, firm members, partners, joint ventures, and company or corporate officers having a principal interest in this proposal: Name Title Address Telephone Matthew Jafari, President 63 Via Gatillo, Rancho Santa Margarita, CA 92688 949-283-5179 Corporation organized under the laws of the State of California W The dates of any voluntary or involuntary bankruptcy judgments against any principal having an interest in this proposal are as follows: N/A All company, corporate, or fictitious business names used by any principal having interest in this proposal are as follows: N/A For all arbitrations, lawsuits, settlements or the like (in or out of court) you have been involved in with public agencies in the past five years (Attach additional Sheets if necessary) provide: Provide the names, addresses and telephone numbers of the parties; NIA Briefly summarize the parties' claims and defenses; N/A Have you ever had a contract terminated by the owner/agency? If so, explain. We Have you ever failed to complete a project? If so, explain. No For any projects you have been involved with in the last 5 years, did you have any claims or actions by any outside agency or individual for labor compliance (i.e. failure to pay prevailing wage, falsifying certified payrolls, etc.)? Yes(o 17 Are any claims or actions unresolved or outstanding? Yes / vim% If yes to any of the above, explain. (Attach additional sheets, if necessary) N/A Failure of the bidder to provide ALL requested information in a complete and accurate manner may be considered non -responsive. A2Z Construct Inc Bidder Matthew Jafari (Print name of Owner or President of Corp or 'o om any) zed i a ur /Title President Title Date On before me, , Notary Public, personally appeared who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. Wel CALMNA NOTARY, ATTACH 0 Notary Public in and for said State My Commission Expires: . 7�o�� (SEAL) ACKNOWLEDGMENT A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California County of Orange On August loth, 2022 before me, Jed Russell Walters, Notary Public, (insert name and title of the officer) personally appeared Matthew Jafari ---------------------- who proved to me on the basis of satisfactory evidence to be the sonts whose name is/ re bscribed to the within instrument and acknowle ed to me tha he/ he/they executed the ame in is er/their authorized capacitylIgs�, and that b hls her/their sign ures,Lon the instrument the sorts or the entity upon behalf of which the persori�acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official Signature +-�c� GIA ► w n � -fi r L Auf-m , -% u �-) ,5�"`•,°i.r�� JEDRUSSELLWALTERS Notary Public • California Orange County > Commission 9 2372527 My Comm. Expires Aug 27, 2025 — s�w (Seal) Re�0-f, 8 ,jde r CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT INDEX FOR SPECIAL PROVISIONS 38th STREET PARK AND SAN MIGUEL PARK FENCING PROJECT PROJECT NO. 22P11 CONTRACT NO. C-8721-1 PART 1 - GENERAL PROVISIONS 1 SECTION 1— TERMS, DEFINITIONS, ABBREVIATIONS, UNITS OF MEASURE, AND SYMBOLS 1 1-2 TERMS AND DEFINITIONS 1 SECTION 2 - SCOPE AND CONTROL OF THE WORK 2-1 AWARD AND EXECUTION OF THE CONTRACT 2-5 PLANS AND SPECIFICATIONS 2-5.2 Precedence of Contract Documents 2-6 WORK TO BE DONE SECTION 3 - CHANGES IN WORK 3-3 EXTRA WORK 3-3.2 Payment 3-3.2.2 Basis for Establishing Cost 3-3.2.3 Markup SECTION 4 - CONTROL OF MATERIALS 4-1 MATERIALS AND WORKMANSHIP 4-1.3 Inspection Requirements 4-1.3.1 General SECTION 5 - UTILITIES 5-1 LOCATION 5-1.1 General 5-2 PROTECTION 5-4 RELOCATION 1 1 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 4 4 SECTION 6 - PROSECUTION, PROGRESS AND ACCEPTANCE OF THE WORK 4 6-1 CONSTRUCTION SCHEDULE AND COMMENCEMENT OF WORK 4 6-1.1 Construction Schedule 4 6-7 TIME OF COMPLETION 5 6-7.1 General 5 6-8 COMPLETION, ACCEPTANCE, AND WARRANTY 6 6-9 LIQUIDATED DAMAGES 6 SECTION 7 - RESPONSIBILITIES OF THE CONTRACTOR 6 7-1 THE CONTRACTOR'S EQUIPMENT AND FACILIITIES 6 7-1.2 Temporary Utility Services 6 7-2 LABOR 7 7-2.2 Prevailing Wages 7 7-7 COOPERATION AND COLLATERAL WORK 7 7-8 WORK SITE MAINTENANCE 7 7-8.4 Storage of Equipment and Materials 7 7-8.4.2 Storage in Public Streets 7 7-8.6 Water Pollution Control 7 7-8.6.2 Best Management Practices (BMPs) 7 7-10 SAFETY 8 7-10.3 Haul Routes 8 7-10.4 Safety 8 7-10.4.1 Work Site Safety 8 SECTION 9 - MEASUREMENT AND PAYMENT 8 9-2 LUMP SUM WORK 8 9-3 PAYMENT 8 9-3.1 General 8 9-3.2 Partial and Final Payment. 10 PART 2 - CONSTRUCTION MATERIALS 10 SECTION 201 - CONCRETE, MORTAR, AND RELATED MATERIALS 10 201-1 PORTLAND CEMENT CONCRETE 10 201-1.1 Requirements 10 201-1.1.2 Concrete Specified by Class and Alternate Class 10 201-2 REINFORCEMENT FOR CONCRETE 11 201-2.2 Steel Reinforcement 11 201-2.2.1 Reinforcing Steel 11 SECTION 206 — MISCILLANEOUS METAL MATERIALS 11 206-1 Fencing 11 206-1-1 General 11 206-2 Fittings and Connections 11 206-2-1 General 11 SECTION 212 — LANDSCAPE AND IRRIGATION MATERIALS 11 212-1 Landscape and Irrigation Materials 11 212-1-1 City of Newport Beach Approved Material List 11 PART 3 - CONSTRUCTION METHODS 12 SECTION 300 - EARTHWORK 12 300-1 CLEARING AND GRUBBING 12 300-1.3 Removal and Disposal of Materials 12 300-1.3.1 General 12 300-1.3.2 Requirements 12 SECTION 303 - CONCRETE AND MASONRY CONSTRUCTION 13 303-5 CONCRETE CURBS, WALKS, GUTTERS, CROSS GUTTERS, ALLEY INTERSECTIONS, ACCESS RAMPS AND DRIVEWAYS 13 303-5.1 Requirements 13 303-5.1.1 General 13 303-5.5 Finishing 13 303-5.5.1 General 13 303-5.5.2 Curb 13 PART 6 — TEMPORARY TRAFFIC CONTROL 13 SECTION 600 - ACCESS 13 600-1 GENERAL 13 600-2 VEHICULAR ACCESS 14 600-3 PEDESTRIAN ACCESS 14 SECTION 601— WORK AREA TRAFFIC CONTROL 14 601-1 GENERAL 14 601-2 TRAFFIC CONTROL PLAN (TCP) 15 PART 8 — LANDSCAPING AND IRRIGATION 15 SECTION 800 - MATERIALS 15 800-1 LANDSCAPING MATERIALS 15 800-1.1 Topsoil 15 800-1.1.1 General 15 800-1.4.1 General 16 800-2 IRRIGATION SYSTEM MATERIALS 16 800-2.1 Piping and Fittings 16 800-2.1.1 General 16 SECTION 801 - INSTALLATION 16 801-1 GENERAL 16 801-6 MAINTENANCE AND PLANT ESTABLISHMENT 17 APPENDIX A — PARKS DIVISION STANDARD IRRIGATION MATERIAL LIST 18 CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT SPECIAL PROVISIONS 381h STREET PARK AND SAN MIGUEL PARK FENCING PROJECT PROJECT NO. 22P11 CONTRACT NO. C-8721-1 INTRODUCTION All work necessary for the completion of this contract shall be done in accordance with (1) these Special Provisions; (2) the Plans (Drawing No. P-5270-S); (3) the City's Design Criteria and Standard Drawings for Public Works Construction, (2021 Edition); (4) Standard Specifications for Public Works Construction (2015 Edition) including supplements. The City's Design Criteria and Standard Drawings for Public Works Construction are available at the following website: http://www.newportbeachca.gov/government/departments/public-works/resources Copies of the Standard Specifications for Public Works Construction may be purchased online at www.bnibooks.com/products/standard-specifications-public-works-construction or call 888-BNI BOOK (888-264-2665). The following Special Provisions supplement or modify the Standard Specifications for Public Works Construction as referenced and stated hereinafter: PART 1 - GENERAL PROVISIONS SECTION 1 — TERMS, DEFINITIONS, ABBREVIATIONS, UNITS OF MEASURE, AND SYMBOLS 1-2 TERMS AND DEFINITIONS Add the following definition: City — City of Newport Beach SECTION 2 - SCOPE AND CONTROL OF THE WORK 2-1 AWARD AND EXECUTION OF THE CONTRACT Page SP 1 of 18 At the time of the award and until completion of work, the Contractor shall possess a Class "A" or a Class "C-13" license. At the start of work and until completion of work, the Contractor and all Subcontractors shall possess a valid Business License issued by the City. 2-5 PLANS AND SPECIFICATIONS 2-5.2 Precedence of Contract Documents If there is a conflict or discrepancy between different Contract Documents, the more stringent requirement as determined by the Engineer shall control. 2-6 WORK TO BE DONE The work necessary for the completion of this contract consists of removing and replacing old fencing, damaged concrete fence post, and concrete sidewalk panels and installing new fencing and plants at San Miguel Park. SECTION 3 - CHANGES IN WORK 3-3 EXTRA WORK 3-3.2 Payment 3-3.2.2 Basis for Establishing Cost 3-3.2.2.3 Tool and Equipment Rental Tool and equipment rental rates shall be based on the current Caltrans rental rates. 3-3.2.3 Markup 3-3.2.3.1 Work by the Contractor Delete this section and replace with the following: The following percentages shall be added to the Contractor's costs and shall constitute the markup for all overhead and profit: 1) Labor ............................................ 15 2) Materials ....................................... 15 3) Equipment Rental ........................... 15 4) Other Items and Expenditures ........... 