HomeMy WebLinkAboutCCO#6 Electrical and Lighting, Multiple ItemsChange Order
Project
Newport Beach Civic Center and
1100 Avocado Drive
Newport Beach, CA 92660
Contractor
C.W. Driver
15615 Alton Parkway
Irvine, CA 92618
CONTRACT NUMBER: 4021
Park Project CHANGE ORDER NUMBER: 006
C. 0. INITIATION DATE: 9/14/2012
CONTRACT DATE. 04/2712010
THE CONTRACT IS CHANGED AS FOLLOWS:
CDR #016
Parking Structure Elevator Canopy
$17,064
CDR #039
FO- 106,141,169: Modifications to RF -1 in Mech Room 0034
$5,078
CDR #051
Field Order -0096: Pipe Size Revisions /Backflow Valve
$10,400
COR #155.
FO -266: Detail for Low Roof Section at Bays A - E
$17,679
CDR #169
Subm -178- 073116 -2' Fascia Material Revision at Roof Edge
$36,525
COR #171
RFI -0752: Infill of Hole on West Side of Roof Core's
$8,396
CDR #173
Added White 3 -Coat Finish for Metal Panels
$2,100
COR #174
RFI -0733: Add substructure for Eurospan celings
$28,522
COR #184
FO #187 - Added /Deleted Beams at Library
$3,761
COR #187
FO -255: Change Cat -3 to Cat -5 Comm. Cabling
$6,154
CDR #200
Added auxiliary room at Parking Structure
$24,931
CDR #203
Added wall furring per FO #217
$2,184
CDR #205
Framing Revisions per FO 310
$5,080
CDR #211
Relocate AC -8 per FO 4277
$3,952
CDR #225
FO -0265 - Remove & Relocate Base Plate
$3,364
CDR #227
RFI -0378: Additional SD and SS at Bay B
$5,067
CDR #231
FO -336: Conduit & Framing Structure for City Hall Antennae
$19,424
CDR #234
FO -327: Power[AV for Plasma Screen in Libr.ary Conf. Rm.
$1,976
CDR #248
FO -345: Change E5 Fixture to E4 at Library Exterior
$914
CDR #255
FO -0192- Floor Box Power in Room 112
$2,275
CDR #260
RFI -0847 - Remove backup bars at Libr. SSDA connections
$5,932
CDR #262
RFI -0714 - Relocate Base Plate & Add Stiffener
$4,344
CDR #275
FO -356: Lighting Changes (Post Bulletin 12.1)
$3,940
CDR #282
FO -369: Display Screen in Council Chambers Vestibule
$12,795
CDR #311
FO -418: Council Chambers -added receptacles in Conf. Rm.
$1,476
CDR #314
FO -323 - Power for Refrigerators & Icemakers
$7,959
COR #315
Pivot Rack in NBTV Room per City Request
$2,119
CDR #316
FO -349- Interior Light Fixture Changes
$2,501
CDR #317
Custom Color Fixtures - Type A26
$4,579
Total
$ 250,493
Page 1 of 2
Change Order
The original Guaranteed Maximum Price Contract Sum was
Amendments to the Guaranteed Maximum Price (1 through 4)
The Amended Guaranteed Maximum Price Contract Sum is
Net change by previously authorized Change Orders
The total Contract Sum prior to this Change Order was
The Contract Sum will be Increased by this Change Order in the amount of
The new Contract Sum including this Change Order will be
Not valid until signed by all parties,
CONTRACTOR
C.W. Driver
1100 Avocado Drive
Newport Beach, CA 92660
By:
pan erts, President —
Date: —/eq/ ; /
OWNER
City of Newport Beach
3300 Newport Boulevard
Newport Beach, CA 92663
By:
D M, Oily Manager
Date: 11rl a '-?.o ld
Page 2 of 2
$ 14,505,694
$91,277,518
$ 105,783,212
$508,350
$ 106,041,059
$ 250,493
$106,291,562
IoW Driver
BUILDERS SINCE 1919
May 15, 2012
Mr. Steve Badum
City of Newport Beach
3300 Newport Boulevard
Newport Beach, CA 92663
PROJECT: NEWPORT BEACH CIVIC CENTER AND PARK PROJECT
SUBJECT: Parking Structure Elevator Canopy
Change Order Request No. Of 6
Dear Steve:
15615 Alton Parkway
Suite 150
Irvine, CA 9261 B
Fax 949261.5167
Telephone 949261.5100
Sent: Email / Hand
Please review this Change Order Request in the amount of $17,064 to furnish and install a
custom elevator canopy at parking structure per BCJ direction.
Attached for your review is supporting information.
Sincerely,
William Hahn
Senior Project Manager
File: 10012-22016
Copy
Los Angeles Irvine
Signature above authorizes C.W. Driver to proceed
pursuant to the terms of this Change Order Request
OF
Ontario San Diego License No. 102
C.W. Driver
16ti1,'I. DL'.it.1 q I N01 C €019
PROJECT: NEWPORT BEACH CIVIC CENTER AND PARK PROJECT
CHANGE ORDER REQUEST #16: Parking Structure Elevator Canopy
_.._. 05n57t2
Item
Detaription
ontractor
abor
at.
Subeantraatt
To tat
001
Furnish and install a custom elevator canopy at parking structure per BCJ
direcdon,
Eomel
16,304
16,304
Subtotals Direct Cost
0
0
16,304
16,304
Uability Ins. (0.71% of Cost)
Fee (3.25% of Cost +Liab. Ins.)
Prime Contr. Bond (0.65% of Cost + Liab. Ins. + Fee )
lie
534
710
TOTAL AMOUNT OF CHANGE ORDER REQUEST
17,064
Page 4 of I
u.W. Driver
BUILDERS SINCE 1919
May 14, 2012
Mr. Steve Bad'urn
City of Newport Beach
3300 Newport Boulevard
Newport Beach, CA 92663
PROJECT: NEWPORT BEACH CIVIC CENTER AND PARK PROJECT
15615A1ton Parkway
Suite 150
Irvine, CA 92618
Fax 949.261 .5167
Telephone 949.261.5100
Sent: Email I Hand
SUBJECT: RFI- 223,371,417& FO- 106,141,169: Modifications to RF -1, Flues & Door in
Mech Room 0034
Change Order Request No. 039
Dear Steve:
Please review this Change Order Request in the amount of $5,078.00 to incorporate
modifications to RF -I, boiler and water heater flues & door in Mech Room 0034 per RF1S
223,371,417 and Field Orders & FO -106 and 169:.
Attached for your review is supporting information.
