FO -043: Conduit Holes Revised at Roof Trusses
$10,942
COR #031
FO -079: Fire Protection System Drainage
$18,831
COR #036
Bulletin No. 8 & RFI -0167: Fire Rating Revisions
$33,292
COR #049
FO -397: Add zinc cladding at San Miguel Bridge tower
$61,843
COR #053
Library 4" Sanitary Sewer Tie In
$5,624
COR #055
Parking Structure Added P9 Light Fixtures at Stairs
$16,038
COR #058
FO -063 - Added stiffener plates for bridge connection
$1,156
COR #069
RFI -0463 - City Hall -MEP Conflicts with Balcony Steel
$12,817
COR #078
FO -094 - Structural Steel Submittal Mark -ups
$29,475
COR #079
FO -15 / FO -15.1: Modify Fall Arrest System
$40,395
COR 4095
Bulletin No. 14 - Fire Rating Revisions
($13,937)
COR #122
RFI #282 - Bent Plate Changes for Balloon Framing
$36,026
COR 4137
RFI #738 - Added HSS conduit supports at Council Chamber
$2,672
COR #183
FO -296/ RFI -0742: FDC at Council Chambers
$8,801
COR #189
FO -211: City Hall Electrical Modifications
$27,719
COR #236
Rework 8" storm drain connection due to existing vault
$4,992
COR #263
FO -325: Revised design for presentation wall In Comm. Rm.
$3,300
COR #269
RFI -0185: Dimension Clarification at Curve Roof Awning
$22,226
COR #270
Field Order No. 45 - Revised Perimeter Skylight Framing
$10,562
COR #297
RFI - 0854.1: Library Shaft Wall Revisions
$4,947
COR #300.2
FO -547: Power to under floor fan terminals
$3,354
COR #328
FO -408: Added /Removed Duress Buttons in City Hall
$827
COR #329
FO -427: Linear Wood, additional trim piece at outside edges.
'" ., .$22,265
COR #341
RFI -1097: Revision of Perimeter Angle at Linear Wood
$4,957
COR #350
FO -383: Lower Existing Soffit and Raise Existing AC
$2,055
COR 9351
FO -221: Add and Remove Ceilings
$733
COR #357
RFI -1115: Waterproofing at Library Wall Base (Revised)
$10,800
COR #365
RFI -1224 : Council Chambers Roof Parapet Height
$4,925
COR #366
Piles at San Miguel Bridge Elevator Footings
$93,147
COR #368
Fire Protection Re -route due to Inspection Report
$9,496
COR #377
FO -378: Library - Telecom Required for Point -of -Sale at Cafe
$2,347
COR #396
FO -461: Change to Weatherproof Exit Sign @ Bay F
$622
COR#496
RFI -1355: Stiffeners for South Wall in Community Room
$1,761
Page 1 of 2
Change Order
Project
Newport Beach Civic Center and Park Project
1100 Avocado Drive
Newport Beach, OA 92660
CONTRACT NUMBER: 4021
CHANGE ORDER NUMBER: 009
C. 0. INITIATION DATE: 01118/2013
CONTRACT DATE: 04/2712010
COR #499
Revised Hall Lanterns at Elevator
$1,151
COR #503
FO -466! RFI -1226: Revised list & 2nd Floor FFE Layout
$7,657
COR #516
RFI -1403: Baffle at Sidewall Heads
$3,014
COR #529
FO -519: Low Wall Supports In Cafe
$1,477
COR #545
FO- 271.1: Add Outlets @ Bay A End Office 1005
$3,088
COR 9555
RFI -0218: Existing Library Floor Leveling
$50,514
Total $ 561,912
The original Guaranteed Maximum Price Contract Sum was $ 14,605,694
Amendments to the Guaranteed Maximum Price (1 through 5) $91,998,431
The Amended Guaranteed Maximum Price Contract Sum is $ 106,504,125
Net change by previously authorized Change Orders $1,391,858
The total Contract Sum prior to this Change Order was $ 107,895,983
The Contract Sum will be increased by this Change Order in the amount of $ 561,912
The new Contract Sum includlna this Change Order will be $ 108,467,895
Not valid until signed by all parties.
CONTRACTOR
C.W. Driver
1100 Avocado Drive
(fNewpo each, CA 92G60
B
an obe s, President
Date: ®2 m _
OWNER
City of Newport Beach
3300 Newport Boulevard
Newport Beach, CA 92663
By: _ -N
Davb Kiff, City Manager
Date: ? /2')1-5
Page 2 of 2