15 To the sum of the costs and markups provided in this subsection, one (1) percent may be added as compensation for bonding. Page SP 2 of 18 3-3.2.3.2 Work by a Subcontractor When all or any part of the extra work is performed by a Subcontractor, the markup established in Section 3-3.2.3.1 shall be applied by the Subcontractor to the actual costs and shall constitute the markup for all overhead and profit. An additional markup of five (5) percent of the total subcontracted cost may be added by the Contractor. To the sum of the costs and markups provided in this subsection, one (1) percent may be added as compensation for bonding. SECTION 4 - CONTROL OF MATERIALS 4-1 MATERIALS AND WORKMANSHIP 4-1.3 Inspection Requirements 4-1.3.1 General All material and articles furnished by the Contractor shall be subject to rigid inspection, and no material or article shall be used until it has been inspected and accepted by the Engineer. The Contractor shall furnish the Engineer with full information as to the progress of the work in its various parts and shall give the Engineer timely (48-hours minimum) notice of the Contractor's readiness for inspection. Submittals are required for all construction material. The Engineer shall select an independent testing laboratory and pay for all testing as specified in the various sections of the Standard Special Provisions and these Special Provisions. When, in the opinion of the Engineer, additional tests and retesting due to failed tests or inspections are required because of unsatisfactory results in the manner in which the Contractor executed the work, such tests and inspections shall be paid for by the Contractor. SECTION 5 - UTILITIES 5-1 LOCATION 5-1.1 General The Contractor is responsible for, and shall at his or her expense, pothole all existing utilities which may be affected by the work to verify points of connection and potential conflicts. No segment of work shall begin until the contractor has potholed and verified points of connection and related connection material requirements, and coordinated the final/existing layout of the laterals/pipeline with the Engineer, including adjustments due to field conflicts with other utilities or structures above or below ground. Within seven (7) calendar days after completion of the work or phase of work, the Contractor shall remove all USA utility markings. Removal by sandblasting is not Page SP 3 of 18 allowed. Any surface damaged by the removal effort shall be repaired to its pre - construction condition or better at the contractor's expense. 5-2 PROTECTION In the event that an existing pull box, meter box or any other utility box is damaged by the Work and is not re -useable, the Contractor shall provide and install a new replacement pull box, meter box or any other utility box of identical type and size at no additional cost to the City. 5-4 RELOCATION All City owned pull boxes, water meter boxes, water valve boxes, sewer cleanout boxes and survey monument boxes (collectively known as "utility boxes") which are affected by the Work shall be replaced to finish grade with new utility boxes. During asphalt paving operation, manholes and utility boxes within paving area shall be temporarily lowered and covered. Upon completion of paving operation, manholes and utility boxes shall be permanently adjusted to finish grade. The Contractor shall adjust all temporarily lowered manholes and utility boxes to the new finished grade within five (5) calendar days of completing the AC finished course. The Contractor will be required to contact Southern California Edison, The Gas Company, cable television companies, telecommunication companies and any other utility companies to have their existing utilities adjusted to finish grade. The Contractor shall coordinate with each utility company for the adjustment of their facilities in advance of work to avoid potential delays to the project schedule. The Contractor shall provide the necessary survey control for all utility companies to adjust boxes and vaults to the final grade. The Contractor will be required to coordinate with these companies for inspection of the work. SECTION 6 - PROSECUTION, PROGRESS AND ACCEPTANCE OF THE WORK 6-1 CONSTRUCTION SCHEDULE AND COMMENCEMENT OF WORK 6-1.1 Construction Schedule No work shall begin until a Notice to Proceed has been issued, a pre -construction meeting has been conducted, and a schedule of work has been approved by the Engineer. The Contractor shall submit a baseline schedule to the Engineer for approval a minimum of five working days prior to the pre -construction meeting. The Engineer will review the baseline schedule and may require the Contractor to modify the schedule to conform to the requirements of the Contract Documents. If work falls behind the approved baseline schedule, the Contractor shall be prohibited from starting additional work until Contractor has exerted extra effort to meet the baseline schedule and has demonstrated the ability to maintain the schedule in the future. Such stoppages of work shall in no way relieve the Contractor from the overall time of completion requirement, Page SP 4 of 18 nor shall it be construed as the basis for payment of extra work because additional personnel and equipment were required on the job. Contractor shall update the schedule periodically or as directed by the Engineer to reflect any delay or extension of time. In addition, Contractor shall prepare 2-week look -ahead schedules on a bi-weekly basis with detailed daily activities. 6-7 TIME OF COMPLETION 6-7.1 General The Contractor shall complete all work under the Contract within 25 consecutive working days after the date on the Notice to Proceed. The Contractor shall ensure the availability and delivery of all material prior to the start of work. Unavailability of material will not be sufficient reason to grant the Contractor an extension of time. Normal working hours are limited to 7 a.m. to 5 p.m., Monday through Friday. The Contractor, subcontractors, suppliers, etc., shall not generate any noise at the work site, storage sites, staging areas, etc., outside of the working hours. Should the Contractor elect to work outside normal working hours, Contractor must first obtain special permission from the Engineer. The request may be for 6 p.m. to 6:30 p.m. on weekdays or 8:00 a.m. to 6:00 p.m. on Saturdays only. A request for working outside the normal working hours must be made at least 72 hours in advance of the desired time period. A separate request must be made for each work shift. The Engineer reserves the right to deny any or all such requests. Additionally, the Contractor shall pay for supplemental inspection costs of $207 per hour when such time periods are approved. The following days are designated City holidays and are non -working days: 1. January 1st (New Year's Day) 2. Third Monday in January (Martin Luther King Day) 3. Third Monday in February (President's Day) 4. Last Monday in May (Memorial Day) 5. July 4t" (Independence Day) 6. First Monday in September (Labor Day) 7. November 11t" (Veterans Day) 8. Fourth Thursday and Friday in November (Thanksgiving and Friday after) 9. December 24t", (Christmas Eve) 10. December 25t" (Christmas) 11. December 26t" thru 30t" (City Office Closure) 12. December 31 st (New Year's Eve) If the holiday falls on a Sunday, the following Monday will be considered the holiday. If the holiday falls on a Saturday, the Friday before will be considered the holiday. Page SP 5 of 18 6-8 COMPLETION, ACCEPTANCE, AND WARRANTY Prior to acceptance of work, the Contractor shall submit a full size set of plans to the Engineer. Retention payment and bonds will not be released until the as -built plans are reviewed and approved by the Engineer. A set of approved plans and specifications shall be on the job site at all times. The Contractor shall maintain as -built drawings of all work as the job progresses. A separate set of drawings shall be maintained for this purpose. These drawings shall be up-to-date and reviewed by the Engineer at the time each progress payment is submitted. Any changes to the approved plans that have been made with approval from the Engineer shall be documented on the as -built plans. The Contractor shall maintain books, records, and documents in accord with generally accepted accounting principles and practices. These books, records, and documents shall be retained for at least three years after the date of completion of the project. During this time, the material shall be made available to the Engineer. Suitable facilities are to be provided for access, inspection, and copying of this material. 6-9 LIQUIDATED DAMAGES For each consecutive calendar day after the time specified in Section 6-7.1 for completion of the work, the Contractor shall pay to the City or have withheld from moneys due it, the daily sum of $750.00. Execution of the Contract shall constitute agreement by the City and Contractor that the above liquidated damages per calendar day is the minimum value of the costs and actual damage caused by the failure of the Contractor to complete the Work within the allotted time. The intent of this section is to emphasize to the Contractor the importance of prosecuting the work in an orderly preplanned continuous sequence so as to minimize inconvenience to residences, businesses, vehicular and pedestrian traffic, and the public as a result of construction operations. SECTION 7 - RESPONSIBILITIES OF THE CONTRACTOR 7-1 THE CONTRACTOR'S EQUIPMENT AND FACILIITIES 7-1.2 Temporary Utility Services If the Contractor elects to use City water, Contractor shall arrange for a meter and tender a $973.00 meter deposit with the City. Upon return of the meter to the City, the deposit will be returned to the Contractor, less a $90 monthly charge for meter use, a charge for water usage and any repair charges for damage to the meter. Water used during construction shall be paid for by the Contractor. This includes water for flushing and pressure testing water lines, compaction, dust control, irrigation during maintenance period for landscaping, etc. Page SP 6 of 18 City shall designate to the Contractor the location of the fire hydrant or other connection acceptable for drawing of construction and temporary water. City reserves the right to limit the location, times and rates of drawing such water. 7-2 LABOR 7-2.2 Prevailing Wages In accordance with California Labor Code Section 1720.9, hauling and delivery of ready - mixed concrete for public works contracts are subject to prevailing wages. 