Loading...
HomeMy WebLinkAbout08 - C-3368 - Buck Gully Pump StationTO: Mayor and Members of the City Council FROM: Public Works Department September 11, 2001 CITY COUNCIL AGENDA ITEM NO. 5 COUNCIL AGENDA NO. S q/25/ol SUBJECT: BUCK GULLY PUMP STATION REHABILITATION, CONTRACT NO. 3368 — AMENDMENT NO. 1 TO PROFESSIONAL SERVICES AGREEMENT WITH THE KEITH COMPANIES RECOMMENDATIONS: Approve Amendment No. 1 to The Keith Companies for additional design services for Buck Gully Pump Station Rehabilitation and upgrades to the Carnation and Linda Isle pump stations and authorize the Mayor and City Clerk to execute the amendment for a fee of $39,220. DISCUSSION: On May 8, 2001, the City Council approved a professional services agreement with The Keith Companies to develop plans and specifications for the refurbishment of the Buck Gully Wastewater Pump Station located near Little Corona Beach off Ocean Boulevard in Corona del Mar. See attached Exhibit "A" for the location of all of the City's pump stations. This pump station was constructed in the 1940's when the community was not as developed and its sewer load was considerably less. The 50 -year old station has operated beyond its design life and the pumps are worn and obsolete. Many of the components of the station need to be upgraded to meet current State mandated codes and standards. The fee for the contracted services is $86,065. THE REQUESTED AMENDMENT: During the design process for the Buck Gully Pump Station, a concern was raised about maintaining the existing pump station's operation during the refurbishment. It is suggested that a new pump room adjacent to the existing station be added to house the new pumps, motors, and electrical controls. After testing and acceptance, the old pumps will be removed and the flow will be allowed into the new pump structure. Staff believes there would be significant savings relating to the bypassing during construction. The new pump room will also provide better clearance between the pumps and motors and allow a safer environment for the operations staff. SUBJECT: PACIFIC COAST HIGHWAY WIDENING FROM MORNING CANYON ROAD TO CAMEO SHORES ROAD — APPROVAL OF PROFESSIONAL SERVICES AGREEMENT, CONTRACT NO. 3435 September 11, 2001 Page 2 In addition, staff is suggesting adding two other upgrades to this contract in an effort to save time and construction costs The Carnation and Linda Isle Pump stations were planned for upgrades later this year in a separate contract. The upgrades planned for these two stations include new hatches to allow better access to the stations and electrical upgrades, including emergency generator connections. A new bypass pump connection vault is also planned at Linda Isle. Since the Buck Gully project includes the same type of hatches, electrical controls, and bypass components, construction cost savings could be realized if all three stations were bid as one contract. Staff requested and negotiated a design cost to include the new pump room at Buck Gully and to include the design efforts for the Carnation and Linda Isle pump stations. The attached Amendment No. 1 is for these additional design upgrades and is for an additional fee of $39,202. Staff believes this is a fair amount for the design efforts and recommends approval. There are sufficient funds available in the Sewer Pump Station Capital Improvement Account No. 7532- C5600100, Sewer Pump Station Improvement. Respectfully su WORKS DEPARTMENT G. Badum, Director By: Michael J. Sinacor P.E. Utilities Engineer Attachments: City Pump Station Location Map Amendment No. 1 to the Professional Services Agreement with The Keith Companies ;nGn, | l � | | , Z ]i 2 M. ! ! | h � . ! )g /d2 -!| ! \ \b!• . - &2 \!�) / / }� \° ~ , ,, § �\ { ® "! o / Ll. a ) � �§ I e � 0 z >� >.. \ � » �§ : I e � 0 z BUCK GULLY PUMP STATION REHABILITATION AMENDMENT NO. 1 TO PROFESSIONAL SERVICES AGREEMENT WITH THE KEITH COMPANIES THIS AMENDMENT NO. 1 TO PROFESSIONAL SERVICES AGREEMENT, entered into this _ day of September 2001, by and between the CITY OF NEWPORT BEACH, a municipal corporation, (hereinafter referred to as "CITY ") and The Keith Companies whose address is 2955 Red Hill Avenue, Costa Mesa, California, 92626, (hereinafter referred to as "Consultant'), is made with reference to the following: RECITALS: A. On May 8, 2001, CITY and CONSULTANT entered into a Professional Services