HomeMy WebLinkAboutCCO#8 Architectural, Multiple ItemsChange Order
Project
Newport Beach Civic Center and Park Project
1100 Avocado Drive
Newport Beach, CA 92660
Contractor
C.W. Driver
15615 Alton Parkway
Irvine, CA 92618
THE CONTRACT IS CHANGED AS FOLLOWS:
CONTRACT NUMBER: 4021
CHANGE ORDER NUMBER: 008
C. O. INITIATION DATE: 12/7/2012
CONTRACT DATE: 04/2712010
COR 4006
Various Architectural, Structural, MEP rev's per Bulletin No. 3
$286,638
COR #014
Various Architectural, Structural, MEP rev's per Bulletin No. 6
$123,315
COR #014.2
Bulletin No. 6: Additional Gas Line Installation
$8,606
COR #036.1
Bulletin No. 8: Add smoke barriers in HVAC shafts
$11,093
COR 4065
Bulletin No. 9; Lighting Control revisions
$64,114
COR #087
FO -198 & 199: Added Builders Plenums
$6,483
COR #101
FO- 0213:1: Eye Wash Stations at Bsmt. & Cooling Tower
$16,874
COR #147
FO -0234: Grilles /Diffusers for AC -12A & B in Computer Rm.
$3,922
COR #160
Door Hardware Submittal Mark -ups
$49,586
COR #182
FO -216 & 247: Added "A126" Fixtures in Door Canopies
$5,416
COR #217
FO -318: Revised Height of Main Skylight above Core Stairs
$4,400
COR #301
RFI -1033: Added HDMI Feeds to Monitors in Traffic Mgmt.
$2,436
COR #304
FO -454: Added Card Readers and Bollard
$14,132
COR #306
FO -399: Lower Level Bathroom RCP Revisions
$1,180
COR #320
FO-424: Add exit signs at Library
$2,496
COR #321
RFI - 1128.1: Revisions to type A23 Light Fixtures
$2,108
COR #336
Cable TV Changes
$6,330
COR 4345
Farallon Entry Drive Revisions per City
$2,709
Total $ 611,842
The original Guaranteed Maximum Price Contract Sum was
$ 14,505,694
Amendments to the Guaranteed Maximum Price (1 through 5)
$91,998,431
The Amended Guaranteed Maximum Price Contract Sum is
$ 106,504,125
Net change by previously authorized Change Orders
$780,016
The total Contract Sum prior to this Change Order was
$ 107,284,141
The Contract Sum will be increased by this Change Order in the amount of
$ 611,842
The new Contract Sum including this Change Order will be
$ 107,895,983
Page 1 of 2
Change Order
Project
Newport Beach Civic Center and Park Project
1100 Avocado Drive
Newport Beach, CA 92660
Contractor
C.W. Driver
15615 Alton Parkway
Irvine, CA 92618
Not valid until signed by all parties.
CONTRACTOR
C.W. Driver
1100 Avocado Drive
Newport Beach, CA 92660
Y2�O)rs, President
D. fl A7711-S
CONTRACT NUMBER: 4021
CHANGE ORDER NUMBER: 008
C. O. INITIATION DATE: 12/7/2012
CONTRACT DATE: 04/27/2010
OWNER
City of Newport Beach
330D Newport Boulevard
Newport Beach, CA 92663
By: i
Kitt, City Manager
Date: 11011 -=-�
Page 2 of 2
N
H
H
N
H
H
Y
40
a
C�
d
c
N
V
U
V
L
U
m
N
m
0
O
CL
3
v
Z
N
H
0
O
H
0
O
T
O
O
vi
O
�r
M
C
0
C
O
V
m
v
G
d
a
C
X
w
m
v
R
L
d
a
U
C
O
Q
H
c
0
O
E
Q
u
c
V
C
L
u
H
H
N
N
r\
Ln
m
y
N
f0
h
ry
L
•.L�
1 1
L\f7
W
oo
000
W
0
N
r4�
vim-
-0
'6
'a
V
V
d
u
>
U
U
U
v
v
c
m
m
as
v
m
m
x
x
W
w
t�l
N
O
W
W
{n
W
W
W
❑
0
0
0
0
0
0
0
0
0
0
0
O
00
O
O
O
O
O
O
O.
