Loading...
HomeMy WebLinkAbout11 - C-3296 CDM Main Beach-Breakers Dr Main ReplacementJanuary 9, 2001 CITY COUNCIL AGENDA ITEM NO. li TO: Mayor and Members of the City Council FROM: Public Works Department SUBJECT: CORONA DEL MAR MAIN BEACH SEWER FORCE MAIN AND BREAKERS DRIVE WATER MAIN REPLACEMENT- REJECT ALL BIDS FOR CONTRACT NO. 3296 RECOMMENDATIONS: 1. Reject all bids. 2. Authorize the Mayor and City Clerk to execute Amendment No. 3 to the Professional Services Agreement with The Keith Companies for additional design fee of $8,700 to prepare revised plans. DISCUSSION: On November 29, 2000, the City Clerk opened and read the following bids for this project: Low R & L Sewer Inc. 2 Williams Supply Company, Inc. 3 GCI Construction, Inc. 4 A.D. General Engineering Const. 5 W.A. Rasic Construction Co., Inc. BASE BID BASE BID PLUS ADDITIVE ITEMS 19 AND 20 $322,358.50 $355,521.00 $329,795.00 $361,107.50 $424,870.00 $447,225.00 $429,060.00 $638,997.00 $767,395.00 $851,195.00* * Corrected Base Bid Amount is $767,695.00 The Low Bid exceeded the Engineer's estimate of $190,344 by 69 percent PROJECT DESCRIPTION: This project calls for the replacement of 355 feet of 1952 sewer force main that extends from the Main Beach Sewer Pump Station in Breakers Drive up the slope between two houses to Ocean Boulevard and then up Marguerite Avenue to the first alley. Instead of replacing the line in the same location up a steep slope between two houses, an alternate alignment in Breakers Drive, up the ramp serving Corona del Mar Main Beach and along Jasmine Avenue was chosen. Even though this alignment is almost 4.5 times longer, it was felt that a standard installation in the street would not be Subject: MAIN BEACH SEWER FORCE MAIN AND BREAKERS DRIVE WATER MAIN REPLACEMENT- REJECT ALL BIDS FOR CONTRACT NO. 3296 January 9, 2001 Page: 2 significantly more expensive and that the new line would be more accessible in the future for maintenance. The bid price for the sewer force main was 121 % greater than the Engineers estimate. Most of the price difference was in the sewer force main pipe installation cost. Also included in the project is the replacement of the existing 4 -inch cast iron water main within Breakers Drive with a new 8 -inch water main. This line was installed in 1938 and relined in 1980. Existing water services and fire hydrants are to be replaced. The new water line provides increased fire flow protection to Breakers Drive and the project is recommended in the soon to be completed water master plan. The price for the water line portions of the project were 21 % over the Engineers estimate and appear to be in line with other water line projects recently bid. It is recommended that the bids be rejected and that the project plans be revised to provide for the replacement of the sewer force main in its existing alignment up the slope and in Marguerite Avenue. Work on and in the slope will be expensive due to space restrictions, but there is only about 160 feet of this work. It is anticipated that,the total cost of this alignment will be $50,000 to $75,000 less than the bids received. Also the Breakers Drive repaving options for the waterline will be reviewed to see if so: me cost savings can be obtained. Breakers Drive is gated and not open to the public, so that even though the street right of way is public the street is maintained by ,the Breakers Drive Association. The staff will work with the Association to see if they wish to participate in the cost to overlay the street in the areas that are outside the water line trench area. The Keith Companies completed the current design of the water and force main