HomeMy WebLinkAboutC-8229-1 - PSA for Pavement Management Program Services3W N PROFESSIONAL SERVICES AGREEMENT 1 WITH BUCKNAM INFRASTRUCTURE GROUP, INC. FOR U PAVEMENT MANAGEMENT PROGRAM SERVICES THIS PROFESSIONAL SERVICES AGREEMENT ("Agreement") is made and entered into as of this 19th day of September, 2016 ("Effective Date"), by and between the CITY OF NEWPORT BEACH, a California municipal corporation and charter city ("City"), and BUCKNAM INFRASTRUCTURE GROUP, INC., a California corporation ("Consultant"), whose address is 3548 Seagate Way, Suite 230, Oceanside, California 92056, and is made with reference to the following: RECITALS A. City is a municipal corporation duly organized and validly existing under the laws of the State of California with the power to carry on its business as it is now being conducted under the statutes of the State of California and the Charter of City. B. City desires to engage Consultant to provide pavement inspection and data management services for the City's Pavement Management Program for Fiscal Years 2016/2017 and 2017/2018 ("Project"). C. Consultant possesses the skill, experience, ability, background, certification and knowledge to provide the professional services described in this Agreement. D. City has solicited and received a proposal from Consultant, has reviewed the previous experience and evaluated the expertise of Consultant, and desires to retain Consultant to render professional services under the terms and conditions set forth in this Agreement. NOW, THEREFORE, it is mutually agreed by and between the undersigned parties as follows: 1. TERM The term of this Agreement shall commence on the Effective Date, and shall terminate on December 31, 2018, unless terminated earlier as set forth herein. 2. SERVICES TO BE PERFORMED Consultant shall diligently perform all the services described in the Scope of Services attached hereto as Exhibit A and incorporated herein by reference ("Services" or "Work"). City may elect to delete certain Services within the Scope of Services at its sole discretion. 3. TIME OF PERFORMANCE 3.1 Time is of the essence in the performance of Services under this Agreement and Consultant shall perform the Services in accordance with the schedule included in Exhibit A. In the absence of a specific schedule, the Services shall be performed to completion in a diligent and timely manner. The failure by Consultant to strictly adhere to the schedule set forth in Exhibit A, if any, or perform the Services in a diligent and timely manner may result in termination of this Agreement by City. 3.2 Notwithstanding the foregoing, Consultant shall not be responsible for delays due to causes beyond Consultant's reasonable control. However, in the case of any such delay in the Services to be provided for the Project, each party hereby agrees to provide notice within two (2) calendar days of the occurrence causing the delay to the other party so that all delays can be addressed. 3.3 Consultant shall submit all requests for extensions of time for performance in writing to the Project Administrator as defined herein not later than ten (10) calendar days after the start of the condition that purportedly causes a delay. The Project Administrator shall review all such requests and may grant reasonable time extensions for unforeseeable delays that are beyond Consultant's control. 3.4 For all time periods not specifically set forth herein, Consultant shall respond in the most expedient and appropriate manner under the circumstances, by hand -delivery or mail. 4. COMPENSATION TO CONSULTANT 4.1 City shall pay Consultant for the Services on a time and expense not -to - exceed basis in accordance with the provisions of this Section and the Schedule of Billing Rates attached hereto as Exhibit B and incorporated herein by reference. Consultant's compensation for all Work performed in accordance with this Agreement, including all reimbursable items and subconsultant fees, shall not exceed Forty Eight Thousand Nine Hundred Seventy Two Dollars and 00/100 ($48,972.00), without prior written authorization from City. No billing rate changes shall be made during the term of this Agreement without the prior written approval of City. 4.2 Consultant shall submit monthly invoices to City describing the Work performed the preceding month. Consultant's bills shall include the name of the person who performed the Work, a brief description of the Services performed and/or the specific task in the Scope of Services to which it relates, the date the Services were performed, the number of hours spent on all Work billed on an hourly basis, and a description of any reimbursable expenditures. City shall pay Consultant no later than thirty (30) calendar days after approval of the monthly invoice by City staff. 4.3 City shall reimburse Consultant only for those costs or expenses specifically identified in Exhibit B to this Agreement or specifically approved in writing in advance by City. 4.4 Consultant shall not receive any compensation for Extra Work performed without the prior written authorization of City. As used herein, "Extra Work" means any Work that is determined by City to be necessary for the proper completion of the Project, but which is not included within the Scope of Services and which the parties did Bucknam Infrastructure Group, Inc. Page 2 not reasonably anticipate would be necessary at the execution of this Agreement. Compensation for any authorized Extra Work shall be paid in accordance with the Schedule of Billing Rates as set forth in Exhibit B. 5. PROJECT MANAGER 5.1 Consultant shall designate a Project Manager, who shall coordinate all phases of the Project. This Project Manager shall be available to City at all reasonable times during the Agreement term. Consultant has designated Peter Bucknam to be its Project Manager. Consultant shall not remove or reassign the Project Manager or any personnel listed in Exhibit A or assign any new or replacement personnel to the Project without the prior written consent of City. City's approval shall not be unreasonably withheld with respect to the removal or assignment of non -key personnel. 5.2 Consultant, at the sole discretion of City, shall remove from the Project any of its personnel assigned to the performance of Services upon written request of City. Consultant warrants that it will continuously furnish the necessary personnel to complete the Project on a timely basis as contemplated by this Agreement. 5.3 If Consultant is performing inspection services for City, the Project Manager and any other assigned staff shall be equipped with a cellular phone to communicate with City staff. The Project Manager's cellular phone number shall be provided to City. 6. ADMINISTRATION This Agreement will be administered by the Public Works Department. City's Public Works Director or designee shall be the Project Administrator and shall have the authority to act for City under this Agreement. The Project Administrator shall represent City in all matters pertaining to the Services to be rendered pursuant to this Agreement. 7. CITY'S RESPONSIBILITIES To assist Consultant in the execution of its responsibilities under this Agreement, City agrees to provide access to and upon request of Consultant, one copy of all existing relevant information on file at City. City will provide all such materials in a timely manner so as not to cause delays in Consultant's Work schedule. 8. STANDARD OF CARE 8.1 All of the Services shall be performed by Consultant or under Consultant's supervision. Consultant represents that it possesses the professional and technical personnel required to perform the Services required by this Agreement, and that it will perform all Services in a manner commensurate with community professional standards and with the ordinary degree of skill and care that would be used by other reasonably competent practitioners of the same discipline under similar circumstances. All Services shall be performed by qualified and experienced personnel who are not employed by City. By delivery of completed Work, Consultant certifies that the Work Bucknam Infrastructure Group, Inc. Page 3 conforms to the requirements of this Agreement, all applicable federal, state and local laws, and legally recognized professional standards. 