O
O
O
O
O
O
O
00
O
m
d'
O
ri
M
.4
N
0)
a
H
oo
N
m
LD
N
co
V)
co
O
Co
:-i
M
N
O
U
G
H
O
m
LD
zt
N
++
00
M
O
N
m
�t
0)
O
tD
O
V
to
cp
co
j
to
F
O
10
Occ
a
=
N
o
u1
7
Lr
O
r-i
r-i
M
Q
N
R
O
m
O
C
E
d'
m
O
V
f�
m
IA
H
N
N
lD
m
H
m
o
a
N
a
c
Q1
y
G
N
ry
v
r
0
o
m
rr
N
p
N M
u
0
H ti
U
N
d
f N M
mo
C
C
C
H �-4 N
`~
y
h
O
F
ate+
D
.0
rl
tD N N
H tD
t1
v
!6
Q
Lr
U
U
H
N
u
ul N
w
u
u
N
m
H N N
H
❑
C
❑
�
UN
a`+
N
K
+�+
1p N
1�
c
"O
-
E
5
m
w
v
a
o
a N N
v
Y
.n
m
co
ri
m o vi oo
v
m
0 o w
a
?
U
Lo
�o
V
CD
a
H ry ry cn
N
M
ao
y
a
o
o
o
"
o
N ri W r�
N
tU
m
#
it
7k
it
#
# N m
_,
# M
f¢
(G
C
C
l
y
�P
CC Ol V
0
0
0
0
0
0 w m .-+
O N N
a
s
VI
U'1
J
H
U
V
U
U
U
U H N m
U m
CL
H
N
L9
H
H
N
H
41
O
H
H
\
m
H
\
\
m
m
L
C
\\
Dl
N
Ul
W
W
G
H
W
H
\
m
\
E
E
E
E
E
E
s
m°
H
ti
U
OH
rn
H
N
V
Y
E
H
N
M
a
tit
0
t•
m
Q
Q
Q
Q
Q
#
#
#
#
#
#
#
#
Q
a
a
a
m
a
0
0
0
0
0
0
O
O
u
u
u
u
u
u
u
u
0
(D
0
l7
l7
I
I
a
a
n,
a
a
Q
H
c
0
O
E
Q
u
c
V
C
L
u
CAV giver
BUILf)ERS SINEE 1914
PROJECT: NEWPORT BEACH CIVIC CENTER AND PARK PROJECT
CHANGE ORDER REQUEST #006: Bulletin #3
12l27M2
[em
I Description
outractar
Labor
at.
Subcontracts
Towl
001
Incorporate revisions w site finish grade per Bulletin 3 civil plans
Srice -
no crisul
0
002
lReAsions to storm drains H & K in the loading dock area
Delta Pipeline
2,5601
2560
003
Site Concrete Revisions
Griffith
0
L Add thickened slab where site cencreto alcias exterior door doer
closer(operators.
Scope omitted
b. Increase soo f library playa ramp walls and add recessed light
blockouu
See COR t1tlOfi.l
004
Revised planting ac loading deck due to Edison changes: Delete 6 ea 15
Park West
gal. Prunis {yinli and 163 ea. Ceanothus Concha, and add 5 ea. 15 gal.
Torreyana and 68 ea. 5 gaL Conorhus Ray Hartman
(710)
(710)
005
Structural Convete Revisions
Boreal
11,751
a. Add slab depressions and embeds for added floor doscrloperators.
Scope omitted
b. Add tapping slab for community hall and council chamber vslkroa
matu.
600
G Revise alignment of st. retshdog wall G and add additional footing
snip
11,151,
006
Miscellaneous structural steel revisions per 5"cmml dwgs 51.08, 51.09,
SME Steel
52.13 & 55.23.
1,840
1,840
007
Revisions to Miscclleaneous and Ormnxmenral Metals
Somhwest Steel
6,640
a. Add (14) gale. Sel troughs far added Boor cht,allopentears.
Scope omitted
b. Add closer places and but peas ac bridge landing (51A4.05 &
I VA5.08)
2,521
C. Add wad brackets to support railings on roc walk F &G (3 &VA5.03)
in lieu of core drilled fee.
9,584
d. Revisdsimplify door hod detail at council chambers (I 2/A4.50.
I SIA5.52
(869)
d. Delete (4) power assist bollards.
(4,596)
DOB
Miscellaneous added wood milers, etc
Golden Stare Framers
an cost
0
009
Revise counter nip at Council Chamber podium from wood veneer to
Monthlou
solid FSC maple.
