HomeMy WebLinkAboutC-5166 - Janitorial Services Agreement for Restroom Potering Servicesf
JANITORIAL SERVICES AGREEMENT
WITH ED BUILDING MAINTENANCE FOR
J RESTROOM PORTERING SERVICES
THIS JANITORIAL SERVICES AGREEMENT ("Agreement") is made and
entered into as of this 2nd day of June, 2014 ("Effective Date"), by and between the
CITY OF NEWPORT BEACH, a California municipal corporation and charter city
("City"), and ED BUILDING MAINTENANCE, a California limited partnership
("Contractor"), whose address is 23441 Golden Springs Drive, # 249, Diamond Bar,
California 91765, and is made with reference to the following:
RECITALS
A. City is a municipal corporation duly organized and validly existing under the laws
of the State of California with the power to carry on its business as it is now being
conducted under the statutes of the State of California and the Charter of City.
B. City desires to engage Contractor to perform restroom portering services for
twenty four (24) City public restrooms ("Project").
C. Contractor possesses the skill, experience, ability, background, certification and
knowledge to provide the janitorial services described in this Agreement.
D. Contractor has examined the location of all proposed work, carefully reviewed
and evaluated the specifications set forth by City for the Project, is familiar with
all conditions relevant to the performance of services, and has committed to
perform all work required for the compensation specified in this Agreement.
NOW, THEREFORE, it is mutually agreed by and between the undersigned
parties as follows:
1. TERM
The term of this Agreement shall commence on the Effective Date, and shall
terminate on March 31, 2015, unless terminated earlier as set forth herein.
2. SERVICES TO BE PERFORMED
2.1 Contractor shall diligently perform all the services described in the Scope
of Services attached hereto as Exhibit A and incorporated herein by reference
("Services" or "Work"). As a material inducement to City entering into this Agreement,
Contractor represents and warrants that Contractor is a provider of first class work and
Contractor is experienced in performing the Work contemplated herein and, in light of
such status and experience, Contractor covenants that it shall follow the highest
industry standards in performing the Work required hereunder and that all materials will
be of good quality. For purposes of this Agreement, the phrase "highest industry
standards" shall mean those standards of practice recognized by one or more first-class
firms performing similar work under similar circumstances.
2.2 Contractor shall perform all Work required to be performed, and shall
provide and furnish all the labor, materials, necessary tools, expendable equipment and
all utility and transportation services necessary for the Project.
3. TIME OF PERFORMANCE
3.1 Time is of the essence in the performance of Services under this
Agreement and Contractor shall perform the Services in accordance with the schedule
included in Exhibit A. In the absence of a specific schedule, the Services shall be
performed to completion in a diligent and timely manner. The failure by Contractor to
strictly adhere to the schedule set forth in Exhibit A, if any, or perform the Services in a
diligent and timely manner may result in termination of this Agreement by City.
3.2 Notwithstanding the foregoing, Contractor shall not be responsible for
delays due to causes beyond Contractor's reasonable control. However, in the case of
any such delay in the Services to be provided for the Project, each party hereby agrees
to provide notice within two (2) calendar days of the occurrence causing the delay to the
other party so that all delays can be addressed.
3.3 Contractor shall submit all requests for extensions of time for performance
in writing to the Project Administrator as defined herein, not later than two (2) calendar
days after the start of the condition that purportedly causes a delay. The Project
Administrator shall review all such requests and may grant reasonable time extensions
for unforeseeable delays that are beyond Contractor's control.
3.4 For all time periods not specifically set forth herein, Contractor shall
respond in the most expedient and appropriate manner under the circumstances, by
fax, hand-delivery or mail.
4. COMPENSATION TO CONTRACTOR
4.1 City shall pay Contractor for the Services on a time and expense not-to-
exceed basis in accordance with the provisions of this Section and the Schedule of
Billing Rates attached hereto as Exhibit B and incorporated herein by reference. Except
as otherwise provided herein, no rate changes shall be made during the term of this
Agreement without the prior written approval of City. Contractor's compensation for all
Services performed in accordance with this Agreement, including all reimbursable
items, shall not exceed One Hundred and Five Thousand Dollars and 00/100
($105,000.00), without prior written amendment to the Agreement.
4.2 Contractor shall submit monthly invoices to City describing the Work
performed the preceding month. Contractor's bills shall include the name and/or
classification of employee who performed the Work, a brief description of the Services
performed and/or the specific task in the Scope of Services to which it relates, the date
the Services were performed, the number of hours spent on all Worts billed on an hourly
basis, and a description of any reimbursable expenditures. City shall pay Contractor no
later than thirty (30) calendar days after approval of the monthly invoice by City staff.
ED BUILDING MAINTENANCE . Page 2
4.3 City shall reimburse Contractor only for those costs or expenses
specifically identified in Exhibit B to this Agreement, or specifically approved in writing in
advance by City.
4.4 Contractor shall not receive any compensation for Extra Work performed
without the prior written authorization of City. As used herein, "Extra Work' means any
Work that is determined by City to be necessary for the proper completion of the
Project, but which is not included within the Scope of Services and which the parties did
not reasonably anticipate would be necessary at the execution of this Agreement.
Compensation for any authorized Extra Work shall be paid in accordance with Exhibit B.
5. PROJECT MANAGER
5.1 Contractor shall designate a Project Manager, who shall coordinate all
phases of the Project. This Project Manager shall be available to City at all reasonable
times during the Agreement term. Contractor has designated Billie Alexander to be its
Project Manager. Contractor shall not remove or reassign the Project Manager or any
personnel listed in Exhibit A or assign any new or replacement personnel to the Project
without the prior written consent of City. City's approval shall not be unreasonably
withheld with respect to the removal or assignment of non -key personnel.
5.2 Contractor, at the sole discretion of City, shall remove from the Project any
of its personnel assigned to the performance of Services upon written request of City.
Contractor warrants that it will continuously furnish the necessary personnel to complete
the Project on a timely basis as contemplated by this Agreement.
6. ADMINISTRATION
This Agreement will be administered by the Municipal Operations Department.
City's Operations Support Superintendent or designee shall be the Project Administrator
and shall have the authority to act for City under this Agreement. The Project
Administrator shall represent City in all matters pertaining to the Services to be
rendered pursuant to this Agreement.
7. CITY'S RESPONSIBILITIES
To assist Contractor in the execution of its responsibilities under this Agreement,
City agrees to provide access to and upon request of Contractor, one copy of all
existing relevant information on file at City. City will provide all such materials in a
timely manner so as not to cause delays in Contractor's Work schedule.
8. TYPE AND INSTALLATION OF MATERIALS/STANDARD OF CARE
8.1 Contractor shall use only the standard materials described in Exhibit A in
performing Services under this Agreement. Any deviation from the materials described
in Exhibit A shall not be installed or utilized unless approved in advance and in writing
by the Project Administrator.
8.2 All of the Services shall be performed by Contractor or under Contractor's
supervision. Contractor represents that it possesses the personnel required to perform
ED BUILDING MAINTENANCE Page 3
the Services required by this Agreement, and that it will perform all Services in a
manner commensurate with highest industry standards. All Services shall be performed
by qualified and experienced personnel who are not employed by City. By delivery of
completed Work, Contractor certifies that the Work conforms to the requirements of this
Agreement and all applicable federal, state and local laws and the industry standard.
8.3 Contractor represents and warrants to City that it has, shall obtain and
shall keep in full force and effect during the term hereof, at its sole cost and expense, all
licenses, permits, qualifications, insurance and approvals of whatsoever nature that is
legally required of Contractor to practice its profession. Contractor shall maintain a City
of Newport Beach business license during the term of this Agreement.
8.4 Contractor shall not be responsible for delay, nor shall Contractor be
responsible for damages or be in default or deemed to be in default by reason of strikes,
lockouts, accidents, acts of God, or the failure of City to furnish timely information or to
approve or disapprove Contractor's Work promptly, or delay or faulty performance by
City, contractors, or governmental agencies.
9. RESPONSIBILITY FOR DAMAGES OR INJURY
9.1 City and all officers, employees and representatives thereof shall not be
responsible in any manner for any loss or damage to any of the materials or other things
used or employed in performing the Project or for injury to or death of any person as a
result of Contractor's performance of the Services required hereunder; or for damage to
property from any cause arising from the performance of the Project by Contractor, or
its subcontractors, or its workers, or anyone employed by either of them.
9.2 Contractor shall be responsible for any liability imposed by law and for
injuries to or death of any person or damage to property resulting from defects,
obstructions or from any cause arising from Contractor's Work on the Project, or the
Work of any subcontractor or supplier selected by Contractor.
9.3 To the fullest extent permitted by law, Contractor shall indemnify, defend
and hold harmless City, its City Council, boards and commissions, officers, agents,
volunteers, and employees (collectively, the "Indemnified Parties") from and against any
and all claims (including, without limitation, claims for bodily injury, death or damage to
property), demands, obligations, damages, actions, causes of action, suits, losses,
judgments, fines, penalties, liabilities, costs and expenses (including, without limitation,
attorneys' fees, disbursements and court costs) of every kind and nature whatsoever
(individually, a Claim; collectively, "Claims"), which may arise from or in any manner
relate (directly or indirectly) to any breach of the terms and conditions of this
Agreement, any Work performed or Services provided under this Agreement including,
without limitation, defects in workmanship or materials or Contractor's presence or
activities conducted on the Project (including the negligent and/or willful acts, errors
and/or omissions of Contractor, its principals, officers, agents, employees, vendors,
suppliers, consultants, subcontractors, anyone employed directly or indirectly by any of
them or for whose acts they may be liable or any or all of them).
ED BUILDING MAINTENANCE Page 4
9.4 Notwithstanding the foregoing, nothing herein shall be construed to
require Contractor to indemnify the Indemnified Parties from any Claim arising from the
sole negligence or willful misconduct of the Indemnified Parties. Nothing in this
indemnity shall be construed as authorizing any award of attorneys' fees in any action
on or to enforce the terms of this Agreement. This indemnity shall apply to all claims
and liability regardless of whether any insurance policies are applicable. The policy
limits do not act as a limitation upon the amount of indemnification to be provided by
Contractor.
9.5 Contractor shall perform all Work in a manner to minimize public
inconvenience and possible hazard, to restore other work areas to their original
condition and former usefulness as soon as possible, and to protect public and private
property. Contractor shall be liable for any private or public property damaged during
the performance of the Work by Contractor or its agents.
9.6 To the extent authorized by law, as much of the money due Contractor
under and by virtue of the Agreement as shall be considered necessary by City may be
retained by it until disposition has been made of such suits or claims for damages as
aforesaid.
9.7 The rights and obligations set forth in this Section shall survive the
termination of this Agreement.
10. INDEPENDENT CONTRACTOR
It is understood that City retains Contractor on an independent contractor basis
and Contractor is not an agent or employee of City. The manner and means of
conducting the Work are under the control of Contractor, except to the extent they are
limited by statute, rule or regulation and the expressed terms of this Agreement. No
civil service status or other right of employment shall accrue to Contractor or its
employees. Nothing in this Agreement shall be deemed to constitute approval for
Contractor or any of Contractor's employees or agents, to be the agents or employees
of City. Contractor shall have the responsibility for and control over the means of
performing the Work, provided that Contractor is in compliance with the terms of this
Agreement. Anything in this Agreement that may appear to give City the right to direct
Contractor as to the details of the performance of the Work or to exercise a measure of
control over Contractor shall mean only that Contractor shall follow the desires of City
with respect to the results of the Services.
11. COOPERATION
Contractor agrees to work closely and cooperate fully with City's designated
Project Administrator and any other agencies that may have jurisdiction or interest in the
Work to be performed. City agrees to cooperate with Contractor on the Project.
12. CITY POLICY
Contractor shall discuss and review all matters relating to policy and Project
direction with City's Project Administrator in advance of all critical decision points in
ED BUILDING MAINTENANCE Page 5
order to ensure the Project proceeds in a manner consistent with City goals and
policies.