7-7 COOPERATION AND COLLATERAL WORK City forces will perform all shut downs of water, sewer and storm drain facilities as required. The Contractor shall provide the City advanced notice a minimum of seven calendar days prior to the time contractor desires the shutdown these City facilities. A four-hour shut down of water facilities during the daytime hours of 10:00 a.m. to 2:00 p.m. or a six -hour shut down between the nighttime hours of 11.-00 p.m. to 5:00 a.m. will be allowed. The Contractor will be responsible for completing all water connections within the time period allowed. The times and dates of any utility to be shut down must be coordinated with the Engineer. It is the Contractor's responsibility to notify the affected businesses and residents of the upcoming water shutdown with a form provided by the Engineer at least 48 hours in advance of the water shut down. 7-8 WORK SITE MAINTENANCE 7-8.4 Storage of Equipment and Materials 7-8.4.2 Storage in Public Streets Construction materials and equipment may only be stored in streets, roads, or sidewalk areas if approved by the Engineer in advance. It is the Contractor's responsibility to obtain an area for the storage of equipment and materials. The Contractor shall obtain the Engineer's approval of a site for storage of equipment and materials prior to arranging for or delivering equipment and materials to the site. Prior to move -in, the Contractor shall take photos of the laydown area. The Contractor shall restore the laydown area to its pre -construction condition. The Engineer may require new base and pavement if the pavement condition has been compromised during construction. 7-8.6 Water Pollution Control 7-8.6.2 Best Management Practices (BMPs) The Contractor shall submit a Best Management Practice (BMP) plan for containing any wastewater or storm water runoff from the project site including, but not limited to the following: Page SP7of18 a. No placement of construction materials where they could enter storm drain system, which includes gutters that lead to catch basins. b. Checking construction vehicles for leaking fluids. c. Providing a controlled area for cleaning or rinse -down activities. d. Monitoring construction activities. e. Minimizing usage of water when saw -cutting and vacuum the residue. f. Providing measures to capture or vacuum -up water contaminated with construction debris. g. Removing any construction related debris on a daily basis. h. Protecting work areas from erosion. The BMP will be approved by the Engineer prior to any work. The City will monitor the adjacent storm drains and streets for compliance. Failure of the Contractor to follow BMP will result in immediate cleanup by City and back -charging the Contractor for all costs plus 15 percent. The Contractor may also receive a separate administrative citation per Section 14.36.030 of the City's Municipal Code. 7-10 SAFETY 7-10.3 Haul Routes Haul routes shall be submitted to the Engineer for review and approval. 7-10.4 Safety 7-10.4.1 Work Site Safety The Contractor shall be solely and completely responsible for conditions of the job site, including safety of all persons and property during performance of the work. The Contractor shall fully comply with all state, federal and other laws, rules, regulations, and orders relating to the safety of the public and workers. The right of the Engineer or the City's representative to conduct construction review or observation of the Contractor's performance shall not include review or observation of the adequacy of the Contractor's safety measures in, on, or near the construction site. SECTION 9 - MEASUREMENT AND PAYMENT 9-2 LUMP SUM WORK Contractor shall submit a detailed schedule of value for all lump sum bid items to the Engineer within 15 days after award of contract. 9-3 PAYMENT 9-3.1 General Page SP 8 of 18 Revise paragraph two to read: The unit and lump sum bid prices for each item of work shown on the proposal shall include full compensation for furnishing the labor, materials, tools, and equipment and doing all the work, including restoring all existing improvements, to complete the item of work in place and no other compensation will be allowed thereafter. Payment for incidental items of work not separately listed shall be included in the prices shown for the other related items of work. The following items of work pertain to the bid items included within the Proposal: Item No. 1 Mobilization and Demobilization: Work under this item shall include, but not be limited to, all labor, tools, equipment and material costs for providing bonds, insurance and financing, preparing and implementing the BMP Plan, preparing and updating construction schedules as requested by the Engineer, attending construction progress meetings as needed, and all other related work as required by the Contract Documents. This bid item shall also include work to demobilize from the project site including but not limited to site cleanup, removal of USA markings and providing any required documentation as noted in these Special Provisions. Item No. 2 Traffic Control: Work under this item shall include, but not be limited to, all labor, tools, equipment and material costs for delivering all required notifications and temporary parking permits, posting signs, covering conflicting existing signs, and all costs incurred notifying businesses and residents. Item No. 3 Remove Existing Chainlink Fence Panel at 38th Street Park: Work under this item shall include, but not be limited to, removing existing chainlink fence panel, fence hardware, fence connections and associated hardware disposal of material by City approved licensed Franchise Commercial Solid Waste Haulers. Item No. 4 Remove and Replace Concrete Fence Post: Work under this item shall include, but not be limited to, all labor, tools, equipment and material costs for removing existing broken concrete fence post and concrete band at base, by City approved licensed Franchise Commercial Solid Waste Haulers, and replacing with new concrete band and concrete fence post. Item No. 5 Remove and Replace Concrete Sidewalk Panels: Work under this item shall include, but not be limited to, all labor, tools, equipment and material costs for removing existing broken concrete sidewalk panels by City approved licensed Franchise Commercial Solid Waste Haulers; replacing with new concrete sidewalk panels per Contract Drawings, match adjacent sidewalk panels and all other related work items as required to complete the work in place. Item No. 6 Crack Seal and Spall Repair: Work under this item shall include, but not be limited to, all labor, tools, equipment and material costs for routing out concrete cracks, removing loose concrete, crack sealing, spall repair, and all other work items as required to complete the work in place. Item No. 7 Furnish and Install Chainlink Fence Panel at 38th Street Park: Work under this item shall include, but not be limited to, all labor, tools, equipment and Page SP 9 of 18 material costs for drilling new connection holes in concrete posts, patching old holes, furnishing and installing chainlink fence panels with stainless steel connections, and all other work items as required to complete the work in place. Item No. 8 Furnish and Install 3-ft High Black Vinyl Coated #9 Gauge Chainlink Fence and Post at San Miguel Park: Work under this item shall include, but not be limited to, all labor, tools, equipment and material costs for furnishing and installing the fence and all other work items as required to complete the work in place. Item No. 9 Furnish and Install New Plants at San Miguel Park: Work under this item shall include, but not be limited to, all labor, tools, equipment and material costs for installing new plants per the Contract Documents and all other work items as required to complete the work in place. Item No. 10 Irrigation at San Miguel Park: Work under this item shall include, but not be limited to, all labor, tools, equipment and material costs for any updates to the irrigation system at San Miguel Park as directed by the Engineer and all other work items as required to complete the work in place. Item No. 11 Provide As -Built Plans: Work under this item shall include, but not be limited to, all labor, tools, equipment and material costs for all actions necessary to provide as -built drawings. These drawings must be kept up to date and submitted to the Engineer for review prior to request for payment. An amount of $500.00 is determined for this bid item. The intent of this pre-set amount is to emphasize to the Contractor the importance of as -build drawings. 9-3.2 Partial and Final Payment. From each progress payment, five (5) percent will be retained by the City, and the remainder less the amount of all previous payments will be paid. Partial payments for mobilization and traffic control shall be made in accordance with Section 10264 of the California Public Contract Code. PART 2 - CONSTRUCTION MATERIALS SECTION 201 - CONCRETE, MORTAR, AND RELATED MATERIALS 201-1 PORTLAND CEMENT CONCRETE 201-1.1 Requirements 201-1.1.2 Concrete Specified by Class and Alternate Class Portland cement concrete shall be Class 560-C-3250 unless shown otherwise on the plans. Page SP 10 of 18 201-2 REINFORCEMENT FOR CONCRETE 201-2.2 Steel Reinforcement 201-2.2.1 Reinforcing Steel Reinforcing steel shall be Grade 60 epoxy -coated steel bars conforming to ASTM A775 with 2-inch minimum cover unless shown otherwise on the plans. SECTION 206 — MISCILLANEOUS METAL MATERIALS 206-1 Fencing 206-1-1 General All fencing material shall be #9 Gauge Black Vinyl Coated Chainlink Fence with 2-inch openings. 