2.201
2,201
010
Added metal panels due te, increased parapet height and wnppcd corner
CMF
at Library Expansion
18.3991
18,399
Oil
Curtain Wall f Glass A Glazing Revisions:
Tower Glass
61,499
0. Misc. minor revisions to glass sizesftleandaes
244
h. Credit exoerlor storefront door hardware per original design
Scope omitted
c. Add exeeriar storefront door hardware per new design
Scope omitted
d. Add underfloor automatic operators
Scope omitted
d, Cost far new dies and cooling and for added aluminum due to
changes in alum. face caps
61,256
012
Miscellaneous dryvrall framing revisions
Superior Wall Systems
32.502
a. Change u 11 from type Mow to type Hy.4 at rooms 21578153 and
1152JI 153 (added furring and bracing)
51958
b. Add 231f. (x[4' high) of type Jas roll at rooms 2154 and 2355
4,576
C. Add curtain wall jamb & head framing at council chamber par details
7 & 91A5.50, B1A5.52 Si 71AS.53
6,668
d. Add recess in council chamber parapet vnll for roof drain per derail
I WA5.53
617
e. Added framing at metal panel to curtain wall tnnsiden per IVA5.1 I
and 121A5.07
3,934
f.
Added furring for scone and added limestone plaster in Stair F
3.574
g.
Added infl framing at bridges per 7 & I IIA5.13
4464
h.
Added 3221.f. reveal trim at drywall to curtain mill per details on
sheet A5.07
4448
I.
Added column furring at Library col grid I and NN
1.570
(.
Increase thickness of library wall to 10" per I IR4.01
493
Item
I Description
Contractor
Libo r
at.
a contracts
Tcn
013
Change underground storm drain piping 4" dnmorcr to 6" & 8" diameter
Pan Pacific Plumbing .
bctwecn term 27 and 27 star sheet 1.06U.
7.828
7.828
014
Added! revised boiler Iluc. Misc. dacty rk revisions, Relocated exhaust
CriaMicld Mechanical
fans and equipment 8MS conrrols spec changes. Incorporate new hydronic
piping spec.
70,673
a. Added I reused boiler flue. Rise. ductwork revisions, Relocated
exhaust fans and equipment.
20,354
b. Addidauai engineering antl BIM coordination
2,041
C. Provide loaf control of temperarue setpoints per 115.02
8,278
ols
Electrical Revisions:
Rosendin Eleecic
98,695
a. Delete type E4 bollards and add type Ed recessed vvall lights near
library.
See COR #006.1
b. Revised afeevical utility meter enclosure and claetrfal site routing
per updated single line.
66,568
C. Revisions to light fixture types L4, A6, A6n, A7, A7p, A238 and E7
32,127
Subtotals Direct Creep
01
273,879
273,879
Liability Ins. (0.71% of Cost Gen. Req.)
1,945
Fee ( 0.25 %of Cost +Gun. Req. +Lieb. Ins.)
8,954
Pdme.Contr. Bond (0.65 %of Cost +Gen. Reg. +Lich, Ins. +Fee)
1,851
TOTAL AMOUNT OF CHANGE ORDER REQUEST
2R5,639
Qualifications & Exclusions
1. resin for roller shade control per Bulletin 3 are excluded due to subsequent scope review and discussions.
Rater to COR 4006.1 for casts associated with revisions to library ramp walls and associated lighting revisions.
M. Driver
B U 11, I):IrlttS 8INc i 19111
PROJECT: NEWPORT BEACH CIVIC CENTER AND PARK PROJECT
CHANGE ORDER REQUEST #0014: Bulletin #G
12,27112
Item
I Description
I Contractor
Labor
Mail.
Subcontracts
Total
001
Addi0onal mass excavation for lean concrete
IStice
609
609
00E
Credit deleted storm drain laterals
I Delta Pipeline
(2,170
—
(2,170)
003
Revisions to Retaining Walls F & G. Added lean concrete under basement
ifoondatlows, fing, R
Bomel
36,393
38,393
003
Add cast in place concrete cable trench (CWD esdmed)
Boreal
14,791
14,791
004
Add Floor access plates for sum pits. Add curb angles and plate at bridge
landing.
