HomeMy WebLinkAboutC-8452-1 - Cooperative Agreement for General Traffic Signal Synchronization, District Agreement No. 12-74512 -ORA -1 -PM 12.55-21.27
EA: 926092, ID: 1217000025
District Agreement No. 12-745
COOPERATIVE AGREEMENT
(General Traffic Signal Synchronization)
THIS AGREEMENT, ENTERED INTO EFFECTIVE ON NtArC� JC7 , 2017, is between
the STATE OF CALIFORNIA, acting by and through its Department of Transportation, referred to herein
as "STATE", the CITY OF NEWPORT BEACH body politic and municipal corporation of the State of
California, referred to herein as "CITY", together, the 'PARTIES."
RECITALS
1. STATE and CITY, collectively referred to as PARTIES, pursuant to Streets and Highways Code
Sections 114 and 130, are authorized to enter into a cooperative agreement for improvements to
State Highways within CITY.
2. Measure M2 Regional Traffic Signal Synchronization Program (RTSSP) of Orange County targets
over 2,000 signalized intersections across the County to maintain traffic signal synchronization,
improve traffic flow, and reduce congestion across jurisdictions.
3. STATE and CITY desire to implement signal synchronization at fourteen (14) state -operated
intersections along Pacific Coast Highway (SR -1) to enhance traffic flow and reduce congestions
at those intersections between CITY streets and State Highway System (SHS).
4. STATE and CITY are committed to implementing multi jurisdictional signal synchronization to
enhance countywide traffic flow and reducing congestion in relation to the State Highway System
(SHS).
5. CITY has received separate funding from Orange County Transportation Authority (OCTA) for
Regional Traffic Signal Synchronization along the Pacific Coast Highway corridor within City
limits.
6. CITY desires STATE to implement traffic signal controllers, coordinated signal timing, and other
work elements as detailed in the attached SCOPE SUMMARY referred to herein as
"IMPROVEMENTS" at the following locations identified in Exhibit A attached to and made a part
of this Agreement by reference and referred to hereinafter as "INTERSECTIONS":
a. Pacific Coast Highway / Orange Street
b. Pacific Coast Highway / Prospect Street
c. Pacific Coast Highway / Superior Avenue / Balboa Boulevard
d. Pacific Coast Highway / Hoag Drive
e. Pacific Coast Highway / SR -55 SB Ramp/ Newport Boulevard
f Pacific Coast Highway / Riverside Avenue
g. Pacific Coast Highway / Tustin Avenue
It. Pacific Coast Highway / Balboa Bay Way
i. Pacific Coast Highway / Dover Drive
j. Pacific Coast Highway / Bayside Drive
12 -ORA -1 -PM 12.55-21.27
EA: 926092, ID: 1217000025
District Agreement No. 12-745
k. Pacific Coast Highway / Promontory Drive
1. Pacific Coast Highway / Crystal Cove / Los Trancos
in. Pacific Coast Highway / Crystal Heights Drive
n. Pacific Coast Highway / Reef Point Drive
7. PARTIES agree that IMPROVEMENTS will cost a total of $96,250.00
STATE will install traffic signal controller equipment components of the IMPROVEMENTS, as specified
in Exhibit A. NOW, THEREFORE, in consideration of the foregoing recitals and the following terms,
covenants and conditions, the PARTIES agree as follows:
SECTION A
STATE AGREES:
1. To perform the work elements in order to complete IMPROVEMENTS as specified in the SCOPE
SUMMARY attached to and made a part of this Agreement.
2. To implement coordination of traffic signal timing (TIMING PLAN) for INTERSECTIONS in
accordance with the Caltrans Traffic Operations Manual.
3. To review the draft TIMING PLAN prepared by CITY, and finalize it subject to revisions mutually
agreed to between PARTIES.
4. To submit an invoice for a lump sum (single payment) of $96,250.00 to CITY for the
IMPROVEMENT within 30 days of execution of this agreement.
SECTION B
CITY AGREES:
1. To fully fund IMPROVEMENTS not exceeding $96,250.00.
2. To develop TIMING PLAN for INTERSECTIONS and submit it for STATE review and approval.
3. To work in good faith with STATE to revise and finalize TIMING PLAN.
4. To make written application to STATE for necessary encroachment permits authorizing entry of
CITY onto SHS right of way to perform work for IMPROVEMENTS. CITY shall also require its
consultants and contractors if any, to make written application to STATE for necessary
encroachment permits.
5. Prepare and review a final report of the IMPROVEMENTS with STATE, and assess the
performance of the PARTIES in relation to the terms, covenants and conditions of the Agreement.
12 -ORA -1 -PM 12.55-21.27
EA: 926092, ID: 1217000025
District Agreement No. 12-745
6. Pay to STATE, within thirty (30) days of receipt of invoice, the amount of $96,250.00.
SECTION C
IT IS MUTUALLY AGREED THAT:
1. All obligations of STATE under the terms of this Agreement are subject to the appropriation of
resources by the Legislature and the State Budget Act.
2. CITY's total obligation is set at $96,250.00. If STATE anticipates that funding will be insufficient
to complete IMPROVEMENTS, due to (i) mutually agreed material modifications, (ii) the failure
by CITY to perform its obligations under this Agreement following written notice from the STATE
to CITY or (iii) unforeseen conditions that are discovered during the performance of
IMPROVEMENTS, STATE will promptly notify CITY. STATE may be required to stop work on
IMPROVEMENT until additional funding is secured and/or to restore the site of
IMPROVEMENTS to a condition of safe operation, using any then unexpended funds, if additional
funds are not made available for IMPROVEMENTS.