206-2 Fittings and Connections 206-2-1 General All fittings and connections shall be Type 316 stainless steel. SECTION 212 — LANDSCAPE AND IRRIGATION MATERIALS 212-1 Landscape and Irrigation Materials 212-1-1 City of Newport Beach Approved Material List Irrigation materials supplied to the project shall comply with the City of Newport Beach, Parks Division Standard Irrigation Materials List per Appendix A. Substitutions are not allowed. Page SP 11 of 18 PART 3 - CONSTRUCTION METHODS SECTION 300 - EARTHWORK 300-1 CLEARING AND GRUBBING 300-1.3 Removal and Disposal of Materials Removal and disposal of material shall be done by City approved licensed and Franchised Commercial Solid Waste Haulers. A current list of approved haulers can be found on the City's website at: http://newportbeachca.gov/index.aspx?page=157 and then selecting the link for Franchised Haulers List. 300-1.3.1 General The Contractor shall maintain the job site in a clean and safe condition. The Contractor shall remove any broken concrete, debris or other deleterious material from the job site at the end of each workday or as directed by the Engineer. All areas of roadway removal and replacement shall have a minimum trench width of 3-feet to facilitate maximum compaction. Contractor shall meet with the Engineer to mark out the areas of roadway removal and replacement. Non -reinforced concrete and asphalt wastes generated from the job site shall be disposed of at a facility that crushes such materials for reuse. Excess soil and other recyclable solid wastes shall not be disposed of at a sanitary landfill. The Contractor shall maintain monthly tonnage records of total solid wastes generated and solid wastes disposed of at a sanitary landfill. The Contractor shall report said tonnage monthly to the Engineer and provide appropriate confirmation documentation from the recycling facility. All material disposal manifests shall be provided to the Engineer prior to release of final retention. The Contractor shall dispose of all excess or waste material and shall include all fees for such disposal in the appropriate bid items. 300-1.3.2 Requirements (c) Concrete Curb, Walk, Gutters, Cross Gutters, Driveway, and Alley Intersections. Concrete shall be removed from existing joint to existing joint. Alternatively, with prior approval from the Engineer, existing concrete may be neatly sawed to form straight edges to join proposed concrete improvements. Saw cuts on concrete surfaces shall be a minimum of two (2) inches deep. Saw cuts on asphalt pavement shall be full depth. Final removal between the sawcut lines may be accomplished by the use of jackhammers or sledgehammers. Pavement breakers or stompers will not be permitted on the job. The Engineer must approve final removal accomplished by other means. Page SP 12 of 18 SECTION 303 - CONCRETE AND MASONRY CONSTRUCTION 303-5 CONCRETE CURBS, WALKS, GUTTERS, CROSS GUTTERS, ALLEY INTERSECTIONS, ACCESS RAMPS AND DRIVEWAYS 303-5.1 Requirements 303-5.1.1 General Sidewalks and curb access ramps shall be opened to pedestrian access on the day following concrete placement. In addition, all forms shall be removed, irrigation systems shall be repaired, and backfill or asphalt concrete patchback shall be placed within 72 hours following concrete placement. 303-5.5 Finishing 303-5.5.1 General Concrete sidewalk panel shall have a broom brush finish as shown per Contract Drawings. 303-5.5.2 Curb The Contractor shall repaint any red curb that is damaged or removed. The curb shall be repainted to match the original red curb lengths." Red Paint shall be "Red Fast Dry", Product Code 181 manufactured by American Traffic Products, Inc. or approved equal. Paint can be purchased by contacting Scott Givens, Roadline Products, 562-404-8889. The Contractor shall repaint any blue curb that is damaged or removed. The curb shall be repainted to match the original blue curb lengths. Curb marking shall be reinstalled within 48 hours from re -pouring of concrete curbs. Contractor shall place Temporary No Parking ANYTIME signs on barricades where red curb marking has been removed and maintain the signs until the curb marking has been replaced. PART 6 — TEMPORARY TRAFFIC CONTROL SECTION 600 - ACCESS 600-1 GENERAL Ten (10) working days prior to starting work, the Contractor shall distribute construction notices to residents within 250 feet of the project, describing the project and indicating the limits of construction. The City will provide the notices. Page SP 13 of 18 Forty-eight (48) hours prior to the start of construction, the Contractor shall distribute to the residents a second written notice prepared by the City clearly indicating specific dates in the space provided on the notices when construction operations will start for each block or street. An interruption of work at any location in excess of 14 calendar days shall require re -notification. The Contractor shall insert the applicable dates and times at the time the notices are distributed. The written notices will be prepared by the City, but shall be completed and distributed by the Contractor. Errors in distribution, false starts, acts of God, strikes or other alterations of the schedule will require Contractor re -notification using an explanatory letter furnished by the City. 600-2 VEHICULAR ACCESS The Contractor shall install and maintain in place "NO PARKING -TOW AWAY" signs (even if streets have posted "NO PARKING" signs) which shall be posted at least forty- eight hours in advance of the need for enforcement. The signs will be provided by the City at no cost to the Contractor. However, the City reserves the right to charge $2.00 per sign following any excessive abuse or wastage of the signs by the Contractor. In addition, it shall be the Contractor's responsibility to notify the City's Police Department at (949) 644-3717 for verification of posting at least forty-eight hours in advance of the need for enforcement. City "Temporary Tow -Away, No Parking" signs are available at the Public Works Department public counter. The Contractor shall print the hours and dates of parking restriction on the "NO PARKING -TOW AWAY" sign in 2-inch high non -erase letters and numbers. A sample of the completed sign shall be reviewed and approved by the Engineer prior to posting. 600-3 PEDESTRIAN ACCESS Pedestrian access to all storefronts, offices, residences, etc., within the limits of work must be maintained at all times. The Contractor shall cooperate with the Engineer to provide advance notice to any and all establishments whose access will be impacted by construction operations, particularly sidewalk construction. SECTION 601 — WORK AREA TRAFFIC CONTROL 601-1 GENERAL The Contractor shall furnish and install signage, barricades, delineators, yellow safety ribbons, changeable message signs (CMS), and any other measures deemed necessary by the Engineer to safely direct the public around areas of construction, and into and out of the affected establishments. Messages for the CMS shall be updated by the Contractor as directed by the Engineer. Page SP 14 of 18 601-2 TRAFFIC CONTROL PLAN (TCP) The Contractor shall provide traffic control and access in accordance with Section 7-10 of the Standard Specifications and the WORK AREA TRAFFIC CONTROL_ HANDBOOK (W.A.T.C.H), Latest Edition. Traffic control and detours shall incorporate the following items: 1. Emergency vehicle access shall be maintained at all times. 2. The locations and wordings of all barricades, signs, delineators, lights, warning devices, parking restrictions, and any other required details shall ensure that all pedestrian and vehicular traffic will be handled in a safe manner with a minimum of inconvenience to the public. 3. All advanced warning sign installations shall be reflectorized and/or lighted. 4. The Contractor shall accommodate the City's trash collection. If the Contractor elects to work on a street or alley during its trash collection day, it shall be the Contractor's responsibility to make alternative trash collection arrangements by contacting the City's Refuse Superintendent, at (949) 718- 3466 and all affected property owners. 5. At a minimum, the Contractor shall maintain one lane of traffic in each direction at all times when completing the work. Temporary striping may be required and shall be shown on the TCP. 6. Sidewalk closures in residential areas, or as determined by the City, shall be set with barricades and SIDEWALK CLOSED signs on barricades at the closure. 7. Bike lane closures shall have BIKE LANE CLOSED AHEAD, BIKE LANE CLOSED, and SHARE THE ROAD/BICYCLE WARNING (combination) signs mounted on barricades in order on the approach and at the closure. PART 8 - LANDSCAPING AND IRRIGATION SECTION 800 - MATERIALS 800-1 LANDSCAPING MATERIALS 800-1.1 Topsoil 800-1.1.1 General Topsoil shall be designated as Class A (imported). Page SP 15 of 18 800-1.4.1 General Contractor shall supply photos of actual proposed plants for approval by the Engineer. 800-2 IRRIGATION SYSTEM MATERIALS 800-2.1 Piping and Fittings 800-2.1.1 General The type of pipe materials and fittings shall comply with the City of Newport Beach, Parks Division Standard Irrigation Materials List per Appendix A. Substitutions are not allowed. SECTION 801 - INSTALLATION 801-1 GENERAL The landscape contractor or subcontractor shall provide a licensed Pest Control Advisor (PCA) prior to applying herbicide. The PCA will be responsible for preparing and approving a Pest Control Recommendation and providing Safety Data Sheets (SDS). These items shall be included with the herbicide submittal. If required, the submittal shall adhere to the following guidelines. 