8.2 Consultant represents and warrants to City that it has, shall obtain, and shall keep in full force and effect during the term hereof, at its sole cost and expense, all licenses, permits, qualifications, insurance and approvals of whatsoever nature that is legally required of Consultant to practice its profession. Consultant shall maintain a City of Newport Beach business license during the term of this Agreement. 8.3 Consultant shall not be responsible for delay, nor shall Consultant be responsible for damages or be in default or deemed to be in default by reason of strikes, lockouts, accidents, acts of God, or the failure of City to furnish timely information or to approve or disapprove Consultant's Work promptly, or delay or faulty performance by City, contractors, or governmental agencies. 9. HOLD HARMLESS 9.1 To the fullest extent permitted by law, Consultant shall indemnify, defend and hold harmless City, its City Council, boards and commissions, officers, agents, volunteers and employees (collectively, the "Indemnified Parties") from and against any and all claims (including, without limitation, claims for bodily injury, death or damage to property), demands, obligations, damages, actions, causes of action, suits, losses, judgments, fines, penalties, liabilities, costs and expenses (including, without limitation, attorneys' fees, disbursements and court costs) of every kind and nature whatsoever (individually, a Claim; collectively, "Claims'), which may arise from or in any manner relate (directly or indirectly) to any breach of the terms and conditions of this Agreement, any Work performed or Services provided under this Agreement including, without limitation, defects in workmanship or materials or Consultant's presence or activities conducted on the Project (including the negligent, reckless, and/or willful acts, errors and/or omissions of Consultant, its principals, officers, agents, employees, vendors, suppliers, consultants, subcontractors, anyone employed directly or indirectly by any of them or for whose acts they may be liable, or any or all of them). 9.2 Notwithstanding the foregoing, nothing herein shall be construed to require Consultant to indemnify the Indemnified Parties from any Claim arising from the sole negligence or willful misconduct of the Indemnified Parties. Nothing in this indemnity shall be construed as authorizing any award of attorneys' fees in any action on or to enforce the terms of this Agreement. This indemnity shall apply to all claims and liability regardless of whether any insurance policies are applicable. The policy limits do not act as a limitation upon the amount of indemnification to be provided by Consultant. 10. INDEPENDENT CONTRACTOR It is understood that City retains Consultant on an independent contractor basis and Consultant is not an agent or employee of City. The manner and means of conducting the Work are under the control of Consultant, except to the extent they are Bucknam Infrastructure Group, Inc. Page 4 limited by statute, rule or regulation and the expressed terms of this Agreement. No civil service status or other right of employment shall accrue to Consultant or its employees. Nothing in this Agreement shall be deemed to constitute approval for Consultant or any of Consultant's employees or agents, to be the agents or employees of City. Consultant shall have the responsibility for and control over the means of performing the Work, provided that Consultant is in compliance with the terms of this Agreement. Anything in this Agreement that may appear to give City the right to direct Consultant as to the details of the performance of the Work or to exercise a measure of control over Consultant shall mean only that Consultant shall follow the desires of City with respect to the results of the Services. 11. COOPERATION Consultant agrees to work closely and cooperate fully with City's designated Project Administrator and any other agencies that may have jurisdiction or interest in the Work to be performed. City agrees to cooperate with the Consultant on the Project. 12. CITY POLICY Consultant shall discuss and review all matters relating to policy and Project direction with City's Project Administrator in advance of all critical decision points in order to ensure the Project proceeds in a manner consistent with City goals and policies. 13. PROGRESS Consultant is responsible for keeping the Project Administrator informed on a regular basis regarding the status and progress of the Project, activities performed and planned, and any meetings that have been scheduled or are desired. 14. INSURANCE Without limiting Consultant's indemnification of City, and prior to commencement of Work, Consultant shall obtain, provide and maintain at its own expense during the term of this Agreement or for other periods as specified in this Agreement, policies of insurance of the type, amounts, terms and conditions described in the Insurance Requirements attached hereto as Exhibit C, and incorporated herein by reference. 15. PROHIBITION AGAINST ASSIGNMENTS AND TRANSFERS Except as specifically authorized under this Agreement, the Services to be provided under this Agreement shall not be assigned, transferred contracted or subcontracted out without the prior written approval of City. Any of the following shall be construed as an assignment: The sale, assignment, transfer or other disposition of any of the issued and outstanding capital stock of Consultant, or of the interest of any general partner or joint venturer or syndicate member or cotenant if Consultant is a partnership or joint -venture or syndicate or co -tenancy, which shall result in changing the control of Consultant. Control means fifty percent (50%) or more of the voting Bucknam Infrastructure Group, Inc. Page 5 power or twenty-five percent (25%) or more of the assets of the corporation, partnership or joint -venture. 16. SUBCONTRACTING The subcontractors authorized by City, if any, to perform Work on this Project are identified in Exhibit A. Consultant shall be fully responsible to City for all acts and omissions of any subcontractor. Nothing in this Agreement shall create any contractual relationship between City and any subcontractor nor shall it create any obligation on the part of City to pay or to see to the payment of any monies due to any such subcontractor other than as otherwise required by law. City is an intended beneficiary of any Work performed by the subcontractor for purposes of establishing a duty of care between the subcontractor and City. Except as specifically authorized herein, the Services to be provided under this Agreement shall not be otherwise assigned, transferred, contracted or subcontracted out without the prior written approval of City. 17. OWNERSHIP OF DOCUMENTS 17.1 Each and every report, draft, map, record, plan, document and other writing produced, including but not limited to, websites, blogs, social media accounts and applications (hereinafter "Documents'), prepared or caused to be prepared by Consultant, its officers, employees, agents and subcontractors, in the course of implementing this Agreement, shall become the exclusive property of City, and City shall have the sole right to use such materials in its discretion without further compensation to Consultant or any other party. Additionally, all material posted in cyberspace by Consultant, its officers, employees, agents and subcontractors, in the course of implementing this Agreement, shall become the exclusive property of City, and City shall have the sole right to use such materials in its discretion without further compensation to Consultant or any other party. Consultant shall, at Consultant's expense, provide such Documents, including all logins and password information to City upon prior written request. 17.2 Documents, including drawings and specifications, prepared by Consultant pursuant to this Agreement are not intended or represented to be suitable for reuse by City or others on any other project. Any use of completed Documents for other projects and any use of incomplete Documents without specific written authorization from Consultant will be at City's sole risk and without liability to Consultant. Further, any and all liability arising out of changes made to Consultant's deliverables under this Agreement by City or persons other than Consultant is waived against Consultant, and City assumes full responsibility for such changes unless City has given Consultant prior notice and has received from Consultant written consent for such changes. 