13. PROGRESS
Contractor is responsible for keeping the Project Administrator informed on a
regular basis regarding the status and progress of the Project, activities performed and
planned, and any meetings that have been scheduled or are desired.
14. INSURANCE
Without limiting Contractor's indemnification of City, and prior to commencement
of Work, Contractor shall obtain, provide and maintain at its own expense during the
term of this Agreement or for other periods as specified in this Agreement, policies of
insurance of the type, amounts, terms and conditions described in the Insurance
Requirements attached hereto as Exhibit C, and incorporated herein by reference.
15. PROHIBITION AGAINST ASSIGNMENTS AND TRANSFERS
Except as specifically authorized under this Agreement, the Services to be
provided under this Agreement shall not be assigned, transferred contracted or
subcontracted out without the prior written approval of City. Any of the following shall
be construed as an assignment: The sale, assignment, transfer or other disposition of
any of the issued and outstanding capital stock of Contractor, or of the interest of any
general partner or joint venturer or syndicate member or cotenant if Contractor is a
partnership or joint -venture or syndicate or cotenancy, which shall result in changing the
control of Contractor. Control means fifty percent (50%) or more of the voting power or
twenty-five percent (25%) or more of the assets of the corporation, partnership or joint -
venture.
The subcontractors authorized by City, if any, to perform Work on this Project are
identified in Exhibit A. Contractor shall be fully responsible to City for all acts and
omissions of any subcontractor. Nothing in this Agreement shall create any contractual
relationship between City and any subcontractor nor shall it create any obligation on the
part of City to pay or to see to the payment of any monies due to any such
subcontractor other than as otherwise required by law. City is an intended beneficiary
of any Work performed by the subcontractor for purposes of establishing a duty of care
between the subcontractor and City. Except as specifically authorized herein, the
Services to be provided under this Agreement shall not be otherwise assigned,
transferred, contracted or subcontracted out without the prior written approval of City.
17. OWNERSHIP OF DOCUMENTS
Each and every report, draft, map, record, plan, document and other writing
produced (hereinafter "Documents"), prepared or caused to be prepared by Contractor,
its officers, employees, agents and subcontractors, in the course of implementing this
Agreement, shall become the exclusive property of City, and City shall have the sole
right to use such materials in its discretion without further compensation to Contractor or
ED BUILDING MAINTENANCE Page 6
any other party. Contractor shall, at Contractor's expense, provide such Documents to
City upon prior written request.
18. CONFIDENTIALITY
All Documents, including drafts, preliminary drawings or plans, notes and
communications that result from the Services in this Agreement, shall be kept
confidential unless City expressly authorizes in writing the release of information.
19. RECORDS
Contractor shall keep records and invoices in connection with the Services to be
performed under this Agreement. Contractor shall maintain complete and accurate
records with respect to the costs incurred under this Agreement and any Services,
expenditures and disbursements charged to City, for a minimum period of three (3)
years, or for any longer period required by law, from the date of final payment to
Contractor under this Agreement. All such records and invoices shall be clearly
identifiable. Contractor shall allow a representative of City to examine, audit and make
transcripts or copies of such records and invoices during regular business hours.
Contractor shall allow inspection of all Work, data, Documents, proceedings and
activities related to the Agreement for a period of three (3) years from the date of final
payment to Contractor under this Agreement.
20. WITHHOLDINGS
City may withhold payment to Contractor of any disputed sums until satisfaction
of the dispute with respect to such payment. Such withholding shall not be deemed to
constitute a failure to pay according to the terms of this Agreement. Contractor shall not
discontinue Work as a result of such withholding. Contractor shall have an immediate
right to appeal to the City Manager or his/her designee with respect to such disputed
sums. Contractor shall be entitled to receive interest on any withheld sums at the rate of
return that City earned on its investments during the time period, from the date of
withholding of any amounts found to have been improperly withheld.
21. CITY'S RIGHT TO EMPLOY OTHER CONTRACTORS
City reserves the right to employ other contractors in connection with the Project.
22. CONFLICTS OF INTEREST
22.1 Contractor or its employees may be subject to the provisions of the
California Political Reform Act of 1974 (the "Act"), which (1) requires such persons to
disclose any financial interest that may foreseeably be materially affected by the Work
performed under this Agreement, and (2) prohibits such persons from making, or
participating in making, decisions that will foreseeably financially affect such interest.
22.2 If subject to the Act, Contractor shall conform to all requirements of the
Act. Failure to do so constitutes a material breach and is grounds for immediate
termination of this Agreement by City. Contractor shall indemnify and hold harmless
ED BUILDING MAINTENANCE Page 7
City for any and all claims for damages resulting from Contractor's violation of this
Section.
23. NOTICES
23.1 All notices, demands, requests or approvals, including any change in
mailing address, to be given under the terms of this Agreement shall be given in writing,
and conclusively shall be deemed served when delivered personally, or on the third
business day after the deposit thereof in the United States mail, postage prepaid, first-
class mail, addressed as hereinafter provided.
23.2 All notices, demands, requests or approvals from Contractor to City shall
be addressed to City at:
Attn: Operations Support Superintendent
Municipal Operations Department
City of Newport Beach
100 Civic Center Drive
PO Box 1768
Newport Beach, CA 92658
23.3 All notices, demands, requests or approvals from City to Contractor shall
be addressed to Contractor at:
Attn: Billie Alexander
ED BUILDING MAINTENANCE
23441 Golden Springs Drive, # 249
Diamond Bar, California 91765
24. CLAIMS
Unless a shorter time is specified elsewhere in this Agreement, before making its
final request for payment under this Agreement, Contractor shall submit to City, in
writing, all claims for compensation under or arising out of this Agreement.
Contractor's acceptance of the final payment shall constitute a waiver of all claims for
compensation under or arising out of this Agreement except those previously made in
writing and identified by Contractor in writing as unsettled at the time of its final request
for payment. Contractor and City expressly agree that in addition to any claims filing
requirements set forth in the Agreement, Contractor shall be required to file any claim
Contractor may have against City in strict conformance with the Government Claims Act
(Government Code sections 900 et seq.).
25. TERMINATION
25.1 In the event that either party fails or refuses to perform any of the
provisions of this Agreement at the time and in the manner required, that party shall be
deemed in default in the performance of this Agreement. If such default is not cured
within a period of two (2) calendar days, or if more than two (2) calendar days are
reasonably required to cure the default and the defaulting party fails to give adequate
assurance of due performance within two (2) calendar days after receipt of written
ED BUILDING MAINTENANCE Page 8
notice of default, specifying the nature of such default and the steps necessary to cure
such default, and thereafter diligently take steps to cure the default, the non -defaulting
party may terminate the Agreement forthwith by giving to the defaulting party written
notice thereof.
25.2 Notwithstanding the above provisions, City shall have the right, at its sole
and absolute discretion and without cause, of terminating this Agreement at any time by
giving no less than seven (7) calendar days' prior written notice to Contractor. In the
event of termination under this Section, City shall pay Contractor for Services
satisfactorily performed and costs incurred up to the effective date of termination for
which Contractor has not been previously paid. On the effective date of termination,
Contractor shall deliver to City all reports, Documents and other information developed
or accumulated in the performance of this Agreement, whether in draft or final form.
26. PREVAILING WAGES
Pursuant to the applicable provisions of the Labor Code of the State of California,
not less than the general prevailing rate of per diem wages including legal holidays and
overtime Work for each craft or type of workman needed to execute the Work
contemplated under the Agreement shall be paid to all workmen employed on the Work
to be done according to the Agreement by the Consultant and any subcontractor. In
accordance with the California Labor Code (Sections 1770 et seq.), the Director of
Industrial Relations has ascertained the general prevailing rate of per diem wages in the
locality in which the Work is to be performed for each craft, classification, or type of
workman or mechanic needed to execute the Agreement. A copy of said determination
is available by calling the prevailing wage hotline number (415) 703-4774, and
requesting one from the Department of Industrial Relations. The Contractor is required
to obtain the wage determinations from the Department of Industrial Relations and post
at the job site the prevailing rate or per diem wages. It shall be the obligation of the
Contractor or any subcontractor under him/her to comply with all State of California
labor laws, rules and regulations and the parties agree that the City shall not be liable
for any violation thereof.
27. LABOR
27.1 Contractor shall conform with all applicable provisions of state and federal
law including, but not limited to, applicable provisions of the federal Fair Labor
Standards Act ("FLSA") (29 USCA § 201, et seq.).
27.2 Contractor shall comply with all applicable provisions of the California
Labor Code, including the Displaced Janitors Opportunity Act (Labor Code §§1060-
1065).
27.3 Whenever Contractor has knowledge that any actual or potential labor
dispute is delaying or threatens to delay the timely performance of this Agreement,
Contractor shall immediately give written notice to City, and provide all relevant
information.
27.4 Contractor represents that all persons working under this Agreement are
verified to be U.S. citizens or persons legally authorized to work in the United States.
ED BUILDING MAINTENANCE Page 9
27.5 To the fullest extent permitted by law, Contractor shall indemnify, defend,
and hold harmless City, its City Council, boards and commissions, officers, agents,
volunteers, and employees from loss or damage, including but not limited to attorneys'
fees, and other costs of defense by reason of actual or alleged violations of any
applicable federal, state and local labor laws or law, rules, and/or regulations. This
obligation shall survive the expiration and/or termination of the Agreement.
28. STANDARD PROVISIONS
28.1 Recitals. City and Contractor acknowledge that the above Recitals are
true and correct and are hereby incorporated by reference.
28.2 Compliance with all Laws. Contractor shall, at its own cost and expense,
comply with all statutes, ordinances, regulations and requirements of all governmental
entities, including federal, state, county or municipal, whether now in force or hereinafter
enacted. In addition, all Work prepared by Contractor shall conform to applicable City,
county, state and federal laws, rules, regulations and permit requirements and be
subject to approval of the Project Administrator and City.
28.3 Waiver. A waiver by either party of any breach, of any term, covenant or
condition contained herein shall not be deemed to be a waiver of any subsequent
breach of the same or any other term, covenant or condition contained herein, whether
of the same or a different character.
28.4 Integrated Contract. This Agreement represents the full and complete
understanding of every kind or nature whatsoever between the parties hereto, and all
preliminary negotiations and agreements of whatsoever kind or nature are merged
herein. No verbal agreement or implied covenant shall be held to vary the provisions
herein.
28.5 Conflicts or Inconsistencies. In the event there are any conflicts or
inconsistencies between this Agreement and the Scope of Services or any other
attachments attached hereto, the terms of this Agreement shall govern.
28.6 Interpretation. The terms of this Agreement shall be construed in
accordance with the meaning of the language used and shall not be construed for or
against either party by reason of the authorship of the Agreement or any other rule of
construction which might otherwise apply.
28.7 Amendments. This Agreement may be modified or amended only by a
written document executed by both Contractor and City and approved as to form by the
City Attorney.
28.8 Severability. If any term or portion of this Agreement is held to be invalid,
illegal, or otherwise unenforceable by a court of competent jurisdiction, the remaining
provisions of this Agreement shall continue in full force and effect.
28.9 Controlling Law and Venue. The laws of the State of California shall
govern this Agreement and all matters relating to it and any action brought relating to
ED BUILDING MAINTENANCE Page 10
this Agreement shall be adjudicated in a court of competent jurisdiction in the County of
Orange, State of California.
28.10 Equal Opportunity Employment. Contractor represents that it is an equal
opportunity employer and it shall not discriminate against any subcontractor, employee
or applicant for employment because of race, religion, color, national origin, handicap,
ancestry, sex, age or any other impermissible basis under law.
28.11 No Attorneys' Fees. In the event of any dispute or legal action arising
under this Agreement, the prevailing party shall not be entitled to attorneys' fees.
28.12 Counterparts. This Agreement may be executed in two (2) or more
counterparts, each of which shall be deemed an original and all of which together shall
constitute one (1) and the same instrument.