Sincerely,
William Hahn
Senior Project Manager
File: 10012-22039
Signature above authorizes C.W. Driver to proceed
pursuant to the terms of this Change Order Request
Los Angeles Irvine Onunrio
San Diego
License No. 102
D'ver osnanz
J3 U F1 pr SLim Ids cr 1
PROJECT: NEWPORT BEACH CIVIC CENTER AND PARK PROJECT
CHANGE ORDER REQU EST 15039: Boiler Flue Revisions 1 Relocation of M' Cbaniaal Door In Bay A BSrrit per F.O. 106 g 169
Item
001 Add med shaft at 2nd floor w cover horizonud exhaust dux per F.O. 0106 Superior Wxll Systems
002 Reoavt and downsize boiler Oue and water heater a hausu
CWteh6dd Ne<hanital
Otl3 Atrandon In -slab condWts and reroute overhead due to relocated door Roeendin Eloewic
Ility Ins. (0.71 % of Cast) - -_
(3.25% of Cost+ Li 3G ab. Ins.) 150
e Contr. 80nd(0.65% of Cost +Liab Ins +Fee) _ 33
Page. I of 1
�a o Dr Iver
BUILDERS SINCE 1919
May 03,. 2012
Mr. Steve Badum
City of Newport Beach
3300 Newport Boulevard
Newport Beach, CA 92663
PROJECT: NEWPORT BEACH CIVIC CENTER AND PARK PROJECT
SUBJECT: Field Order -0096: Pipe Size Revisions /Backf1ow Valve
Change Order Request No. 051
Dear Steve:
15615 Alton Parkway
Suite 150
Irvine, CA 92618
Fax 94926!.5167
Telephone 949.261.5100
Sent: Email / Hand
Please review this Change Order Request in the amount of $10,400 to increase size of storm
drain piping and vents at library and add backwater valve per Field Order 4096.
Attached for your review is supporting information.
Sincerely,
William Hahn
Senior Project Manager
File: 10012-22051
Date:
signature above authorizes C.W. Driver to proceed
Pursuant to the terms of this Change Order Request.
INA
I MF1
Los Angetes Irvine Onmrio San Diego
License No. 102
c.w. .fever
b 1111 D1. RS SI \'C I" 19'17
PROJECT: NEWPORT BEACH CIVIC CENTER AND PARK PROJECT
CHANGE ORDER REQUEST 4051: Increased size of storm drain piping at Library per F.O. 496
_ ____. r�ai�. pubCOnhrTCCS
Oql Increase sigq of srorm drain piping and vents az Library and add backwaper Pxn Patifc Plumbing
nlve per Field Order #096
161ylns. (0.71 %orCost +Gen. Req.)
(3.25% of Cost + Gen. Req. + Lieb. Ins.)
�e Contr. Bond (0.65% of Cost+ Gen. Req. + Liab.
Page 1 of i
05/03(12
C.W. Driver
BUILDERS SJNCF t9l9
May 10, 2012
Mr. Steve Badum
City of Newport Beach
3300 Newport Boulevard
Newport Beach, CA 92663
PROJECT: NEWPORT BEACH CIVIC CENTER AND PARK PROJECT
SUBJECT: RFI- 0589 /FO -266: Detail for Low Roof Section at Bays A - E
Change Order Request No. 155
Dear Steve:
15615 Afton Parkway
Suite I s0
Irvine, CA 926 f 8
Fax 949.261.5167
Telephone 949.261.5100
Sent: Email I Hand
Please review this Change Order Request in the amount of $17,679 to furnish and install
added structural and miscellaneous stel to complete infill detail for low roof opening at Bays A
- E.
Attached for your review is- supporting information.
Sincerely,
William Hahn
Senior Project Manager
Fide: 10012 -22155
Los Angeles Irvine Ontario
Signature above authorizes C DDriver to proceed
pursuant to the terms of this Change Order Request
AID—]
San Diego Lieense No, 102
C.W.Driver 05,10112
tfarLDr.RS�s1>vcr. - -. t�19
PROJECT: NEWPORT BEACH CIVIC CENTER AND PARK PROJECT
CHANGE ORDER REQUEST #Y55: F.O. #266 - Detail for Low Roof Opening at Bays A - E
Item CWD CWD
Description Contractor Labor Macl, Subcontractors
f10I Furnish and install added svycwral and miscellaneous stet to complece infill SME Steel Total
deiell for fow I-Cf ecnin z at aasA -E 16892
16,892
-- -- -...,, o ,, I - I - 16,892 76892
illly Ins. (0.7i % of COat +Gen. Req.)
(3.25% of Cost + Gen. Req. + Liab. Ins.) 122
55?
e Contr. Bond (0.65 /o of Coal + Gen Req . + Liab Ins + Fee
114
Page 1 of 1
WNW9
May 16, 2012
Mr. Steve Badurn �
City of Newport Beach t" .. Y .
3300 Newport Boulevard
Newport Beach, CA 92663
PROJECT: NEWPORT BEACH CIVIC CENTER AND PARK PROJECT
SUBJECT: Fascia Material Revision at Roof Edge
Change Order Request No. 169
Dear Steve:
15615 Aiton parkvv
Suite 150 ay
Irvine, CA 92618
Fax 949.26f.5167
Telephone 949.261_$100
Sent: Emai! / yand
Please review this Change Order Request in the amount of
material at Civic Center roof edge $34
from o c brushed stainless steel , custom
to revise sheetmetal fascia
Attached for your review painted
Sincerely,
Is suppor-ting information.
William Hahn
Senior Project Manager
File. 10012 -22169
Los Angeles
Irvine
OnClric
thorix
Title:
Date:
aluminum.
Signature above authorizes
pursuant to the terms o GW. Driver to proceed
of Change order Request.
S"' n:o.._
m
" "` tl5Hfi112
B 1C1 I,D 1`K5 B1 A(,r fggg
PROJECT: NEWPORT BEACH CIVIC CENTER AND PARK PROJECT
CHANGE ORDER REQOEST Ail) 169- Roof Edge Fascia Material Revision
cem
ie Pose finished aleminvm fascia in lieu of tF q brushed spiniest steel
w limit reflccdvlty of building.
Liability Ins. (0.71% of Cost)
Pee (3.25% of Cost + Liab. Ins.)
Prime Gontr. Bond (0.65% of Co
Page 1, of 1
1.1
GW. rivef
BUfLDERS SINCE 1919
July 19, 2012
Mr. Steve Badum
City of Newport Beach
3300 Newport Boulevard
Newport Beach, CA 92663
PROJECT: NEWPORT BEACH CIVIC CENTER AND PARK PROJECT
SUBJECT. RFI -0752: Infill of Hole on West Side of Roof Core's
Change Order Request No. 171
Dear Steve:
15615 Alton Parkway
Suite 150
Irvine, CA 92618
Fax 949.261.5167
Telephone 949.260.51 D6
Sent Email I Hand
Please review this Change Order Request in the amount of $8,396 to infill hole in west side of
roof structure at wave to low roof transition in Bays B -D per the response to RFI 752.
Upon review and approval we request a Change Order be issued by August 02, 2012 so we
may proceed. In the event we do not receive a. Change Order by this date, further cost and
schedule impacts may result.
Attached for your review is supporting information.