17.3 All written documents shall be transmitted to City in formats compatible with Microsoft Office and/or viewable with Adobe Acrobat. Bucknam Infrastructure Group, Inc. Page 6 18. CONFIDENTIALITY All Documents, including drafts, preliminary drawings or plans, notes and communications that result from the Services in this Agreement, shall be kept confidential unless City expressly authorizes in writing the release of information. 19. INTELLECTUAL PROPERTY INDEMNITY Consultant shall defend and indemnify City, its agents, officers, representatives and employees against any and all liability, including costs, for infringement or alleged infringement of any United States' letters patent, trademark, or copyright, including costs, contained in Consultant's Documents provided under this Agreement. 20. RECORDS Consultant shall keep records and invoices in connection with the Services to be performed under this Agreement. Consultant shall maintain complete and accurate records with respect to the costs incurred under this Agreement and any Services, expenditures and disbursements charged to City, for a minimum period of three (3) years, or for any longer period required by law, from the date of final payment to Consultant under this Agreement. All such records and invoices shall be clearly identifiable. Consultant shall allow a representative of City to examine, audit and make transcripts or copies of such records and invoices during regular business hours. Consultant shall allow inspection of all Work, data, Documents, proceedings and activities related to the Agreement for a period of three (3) years from the date of final payment to Consultant under this Agreement. 21. WITHHOLDINGS City may withhold payment to Consultant of any disputed sums until satisfaction of the dispute with respect to such payment. Such withholding shall not be deemed to constitute a failure to pay according to the terms of this Agreement. Consultant shall not discontinue Work as a result of such withholding. Consultant shall have an immediate right to appeal to the City Manager or designee with respect to such disputed sums. Consultant shall be entitled to receive interest on any withheld sums at the rate of return that City earned on its investments during the time period, from the date of withholding of any amounts found to have been improperly withheld. 22. ERRORS AND OMISSIONS In the event of errors or omissions that are due to the negligence or professional inexperience of Consultant which result in expense to City greater than what would have resulted if there were not errors or omissions in the Work accomplished by Consultant, the additional design, construction and/or restoration expense shall be borne by Consultant. Nothing in this Section is intended to limit City's rights under the law or any other sections of this Agreement. Bucknam Infrastructure Group, Inc. Page 7 23. CITY'S RIGHT TO EMPLOY OTHER CONSULTANTS City reserves the right to employ other Consultants in connection with the Project. 24. CONFLICTS OF INTEREST 24.1 Consultant or its employees may be subject to the provisions of the California Political Reform Act of 1974 (the "Act"), which (1) requires such persons to disclose any financial interest that may foreseeably be materially affected by the Work performed under this Agreement, and (2) prohibits such persons from making, or participating in making, decisions that will foreseeably financially affect such interest. 24.2 If subject to the Act, Consultant shall conform to all requirements of the Act. Failure to do so constitutes a material breach and is grounds for immediate termination of this Agreement by City. Consultant shall indemnify and hold harmless City for any and all claims for damages resulting from Consultant's violation of this Section. 25. NOTICES 25.1 All notices, demands, requests or approvals, including any change in mailing address, to be given under the terms of this Agreement shall be given in writing, and conclusively shall be deemed served when delivered personally, or on the third business day after the deposit thereof in the United States mail, postage prepaid, first- class mail, addressed as hereinafter provided. 25.2 All notices, demands, requests or approvals from Consultant to City shall be addressed to City at: Attn: David A. Webb, Public Works Director Public Works Department City of Newport Beach 100 Civic Center Drive PO Box 1768 Newport Beach, CA 92658 25.3 All notices, demands, requests or approvals from City to Consultant shall be addressed to Consultant at: Attn: Peter Bucknam Bucknam Infrastructure Group, Inc. 3548 Seagate Way, Suite 230 Oceanside, CA 92056 Bucknam Infrastructure Group, Inc. Page 8 26. CLAIMS Unless a shorter time is specified elsewhere in this Agreement, before making its final request for payment under this Agreement, Consultant shall submit to City, in writing, all claims for compensation under or arising out of this Agreement. Consultant's acceptance of the final payment shall constitute a waiver of all claims for compensation under or arising out of this Agreement except those previously made in writing and identified by Consultant in writing as unsettled at the time of its final request for payment. Consultant and City expressly agree that in addition to any claims filing requirements set forth in the Agreement, Consultant shall be required to file any claim Consultant may have against City in strict conformance with the Government Claims Act (Government Code sections 900 et seq.). 27. TERMINATION 27.1 In the event that either party fails or refuses to perform any of the provisions of this Agreement at the time and in the manner required, that party shall be deemed in default in the performance of this Agreement. If such default is not cured within a period of two (2) calendar days, or if more than two (2) calendar days are reasonably required to cure the default and the defaulting party fails to give adequate assurance of due performance within two (2) calendar days after receipt of written notice of default, specifying the nature of such default and the steps necessary to cure such default, and thereafter diligently take steps to cure the default, the non -defaulting party may terminate the Agreement forthwith by giving to the defaulting party written notice thereof. 27.2 Notwithstanding the above provisions, City shall have the right, at its sole and absolute discretion and without cause, of terminating this Agreement at any time by giving no less than seven (7) calendar days' prior written notice to Consultant. In the event of termination under this Section, City shall pay Consultant for Services satisfactorily performed and costs incurred up to the effective date of termination for which Consultant has not been previously paid. On the effective date of termination, Consultant shall deliver to City all reports, Documents and other information developed or accumulated in the performance of this Agreement, whether in draft or final form. 28. PREVAILING WAGES Pursuant to the applicable provisions of the Labor Code of the State of California, not less than the general prevailing rate of per diem wages including legal holidays and overtime Work for each craft or type of workman needed to execute the Work contemplated under the agreement shall be paid to all workmen employed on the Work to be done according to the agreement by the Consultant and any subcontractor. In accordance with the California Labor Code (Sections 1770 et seq.), the Director of Industrial Relations has ascertained the general prevailing rate of per diem wages in the locality in which the Work is to be performed for each craft, classification, or type of workman or mechanic needed to execute the agreement. A copy of said determination is available by calling the prevailing wage hotline number (415) 703-4774, and Bucknam Infrastructure Group, Inc. Page 9 requesting one from the Department of Industrial Relations. The Consultant is required to obtain the wage determinations from the Department of Industrial Relations and post at the job site the prevailing rate or per diem wages. It shall be the obligation of the Consultant or any subcontractor under him/her to comply with all State of California labor laws, rules and regulations and the parties agree that the City shall not be liable for any violation thereof 29. STANDARD PROVISIONS 29.1 Recitals. City and Consultant acknowledge that the above Recitals are true and correct and are hereby incorporated by reference into this Agreement. 