Loading...
HomeMy WebLinkAbout14 - C-3155 - Balboa Peninsula Gateway ParkJune 13, 2000 CITY COUNCIL AGENDA ITEM NO. 14 TO: Mayor and Members of the City Council FROM: Public Works Department SUBJECT: BALBOA PENINSULA GATEWAY PARK, LIDO GATEWAY PARK, AND SOUND WALL LANDSCAPE IMPROVEMENTS, CONTRACT NO. 3155 - COMPLETION AND ACCEPTANCE RECOMMENDATIONS: 1. Accept the work. 2. Authorize the City Clerk to file a Notice of Completion. 3. Authorize the City Clerk to release the Labor and Materials bond 35 days after the Notice of Completion has been recorded in accordance with applicable portions of the Civil Code. 4. Release the Faithful Performance Bond six months after Council acceptance. DISCUSSION: On August 23, 1999, the City Council authorized the award of Balboa Peninsula Gateway Park, Lido Gateway Park, and Sound Wall Landscape Improvements contract to Golden Bear Arborists, Inc., of Monrovia, California. The contract provided for the construction of two landscaped sites known as Balboa Peninsula Gateway Park and Lido Gateway Park near the intersection of Newport Boulevard and Via Lido. The contract has now been completed to the satisfaction of the Public Works Department with the exception of the City Logo and signage on the wall. The contractor was unable to provide the required lettering for the walls and requested relief from the City for this item. Staff concurred and deducted the full lump sum bid item of $3,360 for the logos and signs that were installed. A summary of the contract cost is as follows: Original bid amount: $310,494.05 Actual amount of bid items constructed: 312,301.51 Total amount of change orders: 12,458.29 Final contract cost: $324,759.80 The increase in the amount of actual bid items constructed over the original bid amount resulted from quantity increases exceeding the bid item quantities. The final overall construction cost including change orders was 4.6% over the original bid amount. SUBJECT: BALBOA PENINSULA GATEWAY PARK, LIDO GATEWAY PARK, AND SOUND WALL LANDSCAPE IMPROVEMENTS, CONTRACT NO. 3155 - COMPLETION AND ACCEPTANCE June 13, 2000 Page 2 A total of 5 monetary change orders were issued to complete the project. They were as follows: 1. A change order in the amount of $1,537.07 provided for the installation of a 2- inch copper water line from a water meter to a backflow device. 2. A change order in the amount of $7,264.33 provided for installation of additional irrigation and the removal of an unknown footing at the Balboa site. 3. A change order in the amount of $2,485.00 provided for the relocation of a backflow device, planter drainage and support stacking for vines along the soundwall adjacent to the residents north of Short Street. 4. A change order in the amount of $715.68 provided for removal of anti - graffiti paint on the donor block surfaces. 5. A change order in the amount of $461.21 provided for the replacement of standard lighting hardware and anchor bolts with stainless steel hardware. Funds for the project were budgeted in the following account: Description Account No. Amount Park -in -lieu 7021- C5100372 $245,873.80 OCSD Contribution 7251- C5100372 $ 78,886.00 All work was completed on December 13, 1999, the scheduled completion date. An added 90 -day maintenance period was completed on May 24, 2000 Respectfully submitted, PUBLIC WORKS DEPARTMENT Don Webb, Director By: Horst Hlawaty, P.E. Construction Engineer