1. Root Pruning a. Whenever possible, root pruning shall only be done on one side of the tree unless specifically authorized by the City Arborist. b. Roots shall be cleanly severed using a root -pruning machine, ax or comparable tool. 2. Arbitrary Root Cut a. A straight cut with a root -cutting machine shall be made. b. The cut shall be a maximum 14" below grade for sidewalks and 26" for curbs, and shall be made as far away from the tree base as possible. 3. Selective Root Pruning a. This process involves selectively removing offending roots when a tree trunk or root flare is less than 2 feet from the sidewalk and/or the size, species or condition of the tree warrants a root cut to be hazardous to the tree or when there is only one minor offending root to be removed and/or the damage is minimal (i.e., only one panel uplifted, etc.) Page SP 16 of 18 b. Selective root pruning shall be performed with an ax or stump -grinding machine instead of a root -pruning machine. c. All tree roots that are within the sidewalk construction area shall be removed or shaved down. d. Roots greater than two inches in diameter that must be removed, must be pre -approved by the City Arborist. e. Roots shall be selected for removal on the basis that will have the least impact on the health and stability for the tree. 801-6 MAINTENANCE AND PLANT ESTABLISHMENT The maintenance and plant establishment period shall be for a period of ninety (90) calendar days. Page SP 17 of 18 APPENDIX A — PARKS DIVISION STANDARD IRRIGATION MATERIAL LIST Page SP 18 of 18 .. l ..771 7!;1_41_ Parks Division Standard Irrigation Materials List Heads Toro 570Z-PRX-COM Pop -Up Rain Bird 5000 Rotor Rain Bird 8005 Rotor Controller Rain Master DXi irrigation controller with flow, Cellular & antenna Contact Rain Master Scott Kyle 949-212-8013 Battery Powered Irrigation Controller Toro DDCWP Battery Powered Controller Tempus DC LCD controller Tor IBOC Battery Powered Controller w/Solar Converter (A-SPC-2) Hunter XC Hybrid Battery Powered Controller w/Solar Panel Kit Drip Irrigation Rain Bird Xerigation Landscape Drip Rain Bird XCZ-100-PRF Drip Zone Kit Rain Bird XF Dripline - 0.9 GPH, 12 in. Spacing Miscellaneous Febco 825Y RP Spears # DS-100 Dri-Splice Connectors with crimp sleeves Spears # DS-300 Dri-Splice Sealant Rain Bird #44 or #33 Quick Coupler Valve with Vinyl Cover Rainbird EFB-CP Series Valve with DC Latching Solenoid (Battery Controllers Only) Griswold DW Series Valve (Control Valve) Griswold DW Series Valve with DC latching solenoid (use with battery -powered controller) Griswold 2160 Solenoid Valve (Normally Open Master Valve) Griswold 2000 Solenoid Valve (Normally Closed Master Valve) Matco 754 Series Full Port Ball Valve Schedule 40 PVC Lateral Pipes Class 315 Main Supply Pipe (2" and larger) Schedule 40 PVC Main Supply Pipe (1-1/2" and smaller) Rectangle Valve Box-Plastic-18" L x 12" W x 12" D Round Valve Box-Plastic-10" Control Wire-14 AWG U.F. 600-Volt Direct Burial Copper with PVC Insulation, Rain Master EVFM Flow Sensor EXHIBIT B PP-mrx0r 00'AL A2Z Construct, Inc. Page B-1 Exhibit B Proposal 38t' Street Park and San Miguel Park Fencing Project Item # Item Code Type Item Description UOM QTY Unit Price Line Total Response Comment 1 Mobilization/demobilization LS 1 $5,000.00 $5,000.00 Yes 2 Traffic control LS 1 $2,000.00 $2,000.00 Yes 3 Remove existing chain -link fence panel at 38th Street Park EA 82 $100.00 $8,200.00 Yes 4 Remove and replace concrete fence post LS 1 $8,000.00 $8,000.00 Yes 5 Remove and replace concrete sidewalk panels SF 70 $80.00 $5,600.00 Yes 6 Crack seal and spall repair LS 1 $6,000.00 $6,000.00 Yes 7 Furnish and install chain -link fence panel at 38th Street Park EA 82 $350.00 $28,700.00 Yes 8 Furnish and install 3 ft high black vinyl coated #9 gauge chain -link fence and post at San Miguel Park LF 100 $200.00 $20,000.00 Yes 9 Furnish and install new planets at San Miguel Park LS 1 $5,000.00 $5,000.00 Yes 10 Irrigation at San Miguel Park LS 1 $4,000.00 $4,000.00 Yes 11 As -built plans LS 1 $500.00 $500.00 Yes Section 1 1 $93,000.00 Grand Total $93,000.00 EXHIBIT C INSURANCE REQUIREMENTS — PUBLIC WORKS AND CONSTRUCTION 1. Provision of Insurance. Without limiting Contractor's indemnification of City, and prior to commencement of Work, Contractor shall obtain, provide and maintain at its own expense during the term of this Contract, policies of insurance of the type and amounts described below and in a form satisfactory to City. Contractor agrees to provide insurance in accordance with requirements set forth here. If Contractor uses existing coverage to comply and that coverage does not meet these requirements, Contractor agrees to amend, supplement or endorse the existing coverage. 2. Acceptable Insurers. All insurance policies shall be issued by an insurance company currently authorized by the Insurance Commissioner to transact business of insurance in the State of California, with an assigned policyholders' Rating of A - (or higher) and Financial Size Category Class VII (or larger) in accordance with the latest edition of Best's Key Rating Guide, unless otherwise approved by the City's Risk Manager. 3. Coverage Requirements. A. Workers' Compensation Insurance. Contractor shall maintain Workers' Compensation Insurance providing statutory benefits and Employer's Liability Insurance with limits of at least One Million Dollars ($1,000,000) each employee for bodily injury by accident and each employee for bodily injury by disease in accordance with the laws of the State of California, Section 3700 of the Labor Code. In addition, Contractor shall require each subcontractor to similarly maintain Workers' Compensation Insurance and Employer's Liability Insurance in accordance with California law for all of the subcontractor's employees. The insurer issuing the Workers' Compensation insurance shall amend its policy by endorsement to waive all rights of subrogation against City, its elected or appointed officers, agents, officials, employees and volunteers. Contractor shall submit to City, along with the certificate of insurance, a Waiver of Subrogation endorsement in favor of City, its elected or appointed officers, agents, officials, employees and volunteers. B. General Liability Insurance. Contractor shall maintain commercial general liability insurance, and if necessary umbrella liability insurance, with coverage at least as broad as provided by Insurance Services Office form CG 00 01, in an amount not less than One Million Dollars ($1,000,000) per occurrence, Two Million Dollars ($2,000,000) general aggregate and Two Million Dollars ($2,000,000) completed operations aggregate. The policy shall cover liability arising from premises, operations, products -completed operations, personal and advertising injury, and liability assumed under an A2Z Construct, Inc. Page C-1 insured contract (including the tort liability of another assumed in a business contract). C. Automobile Liability Insurance. Contractor shall maintain automobile insurance at least as broad as Insurance Services Office form CA 00 01 covering bodily injury and property damage for all activities of Contractor arising out of or in connection with Work to be performed under this Contract, including coverage for any owned, hired, non -owned or rented vehicles, in an amount not less than One Million Dollars ($1,000,000) combined single limit for each accident. 4. Other Insurance Requirements. The policies are to contain, or be endorsed to contain, the following provisions: A. Waiver of Subrogation. All insurance coverage maintained or procured pursuant to this Contract shall be endorsed to waive subrogation against City, its elected or appointed officers, agents, officials, employees and volunteers or shall specifically allow Contractor or others providing insurance evidence in compliance with these requirements to waive their right of recovery prior to a loss. Contractor hereby waives its own right of recovery against City, and shall require similar written express waivers and insurance clauses from each of its subcontractors. B. Additional Insured Status. All liability policies including general liability, products and completed operations, excess liability, pollution liability, and automobile liability, if required, shall provide or be endorsed to provide that City, its elected or appointed officers, agents, officials, employees and volunteers shall be included as additional insureds under such policies. C. Primary and Non Contributory. Contractor's insurance coverage shall be primary insurance and/or the primary source of recovery with respect to City, its elected or appointed officers, agents, officials, employees and volunteers. Any insurance or self-insurance maintained by City shall be excess of Contractor's insurance and shall not contribute with it. D. Notice of Cancellation. All policies shall provide City with thirty (30) calendar days notice of cancellation or nonrenewal of coverage (except for nonpayment for which ten (10) calendar days notice is required) for each required coverage except Builders Risk Insurance, which shall contain an endorsement with said required notices. 