29.2 Compliance with all Laws. Consultant shall, at its own cost and expense, comply with all statutes, ordinances, regulations and requirements of all governmental entities, including federal, state, county or municipal, whether now in force or hereinafter enacted. In addition, all Work prepared by Consultant shall conform to applicable City, county, state and federal laws, rules, regulations and permit requirements and be subject to approval of the Project Administrator and City. 29.3 Waiver. A waiver by either party of any breach, of any term, covenant or condition contained herein shall not be deemed to be a waiver of any subsequent breach of the same or any other term, covenant or condition contained herein, whether of the same or a different character. 29.4 Integrated Contract. This Agreement represents the full and complete understanding of every kind or nature whatsoever between the parties hereto, and all preliminary negotiations and agreements of whatsoever kind or nature are merged herein. No verbal agreement or implied covenant shall be held to vary the provisions herein. 29.5 Conflicts or Inconsistencies. In the event there are any conflicts or inconsistencies between this Agreement and the Scope of Services or any other attachments attached hereto, the terms of this Agreement shall govern. 29.6 Interpretation. The terms of this Agreement shall be construed in accordance with the meaning of the language used and shall not be construed for or against either party by reason of the authorship of the Agreement or any other rule of construction which might otherwise apply. 29.7 Amendments. This Agreement may be modified or amended only by a written document executed by both Consultant and City and approved as to form by the City Attorney. 29.8 Severability. If any term or portion of this Agreement is held to be invalid, illegal, or otherwise unenforceable by a court of competent jurisdiction, the remaining provisions of this Agreement shall continue in full force and effect. Bucknam Infrastructure Group, Inc. Page 10 29.9 Controlling Law and Venue. The laws of the State of California shall govern this Agreement and all matters relating to it and any action brought relating to this Agreement shall be adjudicated in a court of competent jurisdiction in the County of Orange, State of California. 29.10 Equal Opportunity Employment. Consultant represents that it is an equal opportunity employer and it shall not discriminate against any subcontractor, employee or applicant for employment because race, religious creed, color, national origin, ancestry, physical handicap, medical condition, marital status, sex, sexual orientation, age or any other impermissible basis under law. 29.11 No Attorneys' Fees. In the event of any dispute or legal action arising under this Agreement, the prevailing party shall not be entitled to attorneys' fees. 29.12 Counterparts. This Agreement may be executed in two (2) or more counterparts, each of which shall be deemed an original and all of which together shall constitute one (1) and the same instrument. [SIGNATURES ON NEXT PAGE] Bucknam Infrastructure Group, Inc. Page 11 IN WITNESS WHEREOF, the parties have caused this Agreement to be executed on the dates written below. APPROVED AS TO FORM: CITY ATr Rf EY'S OFFICE Date: �j I CITY OF NEWPORT BEACH, a California municipal corporation Date: 110 I^ 1 By: By: / Aaron C. Harp David A. Webb City Attorney °��Public Works Director ATTEST: Date: lb., �. 10 By: __aA Leilani I. Brown City Clerk+�� CONSULTANT: Bucknam Infrastructure Group, Inc., a California corporation Date: Signed in Counterpart By: Peter Bucknam President [END OF SIGNATURES] Attachments: Exhibit A — Scope of Services Exhibit B — Schedule of Billing Rates Exhibit C — Insurance Requirements IN WITNESS WHEREOF, the parties have caused this Agreement to be executed on the dates written below. APPROVED AS TO FORM: CITY AT TN Y'S OFFICE Date: 'DN B A--,-- Y- Aaron C. Harp City Attorney ATTEST: Date: By: Leilani I. Brown City Clerk CITY OF NEWPORT BEACH, a California municipal corporation Date: By: David A. Webb Public Works Director CONSULTANT: Bucknam Infrastructure Group, Inc., a California corporation Date: moi' -ZZ By: Peter Buck am President [END OF SIGNATURES] Attachments: Exhibit A — Scope of Services Exhibit B — Schedule of Billing Rates Exhibit C — Insurance Requirements EXHIBIT A SCOPE OF SERVICES Bucknam Infrastructure Group, Inc. Page A-1 August 16, 2016 Mr. Ben Davis City of Newport Beach Public Works Department 3300 Newport Boulevard Newport Beach, CA 92663 Subject: Proposal for Pavement Management Program Services — FY 2016/2018 Dear Ben: It is our pleasure to submit our proposal to assist the City in continuing the proactive management of the City's Pavement Management Program (PMP). With the City of Newport Beach's PMP moving toward automation through condition survey updates, Capital Improvement reporting (CIP), and GIS development, Bucknam Infrastructure Group, Inc. has identified a proactive and cost efficient method to assist the City in the continued success of the PMP program. Our team will focus our high-end pavement management expertise, annual working knowledge of Newport Beach's MicroPAVER dataset and GIS technology to optimize the City's management of the essential infrastructure management programs. Our services will build upon the earlier success of our 2008-16 pavement management program services with cost -conscience pavement inspections, annual work history updates, additional CIP reporting, alternative budgetary reporting, GIS support for the PMP and general database management. By selecting Bucknam, the City of Newport Beach will continue to receive a strong, knowledgeable, innovative and communicative team with the experience to implement a cost-effective pavement management program. Our handpicked pavement management professionals are committed to delivering quality services to the City. Mr. Peter Bucknam will represent our firm for this project and can be contacted at 760-216-6529 (work) 714-501-1024 (cell) or email at peter@bucknam-inc.com. Due to our long-term service to Newport Beach, Bucknam will continue to utilize our previous hourly rates for the next two fiscal years. In order to streamline project management and work schedules, all work efforts will be conducted through our offices in Oceanside and Laguna Niguel, CA Respectfully submitted, Bucknam Infrastructure Group, Inc. w= Peter J. Bucknam Project Manager BUCK NAM IN=RASTRUCTURE GROUP, INC. 3548 Seagate way, Suite 230 Oceanside, CA 92056 T. 760.216.6529 F. 760216.6549 l .bucknam-inc.conn Scope of Work ss Project Understanding /Approach We have defined detailed phases to the scope of work; 1. Project Implementation 2. Client Satisfaction 3. Project Schedule 4. Scope of Work (Major Tasks) 5. Optional Services (i.e. Digital Roadway Imaging — Infrastructure) 1) Project Implementation Task 1.1: Management & Administration — Project Kickoff The first step in implementing a successful pavement management program truly resides in frequent communication and timely scheduled data updates. For the City of Newport Beach it will be essential to establish, up front, the Engineering and Street Maintenance pavement management priorities. Our team will set a Project Kickoff meeting to further discuss and review in detail the expectations of the project, technical approach and the review of schedule and budget. This effort will build consensus between the Street Maintenance and Public Works departments as well as build stronger ARTERIAL and LOCAL maintenance programs. The first key topics to be discussed