HomeMy WebLinkAboutCCO#9 Structure, Multiple ItemsChange Order Proiect Newport Beach Civic Center and Park Project 1100 Avocado Drive Newport Beach, CA 92660 Contractor C.W. Driver 15615 Alton Parkway Irvine, CA 92618 THE CONTRACT IS CHANGED AS FOLLOWS: CONTRACT NUMBER: 4021 CHANGE ORDER NUMBER: 009 C. O. INITIATION DATE: 01/1812013 CONTRACT DATE: 0412712010 COR #022 FO -043: Conduit Holes Revised at Roof Trusses $10,942 COR #031 FO -079: Fire Protection System Drainage $18,831 COR #036 Bulletin No. 8 & RFI -0167: Fire Rating Revisions $33,292 COR #049 FO -397: Add zinc cladding at San Miguel Bridge tower $61,843 COR #053 Library 4" Sanitary Sewer Tie In $5,624 COR #055 Parking Structure Added P9 Light Fixtures at Stairs $16,038 COR #058 FO -063 - Added stiffener plates for bridge connection $1,156 COR #069 RFI -0463 - City Hall -MEP Conflicts with Balcony Steel $12,817 COR #078 FO -094 - Structural Steel Submittal Mark -ups $29,475 COR #079 FO -15 / FO -15.1: Modify Fall Arrest System $40,395 COR 4095 Bulletin No. 14 - Fire Rating Revisions ($13,937) COR #122 RFI #282 - Bent Plate Changes for Balloon Framing $36,026 COR 4137 RFI #738 - Added HSS conduit supports at Council Chamber $2,672 COR #183 FO -296/ RFI -0742: FDC at Council Chambers $8,801 COR #189 FO -211: City Hall Electrical Modifications $27,719 COR #236 Rework 8" storm drain connection due to existing vault $4,992 COR #263 FO -325: Revised design for presentation wall In Comm. Rm. $3,300 COR #269 RFI -0185: Dimension Clarification at Curve Roof Awning $22,226 COR #270 Field Order No. 45 - Revised Perimeter Skylight Framing $10,562 COR #297 RFI - 0854.1: Library Shaft Wall Revisions $4,947 COR #300.2 FO -547: Power to under floor fan terminals $3,354 COR #328 FO -408: Added /Removed Duress Buttons in City Hall $827 COR #329 FO -427: Linear Wood, additional trim piece at outside edges. '" ., .$22,265 COR #341 RFI -1097: Revision of Perimeter Angle at Linear Wood $4,957 COR #350 FO -383: Lower Existing Soffit and Raise Existing AC $2,055 COR 9351 FO -221: Add and Remove Ceilings $733 COR #357 RFI -1115: Waterproofing at Library Wall Base (Revised) $10,800 COR #365 RFI -1224 : Council Chambers Roof Parapet Height $4,925 COR #366 Piles at San Miguel Bridge Elevator Footings $93,147 COR #368 Fire Protection Re -route due to Inspection Report $9,496 COR #377 FO -378: Library - Telecom Required for Point -of -Sale at Cafe $2,347 COR #396 FO -461: Change to Weatherproof Exit Sign @ Bay F $622 COR#496 RFI -1355: Stiffeners for South Wall in Community Room $1,761 Page 1 of 2 Change Order Project Newport Beach Civic Center and Park Project 1100 Avocado Drive Newport Beach, OA 92660 CONTRACT NUMBER: 4021 CHANGE ORDER NUMBER: 009 C. 0. INITIATION DATE: 01118/2013 CONTRACT DATE: 04/2712010 COR #499 Revised Hall Lanterns at Elevator $1,151 COR #503 FO -466! RFI -1226: Revised list & 2nd Floor FFE Layout $7,657 COR #516 RFI -1403: Baffle at Sidewall Heads $3,014 COR #529 FO -519: Low Wall Supports In Cafe $1,477 COR #545 FO- 271.1: Add Outlets @ Bay A End Office 1005 $3,088 COR 9555 RFI -0218: Existing Library Floor Leveling $50,514 Total $ 561,912 The original Guaranteed Maximum Price Contract Sum was $ 14,605,694 Amendments to the Guaranteed Maximum Price (1 through 5) $91,998,431 The Amended Guaranteed Maximum Price Contract Sum is $ 106,504,125 Net change by previously authorized Change Orders $1,391,858 The total Contract Sum prior to this Change Order was $ 107,895,983 The Contract Sum will be increased by this Change Order in the amount of $ 561,912 The new Contract Sum includlna this Change Order will be $ 108,467,895 Not valid until signed by all parties. CONTRACTOR C.W. Driver 1100 Avocado Drive (fNewpo each, CA 92G60 B an obe s, President Date: ®2 m _ OWNER City of Newport Beach 3300 Newport Boulevard Newport Beach, CA 92663 By: _ -N Davb Kiff, City Manager Date: ? /2')1-5 Page 2 of 2