5. Additional Agreements Between the Parties. The parties hereby agree to the following: A. Evidence of Insurance. Contractor shall provide certificates of insurance to City as evidence of the insurance coverage required herein, along with a waiver of subrogation endorsement for workers' compensation and other A2Z Construct, Inc. Page C-2 endorsements as specified herein for each coverage. All of the executed documents referenced in this Contract must be returned to City within ten (10) regular City business days after the date on the "Notification of Award". Insurance certificates and endorsements must be approved by City's Risk Manager prior to commencement of performance. Current certification of insurance shall be kept on file with City at all times during the term of this Contract. The certificates and endorsements for each insurance policy shall be signed by a person authorized by that insurer to bind coverage on its behalf. At least fifteen (15) days prior to the expiration of any such policy, evidence of insurance showing that such insurance coverage has been renewed or extended shall be filed with the City. If such coverage is cancelled or reduced, Contractor shall, within ten (10) days after receipt of written notice of such cancellation or reduction of coverage, file with the City evidence of insurance showing that the required insurance has been reinstated or has been provided through another insurance company or companies. City reserves the right to require complete, certified copies of all required insurance policies, at any time. B. City's Right to Revise Requirements. The City reserves the right at any time during the term of the Contract to change the amounts and types of insurance required by giving Contractor ninety (90) calendar days advance written notice of such change. If such change results in substantial additional cost to Contractor, City and Contractor may renegotiate Contractor's compensation. C. Right to Review Subcontracts. Contractor agrees that upon request, all agreements with subcontractors or others with whom Contractor enters into contracts with on behalf of City will be submitted to City for review. Failure of City to request copies of such agreements will not impose any liability on City, or its employees. Contractor shall require and verify that all subcontractors maintain insurance meeting all the requirements stated herein, and Contractor shall ensure that City is an additional insured on insurance required from subcontractors. For CGL coverage, subcontractors shall provide coverage with a format at least as broad as CG 20 38 04 13. D. Enforcement of Contract Provisions. Contractor acknowledges and agrees that any actual or alleged failure on the part of City to inform Contractor of non-compliance with any requirement imposes no additional obligations on City nor does it waive any rights hereunder. E. Requirements not Limiting. Requirements of specific coverage features or limits contained in this Exhibit A are not intended as a limitation on coverage, limits or other requirements, or a waiver of any coverage normally provided by any insurance. Specific reference to a given coverage feature is for purposes of clarification only as it pertains to a given issue and is not intended by any party or insured to be all inclusive, or to the exclusion of A2Z Construct, Inc. Page C-3 other coverage, or a waiver of any type. If the Contractor maintains higher limits than the minimums shown above, the City requires and shall be entitled to coverage for higher limits maintained by the Contractor. Any available proceeds in excess of specified minimum limits of insurance and coverage shall be available to the City. F. Self -Insured Retentions. Contractor agrees not to self -insure or to use any self -insured retentions on any portion of the insurance required herein and further agrees that it will not allow any indemnifying party to self -insure its obligations to City. If Contractor's existing coverage includes a self -insured retention, the self -insured retention must be declared to City. City may review options with Contractor, which may include reduction or elimination of the self -insured retention, substitution of other coverage, or other solutions. Contractor agrees to be responsible for payment of any deductibles on their policies. G. City Remedies for Non Compliance. If Contractor or any subcontractor fails to provide and maintain insurance as required herein, then City shall have the right but not the obligation, to purchase such insurance, to terminate this Contract, or to suspend Contractor's right to proceed until proper evidence of insurance is provided. Any amounts paid by City shall, at City's sole option, be deducted from amounts payable to Contractor or reimbursed by Contractor upon demand. H. Timely Notice of Claims. Contractor shall give City prompt and timely notice of claims made or suits instituted that arise out of or result from Contractor's performance under this Contract, and that involve or may involve coverage under any of the required liability policies. City assumes no obligation or liability by such notice, but has the right (but not the duty) to monitor the handling of any such claim or claims if they are likely to involve City. Coverage not Limited. All insurance coverage and limits provided by Contractor and available or applicable to this Contract are intended to apply to the full extent of the policies. Nothing contained in this Contract or any other agreement relating to City or its operations limits the application of such insurance coverage. J. Coverage Renewal. Contractor will renew the coverage required here annually as long as Contractor continues to provide any Work under this or any other Contract or agreement with City. Contractor shall provide proof that policies of insurance required herein expiring during the term of this Contract have been renewed or replaced with other policies providing at least the same coverage. Proof that such coverage has been ordered shall be submitted prior to expiration. A coverage binder or letter from Contractor's insurance agent to this effect is acceptable. A certificate of insurance and/or additional insured endorsement as required in these A2Z Construct, Inc. Page C-4 specifications applicable to the renewing or new coverage must be provided to City with five (5) calendar days of the expiration of the coverages. K. Maintenance of General Liability Coverage. Contractor agrees to maintain commercial general liability coverage for a period of ten (10) years after completion of the Project or to obtain coverage for completed operations liability for an equivalent period. A2Z Construct, Inc. Page C-5 EXECUTED IN DUPLICATE BOND NO. RCB0036396 PREMIUM INCLUDED IN PERFORMANCE BOND CITY OF NEWPORT BEACH BOND • RCB0036396 LABOR AND MATERIALS PAYMENT 13OND WHEREAS, the City of Newport Beach, State of California, has awarded to A2Z Construct, Inc. hereinafter designated as the "Principal," a contract for the Improvement of Public Work 38th Street Park and San Miguel Park Fencing Project, in the City of Newport Beach, in strict conformity with the Contract on file with the office of the City Clerk of the City of Newport Beach, which is incorporated herein by this reference. WHEREAS, Principal has executed or is about to execute the Contract and the terms thereof require the furnishing of a bond, providing that if Principal or any of Principal's subcontractors, shall fail to pay for any materials, provisions, or other supplies used in, upon, for, or about the performance of the Work agreed to be done, or for any work or labor done thereon of any kind, the Surety on this bond will pay the same to the extent hereinafter set forth. NOW, THEREFORE, We the undersigned Principal, and, CONTRACTORS BONDING AND INSURANCE COMPANY duly authorized to transact business under the laws of the State of California, as Surety, (referred to herein as "Surety") are held and firmly bound unto the City of Newport Beach, in the sum of Ninety Three Thousand Dollars and 00/100 ($93,000.00) lawful money of the United States of America, said sum being equal to 100% of the estimated amount payable by the City of Newport Beach under the terms of the Contract; for which payment well and truly to be made, we bind ourselves, our heirs, executors and administrators, successors, or assigns, jointly and severally, firmly by these present. THE CONDITION OF THIS OBLIGATION IS SUCH, that if the Principal or the Principal's subcontractors, fail to pay for any materials, provisions, or other supplies, implements or machinery used in, upon, for, or about the performance of the Work contracted to be done, or for any other work or labor thereon of any kind, or for amounts due under the Unemployment Insurance Code with respect to such work or labor, or for any amounts required to be deducted, withheld and paid over to the Employment Development Department from the wages of employees of the Principal and subcontractors pursuant to Section 13020 of the Unemployment Insurance Code with respect to such work and labor, then the Surety will pay for the same, in an amount not exceeding the sum specified in this Bond, and also, in case suit is brought to enforce the obligations of this Bond, a reasonable attorneys' fee, to be fixed by the Court as required by the provisions of Section 9554 of the Civil Code of the State of California. The Bond shall inure to the benefit of any and all persons, companies, and corporations entitled to file claims under Section 9100 of the California Civil Code so as to give a right of action to them or their assigns in any suit brought upon this Bond, as required by and in accordance with the provisions of Sections 9500 et. seg. of the Civil Code of the State of California. A2Z Construct, Inc. And Surety, for value received, hereby stipulates and agrees that no change, extension of time, alterations or additions to the terms of the Contract or to the Work to be performed thereunder shall in any wise affect its obligations on this Bond, and it does hereby waive notice of any such change, extension of time, alterations or