will include the review and assessment of the existing Micro PAVER pavement plan/data, Measure M compliance, survey areas, new construction, data quality and condition, current pavement procedures, historical expenditure levels, and desired service levels. During the project several project assessment meetings and project status meetings will be held to ensure that the major scope tasks and project schedule are being adhered too. Task 1.2: Project Status Meetings — Quality Control Program Status Meetings and Progress Reports • Minimum of three meetings during the project (kickoff, field, and status meetings) — minimum of eight (8) hours • Field review meetings • Monthly progress status reports will be delivered to City project manager Quality Control (QC) We will use a statistical sampling approach for measuring the quality of our field technician's work. In this manner, 10 percent of the original annual surveys will be re- Scope of Work surveyed by an independent survey crew, supervised by a field supervisor, and the results will be compared to the original surveys. Our QC process involves checking the field crews' work in a "blind study" fashion. Quality control checks will be performed at the end of each survey week. This will ensure that all field personnel are properly collecting distresses and pavement quantities for all street segments. Since we are collecting distress information on our field Tablets with the Newport Beach MicroPAVER database live, our staff will perform several quality control tests within the pavement management software using a sample set of the City of Newport Beach's street distress data. This will ensure that all system and analysis settings as well as City recommendations and standards are being followed. As shown within the OCTA "Countywide Pavement Management Program, Guidelines Manual (January 2016)", our staff will follow and deliver on the requirements stated on Section 2.4, page 8 which require specific QA/QC data. All general draft and final reporting will follow the Chapter 3 guidelines. Over the past year, Bucknam has already submitted sixteen (16) OCTA Measure M2 compliant reports for OC municipalities, they include: Brea Huntington Beach Newport Beach Santa Ana ................ ... ......... ........ ........ ......... Costa Mesa ......... ......... Irvine .... RSM .... Fullerton .............. ........ ....................................................-...................................................................;......................... Laguna Hills....._.....:._.._..._Laguna Beach Fountain Valley .................................Tustin......................................SeaLBeach................ i San Juan Capo Westminster Aliso Viejo Our surveys follow the accepted OCTA walking/windshield requirements. A copy of the QA/QC plan utilized by our staff during the project will be submitted along with the PMP certification documents. Our staff has already attended the OCTA MicroPAVER Distress Training Class held in November, 2011, 2012, 2013, 2014, 2015. In March, 2016 our staff was acknowledged as having "qualified inspectors and firm" to prepare Pavement Management Plans compliant with the OCTA Countywide Pavement Management Guidelines (this compliance runs through June 2018). Deliverable: Monthly Project Status reports, field review and project status meetings, compliance with OCTA QA/QC Plan 2) Client Satisfaction Task 2.1: Project Deliverables Shown throughout our Scope of Work, each Task is summarized with project deliverables. Client satisfaction will derive from frequent communication with the Project Manager and key staff members from the Engineering and Street Maintenance departments. Project success is created by delivering on three main factors; 1-2 Scope of Work (9 1. Adherence to scope tasks and deliverables 2. Performing to the standard set by the Project Schedule; and 3. Controlling costs. Our Project Manager will follow each of these factors throughout the duration of the project Deliverable: Project Status Updates, as stated in Task 1.2 1-3 Scope of Work (ci4tena'�n ��"'°�aF 3) Project Schedule Task 3.1: Work Flow/ Project Schedule Our project schedule shows each major task identified in our scope of work, as well as quality control milestones and meetings. Bucknam currently has ample staff to apply to this project in order to meet an aggressive schedule (two field technicians will drive the proactive schedule). See key milestone dates from the project schedule below: • Project Kickoff — October 12, 2016 • Survey Completion —January 11, 2017 • Delivery of draft PMP —January 18, 2016 • City comments returned to Consultant — January 25, 2016 • Delivery of City CIP Final Report — February, 2016 o All necessary OCTA data, reporting and revenue projections will be submitted prior to June 30, 2017 (no later than March, 2017) • Submittal to OCTA of MicroPAVER Certification conforming to Renewed Measure M2 Eligibility Guidelines— March, 2017 • Implementation of MicroPAVER version 6.5/7.0 — Any time after acceptance of Final PMP o One copy of the MicroPAVER database will be delivered o All pavement and GIS data pertinent to the project deliverables will be submitted with the Final PMP report 1-4 Scope of Work 9 4) Scope of Work (Major Tasks) TASK 4.1: Micro PAVER Management — Work History Based on the pavement maintenance that has been performed by in-house staff as well as contractual maintenance, our staff will review all street and alley activities that have been performed since the last 2015-16 PMP update (one year of data). This data will be entered into MicroPAVER v6.5 to enhance pavement deterioration analysis and the recommendations for the upcoming budgetary analysis and CIP reporting. TASK 4.2: Conduct Pavement Inspections 2016-17 Survev Once the pavement segmentation has been assessed and verified, the inspection of approximately 82.4 miles of MPAH, Arterial /Collector segments will be performed. Additionally, based on the City's ongoing local maintenance schedule Bucknam staff will survey 70 miles of the local network (Zones 1, 2, and 3, includes 17.4 miles of alleys). Our survey methodology will include the following approach based on the OCTA reporting guidelines: 1. Walking All sections are surveyed through walking methodologies. Distress types will be collected based upon actual surface conditions and physical characteristics of the segment. Surveying methods will be conducted by remaining consistent with Micro PAVER & the Army Corp of Engineers sampling guidelines while being flexible to current City requirements. All sample locations are observed through walking surveys; additional street factors such as unique distress areas found outside our sample areas will be recorded. According to the OCTA guidelines, Newport Beach MPAH pavement sections are to be surveyed for the upcoming 2016 PMP update: • The inspection of approximately 82.4 miles of MPAH Arterial segments and 70 miles of Locals will be performed — OCTA compliance requirement (based on last inspection dates); • Recent slurry seal and overlay maintenance will reduce total mileage of survey — TBD; • 17.4 miles of Alley sections will be surveyed within the appropriate zones; and • No private streets will be surveyed under this effort. 