replacement project for a fee of $29,780. This fee included two amendments to their agreement that provided for revised scope of work. It is recommended that the Council approve Amendment No. 3 to the Keith Company professional services agreement to increase their fee by $8,700. The fee increase will provide plan revisions and I the additional design to replace the sewer force main in its current alignment and review the water line repaving options. Re a Ily sub ed, PUBLIC WORKS DEPARTMENT Don Webb, Director MichaefJ. Sinacori, PE Utilities Engineer Attachments: Project Location Map Bid Summary Amendment No. 3 1. CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT Main Beach Sewer Force Me In Replacement and Breakers Drive Water R TITL CONTRACT NO.: 3296 ENGINEER'S ESTIMATE: $294,718.90 PROJECT MANAGER: Mike Seaweed BID LOCATION: City Clerk's Office - Cily Hall DATE: 29.Now.00 TIME: 2:30P.M. BY: CHECKED: DATE: Y. \uzars \pbw\shared \comract \99\ \Bid Summary - Main Brach Page 1 En 'nee /s Estimate R.L. SEWER Inc. WILLIAMS GCI Inc. ITEM DESCRIPTION QUANTITY UNIT AMOUNT UNIT I AMOUNT UNIT AMOUNT UNIT AMOUNT 1 Mobilization 1 I LS 5.000.001 5,000.00 25.000.001 25,000.00 10,000.00 10,000.00 18,000.00 18,000.00 2 Traffic Control 1 LS 3.000.001 3,000.00 6,000.00 6,000.00 5,000.00 5,000.00 2,300.00 2,300.00 Main and Install New 6-inch H.D.P.E., SDR-17, Sewer Force Main and Fittings In Breakers 3 Drive 890 LF 16.42 14,613.80 100.00 89000.00 75.00 66,750.00 150.00 133,500.00 Install New 6-inan mu.P.E., SDR -17 Sewer Face Main and Fittings in Breakers Drive, 4 Ramp, Across ocean Boulevard, and in Jasmine Avenue 750 LF 27.12 20,340.00 42.00 31500.00 75.00 56,250.00 105.00 78,750.00 5 Connection to Existing Sewer Manhole 1 EA 2.000.00 2,000.00 2,500.00 2,500.00 500.00 500.00 2,000.00 2,000.00 Install New S -inch PVC F900, Class 150 Water 6 Main in Breakers Drive 1,030 LF 28.59 29,447.70 35.00 36,050.00 60.00 61,800.00 47.00 48,410.00 Service, Including Connection to Existing 7 Pressure Reducing Valve, Meter Box, and Cover 23 EA 900.00 20,700.00 800.001 18,400.00 650.00 14,950.00 1,000.00 23,000.00 Install New Fire Hydrant Assembly and Connect 8 to New 8-inch Water Main 2 EAJ 2,000.00 4,000.00 3,000.00 6,000.00 3,000.00 6,000.00 3,000.00 6,000.00 9 Connect to 6 -inch Existin Water Main 1 EA 500.00 500.00 3500.00 3,500.00 3,000.00 3,000.00 2,000.00 2000.00 10 Install 6 -inch Gate Valve, Including Valve Box and Cower and Appurtenances 3 EA 1,000.00 3,000.00 675.00 1,000.00 3,000.00 1,01)0.00 3000.00 Remove and Resurface A.C. Pavement within Trench Boundaries along Breakers Drive and 11 Jasmine Avenue 8,250 F 4.30 35,475.00 4.85 3.50 28875.00 3.00 24,750.00 Remove and Resurface P.C.C. Pavement E21"4161.0000 withing Trench Boundaries along Jasmine 12 Avenue and Ocean Boulevard 1,220 SF 4.23 5,160.60 8.00 5.50 6,710.00 16.00 19,520.00 Remove and Install Full Depth A.C. Pavement in A.C. /P.C.C. Pavement Within Trench 13 Boundaries along Ram 3,660 SF 8.53 31,219.80 5.85 6.00 21,960.00 14.00 14,640.00 14 Pressure Test, Disinfect, and Flush Water Main 1 LS 2,000.00 2,000.001 1,200.00 1,200.001 3,000.00 3,000.00 2,000.00 2,000.00 Remove Existing and Install Re. Discharge 15 Piping in Existing Sewer Pump Station to Valve Vault, Including Trench Resurfacing 1 LS 5,000.00 5,000.00 10,000.00 10,000.00 20,000.00 20,000.00 12,000.00 12,000.00 16 Construct Sewer Force Main Valve Vault 1 LS 5,887.00 5,887.00 10,000.00 10,000.00 10,000.00 10,000.00 17,000.00 17,000.00 Sheeting, Shoring and Bracing or Equivalent Methods for the Protection of Life and Limb, 17 Which Shall Comply toApplicable safety Orders 1 LS 3,000.00 3,000.00 