Sincerely,
William Hahn Date:
Senior Project Manager Signature above oudinrizes C. W. Driver to proceed
pursuant to die terms of this Change Order Request
File: 10012 -22171
Los Angeles Uvine Ontario San Diego
License No. 102
Cam rivel-
SIlfL,1.)fig5glVf:F,. Igly
PROJECT: NEWPORT BEACH CMC CENTER AND PARK PROJECT
CHANGE ORDER REQUEST -#0f 7f: FtF1 753 -
hem InfoU hole in Roof
wes[ side of roor x[ ware m low mcr [rnsigon fa Says 9.0,
Illy Ins. (0.71% o(Cesu
of Ce51 + Llab. fns.)
OF
Page I or
87/19112
'U".W. Driver
BUILDERS SINCE 1919
July 19, 2012
Mr. Steve Badum
City of Newport Beach
3300 Newport Boulevard
Newport Beach, CA 92663
PROJECT: NEWPORT BEACH CIVIC CENTER AND PARK PROJECT
SUBJECT: Added White 3 -Coat Finish for Metal Panels
Change Order Request No. 173
Dear Steve:
15615 Alton Parkway
Suite 150
Irvine, CA 92618
Fax 949.261.5 167
Telephone 949.261.5100
Sent: Email I Hand
Please review this Change Order Request in the amount of $2,100 to add custom 3 -coat finish
at metal soffit panels to match structural steel color per direction in submittal #145-074219- 1.
Upon review and approval we request a Change Order be issued by August 02, 2012 so we
may proceed. In the event we do not receive a Change Order by this date, further cost and
schedule impacts may result.
Attached for your review is supporting information.
Sincerely,
William Hahn
Senior Project Manager
File: 100 12-22173
Date:
Signoture above authorizes C. W. Driver to proceed
pursuant to the terms of this Change Order Request.
Los Angeles Irvine Onorio San Diego
`401
License. No. 102
Itrnl.nrits stvpr: i.�rie
07/19/12
PROJECT: NEWPORT BEACH CIVIC CENTER AND PARK PROJECT
CHANGE ORDER REQUEST #0173: Add custom color finish for metal soffit panels per subm #145.1
Item
custom 3 -coax finish ac metal soflft panels to mae�h suvdoral
steel Tower Glass
per direction In submittal 4143-0742 19. 1
UablfiTy Ins. (0,77 % of Cost)
Fee (2.26% of Cost+ Liab. ins.)
Page t of 1
o
C.W. Driver
BUILDERS SINGE 1919
July 20, 2012
Mr. Steve Badum
City of Newport Beach
3300 Newport Boulevard
Newport Beach, CA 92663
PROJECT: NEWPORT BEACH CIVIC CENTER AND PARK PROJECT
SUBJECT: RF1 -0733: Add substructure for Eurospan cehngs
Change Order Request No. 174
Dear Steve:
15615 Alton Parkway
Suite 150
Irvine, CA 92618
Fax 949.261.5167
Telephone 949.261.5100
Sent: Email I Hand
Please review this Change Order Request in the amount of $28,522 to add light gauge framing
and plywood trim at conference room ceilings for support and attachment of Eurospan ceilings
per response to RA 4733.
Attached for your review is supporting information.
Sincerely,
William Hahn
Senior Project Manager
File: 1 00 12-22174
Los Angeles Irvine Ontario
Date:
Signature .above authorizes C. W. Driver to proceed
Pursuant to the terms of this Change Order Request.
)
San Diego License No. 102
Cep?Driver 11 ]11 I, 07120/1,11 F[ItS .51iyCI }; 3919
PROJECT: NEWPORT BEACH CIVIC CENTER AND PARK PROJECT
CHANGE ORDER REQUEST 40174: RFI -0733: Add substructure for Eurospa eefings
Item
t gauge framing and plywood Vim at conference room ceilings for Superior Wall Systems
and aaachmen[ of Eurospan ceilings per response [o RF1 lA733.
wsp n O 27,253 27
ility Ins. (8.77 % of Cast)
(3.25% of COSI+ Llah. ins.)
e Confr. Bond (0,65% of Cost + Liab. Ins. + Fee)
AL AMOUNT OF CHANGE 111111 aani e«+
Page 1 of t
C.W. Driver
BUILDERS SINCE 1919
May 14, 2012
Mr, Steve Badum
City of Newport Beach
3300 Newport Boulevard
Newport Beach, CA 92663
PROJECT. NEWPORT BEACH CIVIC CENTER AND PARK PROJECT
SUBJECT: FO #187 - Added /Deleted Beams at Library
Change Order Request No. 184
Dear Steve:
15615Alton Parkway
Suite 150
Irvine, CA 92618
Fax 949.261.5167
Telephone 949.261.5100
Sent: Fax/Mail
Please review this Change Order Request in the amount of $ 3,761.00 to incorporate added
and deleted beams at Library per F.O. #187.
Attached for your review is supporting information.
Sincerely,
William Hahn
Senior Project Manager
File: 10012 -22184
Signature obave authorizes C.W. Driver to proceed
pursuant to the terms of this Change Order Request.
Los Angelcs Irvine Ontario San Diego
�)]
Liceose No, 102
13011,19 F R.,9. S1 KCL., 1919 - 05/14112
PROJECT: NEWPORT BEACH CIVIC CENTER AND PARK PROJECT
CHANGE ORDER REQUEST #0184: FO #/187 - Added /Defeted Beams at Library
Item
n,...._:_.:__
001
ax Ui mry per F.C, # 187 _ SME Steel
Page 1 of 1
Liability Ins. (0,71 %, of Cost)
nee
(3.25% Of Cost Liab. Ins.)
3,593
11
Driver
BUILDERS SINCE 1919
August 13, 2012
15615 Alton Parkway
Suite i50
Irvine, CA 92618
Fax 949.261.5167
Telephone 949.261.5100
Mr. Steve Badum
City of Newport Beach
3300 Newporc Boulevard
Newport Beach, CA 92663
PROJECT: NEWPORT BEACH CIVIC CENTER AND PARK PROJECT
SUBJECT: FO -255: Change Cat -3 to Cat -5 Comm. Backbone & Riser Cabling
Change Order Request No. 187
Dear Steve:
Sent. Email / Hand
Please review this Change Order Request in the amount of $6,154 to change Cat -3 to Cat -5
copper communitcation backbone and riser cabling in various locations FO -255 and
subsequent meetings.
Attached for your review is supporting information.
Sincere) ,
David Edwards
Senior Project Manager
File: 100 12-22187
Los Angeles Irvine
Authorization:
�Tttle
Date:
Signature above outharrzes C. W. Driver to proceed
Pursuant to the terms of this Change Order Request.
101
Ontario San Dieeo
CaW Dr fiver
1711'11 f)I k4 $f \CI'`. 14 L9
PROJECT: NEWPORT BEACH CIVIC CENTER AND PARK PROJECT
CHANGE ORDER REQUEST #0187 (Revised}: Chanv_e CAT -3 Cable to C®a.s ,.P. Fi..l.f n.A— �cc
88113/12
tem
Description
Contractor
a or
atl.
ubcontracts
Tot.