SME f southwest Steel
8,461
8,461
005a
Added pair of doors at opening 0028.1
5celc Brothers
5,771
5,771
005b
Credit for revised non - panic) hardware sec
ISceley Brothers
OB86)
(1,886)
006
Frame added wall and door opening
IScaparlor Wall Systems
1,815
11815
007
Added! rerouted piping and change VTr from Z" to 3" due to relocated
sump pits
Pan Paclac Plumbing
47,581
47,581
000
HVAC coordination and detailing changes
Critchfold Mechanical
1,457
1.457
0119
Convert main electrical feed from duo bank to utiury trench (credit
Rosendin Elec.
3,003
3,003
Subtotals Direct Cost
0
0
117,825
117,825
Liability Ins. (0.71 % cf Cost + Gen. Red.)
Fee (3.25% or Cost + Gen. Req. + Liab. Ins.)
Prime Conti. Bond (0.65% ofCost +Gen. Red. +Liab. let. +Fee)
837
3,857
706
TOTALAMOUNT OF CHANGE ORDER REQUEST
123,315
Qualifications& Exclusions
1. Includes all added lean concrete at basement foundations per final configuration in Field Order 74.
Page 1 of 1
C.W. Driver
null.ol;ns SrvC:E: 1')17
PROJECT: NEWPORT BEACH CIVIC CENTER AND PARK PROJECT
CHANGE ORDER REQUEST #014.2: Bulletin 6 Underground Gas Line
72127/12
Page 1 of 1
Description
Cantrattor
CWD
Labor
CWD
M.U.
Subcontractors
Total
001
Underground gas line from Building POC to relocamd motor
Ira. pacific
8,225
8,225
Subtotals Dlno tC059
8,225
8,225
Liability Ins. (0.71% of Cost)
Fee (8,25% of Cost + Liab. Ins.)
Prime Contr. Bond (0,65% of Cost + Liab. Ins. + Fee
60
269
Se
TOTAL AMOUNT OF CHANGE ORDER REQUEST
6,608
Page 1 of 1
C.W Driver
Iti tI -r)1. Hl ..91 \t: h: I•]l9
PROJECT: NEWPORT SEACH CIVIC CENTER AND PARK PROJECT
CHANGE ORUER'REQUEST #0036.1: Arid shah seperaGtians at duct shafts
06)2 @112
Item ,DesdFiyuon
untnc[or a or
Ma[.
u contracts
ota
OOd Furnlslrand hell shah seodFgtldris atduct shar[s per'6ulledn, 6 General
'Cric6ficld Mechanical
No[e which staces °IN jAN1T.ORIRMS- 2159& 2355 PROVIDE
DU[T FlENEiR4710NAN,ALL510E5
RTNfN. IST &12MD FL TO PREVENT THE PASSAGE OF SMOKE &.f LAME
PER.CRC.SECTION 716.fid"
I(1,$9
„, 10544
subtotals: Olreot COSt o
-0
10;599
10,599
Liability ins. (0]]%,of Cost)
75
Fee (3:25°/x. at Cost+ Liae Ins.)'
Prune Conic Bona (0.65% of Cost- Lleti..lris. + Fee)
,847
72
TOTAL AMOUNT OF CHANGE; ORDER REQUEST
19(09)
Qnallficatiuns & Expipsiuns
1. None.
Page 9 of 1
cC W Driver
111111,D 1 ;R8 SI;.NC 1: Ip 1'7
PROJECT: NEWPORT BEACH CIVIC CENTER AND PARK PROJECT
CHANGE ORDER REQUEST #0065: electrical and Lighting Revisions per Bulletin 9
12127/12
rem
Description
Contractor
Labor
Had.
Subcontracts
Toni
001
Additional power to feed 120 volt circuits to Grafik Eye control station$ in
Rosuse in Electric
cwnfercnce rooms. Labor to install 10 sections of Ilghting track at council
chamber. Addition of 18 dlmmfng.I switching panels
61.260
61,260
Subtotals Direct Cost
0
0
61,260
61,260
Llabllity Ins. (0.71% cf Cost(
435
Fee (3.25% of Cost+ Lfab. Ins.)
2,005
Prime Contr. B0 1 (0.65% of Cost+ List). Ins. + Fee)
414
TOTAL AMOUNT OF CHANGE ORDER REQUEST
54,114
Qualifications & E%tlu5lens
1. None.
Page 1 of 1
C.W. Driver
111111, t7 h: TtS 41� "t: tt tVl7
PROJECT: NEWPORT BEACH CIVIC CENTER AND PARK PROJECT
CHANGE ORDER REQUEST #/087: FO -1981 FO-199: Added Builders Plenums to Resolve Duct Conflicts
12/27112
Item
Description
I Contractor
I Labor
I Mad.