10000.00 10,000.00 12,000.00 12000.00 18000.00 18,000.00 Total Price for Bid Items 1.17 I EE 190 343.90 LOW 322 358.50 2ND 329 795.00 3RD 424,870.00 Additive Bid Items OUANTITYJ UNIT I AMOUNT UNIT AMOUNT UNIT AMOUNT UNIT AMOUNT micro-mnna -m ' Sewer Force Main, Including Fittings, Access Pits, and Miscellaneous appurtenances Along! Ramp. Ocean Boulevard, and Jasmine Avenue (Add or Dededuct Cost of Installing Portions of Bid Item No. 4 in a Micro Tunnel within limits 18 identified on plans and credit for reduced 645 LF 50 32,250.00 200.00 129,000.00 110 70,950.00 140:00 90,300.00 Grinding and Cappin the Asphalt concrete Pavement Along Breakers Drive, Along the Half. 19 Width of the Ramp, and Portion of Jasmine Avenue. 34,350 SF 2.5 85,875.00 0.75 25,762.50 0.75 1 25,762.50 0.50 17,175.00 Grinding of Existing Asphalt Concrete Pavement Along Brakers Drive, Along iha HalfiWidih of the 1 20 lRarnp and Portion of Jasmine Avenue 7,400 SF 2.5 18,500.00 1.00 7,400.00 0.75 5,550.00 0.7,0 5,180.00 Price for Base (1.17) plus Items 19 and 20 rEE 294 718.90 LOW 355 521.00 2ND 361107.50 3RD 447 225.00 Total Price for Bid Items 1 -20 E 1 326 968.90 LOW 484 521.00 2ND 432 057,50 1 3RD 537,525.00 Y. \uzars \pbw\shared \comract \99\ \Bid Summary - Main Brach Page 1 CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT TITL Main Beach Sewer Force Main Replacement and Breakers Drive Water 9 CONTRACT NO.: 32% ENGINEER'S ESTIMATE: 3na4.7Ja.9a PROJECT MANAGER: Mike Sinacarl BID LOCATION: City Clerk's Office - City Hall DATE: 29-NOY-00 TIME: 2:30 P.M. BY: CHECKED: DATE: f. \users \pbw \shoed \contract \99\ \Bid summary - Main Beach Page 2 A.D. GENERAL ENGR. W.A. RASiC CONSTRUCTION ITEM DESCRIPTION QUANTITY UNIT AMOUNT UNIT AMOUNT 1 Mobilization 1 LS 5.700.00 5.700.00 30.000.00 30.000.00 2 Traffic Control 1 Ls 4.400.00 4.400.00 20.000.00 20.000.00 3 Piper Burst Existing 4-inch Cast Iron Water Mair 890 LF 130.00 115.700.00 300.00 267.000.00 4 Install New 6-inch H.D.P.E., SDR-17 Sewer Forc 750 LF 93.00 69.750.00 275.00 206.250.00 5 Connection to Existing Sewer Manhole 1 EA 700.00 700.00 3.000.00 3,000.00 6 Install Now 8-inch PVC C900. Class 150 Water 1030 LF 91.00 93.730.00 120.00 123.600.00 7 Remove Existing and Install Newl -Inch Water S 23 EA 2.000.00 46.000.00 1.000.00 23.000.00 8 Install New Fire Hydrant Assembly and Connect 2 EA 4.400.00 8.800.00 3.500.00 7.000.00 9 Connect to 6-inch Existing Water Main 1 EA 2.400.00 2.400.00 3.000.00 3.000.00 Install 6-inNi Gate Valve. Including Valve Box 10 land Cover and Appurtenances 3 Eat 850.00 2.550.00 900.00 2,700.00 Remove and Resurface A.C. Pavement within Trench Boundaries along Breakers Drive and 11 Jasmine Avenue 8.250 SF 2.90 23.925.00 2.50 20,625.00 Remove and Resurface P.C.C. Pavement withing Trench Boundaries along Jasmine 12 Avenue and Ocean Boulevard 1.220 SF 6.50 7.930.00 7.00 8.540.00 Remove and Install Full Depth A.C. Pavement in A.C. /P.C.C. Pavement Within Trench 13 Boundaries along Raw 3.660 SF 6.25 22.875.00 3.00 10,980.00 14 Pressure Test. Disinfect, and Flush Water Main 1 LS 3.700.00 3.700.00 3.000.00 3.000.00 move Re Existing and Install New Discharge Piping in Existing Sewer Pump Station to Valve 15 Vault, Including Trench Resurfacing 1 I LS 3.900.00 3.900.00 10.000.00 10.000.00 16 Construct Sewer Force Main Valve Vault 1 LS 8.000.001 8.000.00 19.000.00 19,000.00 Excavation Safoy Measures Including Adequate Sheeting, Shoring and Bracing or Equivalent Methods for the Protection of Life and Limb. 17 Which Shall Comply to Applicable Safety Orders 1 LS 9,000.00 9,000.00 10,000.00 10.000.00 Total Price for Bid Items 1.17 4TH 429.060.00 5TH 1 767.695.00 Additive Bid Items QUANTITY1 UNIT I AMOUNT UNIT AMOUNT Sewer Force Main, Including Fittings. Access Pits, and Miscellaneous appurtenances Along Ramp, Ocean Boulevard, and Jasmine Avenue (Add or DeDeduct Cost of Installing Portions of Bid Item No. 4 in a Micro Tunnel within limits 18 identified on Plans and credit for reduced 645 OF 350 225.750.00 150 96,750.00 Grinding and Cappin the Asphalt concrete Pavement Along Breakers Drive, Along the Half. Width of the Ramp. and Portion of Jasmine 19 Avenue. 