[SIGNATURES ON NEXT PAGE]
ED BUILDING MAINTENANCE Page 11
IN WITNESS WHEREOF, the parties have caused this Agreement to be
executed on the dates written below.
APPROVED AS TO FORM: CITY OF NEWPORT BEACH,
CITY ATTORN Y'S OFFICE a California municipal corporation
Date: - Date: ?.,O\ ItA
By: By:
Aaron C.pHarp Dave
City Attorney City Manager
ATTEST:
Date: . 2
By:
Leilani I. Brown
City Clerk
CONTRACTOR: ED BUILDING
MAINTENANCE, a California limited
partnership �
Date: L/
Billie Alexander
Partner
Date: '�'/
B y: - -a" -a "�' �"" -
Anne Alexander
Partner
[END OF SIGNATURES]
Attachments: Exhibit A - Scope of Services
Exhibit B - Schedule of Billing Rates
Exhibit C - Insurance Requirements
ED BUILDING MAINTENANCE Page 12
EXHIBIT A
SCOPE OF SERVICES
ED BUILDING MAINTENANCE Page A-1
SCOPE OF SERVICES
1. Contractor Duties & Responsibilities
1.1. Deliver paper goods to locations.
1.2. Fill all paper dispensers.
1.3. Fill all soap dispensers.
1.4. Empty trash containers and replace liners as needed.
1.5. Keep all restrooms clean and presentable.
1.6. Remove urinal/toilet clogs.
1.7. Litter pick the surrounding area so that the outside perimeter of each restroom
facility shall be kept clean and presentable.
1.8. Remove graffiti.
1.9. Report any and all plumbing, flooding, and electrical issues to City staff
immediately.
1.10. Close and lock restrooms during drain backups or other issues requiring closure,
and direct visitors to the next closest facility. "Out of service" or similar signage
shall be put in place where necessary.
1.11. Provide transportation for crew(s) to multiple locations throughout each day
with "Under Contract with the City of Newport Beach' or similar signage on
display in or on vehicle.
1.12. Provide mops, brooms, standing dust pans and cleaning products and materials.
Unless otherwise specified, provide all other relevant supplies and materials
related to the requested services. Mop water shall be emptied properly after
each cleaning. Pipe chase shall be clean and organized.
1.13. Perform all related duties as directed by City staff.
41 Page
2. Contractor Staff Requirements
2.1. Each individual shall be required to undergo fingerprinting and background
screening by the City.
2.2. Contractor shall provide up to eight (8) staff members (7 Janitors and 1
Supervisor), up to eight (8) hours per day, seven (7) days per week (subject to
change based upon need.)
2.3. Contractor shall provide a crew of up to eight (8) staff members, (7 Janitors and
1 Supervisor), up to ten (10) hours per day on holiday weekends (subject to
change based upon need.)
2.4. Crews shall be formed so as to perform duties at multiple locations. Each crew
shall have up to several locations to monitor.
2.5. Contractor shall provide at least one (1) female per crew to perform duties in
Women's restrooms.
2.6. All supervisory personnel must be able to communicate effectively in English
(both orally and in writing). At least one staff member at each location must also
be able to communicate to the public effectively.
2.7. Field supervisor shall contact City Supervisory Staff daily to provide updates.
2.8. Field staff shall perform all duties responsibly and effectively.
2.9. Field supervisor shall drop off empty cardboard boxes to City's Corporation Yard
following the end of the shift.
2.10. All staff shall wear appropriate attire, consisting of pants or shorts with company
shirts. Any item of clothing with any form of offensive language or imagery shall
not be allowed.
2.11. Staff shall not use cell phones for reasons other than business while on duty.
Staff shall not smoke while on duty.
2.12. Two breaks and one lunch break for each staff member shall be scheduled so as
to have one individual on duty at all times. Lunch break is not billable to the City
and shall be the responsibility of the Contractor
51 Page
3. City Duties & Responsibilities
3.1. City's Project Administrator or his/her designee shall work with Contractor's
supervisory personnel in establishing schedules and locations of work.
3.2. City shall only provide paper products as related to the requested services.
3.3. City reserves the right to request changes in staffing levels based upon need.
4. Porterine Schedule
4.1. May 25, 2014 - September 7, 2014 (Start/end dates may be changed by City
based upon need)
4.2. 11:OOAM — 7:OOPM, Monday— Sunday
4.3. 10:00AM — B:OOPM, Saturday— Sunday (As needed on holiday weekends)
S. Paper Products Delivery Schedule
5.1. Frequency: One time per week for facilities, Three times per week for public
restrooms
5.2. Number of locations: Three facilities, 24 public restrooms
5.3. Approximate amounts: Nine product types, Several cases of each product
delivered per month
6. Locations
6.1. Newport Pier
6.2. 15th Street
6.3.
Balboa Pier
6.4.
Washington Street
6.5.
Balboa Island (Island Ferry & Fire Station)
6.6.
Corona Del Mar State Beach
6.7.
Little Corona/Buck Gully
61 Page
EXHIBIT B
SCHEDULE OF BILLING RATES
ED BUILDING MAINTENANCE Page B-1
ATTACHMENT D: PROPOSAL OFFER FORM
Instructions: Proposers may submit pricing information on their own forms but this Proposal Offer
Form must also be completed. Complete this form, sign, and remit as part of your Proposal as
Attachment D.
Restroom Portering Services
Standard Rate:
Paper Product Delivery
Delivery Rate:
S 13. PP Per Hour
s il5oo Per Month
The undersigned certifies that submission of this Proposal is made without prior understanding,
arrangement, agreement, or connection with any corporation, firm or person submitting a Proposal
for the same services, and Is In all respects fair and without collusion of fraud. The undersigned
certifies that they have not entered into any arrangement or agreement with any City of Newport
Beach public officer. The undersigned understands collusive practices are a violation of State and
Federal law and can result in fines, prison sentences, and civil damage awards.
roposer Signature
Printed Name and Title
Date
D1IPage
EXHIBIT C
INSURANCE REQUIREMENTS — MAINTENANCEIREPAIR/JANITORIAL SERVICES
1. Provision of Insurance. Without limiting Contractor's indemnification of City, and
prior to commencement of Work, Contractor shall obtain, provide and maintain at
its own expense during the term of this Agreement, policies of insurance of the
type and amounts described below and in a form satisfactory to City. Contractor
agrees to provide insurance in accordance with requirements set forth here. If
Contractor uses existing coverage to comply and that coverage does not meet
these requirements, Contractor agrees to amend, supplement or endorse the
existing coverage.
2. Acceptable Insurers. All insurance policies shall be issued by an insurance
company currently authorized by the Insurance Commissioner to transact
business of insurance in the State of California, with an assigned policyholders'
Rating of A- (or higher) and Financial Size Category Class VII (or larger) in
accordance with the latest edition of Best's Key Rating Guide, unless otherwise
approved by the City's Risk Manager.
3. Coverage Requirements.
A. Workers' Compensation Insurance. Contractor shall maintain Workers'
Compensation Insurance, statutory limits, and Employer's Liability
Insurance with limits of at least one million dollars ($1,000,000) each
accident for bodily injury by accident and each employee for bodily injury
by disease in accordance with the laws of the State of California, Section
3700 of the Labor Code.
Contractor shall submit to City, along with the certificate of insurance,
a Waiver of Subrogation endorsement in favor of City, its officers,
agents, employees and volunteers.
B. General Liability Insurance. Contractor shall maintain commercial general
liability insurance and, if necessary, umbrella liability insurance, with
coverage at least as broad as provided by Insurance Services Office form
CG 00 01, in an amount not less than one million dollars ($1,000,000) per
occurrence, two million dollars ($2,000,000) general aggregate. The
policy shall cover liability arising from premises, operations, products -
completed operations, personal and advertising injury, and liability
assumed under an insured contract (including the tort liability of another
assumed in a business contract) with no endorsement or modification
limiting the scope of coverage for liability assumed under a contract.
C. Automobile Liability Insurance. Contractor shall maintain automobile
insurance at least as broad as Insurance Services Office form CA 00 01
covering bodily injury and property damage for all activities of Contractor
ED BUILDING MAINTENANCE Page C-1
arising out of or in connection with Work to be performed under this
Agreement, including coverage for any owned, hired, non -owned or rented
vehicles, in an amount not less than one million dollars ($1,000,000)
combined single limit each accident.
4. Other Insurance Reguirements. The policies are to contain, or be endorsed to
contain, the following provisions:
A. Waiver of Subrogation. All insurance coverage maintained or procured
pursuant to this Agreement shall be endorsed to waive subrogation
against City, its elected or appointed officers, agents, officials, employees
and volunteers or shall specifically allow Contractor or others providing
insurance evidence in compliance with these requirements to waive their
right of recovery prior to a loss. Contractor hereby waives its own right of
recovery against City, and shall require similar written express waivers
from each of its subconsultants.
B. Additional Insured Status. All liability policies including general liability,
excess liability, pollution liability, and automobile liability, if required, shall
provide or be endorsed to provide that City and its officers, officials,
employees, and agents shall be included as insureds under such policies.
C. Primary and Non Contributory. All liability coverage shall apply on a
primary basis and shall not require contribution from any insurance or self-
insurance maintained by City.
D. Notice of Cancellation. All policies shall provide City with thirty (30)
calendar days notice of cancellation (except for nonpayment for which ten
(10) calendar days notice is required) or nonrenewal of coverage for each
required coverage.
5. Additional Agreements Between the Parties. The parties hereby agree to the
following:
A. Evidence of Insurance. Contractor shall provide certificates of insurance
to City as evidence of the insurance coverage required herein, along with
a waiver of subrogation endorsement for workers' compensation and other
endorsements as specified herein for each coverage. Insurance
certificates and endorsement must be approved by City's Risk Manager
prior to commencement of performance. Current certification of insurance
shall be kept on file with City at all times during the term of this
Agreement. City reserves the right to require complete, certified copies of
all required insurance policies, at any time.
B. City's Right to Revise Requirements. City reserves the right at any time
during the term of the Agreement to change the amounts and types of
insurance required by giving Contractor sixty (60) calendar days advance
ED BUILDING MAINTENANCE Page C-2
written notice of such change. If such change results in substantial
additional cost to Contractor, City and Contractor may renegotiate
Contractor's compensation.
C. Right to Review Subcontracts. Contractor agrees that upon request, all
agreements with subcontractors or others with whom Contractor enters
into contracts with on behalf of City will be submitted to City for review.
Failure of City to request copies of such agreements will not impose any
liability on City, or its employees.
D. Enforcement of Agreement Provisions. Contractor acknowledges and
agrees that any actual or alleged failure on the part of City to inform
Contractor of non-compliance with any requirement imposes no additional
obligations on City nor does it waive any rights hereunder.
E. Requirements not Limiting. Requirements of specific coverage features
or limits contained in this Section are not intended as a limitation on
coverage, limits or other requirements, or a waiver of any coverage
normally provided by any insurance. Specific reference to a given
coverage feature is for purposes of clarification only as it pertains to a
given issue and is not intended by any party or insured to be all inclusive,
or to the exclusion of other coverage, or a waiver of any type.
F. Self-insured Retentions. Any self-insured retentions must be declared to
and approved by City. City reserves the right to require that self-insured
retentions be eliminated, lowered, or replaced by a deductible. Self-
insurance will not be considered to comply with these requirements unless
approved by City.
G. City Remedies for Non -Compliance If Contractor or any sub -
consultant fails to provide and maintain insurance as required herein, then
City shall have the right but not the obligation, to purchase such
insurance, to terminate this Agreement, or to suspend Contractor's right to
proceed until proper evidence of insurance is provided. Any amounts paid
by City shall, at City's sole option, be deducted from amounts payable to
Contractor or reimbursed by Contractor upon demand.
H. Timely Notice of Claims. Contractor shall give City prompt and timely
notice of claims made or suits instituted that arise out of or result from
Contractor's performance under this Contract, and that involve or may
involve coverage under any of the required liability policies. City assumes
no obligation or liability by such notice, but has the right (but not the duty)
to monitor the handling of any such claim or claims if they are likely to
involve City.
