HomeMy WebLinkAboutCCO#5 Reimburse for Storm Damage RepairsChange Order Protect Newport Beach Civic Center and Park Project 1100 Avocado Drive Newport Beach, CA 92660 Contractor C.W. Driver 15615 Alton Parkway Irvine, CA 92618 THE CONTRACT IS CHANGED AS FOLLOWS: CONTRACT NUMBER: CHANGE ORDER NUMBER: C. O. INITIATION DATE: CONTRACT DATE: COR #004.2 Reimburse contingency for Storm Damage Repairs covered by FEMA grant The original Guaranteed Maximum Price Contract Sum was Amendments to the Guaranteed Maximum Price (1 through 4) The Amended Guaranteed Maximum Price Contract Sum is Net change by previously authorized Change Orders The total Contract Sum prior to this Change Order was The Contract Sum will be increased by this Change Order In the amount of The new Contract Sum including this Change Order will be Not valid until signed by all parties. CONTRACTOR C.W. Driver 1100 Avocado Driwe Newport Beach, CA 92660 By: oy rts, President Date: y Total OWNER City of Newport Beach 3300 Newport Boulevard Newport Beach, CA 92653 $65,005 $ 65,005 By: �u..,t�� - Da itr, City Manager Date: Page 1 of 2 4021 005 9111112 04/27/10 $ 14,505,694 $91,277,518 $105,783,212 $192,852 $ 105,976,064 $ 65,005 $ 106,041,069 U`-W. Driver BUILDCRs SINCE :1919 September 11, 2012 Mr. Steve Badum City of Newport Beach 3300 Newport Boulevard Newport Beach, CA 92663 1 5615 Alton Parkway Suite I50 Irvine, CA 92618 Fax 949.26 LS 167 Telephone 949.261.5100 Sent: Email / Hand PROJECT: NEWPORT BEACH CIVIC CENTER AND PARK PROJECT SUBJECT: Reimburse Contingency for Inclement Weather Site Impacts & Repairs Change Order Request No. 004.2 Dear Steve: Please review this Change Order Request in the amount of $65,005 to provide emergency labor, materials and equipment to protect the project site and maintain our existing BMP's from the inclement weather during the months of December 2010 and January 201 L Additionally, this proposal includes the measures needed to repair the damage to the project site after the inclement weather had passed. Attached for your review is supporting information. Sincerely, William Hahn Senior Project Manager File: 1 00 12-2200+2 I Signature above authorizes G W. Driver to proceed pursuant to the terms of this Change Order Request. Lox Angeles Irvine Onrario San Diego License Flo. 102 :� L'.Uf Lll C,R.SS 1 VN dd :J:gi'9 PROJECT: NEWPORT BEACH CIVIC CENTER AND PARK PROJECT CHANGE ORDER REQUEST H004RI: Inclement Weather Site Impacts 001 Provide all necessary lahor, equlpment and materials sp manage the min wrier en she during she heavy rains that accred in December 2010 and January 2011. This work was complete in February 201 I. 002 Provfde chres (3) water pumps for use during heavy rains that occurred in December 2010 and January 2011 ]03 Pronde 'necessary Maw, equlpment and materials to resurycy and stake p8e numhers 76 threvgh 81 due so'indemem wuasher. Page 1 of 1 r Company, in, 33,228 Consrnrcdon Equipment. 2,775 r & Assxiaces Engineers, 1,060 ility ins. (o.91% or cost. Gen. Req.) (3.25 % of Cost + Gen. Req. + Liab. Ins.) �e Conir. Bona (1.00 % of Cost + Gen Req. + Liab Ins + AL AMOUNT OF CHANGF nRnPP VCnnccx 09/11/12 57,918 562 2,026 644