HomeMy WebLinkAboutCCO#14 Irrigation, Floor and Various ItemsChange Order Project Newport Beach Civic Center and Park Project 1100 Avocado Drive Newport Beach, CA 92660 Contractor C.W. Driver 15615 Alton Parkway Irvine, CA 92618 THE CONTRACT IS CHANGED AS FOLLOWS: CONTRACT NUMBER: 4021 CHANGE ORDER NUMBER: 014 C. O. INITIATION DATE: 8/1/13 CONTRACT DATE: 04/27/2010 COR #049.4 RFI -1459: Added Reinforcing at San Miguel Bridge Elevator Room $3,264 CO #231.1 FO -550, 550.1, 561 / RFI -1482: Antennae Conduit & Cable Mgmt $26,536 Infrastructure Revisions in Command Center COR #257 RFI -0970: Seismic Joint at Parapet $7,290 COR #271 RFI- 0975.1: Header Beam for Curtainwall at Council Chambers $5,035 Trellis Alcove, West COR #274 FO- 313/RFI- 0769/RFI- 0769.1/RFI- 0769.2: Speaker Installation at $34,229 Bay F COR #276 Bulletin No. 20: Revisions to 2ntl Level Vestibule @ Bay F $6,117 COR #381 FO -475.1 / RFI- 1219.1 & 1232.1: Lighting Revisions @ Library Stair $31,297 1 COR #488 FO -423, FO- 466/RFI -1226, FO- 466.1/RFI -1243: Floor Box & $32,341 Diffuser Additions /Revisions in City Hall Raised Floor COR #515 RFI -1290, 1290.1: Exterior Expansion Joint and Existing Skin Tile -in $27,831 COR #609 RFI -1410 — Library- Aluminum Closure Plate at Curtainwall Floor $43,261 COR #631 Relocate Irrigation Main POC above Pressure Regulator $67,542 COR #647 Central Park Oak Tree Aeration Pipe Conflict $841 COR #673 Replace Discontinued 52" Digital Signage Displays with 55' $5,640 COR #692 RFI- 1387/FO -538: Bay F- Magnetic Hold Open for Door 2510.1, 2nd $3,091 Level Bridge Entrance COR #697 FO -609: Storm Drain Connection to West Stairs and Palm Planters $11,514 COR #703 Dog Park Fence Pickets $3,688 COR #713 FO -618 — Added Steel Landscape Header $1,500 COR #720 Add electrified hardware to glass /alum door 2050.1 $5,517 COR #733 FO -586.1 — Carex at the Boulder Circle $1,831 COR #736 FO -463: Removal and Replacement of ADA Ramp $3,728 COR #767 FO -634 / RFI -1584: Library- Lighting Control Changes Requested by $1,204 Library Staff COR #787 City Hall — Clerestory Light Fixture Framing $13.,232 COR #788 Omit Acoustic Treatment @ Walls in Lower Level Areaway 0050 ($3,678) COR #794 RFI -0399 / 1189:Guardrail Steel Revisions $5,651 COR #795 Resequence landscape work to mitigate delay impacts to schedule $49,693 COR #808 RFI- 1577.1: Dtls & Dimensions for IPE Wood Handrails @ City Hall $8,409 Balconies COR #799 Anderson Drilling Arbitration Award — Rock Drilling $189,481 Total $ 586,085 Page 1 of 3 Change Order Project Newport Beach Civic Center and Park Project 1100 Avocado Drive Newport Beach, CA 92660 CONTRACT NUMBER: 4021 CHANGE ORDER NUMBER: 014 C. O. INITIATION DATE: 8/1/13 CONTRACT DATE: 04/27/2010 The original Guaranteed Maximum Price Contract Sum was $ 14,505,694 Amendments to the Guaranteed Maximum Price (1 through 5) $91,998,431 The Amended Guaranteed Maximum Price Contract Sum is $ 106,504,125 Net change by previously authorized Change Orders $3,409,646 The total Contract Sum prior to this Change Order was $ 109,913,771 The Contract Sum will be increased by this Change Order in the amount of $ 586,085 The new Contract Sum including this Change Order will be $ 110,499,856 Not valid until signed by all parties. CONTRACTOR OWNER C.W. Driver City of Newport Beach 1100 Avocado Drive 3300 Newport Boulevard Newport Beach, CA 92660 Newport Beach, CA 92663 BY� By: ana b s, Preside Dave a Date: e //-A�/3 Da e: Page 2 of 3 Newport Beach Civic Center & Park CWD Jab 1110012 08/01/13 PRIME CONTRACT CHANGE ORDER STATUS SUMMARY THROUGH PCCO 1114 Original GMP Phase 1 Mass Ex and General Conditions 14,505,694.00 Amendments to Base D GMP A d f t !9/i/ M.- 1 status Edison Current Total Status 096 116 (9/11/12) COR II's 117 119 (1/29/13) COR 11's22,31 ,36,49,53,55,58,69,78,79.1,95, 122,137,183 ,189,236,263,269,270,297,300.2, WR If's 66,67 ,68,73,84,89,95.1,97,98;99,105, Executed 4/29/13 106,128,136,154, 200.1, 204, 206, 207, 208, 2 30, 235, 2 72,2 65, 290, 300, 300.1, 308, 338, 343, 373, 3 78,384, 398,411, 485,486,491,501,505,513, 530,531,538,540,543,548,571,611, & 670 PCCO.I ,l COR It's 49.3, 63, 109, 166, 167, 175, 179, 370,208.00 230.1, 233.1, 286, 293, 300.3, 326, 327, 352; Submitted to City for execution on 369, 374, 376, 379.1, 380, 383, 391, 392, 401, 583 & 618 'CCO N12 COR 11's 083, 087.1, 174.2, 189 2, 201, 287, 215,376.00 295, 332, 349, 354, 382, 395, 397, 445, 479, Routed for CWD signature on 6/12 483, 485.1, 487, 489, 492, 494, 528, 550, 551, 557, 564, 566, 570, 572, 573, 577, 580, 582, 589, 595, 596, 604, 606; 620, 625, 629, 632, 636, 641, 643, 650, 654, 663, 664; 668, 676, 685, 688, 699, 710, 714, 718, 724, 744, 749, 754, & 758 CCO 813 COR t!'s 114, 130.1, 150, 202, 216.1, 231.2, 394,627.00 238, 240, 242, 256.5, 279, 285, 301.1, 312, 362 Routed for CWD signature on 7/16/ 379, 393, 402, 403, 410.1, 412, 546, 550.1, 556 558, 569, 576, 585, 591, 597, 599, 612, 623, 633, 634, 645, 659, 674, 677, 695, 698, 715, 722, 727, 731, 732, 737, 738, 739, 740, 741, 747, 756, 757, 772, 773, & 781 :CO 1114 COR it's 49.4, 231.1, 257, 271, 274, 276, 381, 475,665.00 488, 515, 609, 631, 647, 673, 692, 697, 703, 713, 720, 733, 736, 767, 787, 788, 794, 795, 808,799 586,085.00 Total PCCO's to date 3,995,731.00 Current Contract Amount 110499,856.00