ED BUILDING MAINTENANCE Page C-3
Contractor's Insurance. Contractor shall also procure and maintain, at its
own cost and expense, any additional kinds of insurance, which in its own
judgment may be necessary for its proper protection and prosecution of
the Work.
ED BUILDING MAINTENANCE Page C-4
S
AMENDMENT NO. ONE TO
11J} JANITORIAL SERVICES AGREEMENT
WITH ED BUILDING MAINTENANCE SERVICES FOR
RESTROOM POTERING SERVICES
V THIS AMENDMENT NO. ONE TO JANITORIAL SERVICES AGREEMENT
("Amendment No. One") is made and entered into as of this 1st day of October, 2013
("Effective Date"), by and between the CITY OF NEWPORT BEACH, a California
municipal corporation and charter city ("City"), and ED BUILDING MAINTENANCE
SERVICES, a California limited partnership ("Contractor"), whose address is 23441
Golden Springs Drive, #249, Diamond Bar, California 91765, and is made with
reference to the following:
RECITALS
A. On May 24, 2013, City and Contractor entered into a Janitorial Services
Agreement ("Agreement") for restroom portering services at City beach restroom
facilities ("Project").
B. City desires to enter into this Amendment No. One to reflect additional services
not included in the Agreement, to extend the term of the Agreement to May 31,
2014 and to increase the total compensation.
C. City and Contractor mutually desire to amend the Agreement, as provided below.
NOW, THEREFORE, it is mutually agreed by and between the undersigned
parties as follows:
Section 1 of the Agreement is amended in its entirety and replaced with the
following: "The term of this Agreement shall commence on the Effective Date, and shall
terminate on May 31, 2014, unless terminated earlier as set forth herein."
Section 5 of Exhibit A to the Agreement shall be amended to include the Newport
Beach Civic Center.
3. COMPENSATION TO CONTRACTOR
Section 4.1 of the Agreement is amended in its entirety and replaced with the
following: "City shall pay Contractor for the Services on a time and expense not -to -
exceed basis in accordance with the provisions of this Section and the Letter Proposal
and the Schedule of Billing Rates attached hereto as Exhibit B and incorporated herein
by reference. Contractor's compensation for all Work performed in accordance with this
Agreement, including all reimbursable items and subcontractor fees, shall not exceed
One Hundred Twenty Thousand Dollars and 001100 ($120,000.00), without prior
written authorization from City. No billing rate changes shall be made during the term of
this Agreement without the prior written approval of City."
Ed Building Maintenance Page 1
The total amended compensation reflects Contractor's additional compensation
for additional Services to be performed in accordance with this Amendment No. One,
including all reimbursable items and subcontractor fees, in an amount not to exceed
Forty Five Thousand Dollars and 001100 ($45,000.00).
4. INTEGRATED CONTRACT
Except as expressly modified herein, all other provisions, terms, and covenants
set forth in the Agreement shall remain unchanged and shall be in full force and effect.
[SIGNATURES ON NEXT PAGE]
Ed Building Maintenance Page 2
IN WITNESS WHEREOF, the parties have caused this Amendment No. One to
be executed on the dates written below.
APPROVED AS TO FORM:
CITY ATTORN7Y'$ OFFICE
Date: 10 Z I 0
MAN= "MIN'llIMMIM
Aaron C. i—
City Attorney
ATTEST:
Date: 11.11)3 (.1+13
By:
PW—
Leilani I'l3rown
City Clerk
CITY OF NEWPORT BEACH,
a California municipal corporation
Date: Lot uo�,-2
By:
Dave -Riff
City Manager
CONTRACTOR: ED BUILDING
MAINTENANCE, a California limited
partnership
Date:
Billie Alexander
General Partner
[END OF SIGNATURES]
Ed Building Maintenance Page 3
JANITORIAL SERVICES AGREEMENT
WITH ED BUILDING MAINTENANCE SERVICES FOR
RESTROOM PORTERING SERVICES
2gmAV
THIS JANITORIAL ,SERVICES AGREEMENT ("Agreement") is made and
entered into as of this,2,8fh day of May, 2013 ("Effective Date"), by and between the
CITY OF NEWPORT BEACH, a California municipal corporation and charter city
("City"), and ED BUILDING MAINTENANCE SERVICES, a California limited partnership
("Contractor"), whose address is 23441 Golden Springs Drive, #249, Diamond Bar,
California 91765, and is made with reference to the following:
RECITALS
A. City is a municipal corporation duly organized and validly existing under the laws
of the State of California with the power to carry on its business as it is now being
conducted under the statutes of the State of California and the Charter of City.
B. City desires to engage Contractor to perform restroom portering services at City
beach restroom facilities ("Project").
C. Contractor possesses the skill, experience, ability, background, certification and
knowledge to provide the janitorial services described in this Agreement.
D. Contractor has examined the location of all proposed work, carefully reviewed
and evaluated the specifications set forth by City for the Project, is familiar with
all conditions relevant to the performance of services, and has committed to
perform all work required for the compensation specified in this Agreement.
NOW, THEREFORE, it is mutually agreed by and between the undersigned
parties as follows:
[
The term of this Agreement shall commence on the Effective Date, and shall
terminate on December 31, 2013, unless terminated earlier as set forth herein.
2. SERVICES TO BE PERFORMED
2.1 Contractor shall diligently perform all the services described in the Scope
of Services attached hereto as Exhibit A and incorporated herein by reference
("Services" or "Work"), As a material inducement to City entering into this Agreement,
Contractor represents and warrants that Contractor is a provider of first class work and
Contractor is experienced in performing the Work contemplated herein and, in light of
such status and experience, Contractor covenants that it shall follow the highest
industry standards in performing the Work required hereunder and that all materials will
be of good quality. For purposes of this Agreement, the phrase "highest industry
standards" shall mean those standards of practice recognized by one or more first-class
firms performing similar work under similar circumstances.
2.2 Contractor shall perform all Work required to be performed, and shall
provide and furnish all the labor, materials, necessary tools, expendable equipment and
all utility and transportation services necessary for the Project.
3. TIME OF PERFORMANCE
3.1 Time is of the essence in the performance of Services under this
Agreement and Contractor shall perform the Services in accordance with the schedule
included in Exhibit A. In the absence of a specific schedule, the Services shall be
performed to completion in a diligent and timely manner. The failure by Contractor to
strictly adhere to the schedule set forth in Exhibit A, if any, or perform the Services in a
diligent and timely manner may result in termination of this Agreement by City.
3.2 Notwithstanding the foregoing, Contractor shall not be responsible for
delays due to causes beyond Contractor's reasonable control. However, in the case of
any such delay in the Services to be provided for the Project, each party hereby agrees
to provide notice within two (2) calendar days of the occurrence causing the delay to the
other party so that all delays can be addressed.
3.3 Contractor shall submit all requests for extensions of time for performance
in writing to the Project Administrator as defined herein, not later than two (2) calendar
days after the start of the condition that purportedly causes a delay. The Project
Administrator shall review all such requests and may grant reasonable time extensions
for unforeseeable delays that are beyond Contractor's control.
3.4 For all time periods not specifically set forth herein, Contractor shall
respond in the most expedient and appropriate manner under the circumstances, by
fax, hand -delivery or mail.
4. COMPENSATION TO CONTRACTOR
4.1 City shall pay Contractor for the Services on a time and expense not -to -
exceed basis in accordance with the provisions of this Section and the Schedule of
Billing Rates attached hereto as Exhibit B and incorporated herein by reference. Except
as otherwise provided herein, no rate changes shall be made during the term of this
Agreement without the prior written approval of City. Contractor's compensation for all
Services performed in accordance with this Agreement, including all reimbursable
items, shall not exceed Seventy Five Thousand Dollars ($75,000.00), without prior
written amendment to the Agreement.
4.2 Contractor shall submit monthly invoices to City describing the Work
performed the preceding month. Contractor's bills shall include the name and/or
classification of employee who performed the Work, a brief description of the Services
performed and/or the specific task in the Scope of Services to which it relates, the date
the Services were performed, the number of hours spent on all Work billed on an hourly
basis, and a description of any reimbursable expenditures. City shall pay Contractor no
later than thirty (30) calendar days after approval of the monthly invoice by City staff.
Ed Building Maintenance Services Page 2
4.3 City shall reimburse Contractor only for those costs or expenses
specifically identified in Exhibit B to this Agreement, or specifically approved in writing in
advance by City.
4.4 Contractor shall not receive any compensation for Extra Work performed
without the prior written authorization of City. As used herein, "Extra Work" means any
Work that is determined by City to be necessary for the proper completion of the
Project, but which is not included within the Scope of Services and which the parties did
not reasonably anticipate would be necessary at the execution of this Agreement.
Compensation for any authorized Extra Work shall be paid in accordance with Exhibit B.
5.1 Contractor shall designate a Project Manager, who shall coordinate all
phases of the Project. This Project Manager shall be available to City at all reasonable
times during the Agreement term. Contractor has designated Billie Alexander to be its
Project Manager. Contractor shall not remove or reassign the Project Manager or any
personnel listed in Exhibit A or assign any new or replacement personnel to the Project
without the prior written consent of City. City's approval shall not be unreasonably
withheld with respect to the removal or assignment of non -key personnel.
5.2 Contractor, at the sole discretion of City, shall remove from the Project any
of its personnel assigned to the performance of Services upon written request of City.
Contractor warrants that it will continuously furnish the necessary personnel to complete
the Project on a timely basis as contemplated by this Agreement.
6. ADMINISTRATION
This Agreement will be administered by the Municipal Operations Department.
City's Operations Support Superintendent or designee shall be the Project Administrator
and shall have the authority to act for City under this Agreement. The Project
Administrator shall represent City in all matters pertaining to the Services to be
rendered pursuant to this Agreement.
7. CITY'S RESPONSIBILITIES
To assist Contractor in the execution of its responsibilities under this Agreement,
City agrees to provide access to and upon request of Contractor, one copy of all
existing relevant information on file at City. City will provide all such materials in a
timely manner so as not to cause delays in Contractor's Work schedule.
8. TYPE AND INSTALLATION OF MATERIALS/STANDARD OF CARE
8.1 Contractor shall use only the standard materials described in Exhibit A in
performing Services under this Agreement. Any deviation from the materials described
in Exhibit A shall not be installed or utilized unless approved in advance and in writing
by the Project Administrator.
8.2 All of the Services shall be performed by Contractor or under Contractor's
supervision. Contractor represents that it possesses the personnel required to perform
Ed Building Maintenance Services Page 3
the Services required by this Agreement, and that it will perform all Services in a
manner commensurate with highest industry standards. All Services shall be performed
by qualified and experienced personnel who are not employed by City. By delivery of
completed Work, Contractor certifies that the Work conforms to the requirements of this
Agreement and all applicable federal, state and local laws and the industry standard.
8.3 Contractor represents and warrants to City that it has, shall obtain and
shall keep in full force and effect during the term hereof, at its sole cost and expense, all
licenses, permits, qualifications, insurance and approvals of whatsoever nature that is
legally required of Contractor to practice its profession. Contractor shall maintain a City
of Newport Beach business license during the term of this Agreement.
8.4 Contractor shall not be responsible for delay, nor shall Contractor be
responsible for damages or be in default or deemed to be in default by reason of strikes,
lockouts, accidents, acts of God, or the failure of City to furnish timely information or to
approve or disapprove Contractor's Work promptly, or delay or faulty performance by
City, contractors, or governmental agencies.
9. RESPONSIBILITY FOR DAMAGES OR INJURY
9.1 City and all officers, employees and representatives thereof shall not be
responsible in any manner for any loss or damage to any of the materials or other things
used or employed in performing the Project or for injury to or death of any person as a
result of Contractor's performance of the Services required hereunder; or for damage to
property from any cause arising from the performance of the Project by Contractor, or
its subcontractors, or its workers, or anyone employed by either of them.
