Loading...
HomeMy WebLinkAbout13 - Subdrain Improvement ProjectsCITY OF NEWPORT BEACH CITY COUNCIL STAFF REPORT Agenda Item No. 13 September 22, 2009 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: Public Works Department Tom Sandefur, Associate Civil Engineer 949 - 644 -3312 or tandefur@newportbeachca.gov SUBJECT: SUBDRAIN IMPROVEMENT PROJECTS — COMPLETION AND ACCEPTANCE OF CONTRACT NO. 3909 Recommendations: 1. Accept the completed work and authorize the City Clerk to file a Notice of Completion. 2. Authorize the City Clerk to release the Labor and Materials bond 35 days after the Notice of Completion has been recorded in accordance with applicable portions of the Civil Code. 3. Release the Faithful Performance Bond 1 year after Council acceptance. Discussion: On May 12, 2009 the City Council authorized the award of the Subdrain Improvement Projects to TalCal Engineering, Inc. The contract provided for the removal and installation of PVC perforated pipe in pervious backfill material, grading of existing ground, installing cleanouts and manholes, and restoring pavement along Polaris Drive, Santiago Drive, Indian Springs Lane, and Spyglass Hills Road. The contract has now been completed to the satisfaction of the Public Works Department. A summary of the contract cost is as follows: Original bid amount: $248,698.00 Actual amount of bid items constructed: $267,195.00 Total amount of change orders: $1,451.45 Final contract cost: $268,646.45 The increase in the actual amount of bid items constructed over the original bid amount resulted from an increase in the filter fabric required and in the amount of pavement that had to be resurfaced. In addition, there was one change order totaling $1,451.45. The change order was for the following: Subdrain Improvement Projects - Completion and Acceptance of Contract No. 3909 September 22, 2009 Page 2 Change Description Amount Order 1 Removal and disposal of slurry interfering with trench $1,451.45 line and the realignment of interfering electrical line Total Project Change Orders $1,451.45 The final overall construction cost including the one Change Order was 8% percent above the original bid amount. A summary of the project schedule is as follows: Estimated completion date per June 2008 schedule: July 17, 2009 Project award for construction: May 12, 2009 Estimated completion date at award: August 13, 2009 Actual substantial construction completion date: August 18, 2009 Environmental Review: The project was determined to be exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15301 of the CEQA Implementation Guidelines at the time the project was authorized by the City Council. This exemption covers the repair, maintenance and minor alteration of existing public facilities with negligible expansion. Funding Availabilitv: The awarded contract amount was $248,698 and the approved contingency amount to cover the cost of unforeseen work was $25,000 (10 %). $19,948 in contingency funding, 8% percent of the original contract value, was used to accommodate the change order and increased materials needed for the project as described in the discussion section of this report. Funds for the construction contract were expended from the following account: Account Description Account Number Amount General Fund 7012- C2502004 $268,646.45 Total: $268,646.45 In addition to the primary construction contract, this project involved other project expenses. Total project expenses are summarized as follows: Construction $268,646.45 Mate rials /GeotechnicaI Testing 1,240.00 Incidentals 320.77 Total Project Cost $270,207.22 Prepared by: Tom Sandefur Associate Civil Engineer