881
Change all CAT -3 Cable in Comporer Room IOF -1. IDF -2 and Library w
CAT -5
Rosendin Electric
5,888
5,88b
Subtotals Direct Cost
0
6
5,888
5,888
Liability Ins. (0.71% of Cost)
Fee (3.25% of Cost + Liab. Ins.)
Prime COOIr, Bond (6.65% of Cost + Liab. Ins.+ Fee)
42
192
40
TOTAL. AMOUNT OF CHANGE ORDER REQUEST
6,154
Page 1 of 1
C.W. Diver
BUl't,DERS SINCE 1919
May 16, 2012
Mr. Steve Badum
City of Newport Beach
3300 Newport Boulevard
Newport Beach, CA 92663
PROJECT: NEWPORT BEACH CIVIC CENTER AND PARK PROJECT
SUBJECT: Added auxiliary room at Parking Structure
Change Order Request No, 200
Dear Steve:
IS615AIton Parkway
Suite 150
Irvine, CA 92618
Fax 949.261.5167
Telephone 949-261.5 10()
Sent Fax/Mail
949.644.33 18
Please review this Change Order Request in the amount of $24,931 to construct added
auxiiliary room adjacent to ground floor of parking structure elevator to hide machine room
exhaust fan.
Attached for your review is supporting information.
Sincerely,
William Hahn
Senior Project Manager
File: 10012 -22200
Au orization;
Ti
�1 e-� L
Date:
Signature above authorizes CW Driver to proceed
pursuant to the terms of this Change Order Request.
Los Angeles Irvine
Ontario San Diego
1
LirAncn Nn IM
CV' Va Driver
05/1G/12
B L.111.DR, RS. S7 \Ct3 L9'19-
PROJECT. NEWPORT BEACH CIVIC CENTER AND PARK PROJECT
CHANGE ORDER REQUEST #0200: Added Auxil[ary Room at Parking Structure
Descripcian Contractor
a ., It). Subcontracts Tots
a concrete curb and provide added hollow metal door and frame, Bomel CanSVVCdOn
Including finish hardware and added zinc panels for added auxilllary room
;002 rF-is�
nd install light gauge meal framing, sheathing and air barn er and Spperior Waif Systems
19,310 19,310
llow metal door frame for added auxllliary room.
Subtotals Dlrect Cost ul 0 23,8211 23,021
Liability Ins. (0.71 %of Cos) 169
Fee (3.25% of Cost+ Use. Ins.) 780
Prime Conti Bond (0.65 % of Cnct +I iah rz,
Page 1 of 1
G.W. DfIvef
BUILDERS SINCE 1919
July 26, 2012
Mr. Steve Badum
City of Newport Beach
3300 Newport Boulevard
Newport Beach, CA 92663
PROJECT: NEWPORT BEACH CIVIC CENTER AND PARK PROJECT
SUBJECT: Added wall furring per FO #217
Change Order Request No. 203
Dear Stever
15615 Alton Parkway
Suite 150
Irvine, CA 9261 S
Fax 949.261.5167
Telephone 949.261.5100
Please review this Change Order Request in the amount of $2,184 to provide furred wall at
electrical room 2254 as directed through Field Order 217.
Attached for your review is supporting information.
Sincerely,
William Hahn
Senior Project Manager
File: 10012-22203
Date:
Signature above authorizes CW. Driver to proceed
pursuant to the terms of this Change Order Request.
s'a " #i
Co�I, ICS_ river
II CI 111)I: 11.& 91 NC I, I41q
PROJECT., NEWPORT BEACH CIVIC CENTER AND PARK PROJECT
CHANGE ORDER REQUEST #203: F.O. M. 217 - Added Wall Furring in Elec. Rm. 2254
07120112
Item
Descriptioo
C--tractor
cwD
Labe,
cwo
Matl.
Subcontractors
Total
001
Provide furring wall at Electrical Room 2254
Superior Wall 5 stems
2.087
2,087
Subtotals Direct Cost)
2,087
2,987
Liability Ins. (0.71 % of Cost)
Fee (3.25 % of Cost + Liab. Ins.)
Prime Conlr. Bond (0.65% of Cost + Liab. Ins. + Fee)
15
08
14
TOTAL AMOUNT OF CHANGE ORDER REOUEST
2,184
Page 1 of 1
BUILDERS SINCE 1919
July 26, 2012
Mr. Steve Badum
City of Newport Beach
3300 Newport Boulevard
Newport Beach, CA 92663
PROJECT: NEWPORT BEACH CIVIC CENTER AND PARK PROJECT
SUBJECT: Framing Revisions per FO 310
Change Order Request No. 205
Dear Steve:
15615 Alton Parkway
Suite 150
Irvine, CA 92618
Fax 949.261.5167
Telephone 949.26 D.5100
Sent: Email / Hand
Please review this Change Order Request in the amount of $5,080 to construct revised wall
framing at Lunchroom / Kitchennette and added head framing at Library Conference Room and
Media Lab per Field Order #305.
Attached for your review is supporting information.
Sincerely,
William Hahn
Senior Project Manager
File: 100 12-22205
Date:
Signature above authorizes C. W. Driver to proceed
pursuant to the terms of this Change Order Request.
Los Angeles Irvine onrario San Diego
19
License No. 102
Driver
13UI.LD RS SINCH, 1919
PROJECT: NEWPORT BEACH CIVIC CENTER AND PARK PROJECT
CHANGE ORDER REQUEST #205: FO -305 - Wall framing revisions at Kitchen and Library
07/28/12
Item
Description
Contractor
L.h.r
I Mat.
Subcontracts
Total
801
Revlaed wall framing at Lunchroom 1 Kitchennette and added head framing
at Library Conference Room and Media Lab
Superior Wall Systems
4,854
4.854
Subtotals Direct Cost)
0
D
4,854
4,854
Liability Ins. (0.71 %of Cost)
Fee (3.25% of Cost + Ltab. Ins.)
Prime Cent,. Bond (0.65% of Cost+ Llale. Ins. + Fee)
34
159
63
TOTAL AMOUNT OF CHANGE ORDER REQUEST
5,880
Page 1 of 1
C.W. Driver
BUILDERS SINCE 1919
July 27, 2012
Mr. Steve Badum
City of Newport Beach
3300 Newport Boulevard
Newport Beach, CA 92663
PROJECT: NEWPORT BEACH CIVIC CENTER AND PARK PROJECT
SUBJECT: Relocate AC -8 per FO 4277
Change Order Request No. 211
Dear Steve--
IS615 Alton Parkway
Suite 150
Irvine, CA 92618
Fax 949161.5167
Telephone 949,261.5 100
Sent: Email / Hand
Please review this Change Order Request in the amount of $3,952 to incorporate revised
location of AC -8 and revisions to associated ductwork per Field Order 9211.