9.2 Contractor shall be responsible for any liability imposed by law and for
injuries to or death of any person or damage to property resulting from defects,
obstructions or from any cause arising from Contractor's Work on the Project, or the
Work of any subcontractor or supplier selected by Contractor.
9.3 To the fullest extent permitted by law, Contractor shall indemnify, defend
and hold harmless City, its City Council, boards and commissions, officers, agents,
volunteers, and employees (collectively, the °Indemnified Parties") from and against any
and all claims (including, without limitation, claims for bodily injury, death or damage to
property), demands, obligations, damages, actions, causes of action, suits, losses,
judgments, fines, penalties, liabilities, costs and expenses (including, without limitation,
attorneys' fees, disbursements and court costs) of every kind and nature whatsoever
(individually, a Claim; collectively, "Claims"), which may arise from or in any manner
relate (directly or indirectly) to any breach of the terms and conditions of this
Agreement, any Work performed or Services provided under this Agreement including,
without limitation, defects in workmanship or materials or Contractor's presence or
activities conducted on the Project (including the negligent and/or willful acts, errors
and/or omissions of Contractor, its principals, officers, agents, employees, vendors,
suppliers, consultants, subcontractors, anyone employed directly or indirectly by any of
them or for whose acts they may be liable or any or all of them).
Ed Building Maintenance Services Page 4
9.4 Notwithstanding the foregoing, nothing herein shall be construed to
require Contractor to indemnify the Indemnified Parties from any Claim arising from the
sole negligence or willful misconduct of the Indemnified Parties. Nothing in this
indemnity shall be construed as authorizing any award of attorneys' fees in any action
on or to enforce the terms of this Agreement. This indemnity shall apply to all claims
and liability regardless of whether any insurance policies are applicable. The policy
limits do not act as a limitation upon the amount of indemnification to be provided by
Contractor.
9.5 Contractor shall perform all Work in a manner to minimize public
inconvenience and possible hazard, to restore other work areas to their original
condition and former usefulness as soon as possible, and to protect public and private
property. Contractor shall be liable for any private or public property damaged during
the performance of the Work by Contractor or its agents.
9.6 To the extent authorized by law, as much of the money due Contractor
under and by virtue of the Agreement as shall be considered necessary by City may be
retained by it until disposition has been made of such suits or claims for damages as
aforesaid.
9,7 The rights and obligations set forth in this Section shall survive the
termination of this Agreement.
It is understood that City retains Contractor on an independent contractor basis
and Contractor is not an agent or employee of City. The manner and means of
conducting the Work are under the control of Contractor, except to the extent they are
limited by statute, rule or regulation and the expressed terms of this Agreement. No
civil service status or other right of employment shall accrue to Contractor or its
employees. Nothing in this Agreement shall be deemed to constitute approval for
Contractor or any of Contractor's employees or agents, to be the agents or employees
of City. Contractor shall have the responsibility for and control over the means of
performing the Work, provided that Contractor is in compliance with the terms of this
Agreement. Anything in this Agreement that may appear to give City the right to direct
Contractor as to the details of the performance of the Work or to exercise a measure of
control over Contractor shall mean only that Contractor shall follow the desires of City
with respect to the results of the Services.
11. COOPERATION
Contractor agrees to work closely and cooperate fully with City's designated
Project Administrator and any other agencies that may have jurisdiction or interest in the
Work to be performed. City agrees to cooperate with Contractor on the Project.
12. CITY POLICY
Contractor shall discuss and review all matters relating to policy and Project
direction with City's Project Administrator in advance of all critical decision points in
Ed Building Maintenance Services Page 5
order to ensure the Project proceeds in a manner consistent with City goals and
policies.
13. PROGRESS
Contractor is responsible for keeping the Project Administrator informed on a
regular basis regarding the status and progress of the Project, activities performed and
planned, and any meetings that have been scheduled or are desired.
14. INSURANCE
Without limiting Contractors indemnification of City, and prior to commencement
of Work, Contractor shall obtain, provide and maintain at its own expense during the
term of this Agreement or for other periods as specified in this Agreement, policies of
insurance of the type, amounts, terms and conditions described in the Insurance
Requirements attached hereto as Exhibit C, and incorporated herein by reference.
15. PROHIBITION AGAINST ASSIGNMENTS AND TRANSFERS
Except as specifically authorized under this Agreement, the Services to be
provided under this Agreement shall not be assigned, transferred contracted or
subcontracted out without the prior written approval of City. Any of the following shall
be construed as an assignment: The sale, assignment, transfer or other disposition of
any of the issued and outstanding capital stock of Contractor, or of the interest of any
general partner or joint venturer or syndicate member or cotenant if Contractor is a
partnership or joint -venture or syndicate or cotenancy, which shall result in changing the
control of Contractor. Control means fifty percent (50%) or more of the voting power or
twenty-five percent (25%) or more of the assets of the corporation, partnership or joint -
venture.
16. SUBCONTRACTING
The subcontractors authorized by City, if any, to perform Work on this Project are
identified in Exhibit A. Contractor shall be fully responsible to City for all acts and
omissions of any subcontractor. Nothing in this Agreement shall create any contractual
relationship between City and any subcontractor nor shall it create any obligation on the
part of City to pay or to see to the payment of any monies due to any such
subcontractor other than as otherwise required by law. City is an intended beneficiary
of any Work performed by the subcontractor for purposes of establishing a duty of care
between the subcontractor and City. Except as specifically authorized herein, the
Services to be provided under this Agreement shall not be otherwise assigned,
transferred, contracted or subcontracted out without the prior written approval of City.
17, OWNERSHIP OF DOCUMENTS
Each and every report, draft, map, record, plan, document and other writing
produced (hereinafter "Documents"), prepared or caused to be prepared by Contractor,
its officers, employees, agents and subcontractors, in the course of implementing this
Agreement, shall become the exclusive property of City, and City shall have the sole
right to use such materials in its discretion without further compensation to Contractor or
Ed Building Maintenance Services Page 6
any other party. Contractor shall, at Contractor's expense, provide such Documents to
City upon prior written request.
18. CONFIDENTIALITY
All Documents, including drafts, preliminary drawings or plans, notes and
communications that result from the Services in this Agreement, shall be kept
confidential unless City expressly authorizes in writing the release of information.
18. RECORDS
Contractor shall keep records and invoices in connection with the Services to be
performed under this Agreement. Contractor shall maintain complete and accurate
records with respect to the costs incurred under this Agreement and any Services,
expenditures and disbursements charged to City, for a minimum period of three (3)
years, or for any longer period required by law, from the date of final payment to
Contractor under this Agreement. All such records and invoices shall be clearly
identifiable. Contractor shall allow a representative of City to examine, audit and make
transcripts or copies of such records and Invoices during regular business hours.
Contractor shall allow inspection of all Work, data, Documents, proceedings and
activities related to the Agreement for a period of three (3) years from the date of final
payment to Contractor under this Agreement.
20. WITHHOLDINGS
City may withhold payment to Contractor of any disputed sums until satisfaction
of the dispute with respect to such payment. Such withholding shall not be deemed to
constitute a failure to pay according to the terms of this Agreement. Contractor shall not
discontinue Work as a result of such withholding. Contractor shall have an immediate
right to appeal to the City Manager or his/her designee with respect to such disputed
sums. Contractor shall be entitled to receive interest on any withheld sums at the rate of
return that City earned on its investments during the time period, from the date of
withholding of any amounts found to have been improperly withheld.
21. CITY'S RIGHT TO EMPLOY OTHER CONTRACTORS
City reserves the right to employ other contractors in connection with the Project.
22. CONFLICTS OF INTEREST
22.1 Contractor or its employees may be subject to the provisions of the
California Political Reform Act of 1974 (the "Act"), which (1) requires such persons to
disclose any financial interest that may foreseeably be materially affected by the Work
performed under this Agreement, and (2) prohibits such persons from making, or
participating in making, decisions that will foreseeably financially affect such interest.
22.2 If subject to the Act, Contractor shall conform to all requirements of the
Act. Failure to do so constitutes a material breach and is grounds for immediate
termination of this Agreement by City. Contractor shall indemnify and hold harmless
Ed Building Maintenance Services Page 7
City for any and all claims for damages resulting from Contractor's violation of this
Section.
23. NOTICES
23.1 All notices, demands, requests or approvals, including any change in
mailing address, to be given under the terms of this Agreement shall be given in writing,
and conclusively shall be deemed served when delivered personally, or on the third
business day after the deposit thereof in the United States mail, postage prepaid, first-
class mail, addressed as hereinafter provided.
23.2 All notices, demands, requests or approvals from Contractor to City shall
be addressed to City at:
Attn: Operations Support Superintendent
Municipal Operations Department
City of Newport Beach
100 Civic Center Drive
PO Box 1768
Newport Beach, CA 92658
23.3 All notices, demands, requests or approvals from City to Contractor shall
be addressed to Contractor at:
Attn: Billie Alexander
Ed Building Maintenance Services
23441 Golden Springs Dr #249
Diamond Bar, CA 91765
24, CLAIMS
Unless a shorter time is specified elsewhere in this Agreement, before making its
final request for payment under this Agreement, Contractor shall submit to City, in
writing, all claims for compensation under or arising out of this Agreement.
Contractor's acceptance of the final payment shall constitute a waiver of all claims for
compensation under or arising out of this Agreement except those previously made in
writing and identified by Contractor in writing as unsettled at the time of its final request
for payment. Contractor and City expressly agree that in addition to any claims filing
requirements set forth in the Agreement, Contractor shall be required to file any claim
Contractor may have against City in strict conformance with the Government Claims Act
(Government Code sections 900 et seq.).
25. TERMINATION
25.1 In the event that either party fails or refuses to perform any of the
provisions of this Agreement at the time and in the manner required, that party shall be
deemed in default in the performance of this Agreement. If such default is not cured
within a period of two (2) calendar days, or if more than two (2) calendar days are
reasonably required to cure the default and the defaulting party fails to give adequate
assurance of due performance within two (2) calendar days after receipt of written
Ed Building Maintenance
Page 8
notice of default, specifying the nature of such default and the steps necessary to cure
such default, and thereafter diligently take steps to cure the default, the non -defaulting
party may terminate the Agreement forthwith by giving to the defaulting party written
notice thereof.
25.2 Notwithstanding the above provisions, City shall have the right, at its sole
and absolute discretion and without cause, of terminating this Agreement at any time by
giving no less than seven (7) calendar days' prior written notice to Contractor. In the
event of termination under this Section, City shall pay Contractor for Services
satisfactorily performed and costs incurred up to the effective date of termination for
which Contractor has not been previously paid. On the effective date of termination,
Contractor shall deliver to City all reports, Documents and other information developed
or accumulated in the performance of this Agreement, whether in draft or final form.
26. LABOR
26.1 Contractor shall conform with all applicable provisions of state and federal
law including, but not limited to, applicable provisions of the federal Fair Labor
Standards Act ("FLSA") (29 USCA § 201, et seq.).
26.2 Contractor shall comply with all applicable provisions of the California
Labor Code, including the Displaced Janitors Opportunity Act (Labor Code §§1060-
1065).
26.3 Whenever Contractor has knowledge that any actual or potential labor
dispute is delaying or threatens to delay the timely performance of this Agreement,
Contractor shall immediately give written notice to City, and provide all relevant
information.
26.4 Contractor represents that all persons working under this Agreement are
verified to be U.S. citizens or persons legally authorized to work in the United States.
26.5 To the fullest extent permitted by law, Contractor shall indemnify, defend,
and hold harmless City, its City Council, boards and commissions, officers, agents,
volunteers, and employees from loss or damage, including but not limited to attorneys'
fees, and other costs of defense by reason of actual or alleged violations of any
applicable federal, state and local labor laws or law, rules, and/or regulations. This
obligation shall survive the expiration and/or termination of the Agreement.
27. STANDARD PROVISIONS
27.1 Recitals. City and Contractor acknowledge that the above Recitals are
true and correct and are hereby incorporated by reference.