additions to the terms of the Contract or to the Work or to the specifications. In the event that any principal above named executed this Bond as an individual, it is agreed that the death of any such principal shall not exonerate the Surety from its obligations under this Bond. IN WITNESS WHEREOF, this instrument has been duly executed by the above named Principal and Surety, an the 1ST day of SEPTEMBER 2022 A2Z CONSTRUCT, INC. Name of Contractor (Principal) CONTRACTORS BONDING AND INSURANCE COMPANY Name of Surety P.O. BOX 3967, PEORIA, IL 61612 Address of Surety 949/341-9169 Telephone APPROVED AS TO FORM: CITY ATTORNEY'S OFFICE Date__IZ2- By: r ron C. Harp CA & on ity Attorney �WtKorizL %g,%n&ureffitle RNA NOTARY, ATrACN,*D Authorized Agent Signature MARK D. IATAROLA, ATTORNEY -IN -FACT Print Name and Title NOTARY ACKNOWLEDGMENTS OF CONTRACTOR AND SURETY MUST BE A TTA CHED A2Z Construct, Inc. ACKNOWLEDGMENT A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California County of S& On 20 before me, Notary Public, personally appeared who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in hisiher/their authorized capacity(ies), and that by his/her/their signatures(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. Signature ACKNOWLEDGMENT A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California (seat) County of Iss. On 20 before me, Notary Public, personally appeared proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/shelthey executed the same in his/heritheir authorized capacity(ies), and that by his/her/their signatures(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under, PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seat. Signature (seal) A2Z Construct, Inc. CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT CIVIL CODE § 1189 A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California County of SAN DIEGO On 9/1/2022 Date personally appeared before me, TRACY LYNN RODRIGUEZ, NOTARY PUBLIC Here Insert Name and Title of the Officer MARK D. IATAROLA Name(s) of Signer(s) who proved to me on the basis of satisfactory evidence to be the person(s) whose name(4 is/a,e subscribed to the within instrument and acknowledged to me that he/64e419-ey executed the same in his/4-� authorized capacity(fes), and that by his/HefAhei signature(6) on the instrument the person(r,), or the entity upon behalf of which the person(e) acted, executed the instrument. TRACY LYNN RODRIGUEZ COMM. # 2318838 SAN DIEGO COUNTY NOTARY PUBLIC-CALIFORNIAZ MY COMMISSION EXPIRES ` ( JANUARY 11, 2024 Place Notary Seal and/or Stamp Above I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. Signature notu f Notary Public Vr 1 IVI11/.1L Completing this information can deter alteration of the document or fraudulent reattachment of this form to an unintended document. Description of Attached Document Title or Type of Document: Document Date: Signer(s) Other Than Named Above: Capacity(ies) Claimed by Signer(s) Signer's Name: MARK D. IATAROLA ❑ Corporate Officer — Title(s): ❑ Partner — ❑ Limited ❑ General ❑ Individual 9 Attorney in Fact ❑ Trustee ❑ Guardian of Conservator ❑ Other: Signer is Representing: 02017 National Notary Association Number of Pages: Signer's Name: ❑ Corporate Officer — Title(s): ❑ Partner — ❑ Limited ❑ General ❑ Individual ❑ Attorney in Fact ❑ Trustee ❑ Guardian of Conservator ❑ Other: Signer is Representing: POWER OF ATTORNEY RLI Insurance Company Contractors Bonding and Insurance Company 9025 N.Lindbergh Dr. Peoria, IL 61615 Phone: 800-645-2402 Know All Men by These Presents: That this Power of Attorney is not valid or in effect unless attached to the bond which it authorizes executed, but may be detached by the approving officer if desired. That RLI Insurance Company and/or Contractors Bonding and Insurance Company, each an Illinois corporation, (separately and together, the "Company") do hereby make, constitute and appoint: Mark D. Iatarola, John G. Malonev. Helen Maloney, Sandra Figueroa, Tracy Lynn Rodrig_ttez, jointly or severally in the City of Escondido , State of California its true and lawful Agent(s) and Attorny(s) in Fact, with full power and authority hereby conferred, to sign, execute, acknowledge and deliver for and on its behalf as Surety, in general, any and all bonds and undertakings in an amount not.to exceed Twenty Five Million Dollars ( $25,000,000.00 ) for any single obligation. The acknowledgment and execution of such bond by the said Attorney in Fact shall be as binding upon the Company as if such bond had been executed and acknowledged by the regularly elected officers of the Company. RLI Insurance Company and/or Contractors Bonding and Insurance Company, as applicable, have each further certified that the following is a true and exact copy of a Resolution adopted by the Board of Directors of each such corporation, and is now in force, to -wit: "All bonds, policies, undertakings, Powers of Attorney or other obligations of the corporation shall be executed in the corporate name of the Company by the President, Secretary, any Assistant Secretary, Treasurer, or any Vice President, or by such other officers as the Board of Directors may authorize. The President, any Vice President, Secretary, any Assistant Secretary, or the Treasurer may appoint Attorneys in Fact or Agents who shall have authority to issue bonds, policies or undertakings in the name of the Company. The corporate seal is not necessary for the validity of any bonds, policies, undertakings, Powers of Attorney or other obligations of the corporation. The j signature of any such officer and the corporate seal may be printed by facsimile." IN WITNESS WHEREOF, the RLI Insurance Company and/or Contractors Bonding and Insurance Company, as applicable, have caused these presents to be executed by its respective Vice President with its corporate seal affixed this 1st day of April , 2022 . ```OoaG�pGAND:NS�� Pon :m yOv • : t2 . State of Illinois ) ;L ;"°;S . } SS County of Peoria On this 1st day of April 2022 , before me, a Notary Public, personally appeared Barton W. Davis , who being by me duly sworn, acknowledged that he signed the above Power of Attorney as the aforesaid officer of the RLI Insurance Company and/or Contractors Bonding and Insurance Company and acknowledged said instrument to be the voluntary act and deed of said corporation. By: Catherine D. Glover Notary Public CATHERINE D. GLOVER . OFFCA.SEAL -1c Notary Publb - Stab of I ups My ConrnNNon ErrpNra March 24 2024 RLI Insurance Company Contractors Bonding and Insurance Company By: ( / i W .ai Barton W. Davis Vice President CERTIFICATE I, the undersigned officer of RLI Insurance Company and/or Contractors Bonding and Insurance Company, do hereby certify that the attached Power of Attorney is in full force and effect and is irrevocable; and furthermore, that the Resolution of the Company as set forth in the Power of Attorney, is now in force. In testimony whereof, I have hereunto set my hand and the seal of the RLI Insurance Company and/or Contractors Bonding and Insurance Company this 1ST day of SEPTFMBER 2022 . RLI Insurance Company Contractors Bonding and Insurance Company Jeffrey DUickiCorporate Secretary 0456693020212 AOOS8D19 ACKNOWLEDGMENT A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California County of Orange On Sept 8th 2022 before me, Tejal Munsif, Notary Public (insert name and title of the officer) personally appeared Matthew Jafari---------------- __ who proved to me on the basis of satisfactory evidence to be th er on whose nam s is/ re (�isscribed to the within instrument and acknow �dg d to me t at he/ he/they executed the -same in / er/their authorized capacity(ies), and that y his her/their si ture(s) on the instrument the rs'p n(s), or the entity upon behalf of which the e on(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. S�'0" TEJALMUNSIF .t /. �..�....., F W :' Notary Public California Z Orange County z s. Commission N 2335015 ^ �`� My Comm. Expires Oct 17, 2024 . Signature (Seal) M-3 � �' c� & EXECUTED IN DUPLICATE BOND NO. RCB0036396 PREMIUM: $2,325.00 PREMIUM IS FOR CONTRACT TERM AND IS SUBJECT TO ADJUSTMENT EXHIBIT E BASED ON FINAL CONTRACT PRICE CITY OF NEWPORT BEACH BOND NO. RCB0036396 FAITHFUL PERFORMANCE BOND PREMIUM IS FOR CONTRACT TERM AND 13 SUBJECT TO ADJUSTMENT The premium charges on this Bond is $ 2,325.00 BASED ON FINAL CONTRACT PRICE, being at the rate of $ 25.00 PER thousand of the Contract price, WHEREAS, the City of Newport Beach, State of California, has awarded to A2Z Construct, Inc. hereinafter designated as the "Principal," a contract for the Improvement of Public Work 38th Street Park and San Miguel Park Fencing Project, in the City of Newport Beach, in strict conformity with the Contract on file with the office of the City Clerk of the City of Newport Beach, which is incorporated herein by this reference. WHEREAS, Principal has executed or is about to execute the Contract and the terms thereof require the furnishing of a Bond for the faithful performance of the Contract. NOW, THEREFORE, we, the Principal, and CONTRACTORS BONDING AND INSURANCE COMPANY duly authorized to transact business under the laws of the State of California as Surety (hereinafter "Surety"), are held and firmly bound unto the City of Newport Beach, in the sum of Ninety Three Thousand Dollars and 001100 ($93,000.00) lawful money of the United States of America, said sum being equal to 100% of the estimated amount of the Contract, to be paid to the City of Newport Beach, its successors, and assigns; for which payment well and truly to be made, we bind ourselves, our heirs, executors and administrators, successors, or assigns, jointly