Attached for your review is supporting information.
Sincerely,
Z /inv
William Hahn
Senior Project Manager
File: 10012 -2221 1
Signature above authorizes C. W. Driver to proceed
pursuant to the terms of this Change Order Request.
Los Angeles Irvine Ontario San Diego
`License No. 102
M. DrIver
1trltl`.ral:i <,s 41 '01F: Iv.lo
PROJECT: NEWPORT BEACH CIVIC CENTER AND PARK PROJECT
CHANGE ORDER REQUEST 4211: PO -277 - Relocate AC -8
07!27/,2
Item
Description
Contractor
Labor
Mat.
S.la,em accs
Total
001
Revised location of AC -8 and revisions to associated ductwork per Field
Order *211
Critchfield Mechanieel
3,775
3,775
Subtotals Direct Cost
0
0
3,775
3,775
Liability Ins. (0.71 % of Cost)
Fee (3.25% of Cost+ Usti. Ins.)
Prima Dontr. Bond (6.65% of Cost+ Liab. Ins, + Fee)
27
124
26
TCTA4 AINDUNT OF CHARGE ORDER REQUEST
3,952
Page 1 of 1
IoW Driver-
BUILDERS SINCE 1919
May 14, 2012
Mr. Steve Badum
City of Newport Beach
3300 Newport Boulevard
Newport Beach, CA 92663
PROJECT: NEWPORT BEACH CIVIC CENTER AND PARK PROJECT
SUBJECT: RFI- 0698/FO -0265 - Remove & Relocate Base Plate
Change Order Request No. 225
Dear Steve:
15615 Alton Parkway
Suite 150
Irvine, CA 92618
Fax 949.261.5167
Telephone 949.261.5100
Sent: Email 1 Hand
Please review this Change Order Request in the amount of $3,364 to remove and relocate
column base plates at Library due to Library 3" bust.
Attached for your review is supporting information.
Sincerely,
William Hahn
Senior Project Manager
File: 10012 -22225
Signature above authorizes CW. Driver to proceed
pursuant to the terms of difs Change Order Request.
Los Angeles Irvine Ontario San Diego
License No. 102
QW.Driver
aurt.Dtcrts�sf�tcrs 1�i�
PROJECT: NEWPORT BEACH CIVIC CENTER AND PARK PROJECT
CHANGE ORDER REQUEST 140225: RFI- 0648/FO -0265 - Remove & Refocate Rase Plate
05/14/12
I[em
Description
I Contractor
Labor
Mae.
I Suhcontracts
Total
001
Remove and relocate column base plates at Library due no Library T' bust
SME Swrl
3,214
2,219
Subtotals Direct Cost
0
fl
3,214
3,214
Liability Ins. (0.71 % of Cost)
Fee (3.25 %or Cost +Liao. Ins.)
Prime Contr. Bond 0.65% of Cost+ Liab. Ins. + Fee)
23
105
22
TOTAL AMOUNT OF CHANGE ORDER REQUEST
3,364
Page 1 of 1
GW Driver
7 UILDERS SINCE 1919
July 27, 201.2
Mr. Steve Badum
City of Newport Beach
3300 Newport Boulevard
Newport Beach, CA 92663
PROJECT: NEWPORT BEACH CIVIC CENTER AND PARK PROJECT
SUBJECT: RFI -0378: Additional SD and SS at Bay B
Change Order Request No. 227
Dear Steve:
15615 Alton Parkway
Suite 150
Irvine, CA 92618
Fax 949-26 1.5167
Telephone 949.261.5100
Sent: Email I Hand
Please review this Change Order Request in the amount of $5,067 to incorporate revisions to
storm and sanitary sewer lines in Bay A per the response to RFI #378 and Field Order # 145
Attached for your review is supporting information.
Sincerely,
William Hahn
Senior Project Manager
File: 10012 -22227
Date:
Signature above authorizes C. W. Driver to proceed
pursuant to the terms of this Change Order Request
Los Angeles Irvine Ontario San Diego
0E
License No. 102
Driver
It L11 I, 111 RS SI'C p, 1911)
PROJECT: NEWPORT REACH CIVIC CENTER AND PARK PROJECT
CHANGE ORDER REQUEST #227: RFI -0378: Additional SD and SS at Bay B
07127A2
tcm
Description
Contractor
Labor
I Mat.
Subcontracts
Total
001
Incorporate revisions to storm and sanitary sewer lines in Eay A per the
response to RFI 4378 and Field Order #145
Delta Pipeline
4,842
5.842
Subtotals Direct Cost
0
0
4,842
4,842
Liability Ins. (0.71 % of Cost)
Fee (3.25% of Cost + Liab. Ins.)
Prime Conti. Bond (0.65 / of Cost+ Liab. Ins. + Fee)
34
'158
33
TOTAL AM CHANGE ORDER REQUEST
OUNT OF
5,067
Page 1 of I
a Driver
BUILDERS SINCE 1919
May 14, 2012
�,
Mr. Steve Badum t
City of Newport Beach
3300 Newport Boulevard
Newport Beach, CA 92663
PROJECT: NEWPORT BEACH CIVIC CENTER AND PARK PROJECT
15615 Alton Parkway
Suite 150
Irvine, CA 92618
Fax 949.261.5167
Telephone 949.26 1 .5 100
Sent: Fax/Mail
SUBJECT: FO -336 f RFI -0888: Conduit & Framing Structure for City Hall Antennae
Change Order Request No. 231
Dear Steve:
Please review this Change Order Request in the amount of $19,424 to furnish and install
conduit from radio room to rooftop antennae location per Field Order 336,
Attached for your review is supporting information.
Sincerely,
Wifliam Hahn
Senior Project Manager
File: 10012 -22231
Signature above authorizes C.W. Driver to proceed
pursuant to the terms of this Change Order Request.
Los Angeles Irvine Ontario San Diego
S
License No, 102
Co: V" Ye Driver
05114/12
I31!71Y O13RS:'SENCE 191199
a or
PROJECT: NEWPORT BEACH CIVIC CENTER AND PARK PROJECT
CHANGE ORDER REQUEST #0225: RFO- 06981FO -0265 Remove & Relocate Base Plate
tom
Description
Contractor
a or
at.
u contracts
Iota
001
Furnish and install conduit from radio room to rooftop ammnnao location
per Field Order 336
Rosen din Electric
18,560
18.560
Subtotals f0linect Cost
0
0
18,66o
18,560
Liability Ins. (0.71% of CoM)
Fee (3.25% of Cost+ Liab. Ins.)