27.2 Compliance with all Laws. Contractor shall, at its own cost and expense,
comply with all statutes, ordinances, regulations and requirements of all governmental
entities, including federal, state, county or municipal, whether now in force or hereinafter
enacted. In addition, all Work prepared by Contractor shall conform to applicable City,
county, state and federal laws, rules, regulations and permit requirements and be
subject to approval of the Project Administrator and City.
Ed Building Maintenance Services Page 9
27.3 Waiver. A waiver by either party of any breach, of any term, covenant or
condition contained herein shall not be deemed to be a waiver of any subsequent
breach of the same or any other term, covenant or condition contained herein, whether
of the same or a different character.
27.4 Integrated Contract. This Agreement represents the full and complete
understanding of every kind or nature whatsoever between the parties hereto, and all
preliminary negotiations and agreements of whatsoever kind or nature are merged
herein. No verbal agreement or implied covenant shall be held to vary the provisions
herein.
27.5 Conflicts or Inconsistencies. In the event there are any conflicts or
inconsistencies between this Agreement and the Scope of Services or any other
attachments attached hereto, the terms of this Agreement shall govern.
27.6 Interpretation. The terms of this Agreement shall be construed in
accordance with the meaning of the language used and shall not be construed for or
against either party by reason of the authorship of the Agreement or any other rule of
construction which might otherwise apply.
27.7 Amendments, This Agreement may be modified or amended only by a
written document executed by both Contractor and City and approved as to form by the
City Attorney.
27.8 Severability. If any term or portion of this Agreement is held to be invalid,
illegal, or otherwise unenforceable by a court of competent jurisdiction, the remaining
provisions of this Agreement shall continue in full force and effect.
27.9 Controlling Law and Venue. The laws of the State of California shall
govern this Agreement and all matters relating to it and any action brought relating to
this Agreement shall be adjudicated in a court of competent jurisdiction in the County of
Orange, State of California.
27.10 Equal Opportunity Employment. Contractor represents that it is an equal
opportunity employer and it shall not discriminate against any subcontractor, employee
or applicant for employment because of race, religion, color, national origin, handicap,
ancestry, sex, age or any other impermissible basis under law.
27.11 No Attorneys' Fees. In the event of any dispute or legal action arising
under this Agreement, the prevailing party shall not be entitled to attorneys' fees.
27.12 Counterparts. This Agreement may be executed in two (2) or more
counterparts, each of which shall be deemed an original and all of which together shall
constitute one (1) and the same instrument.
[SIGNATURES ON NEXT PAGE]
E"M
Ed Building Maintenance Services Page 10
IN WITNESS WHEREOF, the parties have caused this Agreement to be
executed on the dates written below.
APPROVED AS TO FORM:
CITY ATTORNEY'S OFFICE
Date: .!�-/Z Z 1/3
go
Aaron C. Har
City Attorney
ATTEST:
5-24,Date: 13
ti
By:
Leilani I. Brown
City Clerk ,,VEROIZ,
CITY OF NEWPORT BEACH,
a Californig nLii i I corporation
Date: 3 /17 �, _ /
By:—
Mark armo
cDirector
CONTRACTOR: Ed Building
Maintenance Services, a California
limited partnership
Date:
By:
Bi lie Alexander
General Partner
[END OF SIGNATURES]
Attachments: Exhibit A - Scope of Services
Exhibit B - Schedule of Billing Rates
Exhibit C - Insurance Requirements
Ed Building Maintenance Services Page 11
EXHIBIT A
SCOPE OF SERVICES
1. Portering Duties
Contractor and its employees shall:
1.1. Fill all paper dispensers.
1.2. Fill all soap dispensers.
1.3. Empty trash containers and replace liners if needed.
1.4. Keep all restrooms clean and presentable.
1.5. Remove urinal/toilet clogs.
1.6. Litter pick the surrounding area — the outside perimeter of each restroom
facility shall be
kept clean and presentable.
1.7. Remove graffiti.
1.8. Report any and all plumbing, flooding, and electrical issues to City staff
immediately.
1.9. Close and look restrooms during drain backups or other issues requiring
closure, and direct visitors to the next closest facility. "Out of service" or similar signage
shall be put in place where necessary. Provide transportation for crew(s) to multiple
locations throughout each day.
1.10. Provide mops, brooms, standing dust pans and cleaning products. Mop
water shall be emptied properly after each cleaning. Pipe case shall be clean and
organized.
1.11. Perform all related duties as directed by City staff.
2. Staff Requirements
2.1. Each individual shall be required to undergo fingerprinting and background
screening by the City.
2.2. Contractor shall provide up to eight (8) staff members (7 Janitors and 1
Supervisor), up to eight (8) hours per day, seven (7) days per week (subject to change
based upon need.)
2.3. Contractor shall provide a crew of up to eight (8) staff members, (7 Janitors
and 1 Supervisor), up to ten (10) hours per day on holiday weekends (subject to change
based upon need.)
2.4. Crews shall be formed so as to perform duties at multiple locations. Each
crew shall have up to several locations to monitor.
2.5. Contractor shall provide at least one (1) female per crew to perform duties in
Women's restrooms.
2.6. All supervisory personnel must be able to communicate effectively in English
(both orally and in writing). At least one staff member at each location must also be able
to communicate to the public effectively.
2.7. Field supervisor shall contact City Supervisory Staff daily to provide updates.
2.8. Field staff shall perform all duties responsibly and effectively.
Ed Building Maintenance Services Page A-1
2.9. Field supervisor shall drop off empty cardboard boxes to City's Corporation
Yard following the end of the shift.
2.10. All staff shall wear appropriate attire, consisting of pants or shorts with
company shirts. Any item of clothing with any form of offensive language or imagery
shall not be allowed.
2.11. Staff shall not use cell phones for reasons other than business while on
duty. Staff shall not smoke while on duty.
2.12. Two breaks and one lunch break for each staff member shall be scheduled
so as to have one individual on duty at all times.
3. City Duties & Responsibilities
3.1. City's Project Administrator or his/her designee shall work with Contractor's
supervisory personnel in establishing schedules and locations of work.
3.2. Unless otherwise specified above, City shall provide all other relevant
supplies and materials as related to the requested services.
3.3. City reserves the right to request changes in staffing levels based upon
need.
4. Schedule
4.1. May 27, 2013 - September 10, 2013 (Start/end dates may be changed by
City based upon need)
4.2. 11:OOAM — 7:OOPM, Monday — Sunday
4.3. 10:OOAM — 8:OOPM, Saturday — Sunday (As needed on holiday weekends)
5. Locations
5.1.The Contractor shall provide the Services requested above at the following
public locations. The Project Administrator or his/her designee shall provide the
Contractor with specific routing and schedules. Locations and routes may be
subject to change.
5.1.1. Corona Del Mar State Beach restrooms -- 3001 Ocean Blvd
5.1.2. Newport Pier Beach Restrooms — 70 Newport Pier
5.1.3. Balboa Pier Beach Restrooms — 1 Balboa Pier
5.1.4. 15th St restrooms — 15th St on the beach
5.1.5. Washington St Restrooms — Washington St and Bay Ave E
5.1.6. Balboa Island Ferry Restrooms — Ferry entrance off Agate Ave
5.1.7. Balboa Island Fire Station Restrooms — 124 Marine Ave by the Fire
Station
5.1.8. Buck Gully Restroom (Little Corona) — Glen Drive off of Little Corona
Beach
Ed Building Maintenance Services Page A-2
SCHEDULE OF BILLING RATES
ATTACHMENT D: PROPOSAL OFFER FORM
Instructions: Proposers may submit pricing information on their own forms but this Proposal
Offer Form must also be completed. Complete this form, sign, and remit as part of your
Proposal as Attachment D.
Restroom Portering Services
Standard Rate:
$ /Z� , -N% Per Hour
The undersigned certifies that submission of this Proposal is made without prior understanding,
arrangement, agreement, or connection with any corporation, firm or person submitting a
Proposal for the some services, and is in all respects fair and without collusion of fraud. The
undersigned certifies that they have not entered into any arrangement or agreement with any
City of Newport Beach public officer. The undersigned understands collusive practices are a
violation of State and Federal law and can result in fines, prison sentences, and civil damage
awards.
ProposerSignature Date
Printed Name and Title
Ed Building Maintenance Services Page B-1
EXHIBIT C
INSURANCE REQUIREMENTS — MAINTENANCE/REPAIR/JANITORIAL SERVICES
1. Provision of Insurance. Without limiting Contractor's indemnification of City, and
prior to commencement of Work, Contractor shall obtain, provide and maintain at
its own expense during the term of this Agreement, policies of insurance of the
type and amounts described below and in a form satisfactory to City. Contractor
agrees to provide insurance in accordance with requirements set forth here. If
Contractor uses existing coverage to comply and that coverage does not meet
these requirements, Contractor agrees to amend, supplement or endorse the
existing coverage.
2. Acceptable Insurers. All insurance policies shall be issued by an insurance
company currently authorized by the Insurance Commissioner to transact
business of insurance in the State of California, with an assigned policyholders'
Rating of A- (or higher) and Financial Size Category Class VII (or larger) in
accordance with the latest edition of Best's Key Rating Guide, unless otherwise
approved by the City's Risk Manager.
3. Coverage Requirement .
A. Workers' Compensation Insurance. Contractor shall maintain Workers'
Compensation Insurance, statutory limits, and Employer's Liability
Insurance with limits of at least one million dollars ($1,000,000) each
accident for bodily injury by accident and each employee for bodily injury
by disease in accordance with the laws of the State of California, Section
3700 of the Labor Code.
Contractor shall submit to City, along with the certificate of insurance,
a Waiver of Subrogation endorsement in favor of City, its officers,
agents, employees and volunteers.
B. General Liability Insurance. Contractor shall maintain commercial general
liability insurance and, if necessary, umbrella liability insurance, with
coverage at least as broad as provided by Insurance Services Office form
CG 00 01, in an amount not less than one million dollars ($1,000,000) per
occurrence, two million dollars ($2,000,000) general aggregate. The
policy shall cover liability arising from premises, operations, products -
completed operations, personal and advertising injury, and liability
assumed under an insured contract (including the tort liability of another
assumed in a business contract) with no endorsement or modification
limiting the scope of coverage for liability assumed under a contract.
C. Automobile Liability Insurance. Contractor shall maintain automobile
insurance at least as broad as Insurance Services Office form CA 00 01
covering bodily injury and property damage for all activities of Contractor
arising out of or in connection with Work to be performed under this
Agreement, including coverage for any owned, hired, non -owned or rented
Ed Building Maintenance Services Page C-1
vehicles, in an amount not less than one minion dollars ($1,000,000)
combined single limit each accident.
4. Other Insurance Requirements. The policies are to contain, or be endorsed to
contain, the following provisions:
A. Waiver of Subrogation.„ All insurance coverage maintained or procured
pursuant to this Agreement shall be endorsed to waive subrogation
against City, its elected or appointed officers, agents, officials, employees
and volunteers or shall specifically allow Contractor or others providing
insurance evidence in compliance with these requirements to waive their
right of recovery prior to a loss. Contractor hereby waives its own right of
recovery against City, and shall require similar written express waivers
from each of its subeonsultants.
B. Additional Insured Status. All liability policies including general liability,
excess liability, pollution liability, and automobile liability, if required, shall
provide or be endorsed to provide that City and its officers, officials,
employees, and agents shall be included as insureds under such policies.
C. Primary and Non Contributory. All liability coverage shall apply on a
primary basis and shall not require contribution from any insurance or self-
insurance maintained by City.
D. Notice of Cancellation. All policies shall provide City with thirty (30)
calendar days notice of cancellation (except for nonpayment for which ten
(10) calendar days notice is required) or nonrenewal of coverage for each
required coverage.