34.350 SF 5.25 180.337.50 2 68,700.00 Grinding of Existing Asphalt Concrete Pavement Along Brokers Drive, Along the Half-Width of the 20 Ramp and Portion of Jasmine Avenue 7.400 SF 4 29.600.00 2 14.800.00 Price for Base (1.17) plus Items 19 and 20 4TH 639 997.50 STN 951195.00 Total Price for Bid Items 1 -20 I 4TH 1 864 747.50 5TH 947 945.00 f. \users \pbw \shoed \contract \99\ \Bid summary - Main Beach Page 2 AMENDMENT NO.3 TO MAIN BEACH SEWER FORCE MAIN REPLACEMENT PROFESSIONAL SERVICES AGREEMENT WITH THE KEITH COMPANIES FOR DESIGN ENGINEERING SERVICES This AMENDMENT NO. 3 made and entered into this _ day of 2001, by and between the City of Newport Beach, a municipal corporation (hereinafter referred to as "CITY "), and The Keith Companies, whose address is 2955 Red Hill Avenue, Costa Mesa, CA, 92626 -5923, (hereinafter referred to as "CONSULTANT"), is made with reference to the following: RECITALS: A. On July 29, 1999, a Professional Services Agreement for Design Engineering Services, ( "AGREEMENT") related to the Main Beach Sewer Force Main Replacement Project, ( "PROJECT') was entered into by and between CITY and The Keith Companies, ( "CONSULTANT"). The AGREEMENT terminated in June 2000 by its terms. However two previous AMENDMENTS to the AGREEMENT have been approved. B. The parties wish to extend the AGREEMENT termination date by; this AMENDMENT NO. 3 from June 1, 2000 to October 1, 2001 to allow necessary time to perform additional services. C. All services described in the AGREEMENT and AMENDMENTS No. 1 and 2 have been completed and all agreed payments for services have been made: D. CITY has requested and CONSULTANT has proposed additional services related to the AGREEMENT to include an alternative design to replace the force main in its current bluff side alignment. (See attached Exhibit "X). CITY and CONSULTANT mutually desire to enter into this third AMENDMENT to the AGREEMENT to be performed under the terms and conditions of the AGREEMENT except as modified by the AMENDMENT. NOW, THEREFORE, the parties hereto agree as follows: 1. CONSULTANT shall provide additional engineering services related to the alternative force main design, as described in Exhibit A, and incorporated herein by reference. 2. Compensation to be paid to CONSULTANT for such additional construction management services shall not exceed $8,700. 3. CONSULTANT's not -to -exceed compensation to be paid under AGREEMENT is hereby increased from $29,780 to $38,480. 4. The term of the AGREEMENT shall terminate on October 1 2001. 5. Except as expressly modified herein, all other provisions, terms, and covenants set forth in AGREEMENT shall remain the same and continue to be in full force and effect. IN WITNESS WHEREOF, the parties hereto have executed this AMENDMENT NO. 3 on the date first above written. CITY OF NEWPORT BEACH, a municipal corporation 10 ATTEST: LaVonne Harkless City Clerk Mayor CONSULTANT 10 APPROVED AS TO FORM: Robin Clauson Assistant City Attorney The Keith Companies Robert S. Reid, P.E. Vice President, Water Resources Weis_ 1lsysWSerslpbw�shared %contractsHy 00-01Unain beach sewer force main o-3296Viceith oo amend3.doc 2