Prime Cony. Bond (0.65% of Cost+ Uab. Ins. * Fee)
132
607
125
TOTAL AMOUNT OF CHANGE ORDER REQUEST
19,424
Page 1 of 1
uo Driver
BUILDERS SINCE 1919
July 27, 2012
Mr. Steve Badum
City of Newport Beach
3300 Newport Boulevard
Newport Beach, CA 92663
PROJECT: NEWPORT BEACH CIVIC CENTER AND PARK PROJECT
15615 Alton Parkway
Suite ISO
Irvine, CA 92618
Fax 949.26 1.5167
Telephone 949.261.5100
Sent: Email / Hand
SUBJECT: FO -327 / RFI -0887: Power & AV for Plasma Screen in Library Conf. Rm. 103
Change Order Request No. 234
Dear Steve:
Please review this Change Order Request in the amount of $1,978 to furnish and install added
power and AV service for plasma screen in Library.
Attached for your review is supporting information.
Sincerely,
William Hahn
Senior Project Manager
File: 1 00 12-22234
Los. Angeles Irvine
Signature above authorizes C. W. Driver to proceed
pursuant to the terms of this Change Order Request.
L_P_
onnrio San Diego License No. 102
CM. Driver
11ML,t?1 RS 4lhCF' 1019
PROJECT: NEWPORT BEACH CIVIC CENTER AND PARK PROJECT
CHANGE ORDER REQUEST #234: FO.327 1 RFI -0887: Power & AV for Plasma Screen in Library Conference Rm 103
0712702
[em
Description
Cpntraccot
a or
Mat.
Suhcontracts
Total
001
Furnish and instill added power and AV service for plasma screen in Library
Rosendin Electric
1,890
1,890
Subtotals Direct Cost
0
0
1,890
1,890
Liability Ins. (0.71% of Cost)
Fee (3.25% of Cost + Liab. Ins.)
Prime Conlr. Bond (0.65% of Cost + Llab. Ins. « Fee)
13
62
53
TOTAL AMOUNT OF CHANGE ORDER REQUEST
1,97a
Page 1 of 1
Cow Driver
BUILDERS SINCE 1919
July 27, 2012
15615 Alton Parkway
Suite 150
Irvine, CA 92618
Fax 949.261.5 167
Telephone 949.261.5 100
Sent Email / Hand
Mr. Steve Badum
City of Newport Beach
3300 Newport Boulevard
Newport Beach, CA '92663
PROJECT: NEWPORT BEACH CIVIC CENTER AND PARK PROJECT
SUBJECT: FO -345 / RFI -0909: Change E5 Fixture to E4 at Library.Exterior
Change Order Request No. 248
Dear Steve:
Please review this Change Order Request in the amount of $914 to change wall - mounted E5
fixture at library exterior to bollard type E4 fixture to eliminate the need for exposed conduit
at the existing wail on the library's west side per Fietd Order #380.
Attached for your review is supporting information.
1
Senior Project Manager
File: 100 12-22248
LoS Angeles Irvine
Signature above authorizes C. W Driver to proceed
pursuant to the terms of this Change Order Request.
Onrario San Diego License No. 102
C.W. Driver
If Li'I I I D F R& 9 1Nf:1: 1 'I'19
PROJECT: NEWPORT BEACH CIVIC CENTER AND PARK PROJECT
CHANGE ORDER REQUEST #240: FO -345 - Change ES Fiuture to E4 at Library Exterior
001 (Charge wall - mounted E5 fixture at library exterior to bollard type E4 Rosandui Elearlc
fixture to eliminate. the decd for exposed conduit at the eeisdng wall on die
07/27/72
Liability Ins. (0.71 %of Cost) 5
Fee (3.25% of Cost + Lich. Iris.) 20
Prime COntr. Bond (0.55 %of C05t +Liab. INS. + Fee) G
TOTAL AMOUNT OF CHANCE ORDER RE01IF9T o,a
Page 1 of 1
uo` o Driver
BUILDERS SINCE 1919
May 14, 2012
Mr. Steve Badum
City of Newport Beach
3300 Newport Boulevard
Newport Beach, CA 92663
PROJECT: NEWPORT BEACH CIVIC CENTER AND PARK PROJECT
15615 Alton Parkway
Suite 150
Irvine, CA 92618
Fax 949.261.5 167
Telephone 949.261.5100
Sent: Email 1 Hand
SUBJECT: FO -0192 - Add Receptacles, Conduit & Wire to Floor Boxes in Rm 1 12
Change Order Request No. 255
Dear Steve:
Please review this Change Order Request in the amount of $2,275 to add conduit, wire and
devices for added power outlets in Room 112 floor boxes per F.O. #192.
Attached for your review is supporting information.
Sincerely, Auah
Tit .
Date:
William Hahn
Senior Project Manager Signature above authorizes C.W. Driver to proceed
pursuant to the terms ofthis Change Order Request,
File: J0012 -22255
N1�11
Los Angeles Irvine Ontario San Diego License No. 102
`\_Ao: V Va DJLll.s e 05/14/12
6 TLY) R R975 rNev T,9` I9
PROJECT: NEWPORT BEACH CIVIC CENTER ANO PARK PROJECT
CHANGE ORDER REQUEST #0255: FO.0192 -Add Receptacles, Conduit & Wire to Floor Boxes in Rm 112
Item
Description
I Contractor
Labor
Had.
I Subcontracts
Tota
001
Add condulG wire and dedces for added power eu6eu in Room 112 floor
bcxesper F.O. #192
Rosendin Q%wic
2,174
2,174
Subtotals Direct Cost
D
'D
2,174
2,174
Liability Ins. (0.71% of Cost)
Fee (3.25% of Cost +Liab. Ins.)
Prime Con1r. Bond (0.659% of Cost + Llab. Ins. + Fee)
15
71
15
TOTAL AMOUNT OF CHANGE ORDER REQUEST
2,275
Page 1 of 1
C ]AM. Driver
BULL )ERS SINCE 1919
May 15, 2012
Mr. Steve Badum COP ,
City of Newport Beach
3300 Newport Boulevard
Newport Beach, CA 92663
1561 S Alton Parkway
Suite 150
Irvine, CA 92618
Fax 949.261.5167
Telephone 949.261.5100
Sent: Email / Hand
PROJECT: NEWPORT BEACH CIVIC CENTER AND PARK PROJECT
SUBJECT: RF1847 - Remove top flange backup bars @ Library SSDA connections
Change Order Request No. 260
Dear Steve:
Please review this Change Order Request in the amount of $5,932 to remove moment weld
back -up bars at Library SSDA connections per response to RFI #x`847. Bars are indicated to
remain in place per Detail I /SR5.55, but were directed to remove per RFI 847.
Attached for your review is supporting information.