I S.bcomracts
I Total
001
Added ridgid insulation at top and bottom of plenum box
fAlcaf -
01
01
1,9031
1,903
002
Construct framed plenum box in lieu of metal duct per FO 198
Superior
01
01
4.4101
4,410
003
Construct framed plenum box in lieu of metal dumper FO 199
Superior
0
01
5,4251
5,425
004
Credit doleted sheet metal duff per FO 198
Critchfield Mechanical
1 01
tl
(1,201)
(1,201)
005
Credit deleted sheet metal dua per FO 199
Crltch8eld Mechanical
0
0
(4,347)
(4,343)
Subtotals Direct Cost
01
01
6,194
6,994
Liability Ins, (0,71% of Cost)
Fee (3.25% of Cost t Llab. Ins.)
Prime Contr. Bond (0.65% ofCost + Liab. Ins. + Fee)
44
203
42
TOTAL AMOUNT OF CHANGE ORDER REQUEST
6,483
Page 1 of 1
C.W. Driver
If 1. 11.. D 1. Its 5f1v C: Ii. 1919
PROJECT: NEWPORT BEACH CIVIC CENTER AND PARK PROJECT
CHANGE ORDER REQUEST #101 (Revised): Add emer¢encv Eve wash at Basement and Cnnlino cn 3e111 r
12r27r12
tem
Description
Contractor
a or V
ac.
ru contracts
ota
001
Furnish and install added emergency eyewashlsiower in Civic Center
Pan Pacific Plumying
Basement Chiller Room. Furnish and install added emergency eyewash and
instant water heater at cooling tower yard.
12.466
2.499
12,486
006
Provide electric service from parking structure m instant water heater in
Rosendin Electric
3,635
Subtotals Direct Cost
0
0
16,123
16,123
Liability Ins. (0.71% of Cost)
114
Fee 13.25% of rio5t + Liab. Ins.)
520
Prime Conte. Bond {0.65% of Cost + Liah. Ins. + Fee
109
TOTAL AMOUNT OF CHANGE ORDER REQUEST
16,874
Page 1 of 1
CWDriver
If1.11l,DI ft$ SI:VpI{ 193'1
PROJECT: NEWPORT BEACH CIVIC CENTER AND PARK PROJECT
CHANGE ORDER REQUEST #147: Add supply & return air diffusers in Computer Room per F.O. 4234
12/27/12
Cem
Description
Co. eragtor
I Labor I Mad.
I SvIacontracts
Total
001
Substitute air (low type access floor panels in lieu of solid panels at
Computer Room 1052
Saysicle Interiors
3,747
3,747
Subtotals Direct Cost
0 I)
3,747
3,747
Liability Ins. (0.71% of Cost)
Fee (3.25% of Cost + Liab. Ins.)
Prime Contr. Bond (0.65% of Cost + Liab. Ins. * Fee)
27
143
25
TOTAL AMOUNT OF CHANGE ORDER REQUEST
3,922
Page 1 or 1
.W I 'river
It U 1I,. IIE RS .SIiVcG 1019
PROJECT: NEWPORT BEACH CIVIC CENTER AND PARK PROJECT
CHANGE ORDER REQUEST #0160: Door, Frame and Hdwr. Changes per Submittal Review
12/27/12
tam
Description
Contractor
x or
at.
I 5ulecontracts
Totml
001
Incorporate door frame and hardware revfsfons per submittal review
comments
Seeley Bros
55,435
47,374
Subtotals Direct Cost
6
0
55,435
47,379
Liability Ins. (6.71 /o of Cost)
Fee (3,25% of Cost+ Llab, Ins.)
Prime Contr. Bond (6.66% Of Cost + Lob, Ins. + Fee)
336
1,551
326
TOTAL AMOUNT OF CHANGE ORDER REQUEST
49,586
QualiBcatlons & Excluslons
1. Includes added door louvers per FO 9259
Page 1 of 1
CW Driver
PROJECT: NEWPORT BEACH CIVIC CENTER AND PARK PROJECT
CHANGE ORDER REQUEST #182: FO -216 & 247: Added. "Al2B" Fixtures in Door Canopies
12!271,2
Ikem
Description
Contractor
CWD
Labor
CWO
Matl.