5. Additional Agreements Between the Parties. The parties hereby agree to the
following:
A. Evidence of Insurance. Contractor shall provide certificates of insurance
to City as evidence of the insurance coverage required herein, along with
a waiver of subrogation endorsement for workers' compensation and other
endorsements as specified herein for each coverage. Insurance
certificates and endorsement must be approved by City's Risk Manager
prior to commencement of performance. Current certification of insurance
shall be kept on file with City at all times during the term of this
Agreement. City reserves the right to require complete, certified copies of
all required insurance policies, at any time.
B. City's Right to Revise Reguirements. City reserves the right at any time
during the term of the Agreement to change the amounts and types of
insurance required by giving Contractor sixty (60) calendar days advance
written notice of such change. If such change results in substantial
additional cost to Contractor, City and Contractor may renegotiate
Contractor's compensation.
Ed Building Maintenance Services Page C-2
C. Right to Review Subcontracts. Contractor agrees that upon request, all
agreements with subcontractors or others with whom Contractor enters
into contracts with on behalf of City will be submitted to City for review.
Failure of City to request copies of such agreements will not impose any
liability on City, or its employees.
D, Enforcement of Agreement Provisions. Contractor acknowledges and
agrees that any actual or alleged failure on the part of City to inform
Contractor of non-compliance with any requirement imposes no additional
obligations on City nor does it waive any rights hereunder.
E. Requirements not Limiting. Requirements of specific coverage features
or limits contained in this Section are not intended as a limitation on
coverage, limits or other requirements, or a waiver of any coverage
normally provided by any insurance. Specific reference to a given
coverage feature is for purposes of clarification only as it pertains to a
given issue and is not intended by any party or insured to be all inclusive,
or to the exclusion of other coverage, or a waiver of any type.
F. Self-insured Retentions. Any self-insured retentions must be declared to
and approved by City. City reserves the right to require that self-insured
retentions be eliminated, lowered, or replaced by a deductible. Self-
insurance will not be considered to comply with these requirements unless
approved by City.
G. City Remedies for Non -Compliance If Contractor or any sub -
consultant fails to provide and maintain insurance as required herein, then
City shall have the right but not the obligation, to purchase such
insurance, to terminate this Agreement, or to suspend Contractor's right to
proceed until proper evidence of insurance is provided. Any amounts paid
by City shall, at City's sole option, be deducted from amounts payable to
Contractor or reimbursed by Contractor upon demand.
N. Timely Notice of Claims. Contractor shall give City prompt and timely
notice of claims made or suits instituted that arise out of or result from
Contractor's performance under this Contract, and that involve or may
involve coverage under any of the required liability policies. City assumes
no obligation or liability by such notice, but has the right (but not the duty)
to monitor the handling of any such claim or claims if they are likely to
involve City.
Contractor's Insurance. Contractor shall also procure and maintain, at its
own cost and expense, any additional kinds of insurance, which in its own
judgment may be necessary for its proper protection and prosecution of
the Work.
Ed Building Maintenance Services Page C-3
CERTIFICATE OF INSURANCE
CHECKLIST
This checklist is comprised of requirements as outlined by the City of Newport Beach, *
Date Received: 5-30-1.2 Dept./Contact Received From: Raymund
Date Completed: 6-22-12 Sent to:
Company/Person required to have certificate:
Type of contract:
—Raymund By: Joel
Ed Building Maintenance
All Other
I. GENERAL LIABILITY
EFFECTIVE/EXPIRATION DATE: 6-22-12/6-22-13
A INSURANCE COMPANY: Financial Pacific Insurance
B. AM BEST RATING (A-: VII or greater): A: X
C. ADMITTED Company (Must be California Admitted):
Is Company admitted in California?
0 Yes ❑ No
D. LIMITS (Must be $1M or greater): What is limit provided?
1,000,000
E. ADDITIONAL INSURED ENDORSEMENT— please attach
® Yes ❑ No
F. PRODUCTS AND COMPLETED OPERATIONS (Must
ADMITTED COMPANY (Must be California Admitted):
include): Is it included? (completed Operations status does
not apply to Waste Haulers or Recreation)
® Yes ❑ No
G. ADDITIONAL INSURED FOR PRODUCTS AND
LIMITS - If Employees (Must be $1M min. BI & PD and $500,000
COMPLETED OPERATIONS ENDORSEMENT (completed
Operations status does not apply to Waste Haulers)
® Yes ❑ No
H. ADDITIONAL INSURED WORDING TO INCLUDE (The City
LIMITS Waiver of Auto Insurance 1 Proof of coverage (if individual)
its officers, officials, employees and volunteers): Is it
(What is limits provided?)
included?
® Yes ❑ No
I. PRIMARY & NON-CONTRIBUTORY WORDING (Must be
included): Is it included?
® Yes ❑ No
J. CAUTION! (Confirm that loss or liability of the named insured
G.
is not limited solely by their negligence) Does endorsement
❑ N/A ❑ Yes ® No
include "solely by negligence" wording?
❑ Yes ® No
K. ELECTED SCMAF COVERAGE (RECREATION ONLY):
® N/A ❑ Yes ❑ No
L. NOTICE OF CANCELLATION:
❑ N/A ® Yes ❑ No
II, AUTOMOBILE LIABILITY
EFFECTIVE/EXPIRATION DATE: 6-22-12/6-22-13
A.
INSURANCE COMPANY: Financial Pacific Insurance
B.
AM BEST RATING (A-: VII or greater) m A: X
C.
ADMITTED COMPANY (Must be California Admitted):
Is Company admitted in California?
[9 Yes ❑ No
D.
LIMITS - If Employees (Must be $1M min. BI & PD and $500,000
UM, $2M min for Waste Haulers): What is limits provided?
1,000,000
E
LIMITS Waiver of Auto Insurance 1 Proof of coverage (if individual)
(What is limits provided?)
N/A
F.
PRIMARY & NON-CONTRIBUTORY WORDING (For Waste
Haulers only):
® N/A ❑ Yes ❑ No
G.
HIRED AND NON -OWNED AUTO ONLY:
❑ N/A ❑ Yes ® No
H.
NOTICE OF CANCELLATION:
❑ N/A ® Yes ❑ No
OL WORKERS'COMPENSATION
EFFECTiVE0EXP|RAT|OND/g^E:6-22-1216-22-13
A.
INSURANCE COMPANY: State Fund
B.
/\MBEST RATING (f+:VII orgroater): Kotxatd
C.
ADMITTED Company (Must boCalifornia Adno|Uad):
0Yen
El No
D�
VVORKERS`CDMPENSAT|{)NL|/NlT: Statutory
[_1Yes
FlNo
E�
EMPLOYERS' LIABILITY LIMIT (Must be$1Morgreater)
1,000,000�
F.
WAIVER {)FSUBROGATION (To inn!ude): |sitincluded?
MYeo
El No
G.
SIGNED VV0RKERS'COMPENSAT|0NEXEMPTION FORM:
N/A FlYes
[I No
H.
NOTICE OPCANCELL8T0N� �
El N/A � =
�
ADDITIONAL COVERAGE'S THAT MAYBE REQUIRED
TV. PROFESSIONAL LIABILITY
\/ POLLUTION LIABILITY
\/ BUILDERS RISK
HAVE ALL ABOVE REQUIREMENTS BEEN MET?
IF NO, WHICH ITEMS NEED TO BE COMPLETED?
Agent of/QUmntInsurance Services
Broker of record for the City ofNewport Beach
6~27^|2
Date
Z Yes r_1 No
RISK MANAGEMENT APPROVAL REQUIRED (Non -admitted carrier rated less than ;
Self Insured Retention orDeductible greater than \ [lN/A F7Yes FlNo
Reason for Risk Management
Risk Management
AGREEMENT FOR MAINTENANCE SERVICES
WITH ED BUILDING MAINTENANCE SERVICES
FOR RESTROOM PORTERING SERVICES
.� THIS AGREEMENT FOR MAINTENANCE SERVICES ("Agreement') is made
_ 1 and entered into as of this 956�day of June, 2012 ("Commencement Date") by and
v between the CITY OF NEWPORT BEACH, a California municipal corporation and
charter city ("City"), and ED BUILDING MAINTENANCE SERVICES, a California
General Partnership ("Contractor"), whose principal place of business is 23441 Golden
Springs Drive, Suite 249, Diamond Bar, CA 91765 and is made with reference to the
following:
RECITALS
A. City is a municipal corporation duly organized and validly existing under the laws
of the State of California with the power to carry on its business as it is now being
conducted under the statutes of the State of California and the Charter of City.
B. City requires portering services for the maintenance of City beach restroom
facilities during the summer months.
C. City desires to engage Contractor to provide restroom portering services at City
beach restroom facilities ("Project').
D. Contractor has examined the location of all proposed work, carefully reviewed
and evaluated the specifications. set forth by the City for the Project, and is
familiar with all conditions relevant to the performance of services and has
committed to perform all work required for the price specified in this Agreement.
NOW, THEREFORE, it is mutually agreed by and between the undersigned
parties as follows:
1. TERM
The term of this Agreement shall commence on the Commencement Date, and shall
terminate on October 31, 2012, unless terminated earlier as set forth herein.
2. SCOPE OF WORK
2.1. City and Contractor acknowledge that the above Recitals are true and
correct and are hereby incorporated by reference. Contractor shall perform all the work
described in the Scope of Work attached hereto as Exhibit A and incorporated herein by
this reference ("Services' or "Work'). As a material inducement to the City entering into
this Agreement, Contractor represents and warrants that Contractor is a provider of first
class work and Contractor is experienced in performing the Work contemplated herein
and, in light of such status and experience, Contractor covenants that it shall follow the
highest professional standards in performing the Work required hereunder and that all
materials will be of good quality. For purposes of this Agreement, the phrase "highest
professional standards" shall mean those standards of practice recognized by one or
more first-class firms performing similar work under similar circumstances.
2.2. Contractor shall perform everything required to be performed, and shall
provide and furnish all the labor, materials, necessary tools, expendable equipment and
all utility and transportation services necessary for the Project.
3. TIME OF PERFORMANCE
3.1. Time is of the essence in the performance of Services under this
Agreement and Contractor shall perform the Services in accordance with the schedule
included in Exhibit A. The failure by Contractor to strictly adhere to the schedule may
result in termination of this Agreement by City.
3.2. Notwithstanding the foregoing, Contractor shall not be responsible for
delays due to causes beyond Consultant's reasonable control. However, in the case of
any such delay in the Services to be provided for the Project, each party hereby agrees
to provide notice to the other party so that all delays can be addressed.
3.3. Contractor shall submit all requests for extensions of time for performance
in writing to the Project Administrator not later than two (2) calendar days after the start
of the condition that purportedly causes a delay. The Project Administrator shall review
all such requests and may grant reasonable time extensions for unforeseeable delays
that are beyond Consultant's control.
3.4. For all time periods not specifically set forth herein, Consultant shall
respond in the most expedient and appropriate manner under the circumstances, by
telephone, fax, hand -delivery or mail.
4. COMPENSATION
4.1. City shall pay Contractor for the Services on a time and expense not -to -
exceed basis, in accordance with the provisions of this Section and the Schedule of
Billing Rates attached hereto as Exhibit B and incorporated herein by reference. No
rate changes shall be made during the term of this Agreement without the prior written
approval of the City. Contractor's total compensation for Services performed in
accordance with this Agreement, including all reimbursable items, shall not exceed
Seventy -Five Thousand Dollars and 00/100 ($75,000.00) without written amendment
to the Agreement.
4.2. Contractor shall submit monthly invoices to City describing the Work
performed the preceding month. Contractor's bills shall include the name of the person
and/or classification of employee who performed the Work, a brief description of the
Services performed and/or the specific task from the Scope Services attached hereto
which it relates, the date the Services were performed, the number of hours spent on all
Work billed on an hourly basis, and a description of any reimbursable expenditures.
City shall pay Contractor no later than thirty (30) days after approval of the monthly
invoice by City staff.
ED BUILDING MAINTENANCE SERVICES Page 2
4.3. City shall reimburse Contractor only for those costs or expenses
specifically approved in the Scope of Services attached hereto. Unless otherwise
approved, such costs shall be limited and include nothing more than the actual costs
and/or other costs and/or payments specifically authorized in advance in writing and
incurred by Contractor in the performance of this Agreement.