I °-
5enlor Project Manager
File: 10012 -22260
.Signature above authorizes C.W. Driver to proceed
pursuant to the terms of this Change Order Request
Los Angeles Irvine Ontario San Diego
-
License No. 102
G.W. Driver
B U'ff DEItS:`S €(..O €" 7.9'1'9
PROJECT: NEWPORT BEACH CIVIC CENTER AND PARE( PROJECT
CHANGE ORDER REQUEST 02601 RFI 847 - Remove top fiange backup bars @ Library SSDA connections
Item
001 IRemovebatkupbarazcop ll3r9c of Library SSDA momen [mnnecuons. SMESteel
Bars are indicated to remain in place per Derail I15R5.55, but were direcved
05115/12
Lfability Ins. (0.71,% of Cost) 40
Fee (3,25% of Cost + Lfab. Ins.) 181)
Prime Comr. Bond (0-65% If Cost + Liab. Ins. + Fee) 86
TOTAL AMOUNT OF CHANGE ORDER REQUEST G a—
Page I of 1
C.W. Driver
BUILDERS SINCE ,19]9
May 17, 2012
Mr. Steve Badum
City of Newport Beach
3300 Newport Boulevard
Newport Beach, CA 92663
PROJECT: NEWPORT BEACH CIVIC CENTER AND PARK PROJECT
SUBJECT: RFI #0714 - Relocate Base Plate & Add Stiffener
Change Order Request No. 262
Dear Steve:
f5615Alton Parkway
Suite 150
Irvine, CA 92618
Fax 9.49.261.5 167
Telephone 949.261 -5 f 00
Sent. Email / Hand
Please review this Change Order Request in the amount of $4,344 to relocate Library columns
and add base plates and cap plates to resolve conflict with existing beam per the response to
RA #714.
Attached for your review is supporting information.
Sincerely,
GJ�
William Hahn
Senior Project Manager
File: 10012 -22262
Signature above authorizes C.W. Driver to proceed
Pursuant to the terms of this Change Order Request.
Los Angeles Irvine Ontario San Diego
1
License No. 102
C.W. IL rivef,
11ll11 nL 1fSr' ;;N F. 1'119
PROJECT: NEWPORT BEACH CIVIC CENTER AND PARK PROJECT
CHANGE ORDER REQUEST #0262: RF@ #0714 - Relocate Base Place A, Add cfiffo —
-- - -.... 65/17/12
tcm Descript=iw
Convaetor
alum,
Mat.
ubcontracts
Total
001 Reloace Lib,ary columns and add base p to
E Steel
conflict with existing be per the respo
9,151
4,151
htotals Direct Cost)
0
0
4,151
4,151
blllty Ins. (0.71 % of Cost]
29
e (3.25% of Cost t Liab. Ins.)
me Conlr. Bond 0.65% of Cost + Liab. Ins. + Fee)
136
26
TOTAL AMOUNT OF CHANGE ORDER REQUEST
4,344
Page 1 cf 1
u,W. Driver
BUILDERS SINCE 1919 .
July 28, 2012
Mr. Steve Badum
City of Newport Beach
3300 Newport Boulevard
Newport Beach, CA 92663
PROJECT: NEWPORT BEACH CIVIC CENTER AND PARK PROJECT
SUBJECT: FO -356: Lighting Changes & Clarifications (Post Bulletin 12,1)
Change Order Request No. 275
Dear Steve:
15615 Alton Parkway
Suite 150
Irvine, CA 9261 &
Fax 949.26I.S 167
Telephone 949.261.5100
Sent: Email ! Hand
Please review this Change Order Request in the amount of $3,940 to incorporate post Bulletin
12.1 light fixture revisions per FO -356.
Attached for your review is supporting information.
Sincerely,
William Ha n
Senior Project Manager
File: 100 12-22275
Signature above authorizes C. W. Driver to proceed
pursuant to the terms of this Change Order Request
Los Angeles Irvine Ontaria san Diego
,8r
License No. 102
C-W. Driver
Itt)r,l ucRa- sf�crs irii)
PROJECT: NEWPORT BEACH CIVIC CENTER AND PARK PROJECT
CHANGE ORDER REQUEST #275: EO -358: LiRhtinz Chana_es & Clarifleatinns (Pnct RuBo H.. 19. n
07128M2
tetra
Ocscription
Contractor
Labor
Matt.
Svbcentracts
Total
001
Light fi#ure revisions per FO -356:
- Add 20 louvers for AI9 flxtures
- Add I I Al 2c ll cwres
Add (1) AI la fixture
- Add special wall mount arm for A4a fixtures
Rosendln Eleawic
3.765
3,765
- Delete (1) A20a fixture
- Delete 128'"a futures
Subtotals Direct Cost
0
0
3,765
3,785
Liability Ins. (0.71% of Cost)
27
Fee (3:25% of Cost + Liab. Ins.)
129
Prime Contr. Band (0.55% of Cast+ Liab. Ins. + Fee )
25
TOTAL AMOUNT OF CHANGE ORDER REQUEST
3,940
Page 1 of i
I oW Driver
BUILDERS SINCE 1919
July 28, 2612
Mr. Steve Badum
City of Newport Beach
3300 Newport Boulevard
Newport Beach, CA 92663
PROJECT: NEWPORT BEACH CIVIC CENTER AND PARK PROJECT
SUBJECTS FO -369: Display Screen in Council Chambers Vestibule
Change Order Request No, 282
Dear Steve:
15615 Alton Parkway
Suite 150
Irvine, CA 926 f 8
Fax 949.261.5167
Telephone 949.261.5100
Sent: Email / Hand
Please review this Change Order Request in the amount of $12,795 to supply 55" Samsung
interactive touch screen display in Council Chamber Vestibule per FO 369, Display was
originally to be provided by Owner.
Attached for your review is supporting information.
Sincerely,
William Hahn
Senior Project Manager
File: 100 12-22282
Signature above authorizes C. W. Driver to proceed
pursuant to the terms of this Change Order Request
Los Angeles Irvine Ontario San Diego
AE
J b�
License No. 102
C-W. Driver
❑LII1,D Rk SING €i 9919
PROJECT: NEWPORT BEACH CIVIC CENTER AND PARK PROJECT
CHANGE ORDER REQUEST #282; FO -369: Disvlav Screen in Cen..,H e'ha.. k—E ve.. +:!...t.,
07/28/12
Item
Description
..tractor _....
`Labor
M.t .
Subcontracts
Total
001
Supply 55' Sams.ng interactive touch screen display In Council Chamber
Vestibule per FO 369
Rosendin Electric
12.225
12.225
Subtotals Dlreictcrst
0
0
12,225
92,225
Liability Ins. (0.71% 01 Cost]
07
Fee (3.25% of Cost+ Liab. Ins.)
Prime Conic Bond (0.65% of Cost + Liab. Ins. + Fee)
400
83
TOTAL AMOUNTOF CHANGE ORDER REQUEST
12,795
Page 1 of 1
GIW, Driver
BUILDERS SINCE 1919
July 28, 2012
Mr. Ste ve.Badum
City of Newport Beach
3300 Newport Boulevard
Newport Beach, CA 92663
PROJECT: NEWPORT BEACH CiV9C CENTER AND PARK PROJECT
ISMS Alton Parkway
Suite ISO
Irvine, CA 92618
Fax 949.261.5167
Telephone 949.261.5100
Sent: Email / Hand
SUBJECT: FO -4181 RH -9067: Council Chambers -Added Receptacles in Conference Room
Change Order Request No, 311
Dear Steve:
Please review this Change Order Request in the amount of $1,476 to add one duplex and one
double duplex outlet in Council Chamber Conference Room per Field Order 418.