Agreement, hereinafter referred to as "AGREEMENT ", for Design of the Buck Gully Wastewater Pump Station Rehabilitation, hereinafter referred to as "PROJECT ", was entered into by and between CITY and CONSULTANT. B. CITY desires to enter into this AMENDMENT NO. 1 to reflect additional services not included in the AGREEMENT and to extend the term of the AGREEMENT to December 31, 2002. C. CITY desires to compensate CONSULTANT for additional professional services needed for PROJECT. D. CITY and CONSULTANT mutually desire to amend AGREEMENT, hereinafter referred to as "AMENDMENT NO. 1, as provided here below. NOW, THEREFORE, the parties hereto agree as follows: 1. CONSULTANT shall be compensated for services performed pursuant to this AMENDMENT NO. 1 according to "Exhibit A" dated August 27, 2001, attached hereto. 2. Total additional compensation to CONSULTANT for services performed pursuant to this AMENDMENT NO. 1 shall not exceed thirty -nine thousand two hundred and twenty and no /100 dollars ($39,220). 3. CONSULTANT's not -to- exceed compensation to be paid under AGREEMENT is hearby increased from $86,065 to $125,285. 2002. 4. The term of the AGREEMENT shall be extended to December 31, 5. Except as expressly modified herein, all other provisions, terms, and covenants set forth in AGREEMENT shall remain unchanged and shall be in full force and effect. IN WITNESS WHEREOF, the parties hereto have executed this AMENDMENT NO. 1 on the date first above written. APPROVED AS TO FORM: By: Robin Clauson Assistant City Attorney ATTEST: By: LaVonne Harkless City Clerk CITY OF NEWPORT BEACH A Municipal Corporation By: Garold B. Adams, Mayor City of Newport Beach CONSULTANT Robert S. Reid, P.E., Vice President The Keith Companies, Inc. F: \Users\PBW\Shared\Agreements \Fy 01- 02\TKC Buck Gully -Amend 1.doc August 27, 2001 Mike Sinacori City of Newport Beach Public Works Department 3300 Newport Boulevard P.O. Box 1768 Newport Beach, California 92658 -8915 EXHIBIT A The Keith Compenie9 M<C 13779.00.000 Subject: Additional Engineering Services for the Buck Gully Sewer Pump Station Project and at the Carnation and Linda Isle Sewer Pump Station Sites Dear Mike. During our August 17, 2001 meeting and field trip, you stated that the City wants to modify the existing pump station at the Buck Gully site to include a new underground pump structure to house the new pumps and motors and to revise the proposed roof slab to incorporate the new pump enclosure. In addition, you stated that the City wants to remove the existing below ground pump controls and electrical equipment at the Camation Pump Station and Linda Isle Pump Station sites and replace this equipment with new above ground state of the an pump controls, electrical equipment and cabinets. TKC proposes that our scope of services be increased to include the following tasks: Buck Gully Sewer Pump Station 1. Design a new underground pump enclosure, approximately 10 foot square, (either precast vault or cast -in -place vault) to house the new pumps and motors. The new underground structure will be located between the existing pump structure and restroom. The selected pumps and motors will be positioned within the new underground structure to maximize accessibility and operations. Convert the existing dry well into an expanded wet well. Pump connections into the existing dry well area and to the existing valve vault will be incorporated into the design. Completed project construction plans will be revised to reflect new design concepts. Project technical specifications, special provisions, and control bid documents will incorporate these additional improvements. 2. Design a new roof slab to include the new pump structure as part of the slab structure. Investigate incorporating the retaining/sluff wall into the roof structure design. ��ICSlllielD)VN1T;9.