1-5 Scope of Work 2017-18 Survey Based on the City's request, Bucknam staff will survey 93 miles of the local network (Zones 4, 5, 6, and 7, includes 11.8 miles of alleys). All MicroPAVER — Army Corps of Engineers field survey requirements will be followed. Alley sections will be surveyed within the appropriate zones; no private streets will be surveyed under this effort. Our use of MicroPAVER-Tablet units allows our staff to collect pavement data with the City of Newport Beach's MicroPAVER database live in the field. At the end of the day all electronic data is transferred to our office for quality control and management. Our Tablet methodology sets us apart from the competition since we are using a paper -less inventory process to enter data; this in turn generates cost savings to enhance the project schedule and other portions of the project such as CIP reporting, MicroPAVER training, and on-call services. Roadway Verification Survey- A listing of the field attribute data that is updated/verified during the survey for the pavement management database is listed below (OCTA survey guidelines will be followed): 1. Field Attribute Data (updated and/or verified) :• From/to, indicating the assigned limits of the section, sample test areas, street name, a street codification Street ranking indicating local, alley, arterial, collector, # of lanes, surface type Historical PCI tracking from previous inspections and 2012 PCI inspections Segment quantities, indicating the length, width, and total true area of the section ADTvolumes (if available from previous reports or City documents) 2. Conditional data will be evaluated for all street segments and will include: °a MicroPAVER 20 AC & 19 PCC distresses by type, severity and sample area PCI ratings (0-100), taking into account the surface condition, level of distress Other known or found environmental issues (standing water, site condition, etc.) We welcome staff members from the City of Newport Beach to join our surveys. All pavement data will be entered into the City's most current licensed software (version 6.5, in -hand now). If the City has not obtained the most recent version of MicroPAVER we will assist the City in purchasing the software upgrade (purchase of the MicroPAVER v7 is not currently included within our proposed fee). All items listed above will be maintained by our staff for the duration 1-6 Scope of Work of this project. Data management will be performed in-house at our Oceanside office. At the completion of the project, the MicroPAVER database will be placed within your information services/communication network. 3. Section Distress and PCI Reporting Upon 50% and 100% completion of the required condition surveys, we will prepare draft PCI Reports and PCI GIS maps that document the conditions of all pavement segments. This report will provide the necessary information within MicroPAVER for the City to use and manipulate projected street rehabilitation and maintenance projects. Included in the report will be updated pavement performance curves and maintenance decision models. The City and our staff will review the PCI reports to ensure that all inventory data is correct and the project is running smoothly. Our Report that will include: PCI report - Sorted by Name (A to Z), PCI Order (0-100), Zone (1, 2, 3, etc.) Pavement segment and PCI "Variance Report" 4• Graphical representation of conditions v Condition Report Analysis for each segment Work history report GIS Maps presenting PCI finding by zone and by section Once the City has reviewed, assessed and commented on the draft report, we will address all comments made and deliver the final reports. Deliverable: Citywide PCI reports, compliant OCTA PCI reports, updated MicroPAVER database DEVELOP RECOMMENDED IMPROVEMENT PROGRAM TASK 4.3: Maintenance &CIP/Budgetary Analysis We will assist the City in developing the most cost-effective preventative maintenance, repair and rehabilitation strategies possible. This will be accomplished by meeting with the City to discuss and strategize maintenance activities that are currently being used by the City. Based on the City's current AC & PCC applications and other maintenance practices used we will conduct an historical and prospective analysis on the conditional and financial impact these practices have on the pavement network. Based on our fiscal and deterioration analysis, we will present our results and recommendations to City staff. This analysis will become an essential building block for the 2016-2023 maintenance programs. We will establish a maintenance "decision tree" that will be used to generate pavement recommendations that match current 2016 maintenance approaches. This will be accomplished by assessing/updating the unique and individual deterioration curves within MicroPAVER based on functional class (i.e. arterial, collector, local) and age. 1-7 Scope of Work Our staff will review the Newport Beach's deterioration curves that have been developed based on historical pavement condition, inspection, surface type, and road class. The curves will be modified based on 2016 pavement conditions. The strategies that are typically reviewed are rehabilitation and reconstruction (R&R), localized maintenance, slurry seals, and various overlay types, the expected improvement in pavement condition, the life -cycle extension that would result and the unit costs for maintenance. All maintenance practices/unit costs will be integrated into MicroPAVER and will be derived from the most recent construction bids for pavement rehabilitation. We will account for inflation rates when long-term revenues projections are made. Our Project Manager and Principal will work closely with City in defining repair and rehabilitation strategies during each fiscal year and within each tract/area defined by the City. Once the repair/rehabilitation strategies have been defined, the identification of a seven year Forecasted Maintenance schedule will be generated. The recommended budget scenarios will be identified on the basis of several criteria: • Present pavement conditions; Desired levels of service and available resources • Local Match Reduction guidelines identified by OCTA • Scheduling with the City's maintenance zones and other capital projects (water, sewer) • Accrued backlog levels and stabilization of maintenance backlog • Future routine maintenance needs based on projected deterioration rates • Future OCTA and MPAH objectives and improving citywide weighted PCI The primary emphasis of this task is to maximize the programming of street maintenance projects using the most cost-effective strategies available and taking into account a life -cycle cost analysis. A working "draft" Final Report will be generated for City staff to review. The Draft and Final PMP report will include: • Executive Summary / Findings and Recommendations • Pavement Condition Index (PCI) reports; • 7 -Year CIP identifying arterial and residential maintenance (per section) recommendations (slurry, overlay, recon, etc.) associated with a construction cost • Recommendations for LOCAL maintenance in "groupings" or zones. • GIS mapping Deliverable: Two copies of the Draft Pavement Management Program Report 1-8 Scope of Work F � TASK 4A Citywide CIP/OCTA Compliance Reports We will deliver the Final Report to the City which will be essential for staff reference and use as well as presented in a way that is beneficial for elected officials/upper management. This report will assist the City in complying with OCTA and its most recent Countywide PMP Guideline requirements. The report will be prepared in a format that uses the information delivered by MicroPAVER in conjunction with the information and analysis performed by our team (identical to the report we delivered to OCTA every odd year). The report will provide the City with information on: Current inventory and pavement conditions indices (PCI) for all road classes Projected annual rehabilitation programs for street maintenance for a 7 -yr period (ARTERIAL and LOCAL Forecast Maintenance Reports) that show the largest return on investment and acceptable levels of service Modeling and comparison of budget scenarios typically include: • Maintenance required to complete all streets within 7 -years • Current / Actual budget projection (citywide approach) • 7 -year CIP projection budget for OCTA submittal requirements • Final Local Match Reduction budgetary models / results • Strategies and recommendations for the City's maintenance programs and procedures, including a preventative maintenance schedule • Supporting documentation required by OCTA • A detailed breakdown of deferred maintenance (backlog) We will make a presentation of the results from the 2016-17 PMP update to City personal and/or City Council if necessary. Registered Engineer Mr. Steve Bucknam, P.E. will supervise all operations, review all completed data and prepare and sign a final report incorporating the results of our pavement evaluation and conditions. We will provide engineered recommendations for pavement rehabilitation and replacement design based upon field data and analysis. Deliverable: Three (3) copies of the Final Pavement PMP Report (plus one original signed by our Registered Engineer, CA No. 20903), in binder and electronic form (.pdf), will be sent to the City. Bucknam will provide one (1) DVD copy that includes all final reporting documents, PMP database and GIS files. 