HomeMy WebLinkAboutCCO#17 Various ItemsChange Order
Project
Newport Beach Civic Center and Park Project
100 Civic Center Drive
Newport Beach, CA 92660
Contractor
C.W. Driver
15615 Alton Parkway
Irvine, CA 92618
THE CONTRACT IS CHANGED AS FOLLOWS:
CONTRACT NUMBER: 4021
CHANGE ORDER NUMBER: 017
C. O. INITIATION DATE: 9/27/13
CONTRACT DATE: 04/27/2010
COR #095.2
RFI -0759, 1106 & 1106.1: Fire Rating Changes @ Library
$10,819
Areaways
COR #188
COR #188 FO -298: City Hall Stone Floor Pattern Revisions $6,357
$6,357
COR #189.3
FO -149, 161, 211, 211.1 - City Hall Mech. /Access Floor /Concrete
$48,001
Revisions for New Layout
COR #190
FO -293 / RFI -0629: Revisions to Emergency Generator & Cooling
$114,072
Tower Yards
COR #337
Subm- 340 - 084113: Shuco Motor Cover at Clerestory Windows
$14,519
COR #348
Cost Impacts Due to Stair A Design Delay
$7,488
COR #353
FO -501 / RFI -1158, 1159 & 1162: Revisions to Overhead Linear
$259,447
RG -2 Transfer Grilles @ City Hall Level 2 - Rev. 2
COR #426
Kiosk Redesign
$33,927
COR #521
Linear Woad Modification on South Edge of Waves
$79,953
COR #523
RFI -1375 & 348.1 : Library - Ceiling Rev's at Cafe & Credit Union
$7,342
COR #527
RFI -0854, 0978, 1279: Added Interior Expansion Joints at Library
$7,041
COR #547
FO -526 / RFI -1364: Millwork Adapter for Flush Mounted Ceiling
$8,472
Speakers @ Council Chambers 1600
COR #560
Semi - Circular Covers for Tapered Columns
$5,446
COR #602
FO -503 / RFI - 0384.2 - Framing Rework at Library Plaster Ceiling
$6,833
COR #627
RFI -1537 - City Hall - Door Frame 1406.2 Confirmation
$855
COR #652
RFI -1454, RFI- 1454.1: City Hall- Overhead RG -2 Grille Modifications
$5,446
COR #658
RFI -1026: Revisions to Mechanical Ductwork Below Ceiling in Bay
$17,785
A
Command Ctr 0002
COR #690
Raise Existing Manholes to Grade
$2,777
COR #693
FO -601 - Modifications to Wheel Chair Guides
$16,232
COR #700
RFI - 1407.1 : City Hall - Basement Chiller Room Ceiling Framing
$20,688
Details
COR #701
FO -605 - Storm Catch Basin Revision South of Parking Garage
$7,026
COR #705
RFI -1565 - Add Egress Lighting @ 2nd Level Library Stair Landing
$10,641
COR #712
RFI -1576: Bay B- Missing Supply & Return Air Paths for Traffic
$6,028
Mgmt 2155, 2nd Floor
COR #721
RFI -1580 : City Hall - Mechanical Room 1252 Builder's Plenum
$808
Alteration
COR #725
RFI -1415: Library- Revise Location of EG -R3 Grille in Media Lab
$2,134
106
COR #728
Eliminate lights in Parking Structure handrail returns
$2,000
COR #745
Added Fire Alarm Devices per Interwest's Code Compliance Walk
$27,992
COR #751.1
FO -573: Data Patching and Installation of Wireless WAPs
$2,172
Page 1 of 3
Change Order
Project
Newport Beach Civic Center and Park Project
100 Civic Center Drive
Newport Beach, CA 92660
CONTRACT NUMBER: 4021
CHANGE ORDER NUMBER: 017
C. O, INITIATION DATE: 9127/13
CONTRACT DATE: 04/27/2010
COR #752
Temporary Site Signage
$3,904
COR #766
FO -635 : Detail for Return cavity walls at 2nd Floor
$14,158
COR #768
Additional Exit Signs @ City Hall, Library & Parking Structure
$6,610
Required by IOR
COR #776
FO -006 : Bay F - 1st & 2nd Floor Adjustments
$2,037
COR #778
RFI -1262 - Added Kickers at ACT Ceiling
$12,773
COR #792
RFI -1532 - Library Handrail Revisions
$3,699
COR #793
FO -596 - End Caps at PVC Ceiling
$1,291
COR #796
Re -route Existing Sump Pump Piping at Library
$4,906
COR #798
Perimeter Grille's and Support at Community Room, Council
$53,553
Chambers, Library
COR #806
City Hall: Rework Restroom Exhaust Ductwork in Conflict with
$1,631
Linear A5 Lights
COR #809
RFI -1592: Bay A- Underperformance of Chiller Room Supply Fan
$11,017
SF -1
COR #812
RFI -1586 - City Hall : Operable Windows, Fixed Windows and
$3,835
Curtain Wall Door Caulking Confirmation
COR #813
RFI -520, 918, 976 - Council Chambers Underfloor Duct Revision
$14,120
COR #814
Extended Adjustment Efforts for Council Chambers & Community
$3,206
Rm Track Lighting
COR #815
Change Color of Modular Underfloor Wiring Access Box Lids to
$11,229
Gray
COR #816
Additional Electrical Work @ (E) Library Outside of Contract Terms
$29,339
COR #817
RFI -1594: Community Room SOO Modifications
$5,450
COR #819
RFI- 1165.1: Furnish and Install E10 Intense Rail Fixtures
$7,682
COR #820
Add 120V Circuits for Chambers Skylight and Bottom Up Shade
$12,440
Motors
COR #821
Omit Security Window Contacts @ Bay A1, South Side
($3,041)
COR #825
RFI -1593: Add Global Controller for Electricity Meters to Resolve
$7,760
BMS Communication Issues
COR 9826
Credit Unused Owner Allowance
($131,886)
Total $ 808,014
The original Guaranteed Maximum Price Contract Sum was $ 14,505,694
Amendments to the Guaranteed Maximum Price (1 through 5) $91,998,431
The Amended Guaranteed Maximum Price Contract Sum is $ 106,504,125
Net change by previously authorized Change Orders $5,756,986
The total Contract Sum prior to this Change Order was $ 112,261,111
The Contract Sum will be increased by this Change Order in the amount of $ 808,014
The new Contract Sum includinq this Chanqe Order will be $ 113,069,125
Not valid until signed by all parties.
Page 2 of 3
Change Order
Project CONTRACT NUMBER: 4021
Newport Beach Civic Center and Park Project CHANGE ORDER NUMBER: 017
100 Civic Center Drive C. O. INITIATION DATE: 9/27/13
Newport Beach, CA 92660 CONTRACT DATE: 04/27/2010
CONTRACTOR OWNER
C.W. Driver City of Newport Beach
1100 Avocado Drive 3300 Newport Boulevard
Newport Beach, CA 92660 Newport Beach, CA ^92663 ; •,
By: By:
na a President Da Kiff, City Manager
Date: Date: I— A- IL-\
Page 3 of 3