�dttV POSS996 propot�l lem COe Costa Mom DM6lm P.O. Box 25127 Santa Ana Calitomia 92799 -5727 2955 Red Hill Avem,e Costs MPS& Caldomia 92626 -5976 T. 714.540.0800 F:714.668.7026 www.Kemuo.com Mike Sinacori City of Newport Beach August 27, 2001 Page 2 Carnation Sewer Em —Station Conduct a field investigation of existing pump and electrical controls located underground at the site. TKC will meet with the City's operational and utilities staff to discuss the improvements to be implemented at the Carnation station. Part of the field investigation will be to select a location for the new electrical cabinets as to not obstruct existing views or impact the aesthetics of the area. 2. Design new above ground state of the art pump and electrical controls, motor control center cabinets, Myers box facilities and emergency generator transfer switch. Plans will be prepared in AutoCAD Release 14 or newer, and shall be plotted on City standard Mylar sheets. Once completed, the original mylars of all approved drawings shall be submitted to the City together with all other bid documents. Project technical specification, special provisions, and control bid documents shall be prepared in accordance with the requirements of the City's design criteria. TKC shall provide a copy, in Microsoft Word compatible format, of the special provisions and contract bid documents. Provide a hatch design and specifications to replace existing access hatch. Linda isle Sewer Puma Station Conduct a field investigation of existing pump and electrical controls located underground at the site. TKC will meet with the City's operational and utilities staff to discuss the improvements to be implemented at the Linda Isle station. Part of the field investigation will be to select a location for the new electrical cabinets as to not obstruct existing views or impact the aesthetics of the area. 2. Design new above ground state of the art pump and electrical controls, motor control center cabinets, Myers box facilities and emergency generator transfer switch. Plans will be prepared in AutoCAD Release 14 or newer, and shall be plotted on City standard Mylar sheets. Once completed, the original mylars of all approved drawings shall be submitted to the City together with all other bid documents. Project technical specification, special provisions, and control bid documents shall be prepared in accordance with the requirements of the City's design criteria. TKC shall provide a copy, in Microsoft Word compatible format, of the special provisions and contract bid docuuments. NV. 0103WI1779.00MxUMMI pv 41 m,d ITKQC Mike Sinacori City of Newport Beach August 27, 2001 Page 3 3. Provide design and civil construction plan for island improvements in vicinity of sewer pump station to rebuild island curb and gutter to City Standards. 4. Provide a hatch design and specifications to replace existing access hatch. To provide these engineering services, we respectfully request that the upper limit of our contract with the City be increased by $39,300. A breakdown of the requested fee is as follows: Buck Gully Sewer Pump Station $9,275 Carnation Sewer Pump Station $14,775 Linda Isle Sewer Pump Station $15.250 Total all three components $39,300 The preparation of the plans can be completed within four weeks of the notice to proceed for the additional work. This additional work will be incorporated into the bid document package being developed for the Buck Gully project. If there are any questions regarding this request, please do not hesitate to e-mail or call me at (714) 641 -4266. Sincerely, THE KEITH COMPANIES, INC. W, Robert F. Seeman, P.E. Sr. Project Manager cc: Robert Reid, TKC ��Y ,ErtNa1oJV.i1)�'ro.ouW��:ea]sssa popm�J �rne,.aoc Thomas Braun, P.E. President — Costa Mesa Division ITKC W H m x w Q W m CL w Z U. O U c O l6 L d C 0 ag co Q 3 a 3 N l6 3 Y 0 3 m O� m .(b CL a` OMCO N O (OOM 0) OOO L000 0) O O V (M (O `* (O 10 0) V '�Y (0 i0 0) L0 (0 N N (6 In , OaON N Nn �-L ^ 04 N N04 N N o O V r N �" 0 N �" '� N r (n Gt » (» t» t» vo t» t» t» t» 6% » u> (» t» t» 6% w O O O O O O O o L LU 23 10 O h O O O O (0 '- r N 1 r 1 N U. U) r (A (A (q (A (q � 6% w O M00 N O(0 OM 07 0(D 01lJ CO O) O O R Cl) (O 17 (O i0 0) `T 7 (0 i0 0) LO (0 N N O (0 CD co C%4 N. NN V^ C-4N N N N N and J N '- N ( d (V '- (6 N � 01 fA (A 01 69 (A (A (A (A 6% (A (A (A (A (A 6) U! O M M M N N co �0 N N co N M M ID Ile � 3 Z� 3U O o 0 0 V) ~ a U LL p d p 4D O 00 (0 O O O N a0 U p N to Q U rnrn y'a) w o 0 0 0 mp V) K 0 a0 V a0 N N (O V N I (0 V M N I ,Q z a. lL O a N M N �" M N �"' M 7 ti d N '- �- '- �- v CL kz O OO O «L) Y Y F Y O O E a O F K 3 &L .> ; d r O U 3� o.m a Cdr Z ¢ >r U) JQ�'a vi O Z w Q �06 a z a 21M o •�o'J o CL O z� aa2 F cL E F av E _O P J N 0 .0 N d O N 'X Q N W Cl N •In a ' w N g C N a a C p ~ U C N h U C N F C T C •j VI > C 'N > N J IN T N Z C N W C N "O N J N N N N �pK�p 0U�a� yCJ0 aK0 a FZ � N = Q Z M R m U J