1-9 Scope of Work TASK 4.5: Mapping and GIS o .w F ',.�. As an enhancement and proactive approach to this project, our staff will update the existing Pavement -GIS link between MicroPAVER and the City's GIS system. Our staff established this link in 2008 and has updated the unique PMP -GIS layer every year. Our staff will review, with City staff, all ongoing upcoming capital projects that may impact the GIS mapping delivered for this project. The maps described below will be incorporated into the City's Final PMP report: i• PCI values for every section (24 x 36 color) Work History identifications (24 x 36 color) to 7 -yr Arterial / Local Rehabilitation and Slurry Seal Programs (24 x 36 color) Functional classification maps (24 x 36 color) Once the City has approved the Pavement Condition Report, we will update the necessary MicroPAVER-GIS linkages (street names will be shown on all maps). By using the unique ID's within the PMP and the City's ESRI street shapefile ID's, we will create a one-to-one match for each pavement section in the GIS. Our staff will coordinate all project deliveries with the Public Works and the GIS division to ensure that the most current and accurate PMP -GIS maps are represented within the City's GIS enterprise. Deliverable: Complete GIS files/themes based on list above (shapefiles). TASK 4.6: As -Needed Services Pavement Management Program Support Bucknam will provide annual support for a period of two years where we will provide quality and accurate use of the in-house operation of MicroPAVER software. Once the City has approved the Pavement Condition Index Report under this years work effort, this service will become active. Our typical On -Call services include: NN As -needed services will assume 16 man-hours NN Additional budget scenarios, general reporting, deterioration studies !� Additional visual inspections above the mileage amount indicated in Task 3 Additional pavement management — GIS mapping Additional MicroPAVER training, operation use Enter annual work ARTERIAL and LOCAL maintenance records 1-10 Scope of Work w Also, if requested, Bucknam will assess and review the City's upcoming maintenance schedule for that fiscal year. The agreement will continue to include the provision of onsite and telephone support for the City staff. *All work as described above will be submitted prior to March of each corresponding fiscal year OCTA PMP QUALIFICATIONS Shown below is OCTA's verification that Bucknam Infrastructure Group, Inc. is prequalified to prepare Pavement Management Plans. Buckram is "qualified" until June, 2018. Peter, June 30, 2018. May Hout Senior Transportation Funding Analyst Orange County Transportation Authority 6407 S Main Street I Orange, CA 92868 or P.O. Box 14184 1 Orange, CA 92863-1584 [For Fed -Ex) Y: (714) 560-5945 E2 mhoutdDoaa,net APlease consider the environment before printing this e-mail. From: Peter(abucknam.net [mailto:peterPbucknam.net] Sent: Tuesday, August 09, 2416 4:47 PM To: May Hout <mhout@acta.net> Subject: Certification expiration - Bucknam Infrastructure Importance: High May, can you verify if Buckram Infrastructure's "prequalified" status for the PMP is until June, 2017 or June, 2018, thanks. Peter Buckram President BUCKNAM INFRASTRUCTURE GROUP, INC. EXHIBIT B SCHEDULE OF BILLING RATES Bucknam Infrastructure Group, Inc. Page B-1 Scope of Work U r �tiw"°Rr k p N Y A Hien Standard Hourly Rate Schedule Category Rate Principal $ 250 Senior Project Manager 210 Senior Engineer/ Planner 180 Construction Manager 172 Management Analyst 160 Project Engineer / Planner 155 Pavement Management Project Manager 165 Sr. Engineer / Sr. Technician / Sr. GIS Planner / Sr. Inspector 130 Assistant Engineer / Technician / GIS Planner / Inspector 125 CADD Operator 105 Administrative Assistant 100 Field Technician 82 Clerical/ Word Processing 75 Forensic Services Quote Reimbursables Mileage $ 0.65/mile Subconsultant Services Cost + 15% Reproduction Cost + 15% Travel & Subsistence Cost + 15% Fees & Permits Cost + 15% Computer Services (External) Cost + 15% Rates Effective 9/1/16 5-3 U a, LL ti O 00 N 00 Lo -T I Ln to NN o 000 m 00 0 N c0 In r -I rn rn 00� rn N • V t4Lam? O I- v i O r O L N tV tl�j N '6 L I� ty L 0J in ko 00 Ln M N Ln to N m C 00 N M 0 00 i M O a5, L N M ri N N O o v V) c p N C7 <a ^ ) a . +� w `- N fn r -I Ln N 3 N N r -I M =_ ra kD N 3 a ° c0 a � "I 3 Q S N N c L 3 U o Ln 4% c N U a u ru 4-1 m +- •3 I � O In 3 0 H z O c _ O y,C14i o >- aoi U LGJ •�' U y H m M m� 3 _ = N C •Q N p u p r -I r0 Q 3 0 3 O= 3 y �. O V vi m y a O c • ca 0 c N o N f0 a v ° o v� ai r� a, G M CL a`i H a w °1 n O E w 01 ~ �- W wo tw E In E a Z s c c ° 0 � 0o U O u o a, v -4 •� o = au 2 � Y 2 E aT, > r- > O1 Co w c7 CL 3 aoo '^ 0 3 a, o oc v i o oc aJ °1 v Z w a vi v a, c �+ a, aj NJ ,c W L In 7 In i c V M •� ` y I.�L cCL) Y to a O N p a C = N y N vOi cCU 0) q0 -a N 7 0 0) LL O v 'i v v 7 Cu Q t0 A v m •a 0J > O m 01 Y N 0) O V fd N aJ fl. O LL UO 0 OU N a4) C '� Z -Q N A = m C N t0 V X O O L O a O s O Ln V c V > a Q j .0 Q C E c "O — H — m p m p O +� 00 L a a a U oC Q .-� N ri N M Ln d' Q rl r -I y a-1 le N N N le M d he d' -he T Y � Y �' F-• M H" f- I- H H H c�6 f�0 fy0 Im I-- F H H L"M EXHIBIT C INSURANCE REQUIREMENTS — PROFESSIONAL SERVICES 1. Provision of Insurance. Without limiting Consultant's indemnification of City, and prior to commencement of Work, Consultant shall obtain, provide and maintain at its own expense during the term of this Agreement, policies of insurance of the type and amounts described below and in a form satisfactory to City. Consultant agrees to provide insurance in accordance with requirements set forth here. If Consultant uses existing coverage to comply and that coverage does not meet these requirements, Consultant agrees to amend, supplement or endorse the existing coverage. 2. Acceptable Insurers. All insurance policies shall be issued by an insurance company currently authorized by the Insurance Commissioner to transact business of insurance in the State of California, with an assigned policyholders' Rating of A- (or higher) and Financial Size Category Class VII (or larger) in accordance with the latest edition of Best's Key Rating Guide, unless otherwise approved by the City's Risk Manager. 3. Coverage Requirements. A. Workers' Compensation Insurance. Consultant shall maintain Workers' Compensation Insurance, statutory limits, and Employer's Liability Insurance with limits of at least one million dollars ($1,000,000) each employee for bodily injury by accident and each employee for bodily injury by disease in accordance with the laws of the State of California, Section 3700 of the Labor Code. Consultant shall submit to City, along with the certificate of insurance, a Waiver of Subrogation endorsement in favor of City, its City Council, boards and commissions, officers, agents, volunteers and employees. B. General Liability Insurance. Consultant shall maintain commercial general liability insurance, and if necessary umbrella liability insurance, with coverage at least as broad as provided by Insurance Services Office form CG 00 01, in an amount not less than one million dollars ($1,000,000) per occurrence, two million dollars ($2,000,000) general aggregate. The policy shall cover liability arising from premises, operations, personal and advertising injury, and liability assumed under an insured contract (including the tort liability of another assumed in a business contract). C. Automobile Liability Insurance. Consultant shall maintain automobile insurance at least as broad as Insurance Services Office form CA 00 01 covering bodily injury and property damage for all activities of Consultant arising out of or in connection with Work to be performed under this Agreement, including coverage for any owned, hired, non -owned or rented vehicles, in an amount not less than one million dollars ($1,000,000) combined single limit each accident. Bucknam Infrastructure Group, Inc. Page C-1 4. Other Insurance Requirements. The policies are to contain, or be endorsed to contain, the following