Subcontractors
Total
001
Change Type Al 2B light fixtures and add 4 additional lights
Rcsendin Electric
5,175
5,175
Subtotals (Direct COst
-
5,175
5,175
Liablllty Ins. (0.71% of Cost + Gen. Req.)
Fee (3.25% of Cost + Gen. Reg, * Llab. Ins.)
Prime Conir. Bond (0,65 %of Cost +Gen, Reg. +Liab. Ins. +Fee
37
150
35
TOTAL ANIOONT OF CHANGE ORDER REQUEST
5,416
Page 1 of 1
M. Driver
B I,IIL111r: ite AINC1 7919
PROJECT: NEWPORT BEACH CIVIC CENTER AND PARK PROJECT
CHANGE ORDER REQUEST 9217: FO -31 B - revised height of main skylight above Core Stairs 2B -2E
12,27112
Page 1 of 1
CWD
CWD
Item
Description
Contractor
Labor
Mae1.
SubeOntratter5
Tatal
001
T &M work on 4119112 through 4120112 to rework skylight curbs at Civic
Superior Wall Systems
Center low roofs above stairs 23 -2E
1
2.035
2,035
001
T &M work on 4123112, 4)30112 and 511112 through 513112 to rework
Superior Wall Systems
skylight curbs at Cfvic Center low roofs above stairs 2 13,2E
1
6,140
6,140
001
T &M work on 5114112 to rework skylight curbs at Civic Center low roofs
Superior Wall Systems
above stairs 28.2E
230
230
Negodated cast split with Owner
(4,209)
(4,209)
Sublet Direct Cpst
4,204
4,204
Liability Ins. (0.71 % of Cost + Gen. Reg.)
30
Fee (3.25x/, of Cost + Gen, Reg. + Lie b. Ins.)
138
Prime Centr. Bond (0.65% of Cost+ Gen.. Reg. + Liab. Ins. + Fee).
28
TOTAL AMOUNT OF CHANGE ORDER REQUEST
4,400
Page 1 of 1
fit.. Driver
11 t: 11.LLD Ii.R, S N NOP: 1979
PROJECT: NEWPORT BEACH CIVIC CENTER AND PARK PROJECT
CHANGE ORDER REQUEST #301: RFI -1033 -Added HDMI Feeds to Monitors in Traffic Mgmt 2155
12/27/12
Page 1 of 1
CwD
CVVD
Item
Description
'Contractor
Labor
Matt.
Subcontractors
Total
001
Furnlsh and Install added HDMI oudets for traffic monitor,
Roscndin Electric
1.723
1.723
0D2
Added backing for traffic monitors
Superior Wall Symms
604
604
Subtotals joirect Cos!
2:327
2,327
Liability Ins. (0.71% of Cost + Gen. Req.)
17
Fee (3.25% of Cost + Gen. Req. + Liab. Ins.)
76
Prime Contr. Bond (0.65% of Cost + Gen. Rep. + Liab. Ins. + Foe )
16
TOTAL AMOUNT OF CHANGE ORDER REQUEST
2,436
Page 1 of 1
C.W. Diver
nIJILW -:as sr;cl; el.)
PROJECT: NEWPORT BEACH CIVIC CENTER AND PARK PROJECT
CHANGE ORDER REQUEST #304: FO -454 ! RFI -I 141: Added Card Readers and Bollard at City Hall and Council Cham
12/27112
tom
Dcscri Lion
P
Contractor
Labor
at.
u contracts
Total
001
002
003
004
Furnish and Install added power assistbdlard at door 91406.1
Revise hardware at door 1600.3 to electrified
Revise hardware at doors 2055.1 and 2056.1 to electrified
Add conduit, wire, ward readers, programing, etc. at 4 locations
SME I Smthwesr Steel
Tower Glass
Seeley tiros.
Rosendin
5.097
950
1,500
6,006
5,047
950
1,500
6,006
SUhtotals Direct Cost
0
0
13,503
13,503
Liability Ins. (0.71% of Cost)
9fi
Fee (3.25% of Cost +Lists. Ins.)