Neither STATE nor any officer or employee thereof is responsible for any injury, damage, or
liability occurring by reason of anything done or omitted to be done by CITY and/or its agents
under or in connection with any work, authority, or jurisdiction conferred upon CITY or under this
Agreement. It is understood and agreed that, CITY will fully defend, indemnify, and save harmless
STATE and all of its officers and employees from all claims, suits, or actions of every name, kind
and description brought forth under, but not limited to, tortuous, contractual, inverse condemnation
or other theories or assertions of liability occurring by reason of anything done or omitted to be
done by CITY and/or its agents under this Agreement.
4. Neither CITY nor any officer or employee thereof is responsible for any injury, damage, or liability
occurring by reason of anything done or omitted to be done by STATE and/or its agents under or
in connection with any work, authority, or jurisdiction conferred upon STATE or under this
Agreement. It is understood and agreed that, STATE will fully defend, indemnify, and save
harmless CITY and all of its officers and employees from all claims, suits, or actions of every name,
kind and description brought forth under, but not limited to, tortuous, contractual, inverse
condemnation or other theories or assertions of liability occurring by reason of anything done or
omitted to be done by STATE and/or its agents under this Agreement.
5. This Agreement will terminate upon completion of IMPROVEMENT and all parties have met all
scope, cost, and schedule commitments included in this agreement and have signed a cooperative
agreement closure statement, which is a document signed by PARTIES that verifies the completion
of all scope, cost, and schedule commitments. However, all indemnification, document retention,
audit, claims, environmental commitment, legal challenge, hazardous material, operation,
maintenance and ownership articles will remain in effect until terminated, expire by statute of
limitation, or modified in writing by mutual agreement.
12 -ORA -1 -PM 12.55-21.27
EA: 926092, ID: 1217000025
District Agreement No. 12-745
CONTACT INFORMATION
This information provided below indicates the primary contact information for the PARTIES to the
Agreement. PARTIES will notify each other in writing of any personnel or location changes. Contact
Information changes do not require an amendment to this Agreement.
The primary Agreement contact person for STATE is:
Fedrico Hormozi, Branch Chief Electrical Systems
6681 Marine Way
Irvine, CA 92618-1724
Office Phone: (949) 936-3464
Email: fedrico.hormozi@dot.ca.gov
The primary Agreement contact person for the CITY is:
Brad Sommers, Senior Civil Engineer
100 Civic Center Drive
Newport Beach, CA 92660
Office Phone: (949) 644-3326
Email: bsommers@newportbeachca.gov
12 -ORA -1 -PM 12.55-21.27
EA: 926092, ID: 1217000025
District Agreement No. 12-745
SIGNATURES
The individuals signing below warrant that they are duly authorized by the PARTIES to execute this
agreement on their behalf:
STATE OF CALIFORNIA
DEPARTMENT OF TRANSPORTATION
Director
APPROVED AS TO FORM:
By:
Attorney
Department of Transporw on
CERTIFIED AS TO FINANCIAL TERMS
AND CONDITIONS:
By
Accounting Administrator
CERTIFIED AS TO FUNDS: )
By: !vV
eda Sabe
District Budget Manager
CITY OF NEWPORT BEACH
By: \_
id Kiff
City Manager
APPROVED AS TO FORM:
By: ins
Aaron C. Harp o3cB i -I
City Attorney dm-j�
Attest
Leilani 1.�o�,/y(yjC -
Dam: 3
12 -ORA -1 -PM 12.55-21.27
EA: 926092, ID: 1217000025
District Agreement No. 12-745
SCOPE SUMMARY
Work Element
State
city
Perform Preliminary Engineering
X
Encroachment Permit
X
Develop Coordination Traffic Signal Timing
X
Approve and Implement Coordination Signal Timing
X
Monitor and Fine -Tune Traffic Signal Coordination Timing
X
Configure and Install Local Traffic Signal Controllers
X
Configure and Install Master Traffic Signal Controllers
X
Configure and Install GPS Time Source (Clocks)
X
Final Report
X
12 -ORA -1 -PM 12.55-21.27
EA: 926092, ID: 1217000025
District Agreement No. 12-745
Exhibit A
Pacific Coast Highway Regional Traffic Signal Synchronization Project
Reimbursable Caltrans Cost Details
Intersection
Caltrans Controller Install Fee
(35 hours x $125/hour)
+
Caltrans Signal Timing Fee
(20 hours x $125/hour)
Pacific Coast Hwy / Orange St
$6,875.00
Pacific Coast Hwy / Prospect St
$6,875.00
Pacific Coast Hwy / Superior Ave -Balboa
Blvd
$6,875.00
Pacific Coast Hwy l Hoag Dr
$6,875.00
Pacific Coast Hwy / Newport Blvd SB
Ramp (SR -55)
$6,875.00
Pacific Coast Hwy / Riverside Ave
$6,875.00
Pacific Coast Hwy / Tustin Ave
$6,875.00
Pacific Coast Hwy / Balboa Bay Resort
$6,875.00
Pacific Coast Hwy / Dover Dr
$6,875.00
Pacific Coast Hwy / Bayside Dr
$6,875.00
Pacific Coast Hwy / Promontory Dr
$6,875.00
Pack Coast Hwy / Crystal Cove -Los
Trancos
$6,875.00
Pacific Coast Hwy / Crystal Heights Dr
$6,875.00
Pacific Coast Hwy / Reef Point Dr
$6,875.00
TOTAL:
$96,250.00