provisions: A. Waiver of Subrogation. All insurance coverage maintained or procured pursuant to this Agreement shall be endorsed to waive subrogation against City, its City Council, boards and commissions, officers, agents, volunteers and employees or shall specifically allow Consultant or others providing insurance evidence in compliance with these requirements to waive their right of recovery prior to a loss. Consultant hereby waives its own right of recovery against City, and shall require similar written express waivers from each of its subconsultants. B. Additional Insured Status. All liability policies including general liability, excess liability, pollution liability, and automobile liability, if required, but not including professional liability, shall provide or be endorsed to provide that City, its City Council, boards and commissions, officers, agents, volunteers and employees shall be included as insureds under such policies. C. Primary and Non Contributory. All liability coverage shall apply on a primary basis and shall not require contribution from any insurance or self- insurance maintained by City. D. Notice of Cancellation. All policies shall provide City with thirty (30) calendar days notice of cancellation (except for nonpayment for which ten (10) calendar days notice is required) or nonrenewal of coverage for each required coverage. 5. Additional Agreements Between the Parties. The parties hereby agree to the following: A. Evidence of Insurance. Consultant shall provide certificates of insurance to City as evidence of the insurance coverage required herein, along with a waiver of subrogation endorsement for workers' compensation and other endorsements as specified herein for each coverage. Insurance certificates and endorsement must be approved by City's Risk Manager prior to commencement of performance. Current certification of insurance shall be kept on file with City at all times during the term of this Agreement. City reserves the right to require complete, certified copies of all required insurance policies, at any time. B. City's Right to Revise Requirements. City reserves the right at any time during the term of the Agreement to change the amounts and types of insurance required by giving Consultant sixty (60) calendar days advance written notice of such change. If such change results in substantial additional cost to Consultant, City and Consultant may renegotiate Consultant's compensation. Bucknam Infrastructure Group, Inc. Page C-2 C. Enforcement of Agreement Provisions. Consultant acknowledges and agrees that any actual or alleged failure on the part of City to inform Consultant of non-compliance with any requirement imposes no additional obligations on City nor does it waive any rights hereunder. D. Requirements not Limiting. Requirements of specific coverage features or limits contained in this Section are not intended as a limitation on coverage, limits or other requirements, or a waiver of any coverage normally provided by any insurance. Specific reference to a given coverage feature is for purposes of clarification only as it pertains to a given issue and is not intended by any party or insured to be all inclusive, or to the exclusion of other coverage, or a waiver of any type. If the Consultant maintains higher limits than the minimums shown above, the City requires and shall be entitled to coverage for higher limits maintained by the Consultant. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the City. E. Self-insured Retentions. Any self-insured retentions must be declared to and approved by City. City reserves the right to require that self-insured retentions be eliminated, lowered, or replaced by a deductible. Self- insurance will not be considered to comply with these requirements unless approved by City. F. City Remedies for Non -Compliance. If Consultant or any subconsultant fails to provide and maintain insurance as required herein, then City shall have the right but not the obligation, to purchase such insurance, to terminate this Agreement, or to suspend Consultant's right to proceed until proper evidence of insurance is provided. Any amounts paid by City shall, at City's sole option, be deducted from amounts payable to Consultant or reimbursed by Consultant upon demand. G. Timely Notice of Claims. Consultant shall give City prompt and timely notice of claims made or suits instituted that arise out of or result from Consultant's performance under this Contract, and that involve or may involve coverage under any of the required liability policies. City assumes no obligation or liability by such notice, but has the right (but not the duty) to monitor the handling of any such claim or claims if they are likely to involve City. H. Consultant's Insurance. Consultant shall also procure and maintain, at its own cost and expense, any additional kinds of insurance, which in its own judgment may be necessary for its proper protection and prosecution of the Work. Bucknam Infrastructure Group, Inc. Page C-3 CERTIFICATE OF INSURANCE CHECKLIST City of Newport Beach This checklist is comprised of requirements as outlined by the City of Newport Beach. * Date Received: 10/3/16 Date Completed: 10/3/16 Dept./Contact Received From: Raymund Sent to: Raymund By: Company/Person required to have certificate: Bucknam Infrastructure Group Type of contract: Public Works Alicia GENERAL LIABILITY EFFECTIVE/EXPIRATION DATE: 9/16/16-9/16/17 A. INSURANCE COMPANY: Citizens Ins Cc of America B. AM BEST RATING (A-: VII or greater): A: XV C. ADMITTED Company (Must be California Admitted): Is Company admitted in California? ® Yes ❑ No D. LIMITS (Must be $1 M or greater): What is limit provided? E. ADDITIONAL INSURED ENDORSEMENT—please attach F. PRODUCTS AND COMPLETED OPERATIONS (Must include): Is it included? (completed Operations status does not apply to Waste Haulers or Recreation) G. ADDITIONAL INSURED FOR PRODUCTS AND COMPLETED OPERATIONS ENDORSEMENT (completed Operations status does not apply to Waste Haulers) H. ADDITIONAL INSURED WORDING TO INCLUDE (The City its officers, officials, employees and volunteers): Is it included? I. PRIMARY & NON-CONTRIBUTORY WORDING (Must be included): Is it included? J. CAUTION! (Confine that loss or liability of the named insured is not limited solely by their negligence) Does endorsement include "solely by negligence' wording? K. ELECTED SCMAF COVERAGE (RECREATION ONLY): L. NOTICE OF CANCELLATION: II. AUTOMOBILE LIABILITY EFFECTIVE/EXPIRATION DATE: 9/16/16-9/16/17 A. INSURANCE COMPANY: Citizens Ins Cc of America llvl/2M ® Yes ❑ No ® Yes ❑ No ® Yes ❑ No ® Yes ❑ No ❑ Yes ® No ® N/A ❑ Yes ❑ No ❑ N/A ® Yes ❑ No B. AM BEST RATING (A-: VII or greater) A: XV C. ADMITTED COMPANY (Must be California Admitted): Is Company admitted in California? ® Yes ❑ No D. LIMITS - If Employees (Must be $1 M min. BI & PD and $500,000 UM, $2M min for Waste Haulers): What is limits provided? 1M E. LIMITS Waiver of Auto Insurance / Proof of coverage ('d individual) (What is limits provided?) N/A F. PRIMARY & NON-CONTRIBUTORY WORDING (For Waste Haulers only): ® N/A ❑ Yes ❑ No G. HIRED AND NON -OWNED AUTO ONLY: ❑ N/A ❑ Yes ® No H. NOTICE OF CANCELLATION: 0 N/A 0 Yes ❑ No III. WORKERS' COMPENSATION EFFECTIVE/EXPIRATION DATE: 9/16/16-9/16/17 A. INSURANCE COMPANY: Hanover American Ins Cc B. AM BEST RATING (A-: VII or greater): A: XV C. ADMITTED Company (Must be California Admitted): ® Yes ❑ No D. WORKERS' COMPENSATION LIMIT: Statutory ® Yes ❑ No E. EMPLOYERS' LIABILITY LIMIT (Must be $11M or greater) IM F. WAIVER OF SUBROGATION (To include): Is it included? ® Yes ❑ No G. SIGNED WORKERS' COMPENSATION EXEMPTION FORM: ® N/A ❑ Yes ❑ No H. NOTICE OF CANCELLATION: ❑ N/A ® Yes ❑ No ADDITIONAL COVERAGE'S THAT MAYBE REQUIRED IV. PROFESSIONAL LIABILITY V POLLUTION LIABILITY V BUILDERS RISK Approved: ( I Agent of Alliant Insurance Services Broker of record for the City of Newport Beach 10/3/16 Date ® N/A ❑ Yes ❑ No ® N/A ❑ Yes ❑ No ® N/A ❑ Yes ❑ No ® Yes ❑ No RISK MANAGEMENT APPROVAL REQUIRED (Non -admitted carrier rated less than Self Insured Retention or Deductible greater than $ ) ❑ N/A ❑ Yes ❑ No Reason for Risk Management approval/exception/waiver: Approved: Risk Management Date * Subject to the terms of the contract.