HomeMy WebLinkAboutCCO#16 Library Stair, and Various ItemsChange Order Project Newport Beach Civic Center and Park Project 100 Civic Center Drive Newport Beach, CA 92660 Contractor C.W. Driver 15615 Alton Parkway Irvine, CA 92618 THE CONTRACT IS CHANGED AS FOLLOWS: CONTRACT NUMBER: 4021 CHANGE ORDER NUMBER: 016 C. O. INITIATION DATE: 8/29/13 CONTRACT DATE: 04/27/2010 CDR #004.1 SWPPP Rework of Project Site $81,068 COR #042 RFI- 0209/FO -0115: Library Sub Slab Drainage/Waterproofing $47,799 COR #049.1 Overexcavation and Lean Concrete at San Miguel Bridge per $63,833 Leighton Direction CDR #064 Waterproofing at Bay A Electrical Room $47,184 CDR #102 FO -252: Library Stair Replacement $211,009 CDR #127 HSS 3x3 supports and caps to truss ends $12,147 COR #165 FO -276: Metal Edge Fascia Revision $198,503 CDR #185 RFI- 0560 -560.3 - Library Roof Slope Changes $15,140 CDR #279.1 FO -365 / RFI -0943: Modify Stair B Handrails & Mounts due to Utility $5,287 Conflicts CDR #309 FO -414: Glass Guardrail Support at Raised Floor $36,260 CDR #342 RFI -1190 : Interior Linear Wood Ceiling Finish Revision $46,940 COR #358 RFI -1143: Library- Supports for Openings in Low Roof Deck for $4,017 Drains CDR #360 RFI -1134 - City Hall - Storefront Reinforced Walls $81,064 CDR #363 Architectural Comments from Submittal- 304 - 055000 -2- Projection $9,653 Screen Support CDR #371 FO -458: Revisions to Wetlands Bridge and Birdblind Bridge $215,797 CDR #389 RFI -1166 and 1237: Fire Protection Penetrations at Stairs $13,648 CDR #390 FO- 386.1: Planting & Sculpture at the East Side of the Library $31,909 CDR #404 RFI- 0735.2 : Reframe Metal Framing Openings per Interwest $15,955 CDR #406 FO -509 / RFI -1312: Brake Metal at Council Chambers Ceiling $4,650 CDR #413 RFI -1263: Additional Perimeter Ceiling Bracing $5,575 CDR #442 Trellis Beam Elevation at City Hall -Bay A (RFI -902) $25,480 CDR #512 RFI -1407: Chiller Room 0022 Ceiling & MEP Revisions $22,727 COR #561 Submittal 407 - 051200 -2 - San Miguel Bridge Design Changes $15,366 COR #589.1 FO -559 / RFI -1452: Library-RA Ceiling Plenum & Transfer to HRV's $2,374 in Media Lab 106 CDR #590 FO -555 / RFI -1468: Added Security Key Pads @ Community Room $5,488 & Chambers COR #607 RFI -1514 & 1514.1: Revisions to Lighting Control Sequence of $3,929 Operations CDR #608 RFI -1511 - C- channel at Community Room $21,114 CDR #624 RFI -0519: Underfloor Duct / Access Floor Conflicts $21,423 CDR #626 FO -566 - Supply & Install 3M Dots on Council Chambers Sliding $959 Doors CDR #638 Add base and reinforcing to meandering walkway $8,078 Page 1 of 2 Change Order Proiect Newport Beach Civic Center and Park Project 100 Civic Center Drive Newport Beach, CA 92660 CONTRACT NUMBER: 4021 CHANGE ORDER NUMBER: 016 C. O. INITIATION DATE: 8129/13 CONTRACT DATE: 0412712010 COR #651 RFI -1477: Threshold Support at Bay E to Bay F Bridge $0 COR #680 Remove and Replace Header Curb at Parking Garage $7,549 COR #681 Grade beam stem walls at Library $77,523 CDR #682 Revise Curtain Wall Face of Mullion to 1' -7 3/4" $5,349 COR #736 Replacement of Existing ADA Ramp at North Park $0 COR #753 FO -628 : Guardrails at 2nd Floor Cores $23,748 CDR #774 FO -330.5 / RFI- 1229.1 : Library - Soffit and Beam Paint $2,031 Confirmation CDR #777 RFI -0969: Modify Linear Diffuser Layout in Basement Command $3,576 Center COR #779 Command Center Ceiling Conflict $0 COR #786 RFI -1333: Stickers and kickers to support ends of ceilings $3,289 COR #797 City Hall - Added Wall Tile at Men's Restrooms $5,540 COR #800 Electronic brake at Garage Elevator Controller $2,751 COR #803 RFI #1145: Demo and place new landing at Library Stair $6,985 Total $ 1,412,717 The original Guaranteed Maximum Price Contract Sum was $ 14,505,694 Amendments to the Guaranteed Maximum Price (1 through 5) $91,998,431 The Amended Guaranteed Maximum Price Contract Sum is $ 106,504,125 Net change by previously authorized Change Orders $4,344,269 The total Contract Sum prior to this Change Order was $ 110,848,394 The Contract Sum will be increased by this Change Order in the amount of $ 1,412,717 The new Contract Sum including this Change Order will be $112,261,111 Not valid until signed by all parties CONTRACTOR C.W. Driver 1100 Avocado Drive Newport Beach, CA 92660 By: Da o rts, President Date: OWNER City of Newport Beach 3300 Newport Boulevard Newport Beach, CA 92663 By. VsvMKIV, City Manager Date: -Z J "i I t Page 2 of 2