Prime Contr. Band (O.fi5% of Cost+ Lia6. Ins, +Fee)
442
91
TOTAL AMOUNT OF CHANGE ORDER REQUEST
14,132
Page 1 of 1
C.W. Driver
80,1 i..D 1; R.3 S) N(,'[." 1917
PROJECT: NEWPORT BEACH CIVIC CENTER AND PARK PROJECT
CHANGE ORDER REQUEST #306: FO -399: Lower Level Bathroom RCP Revisions
Item I Description I Contractor Labor
001 1 Remove, relocate and reinstall light fixtures and associated conduit in lower I Rosendin Electric
12127112
Mad. $ubcontractons Total
1.127 1.127
1,127 1.127
Liability Ins. (0.71% of Cost + Gen, Req.) g
Fee (3,25% of Cost + Gen. Req: + Liab. Ins.) 37
Prime Contr. Bond (0.65% of Cost+ Gen. Req. +_ Liab. Ins. + Fee) 8
TOTAL AMOUNT OF CHANGE ORDER REQUEST 1,180
Page 1 of 1
C,w. Driver
VkJIl „f)lF,RS S1,NCA7 1919
PROJECT: NEWPORT BEACH CIVIC CENTER AND PARK PROJECT
CHANGE ORDER REQUEST #320: FO- 4241RFI -1079: Add exit signs at
Item I Description
001 relocate and add Illuminated exit signs at Library
Contractor Labor
n 8lecvic
Mat], Subcontractors
2,387
2,387
12127112
Total
2,367
Liability Ins. (0.71 % of Cost + Gen. Req.) 17
Fee. (3.25% of Cost + Gen. Req. +Liab. Ins.) 7S
Prima Contr. Bond (0.65% of Cost + Gen. Req, + Liab. Ins. + Feel 16
ITOTAL AMOUNT OF CHANGE ORDER REQUEST 1 2 AqR I
Page 1 of 1
Driver
12127,12
R Cd J. L. C7 I; 12,5 Sla.4(:Ii 11419
PROJECT: NEWPORT BEACH CIVIC CENTER AND PARK PROJECT
CHANGE ORDER REQUEST #321: RFI -3128: Revisions to type A23 Light Fixtures
CWD
CWD
Item
Description Contractor
Labor
Matl. Subcontractors
Total
001
Replace (4) Type A23 x 4' Tight fixtures with Type A23 x T light fixtures at Rosendln Elettrlc
Communi Room
2,014
2,014
ouototais uirect cost 2,0141 2,014
Liability Ins. (0.71% of Cost +Gen. Req.) 1e
Fee (3.25% Of Cost + Gen. Req. +Liab. Ins.) 6E
Prime Contr. Bond (0.65% of Cost + Gen. Req. + Liab. Ins. + Fee) 14
TOTAL AMOUNT OF CHANGE ORDER REQUEST _ 2,108
Page 1 of 1
Driver
19 t9
PROJECT: NEWPORT BEACH CIVIC CENTER AND PARK PROJECT
CHANGE ORDER REQUEST #336: Add Cable TV Drop and Outlets at Command Center ner Ci . Ren.,o.r
12/27/12
Page 1 of 1
CWU
cwD
Item
Description
Contractor
Labor
Mad.
subcontractors
Total
001
Add cable TV drop to Command Center AV Closet and install power and
Rosendln Electric
able outlets for two TV locations
6.048
6,048
Subtotals DirecttCmt
-
6,048
6,048
Liability Ins. (0.71 %of Cost +Gen. Req.)
48
Fee (3.25% of Cost + Gen. Req. + Liao. Ins.)
1 g8
Prime COntr. Bond 0.65% of Cost+ Gen. Req. + Liab. Ins. + Fee
41
TOTAL AMOUNT OF CHANGE ORDER REQUEST
6,330
Page 1 of 1
C_'AN Wrivel-
'li lil i.3�i: Fiti 51; \(i li�l�l
PROJECT: NEWPORT BEACH CIVIC CENTER AND PARK PROJECT
CHANGE ORDER'Ri =QUEST H345i Ftirallon'Entry Drive
OQI Incoryord[e,raNSibhY to Farallon Drive Envranca!ihdud�rtg revisions to
driycway approach apron and rcvisiods to South walkway/ handicap ramp
I III 9h2
Contractor
Labor
Matt.
Subcontractors
Tota!
Fih
.2.589
7;'589
total5(Direct Cost
-
2,589-
2,559
il8yllfis. (0.71 %,p[Cost: +Gen. Reg.)
(0,25 %.of Gesl + Gen. Req:.+ Liab.,lns:)
e Contr. Bond (0,65 ,14 of C0,1 + Gen. Aeq. :+ Liab, Ins. * Fee)
16
B5
17
AL. AMOUNT OF CHANGE ORDER REQUEST
2,709
Page t of I