Upon review and approval we request a Change Order be issued by August a 3, 20 92 so we
may proceed. In the event we do not receive a Change Order by this date, further cost and
schedule impacts may result.
Attached for your review is supporting information.
Sincerely,
David Edwards
Senior Project Manager
File- 100 12-2231 1
Signature above authorizes C. W Driver to proceed
Pursuant to the terms of this Change Order Request
Los Angeles Irvine Oncirio San Diego
1
License No. 102
C W. Driver
.�.
LiUll DIv RS S € NAC \(;R 1 0I'!
PROJECT: NEWPORT EIEACH CIVIC CENTER AND PARK PROJECT
CHANGE ORDER REQUEST #31 I: FO 417 - Added Receptacles in Counril cha—h— c....r .e., o,...».
07/28112
Item
Description
Contractor
ab.r
Mae.
Su contracts
Total
001
Add one duplex and one double duplex Outlet in Council Chamber
Roscndln Electric
Confere.cc Room
1,410
1.410
Subtotals Direct Cost
0
0
1,410
1,4111
Liability Ins. (0.710/. of Cost)
10
Fee -(3.25 % of Cast * Liab. Ins,)
Prime Contr. Bond (0.65% of Cost +Liab. Ins. +Fee)
46
10
TOTAL AMOUNT OF CHANGE ORDER REQUEST
1,476
Paget of i
C.W. DfIyer
BUILDERS SINCE 1919 .
July 28, 2012
Mr. Steve Badum
City of Newport Beach
3300 Newport Boulevard
Newport Beach, CA 92663
PROJECT: NEWPORT BEACH CIVIC CENTER AND PARK PROJECT
SUBJECT: FO- 323 /RFI -0801 -Power for Refrigerators & Icemakers
Change Order Request No. 314
Dear Steve:
15615 Alton Parkway
Suite 150
Irvine, CA 92618
Fax 949.261.5167
Telephone 949.261.5100
Sent: Email I Hand
Please review this Change Order Request in the amount of $7,605 to add power outlets for
appliances at 7 locations per Field Order 323..
Attached for your review is supporting information.
Sincerefy,
William Hahn
Senior Project Manager
File: 1 00 12-22314
Signature above authorizes C. W Driver to proceed
Pursuant to the terms of this Change Order Request,
IM
Los Angeles Irvine Ontario San Diego g License No. 102
CW Driver
611111 D F-11 S :91 - \('1. 3 417
PROJECT: NEWPORT BEACH CIVIC CENTER AND PARK PROJECT
CHANGE ORDER REQUEST #314; tz0- 323IRF9 -0601 -Power for Refripnrators & Iccmaknrc
0728112
tem
Descrip[ipn
V ontractor Labor
I Mati.
I Subcontracts
Total
001
Add power outlets fur appliances at 7locations
Rosendin Electric
7,605
71605
-
Subtotals, (Direct Cost) 0
0
7,605
7,605
Liability Ins. (0.71% of Cost)
Fee (3.25% or Cost +Liab. Ins.)
Prime Cony. Bond l0.65% of Cost .+ Liab. Ins. + Fee)
54
240
51
TOTAL AMOUNT OF CHANGE ORDER REQUEST
7,959
page 1 of 1
_.river
BUILDERS .SINCE 1919
July 28, 2012
Mr. Steve Badum
City of Newport Beach
3300 Newport Boulevard
Newport Beach, CA 92663
PROJECT: NEWPORT BEACH CIVIC CENTER AND PARK PROJECT
SUBJECT: PCO 315: Pivot Rack in NBTV Room per City Request
Change Order Request No. 315
Dear Steve:
15615 Al con Parkway
Suite 150
Irvine, CA 92618
Fax 949,261.5167
Telephone 9494261,5100
Sent Email! Hand
Please review this Change Order Request in the amount of $2,1 19 to add one pivot Rack and
one quad receptacle in NBTV Room per City Request.
Attached for your review is supporting information.
Sincerely,
William Hahn
Senior Project Manager
File: 1 00 12-22315
Signature above authorizes C. W. Driver to proceed
pursuant to the terms of this oiange Order Request
Los Angeles Irvine onnrio
San Diego
rl
License No, 102
Driver
Hi ?11.1 ?ERS S1 �`(: li 1919
PROJECT: NEWPORT BEACHCIVIC CENTER AND PARK PROJECT
CHANGE ORDER REQUEST 1315: Pivot Rack in NBTV Room ner City Remtes[
07/28/12
cem
Description
Contractor .bar 1t. n)con tracts
otal
901
Pivet.Ratil and I quad mnapods In NBN Room per
n Electric
z.az5
z,ozs
ITOTALAMOONT
ls Direct Cost 0 0 2,025
2,025
Ins. (0.77 % of Cost)
(3.25% of Cost+ Liab. Ins.)
Ontf. Bond 0.05 %04COST +Liao. Ins- +Fee)
14
55
14
OF CHANGE ORDER REQUEST
2,119
Page 1 of 1
e
C C.W. river
BUILDERS SINCE 19I9
July 28, 2012
Mr. Steve Badum
City of Newport Beach
3300 Newport Boulevard
Newport Beach, CA 92663
PROJECT: NEWPORT BEACH CIVIC CENTER AND PARK PROJECT
SUBJECT: Custom Color Fixtures - Type A26
Change Order Request No, 317
Dear Steve:
15615 Alton Parkway
Suite 150
Irvine, CA 92618
Fax 949.261.5167
Telephone 949.2615 100
Sena Email I Hand
Please review this Change Order Request in the amount of $4,579 to provide custom color
finish to light fixture types El, Ela, E2, E2a, E3, E3a and A26.
Attached for your review is supporting information.
Sincerely,
William Hahn
Senior Project Manager
File: 1 00 1 2 -223 17
Aui_ r3zgfion:
Ti /
Date:
Signature above authorizes C W. Driver to proceed
pursuant to the terms of this Change Order Request.
Las Angeles Irvine onorio San Diego
9�e
License No. 102
CWD.riyer 07/29112
0 I I I. L) li Its .V I NC 1: 1019
PROJECT: NEWPORT BEACH CIVIC CENTER AND PARK PROJECT
CHANGE ORDER REQUEST #317: Custom Color Light Fixtures
lem De,cri tine
P Cuntraccor a pr at. Su contracts l'ptal
001
Pa. M. E3a and A26 Rosendln Elcaric 4,775 9.375
Liability Ins. (P.71 % or cosh 31
Fee (3.26% of cost+ uzb. Ins.) F43
Paine Conte Bond (055% of Cast+ Lead. Ins. + Fee1 3n
OFCHANGE
Page 1 of 1