and severally, firmly by these present. THE CONDITION OF THIS OBLIGATION IS SUCH, that if the Principal, or the Principal's heirs, executors, administrators, successors, or assigns, fail to abide by, and well and truly keep and perform any or all the Work, covenants, conditions, and agreements in the Contract Documents and any alteration thereof made as therein provided on its part, to be kept and performed at the time and in the manner therein specified, and in all respects according to its true intent and meaning, or fails to indemnify, defend, and save harmless the City of Newport Beach, its officers, employees and agents, as therein stipulated, then, Surety will faithfully perform the same, in an amount not exceeding the sum specified in this Bond:, otherwise this obligation shall become null and void. As a part of the obligation secured hereby, and in addition to the face amount specified in this Performance Bond, there shall be included costs and reasonable expenses and fees, including reasonable attorneys fees, incurred by the City, only in the event the City is required to bring an action in law or equity against Surety to enforce the obligations of this Bond. A2Z Construct, Inc. Page E-1 Surety, for value received, stipulates and agrees that no change, extension of time, alterations or additions to the terms of the Contract or to the Work to be performed thereunder shall in any way affect its obligations on this Bond, and it does hereby waive notice of any such change, extension of time, alterations or additions of the Contract or to the Work or to the specifications. This Faithful Performance Bond shall be extended and maintained by the Principal in full force and effect for one (1) year following the date of formal acceptance of the Project by the City. In the event that the Principal executed this bond as an individual, it is agreed that the death of any such Principal shall not exonerate the Surety from its obligations under this Bond_ INWITNESS WHEREOF, and Surety above named, on the A2Z CONSTRUCT, INC. Name of Contractor (Principal) CONTRACTORS BONDING AND INSURANCE COMPANY Name of Surety P.O. BOX 3967, PEORIA, IL 61612 Address of Surety 949/341-9169 Telephone APPROVED AS TO FORM: CITY ATTORNEY'S OFFICE Date:—.-VLf, U-1 By: J.1 � 4, (%[ l Afirn C". Harp q 114 City Attorney this instrument has been duly executed by the Principal 1ST day of SEPTEXMBE2()22 S Rdth6ri' d Signaturie/Tjtle // 0 Authorized Agent Signature MARK D. IATAROLA, ATTORNEY -IN -FACT Print Name and Title NOTARY ACKNOWLEDGMENTS OF CONTRACTOR AND SURETY MUST BE ATTACHED T2Z Construct, Inc. Page E-2 FUTMW110011 BWO A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document, State of California County of Iss. On 20 before me, Notary Public, personally appeared who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signatures(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal Signature ACKNOWLEDGMENT A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. I State of California (seal) County of I S& On 20 before me, Notary Public, personally appeared proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signatures(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct_ WITNESSmy hand and official seal. Signature (seal) A2Z Construct, Inc.' CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT CIVIL CODE § 1189 A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California County of SAN DIEGO On 9/1/2022 Date before me, TRACY LYNN RODRIGUEZ, NOTARY PUBLIC Here Insert Name and Title of the Officer personally appeared MARK D. IATAROLA Nome(s) of Signer(s) who proved to me on the basis of satisfactory evidence to be the person(s) whose names} is/are subscribed to the within instrument and acknowledged to me that he/ebeMiey executed the same in his/*efA4& authorized capacity(ies), and that by his/herA ieh signature(s) on the instrument the person(, or the entity upon behalf of which the person(a) acted, executed the instrument. ^ TRACY LYNN RODRIGUEZ COMM.#2318838 SAN DIEGO COUNTY NOTARY PUBLIC-CALIFORNIAZ < MY COMMISSION EXPIRES JANUARY 11, 2024 Place Notary Seal and/or Stamp Above I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. Signature Si 9ature of A&4 Public Completing this information can deter alteration of the document or fraudulent reattachment of this form to an unintended document. Description of Attached Document Title or Type of Document: Document Date: Signer(s) Other Than Named Above: Capacity(les) Claimed by Signer(s) Signer's Name: MARK D. IATAROLA ❑ Corporate Officer — Title(s): ❑ Partner — ❑ Limited ❑ General ❑ Individual M Attorney in Fact ❑ Trustee ❑ Guardian of Conservator ❑ Other: Signer is Representing: ©2017 National Notary Association Number of Pages: Signer's Name: ❑ Corporate Officer — Title(s): ❑ Partner — ❑ Limited ❑ General ❑ Individual ❑ Attorney in Fact ❑ Trustee ❑ Guardian of Conservator ❑ Other: Signer is Representing: POWER OF ATTORNEY RLI Insurance Company Contractors Bonding and Insurance Company 9025 N. Lindbergh Dr. Peoria, IL 61615 Phone: 800-645-2402 Know All Men by These Presents: That this Power of Attorney is not valid or in effect unless attached to the bond which it authorizes executed, but may be detached by the approving officer if desired. That RLI Insurance Company and/or Contractors Bonding and Insurance Company, each an Illinois corporation, (separately and together, the "Company") do hereby make, constitute and appoint: Mark D. Iatarola. John G. Maloney. Helen Maloney. Sandra Figueroa. Tracy L)m Rodriguez, jointly or severally in the City of Escondido , State of California its true and lawful Agent(s) and Attorney(s) in Fact, with full power and authority hereby conferred, to sign, execute, acknowledge and deliver for and on its behalf as Surety, in general, any and all bonds and undertakings in an amount not to exceed Twenty Five Million Dollars ( $25,000,000.00 ) for any single obligation. The acknowledgment and execution of such bond by the said Attorney in Fact shall be as binding upon the Company as if such bond had been executed and acknowledged by the regularly elected officers of the Company. RLI Insurance Company and/or Contractors Bonding and Insurance Company, as applicable, have each further certified that the following is a true and exact copy of a Resolution adopted by the Board of Directors of each such corporation, and is now in force, to -wit: "All bonds, policies, undertakings, Powers of Attorney or other obligations of the corporation shall be executed in the corporate name of I the Company by the President, Secretary, any Assistant Secretary, Treasurer, or any Vice President, or by such other officers as the Board of Directors may authorize. The President, any Vice President, Secretary, any Assistant Secretary, or the Treasurer may appoint Attorneys in Fact or Agents who shall have authority to issue bonds, policies or undertakings in the name of the Company. The corporate seal is not necessary for the validity of any bonds, policies, undertakings, Powers of Attorney or other obligations of the corporation. The signature of any such officer and the corporate seal may be printed by facsimile." IN WITNESS WHEREOF, the RLI Insurance Company and/or Contractors Bonding and Insurance Company, as applicable, have caused these presents to be executed by its respective Vice President with its corporate seal affixed this 1st day of April 2022 '1111"u11te" RLI Insurance Company ,,,"" t%GAND,^, ,�.•�JQpNCEOQ.Contractors Bonding and Insurance Company �Qy••OpPOR T?W/ 0 Z -]eE SEAL b' ; SEAL : `= By: yo , : i Barton W. Davis Vice President State of Illinois o . "LI "ND s `d� ` 4 1 N ON,,,"' )} County of Peoria SS CERTIFICATE On this 1st day of April 2022 , before me, a Notary Public, personally appeared Barton W. Davis , who being by me duly sworn, acknowledged that he signed the above Power of Attorney as the aforesaid officer of the RLI Insurance Company and/or Contractors Bonding and Insurance Company and acknowledged said instrument to be the voluntary act and deed of said corporation. By: �t,� . &W- Catherine D. Glover Notary Public CATHERINE D. GLOVER . ,. OFFICIAL SEAL —10 Notary Public . Sma of IM wx76oa°f My ConwrAnion Expiffn MwW 24 2024 I, the undersigned officer of RLI Insurance Company and/or Contractors Bonding and Insurance Company, do hereby certify that the attached Power of Attorney is in full force and effect and is irrevocable; and furthermore, that the Resolution of the Company as set forth in the Power of Attorney, is now in force. In testimony whereof, I have hereunto set my hand and the seal of the RLI Insurance Company and/or Contractors Bonding and Insurance Company this 1ST day of SEP`I`EMBER , 2022. RLI Insurance Company Contractors Bonding and Insurance Company By: Qdk�, 1 +C-k- Jeffrey DUic0 Corporate Secretary 0456693020212 AOOSSDI9 ACKNOWLEDGMENT A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California County of Orange On Sept 8th 2022 before me, Tejal Munsif, Notary Public (insert name and title of the officer) personally appeared Matthew Jafari ---------------- who proved to me on the basis of satisfactory evidence to be the er s) whose nam is/ re s cribed to the within instrument and acknowledge to me tha he/s e/they executed th ame in his/ er/their authorized capacity(ies), and that y his/h r/their sig re(s) on the instrument the son(s), or the entity upon behalf of which the er n(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. os r TEJAI. MUNSIF Notary Public . California WITNESS my hand and official seal. orange County z r ,. Commission � 2335015 `i!o,,,ri' My Comm, Expires Oct 17, 2024 C Signature '(Seal) 1 :� M