4.4. Contractor shall not receive any compensation for Extra Work without the
prior written authorization of City. As used herein, "Extra Work" means any work that is
determined by the Project Administrator (as defined in Section 5 below) to be necessary
for the proper completion of the Project, but which is not included within the Scope of
Work and which the City and Contractor did not reasonably anticipate would be
necessary. Compensation for any authorized Extra Work shall be paid in accordance
with the Schedule of Billing Rates set forth in Exhibit B.
5. ADMINISTRATION
This Agreement will be administered by the Municipal Operations Department. The
Operations Support Superintendent or his/her designee shall be the Project
Administrator and shall have the authority to act for City under this Agreement. The
Project Administrator or his/her authorized representative shall represent City in all
matters pertaining to the Services to be rendered pursuant to this Agreement.
6. TYPE AND INSTALLATION OF MATERIALS/STANDARD OF CARE
6.1. Contractor shall use only the standard materials described in Exhibit A in
performing Services under this Agreement. Any deviation from the materials described
in Exhibit A shall not be installed unless approved in advance by the Project
Administrator.
6.2. All of the Services shall be performed by Contractor or under Contractor's
supervision. Contractor represents that it possesses the personnel required to perform
the Services required by this Agreement, and that it will perform all Services in a
manner commensurate with highest professional standards. All Services shall be
performed by qualified and experienced personnel who are not employed by City, nor
have any contractual relationship with City.
7. RESPONSIBILITY FOR DAMAGES OR INJURY
7.1. City and all officers, employees and representatives thereof shall not be
responsible in any manner for any loss or damage to any of the materials or other things
used or employed in performing the Project or for injury to or death of any person as a
result of Contractors performance of the Services required hereunder; or for damage to
property from any cause arising from the performance of the Project by Contractor, or
its subcontractors, or its workers, or anyone employed by either of them.
7.2. Contractor shall be responsible for any liability imposed by law and for
injuries to or death of any person or damage to property resulting from defects,
obstructions or from any cause arising from Contractors Work on the Project, or the
Work of any subcontractor or supplier selected by the Contractor.
ED BUILDING MAINTENANCE SERVICES Page 3
7.3. To the fullest extent permitted by law, Contractor shall indemnify, defend
and hold harmless City, its City Council, boards and commissions, officers, agents,
volunteers, and employees (collectively, the "Indemnified Parties") from and against any
and all claims (including, without limitation, claims for bodily injury, death or damage to
property), demands, obligations, damages, actions, causes of action, suits, losses,
judgments, fines, penalties, liabilities, costs and expenses (including, without limitation,
attorney's fees, disbursements and court costs) of every kind and nature whatsoever
(individually, a Claim; collectively, "Claims'), which may arise from or in any manner
relate (directly or indirectly) to any breach of the terms and conditions of this
Agreement, any Work performed or Services provided under this Agreement including,
without limitation, defects in workmanship or materials or Contractors presence or
activities conducted on the Project (including the negligent and/or willful acts, errors
and/or omissions of Contractor, its principals, officers, agents, employees, vendors,
suppliers, consultants, subcontractors, anyone employed directly or indirectly by any of
them or for whose acts they may be liable or any or all of them).
7.4. Notwithstanding the foregoing, nothing herein shall be construed to
require Contractor to indemnify the Indemnified Parties from any Claim arising from the
sole negligence or willful misconduct of the Indemnified Parties. Nothing in this
indemnity shall be construed as authorizing any award of attorney's fees in any action
on or to enforce the terms of this Agreement. This indemnity shall apply to all claims
and liability regardless of whether any insurance policies are applicable. The policy
limits do not act as a limitation upon the amount of indemnification to be provided by the
Consultant.
7.5. Contractor shall perform all Project Work in a manner to minimize public
inconvenience and possible hazard, to restore other work areas to their original
condition and former usefulness as soon as possible, and to protect public and private
property. Contractor shall be liable for any private or public property damaged during
the performance of the Project Work.
7.6. To the extent authorized by law, as much of the money due Contractor
under and by virtue of the Agreement as shall be considered necessary by City may be
retained by it until disposition has been made of such suits or claims for damages as
aforesaid.
7.7. The rights and obligations set forth in this Section shall survive the
termination of this Agreement.
8. INDEPENDENT CONTRACTOR
City has retained Contractor as an independent contractor and neither Contractor nor its
employees are to be considered employees of the City. The manner and means of
conducting the Work are under the control of Contractor, except to the extent they are
limited by statute, rule or regulation and the express terms of this Agreement. No civil
service status or other right of employment shall accrue to Contractor or its employees.
Contractor shall have the responsibility for and control over the means of performing the
Work, provided that Contractor is in compliance with the terms of this Agreement.
Anything in this Agreement that may appear to give City the right to direct Contractor as
ED BUILDING MAINTENANCE SERVICES Page 4
to the details of the performance or to exercise a measure of control over Contractor
shall mean only that Contractor shall follow the desires of City with respect to the results
of the Services.
9. COOPERATION
Contractor agrees to work closely and cooperate fully with City's designated Project
Administrator and any other agencies that may have jurisdiction or interest in the Work
to be performed. City agrees to cooperate with the Contractor on the Project.
10. INSURANCE
10.1. Without limiting Contractor's indemnification of City, and prior to
commencement of Work, Contractor shall obtain, provide and maintain at its own
expense during the term of this Agreement, policies of insurance of the type and
amounts described below and in a form satisfactory to City. The cost of such insurance
shall be included in Contractor's bid.
10.2. Coverage and Limit Requirements.
10.2.1. Workers' Compensation. Contractor shall maintain Workers'
Compensation Insurance providing statutory benefits and employer's liability insurance
with limits of at least one million dollars ($1,000,000) each type for Contractor's
employees in accordance with the laws of the State of California, Section 3700 of the
Labor Code. In addition, Contractor shall require each subcontractor to similarly
maintain Workers' Compensation Insurance and Employer's Liability Insurance in
accordance with the laws of the State of California, Section 3700 for all of the
subcontractor's employees. The insurer issuing the Workers' Compensation insurance
shall amend its policy by endorsement to waive all rights of subrogation against City, its
elected or appointed officers, agents, officials, employees and volunteers. Contractor
shall submit to City, along with the required certificate of insurance, a copy of such
waiver of subrogation endorsement.
10.2.2. General Liability. Contractor shall maintain commercial general
liability insurance in an amount not less than one million dollars ($1,000,000) per
occurrence, two million dollars ($2,000,000) General Aggregate and two million dollars
($2,000,000) Products and Completed Operations Aggregate for bodily injury, personal
injury, and property damage, including without limitation, blanket contractual liability.
Coverage shall be at least as broad as that provided by Insurance Services Office form
CG 00 01. None of the policies required herein shall be in compliance with these
requirements if they include any limiting endorsement that has not been first submitted
to City and approved in writing.
10.2.3. -Automobile Liability. Contractor shall maintain automobile
insurance covering bodily injury and property damage for all activities of the Contractor
arising out of or in connection with Work to be performed under this Agreement,
including coverage for any owned, hired, non -owned or rented vehicles, in an amount
not less than one million dollars ($1,000,000) combined single limit for each accident.
ED BUILDING MAINTENANCE SERVICES Page 5
10.2.4. Builders Risk. For Agreements or Contracts with
Construction/Builders Risk property exposures, Contractor shall maintain Builders Risk
insurance or an installation floater as directed by City, covering damages to the Work
for "all risk" or special form causes of loss with limits equal to one hundred percent
(100%) of the completed value of contract, with coverage to continue until final
acceptance of the Work by City. At the discretion of City, the requirement for such
coverage may include additional protection for Earthquake and/or Flood. City shall be
included as an insured on such policy, and Contractor shall provide the City with a copy
of the policy.
10.3. Other Insurance Provisions or Requirements.
10.3.1. Evidence of Insurance. Contractor shall provide certificates of
insurance to City as evidence of the insurance coverage required herein, along with a
waiver of subrogation endorsement for workers' compensation and an additional
insured endorsement for general liability. Insurance certificates and endorsements
must be approved by City's Risk Manager prior to commencement of performance or
issuance of any permit. Current evidence of insurance shall be kept on file with City at
all times during the term of this Agreement. All of the executed documents referenced in
this Agreement must be returned within ten (10) working days after the date on the
"Notification of Award," so that the City may review and approve all insurance and bond
documentation. City reserves the right to require complete, certified copies of all
required insurance policies, at any time.
10.3.2. General liability insurance provisions. Primary and excess or
umbrella liability policies are to contain, or be endorsed to contain, the following
provisions:
10.3.2.1. City, its elected or appointed officers, agents, officials,
employees, and volunteers are to be covered as additional insureds as respects: liability
arising out of activities performed by or on behalf of Contractor, including the insured's
general supervision of Contractor; products and completed operations of Contractor;
premises owned, occupied or used by Contractor. The coverage shall contain no
special limitations on the scope of protection afforded to City, its elected or appointed
officers, officials, employees, agents or volunteers. Contractor shall submit to City a
copy of the additional insured endorsement along with the required certificates of
insurance.
10.3.2.2. Contractor's insurance coverage shall be primary
insurance and/or primary source of recovery as respects City, its elected or appointed
officers, agents, officials, employees and volunteers as respects to all claims, losses, or
liability arising directly or indirectly from the Contractor's operations or services provided
to the City. Any insurance or self-insurance maintained by City, its officers, officials,
employees and volunteers shall be excess of the Contractor's insurance and shall not
contribute with it.
10.3.2.3. Contractor's insurance shall apply separately to each
insured against whom claim is made or suit is brought, except with respect to the limits
of the insurer's liability.
ED BUILDING MAINTENANCE SERVICES Page 6
10.4. Acceptable Insurers. All insurance policies shall be issued by an
insurance company currently authorized by the Insurance Commissioner to transact
business of insurance in the State of California, with an assigned policyholders' Rating
of A- (or higher) and Financial Size Category Class VII (or larger) in accordance with the
latest edition of Best's Key Rating Guide, unless otherwise approved by the City's Risk
Manager.
10.5. Notice of Cancellation. Contractor agrees to oblige its insurance broker
and insurers to provide to City with 30 days notice of cancellation (except for
nonpayment for which 10 days notice is required) or nonrenewal of coverage for each
required coverage except for builders risk insurance. The builder's risk policy will
contain or be endorsed to contain a provision providing for 30 days written notice to City
of cancellation or nonrenewal, except for nonpayment for which 10 days notice is
required.
10.6. Self -Insured Retentions. Contractor agrees not to self -insure or to use any
self-insured retentions on any portion of the insurance required herein and further
agrees that it will not allow any indemnifying party to self -insure its obligations to City. If
contractors existing coverage includes a self-insured retention, the self-insured
retention must be declared to City. City may review options with the contractor, which
may include reduction or elimination of the self-insured retention, substitution of other
coverage, or other solutions. Contractor agrees to be responsible for payment of any
deductibles on their policies.
10.7. Timely Notice of Claims. Contractor shall give City prompt and timely
notice of any claim made or suit instituted arising out of or resulting from Contractor's
performance under this agreement.
10.8. Waiver. All insurance coverage maintained or procured pursuant to this
agreement shall be endorsed to waive subrogation against City, its elected or appointed
officers, agents, officials, employees and volunteers, or shall specifically allow
Contractor or others providing insurance evidence in ' compliance with these
requirements to waive their right of recovery prior to a loss. Contractor hereby waives its
own right of recovery against City, and shall require similar written express waivers and
insurance clauses from each of its subcontractors.
10.9. Enforcement of Agreement Provisions. Contractor acknowledges and
agrees that any actual or alleged failure on the part of the City to inform Contractor of
non-compliance with any requirement imposes no additional obligations on the City nor
does it waive any rights hereunder.
10.10. Reguirements not Limiting. Requirements of specific coverage features or
limits contained in this Section are not intended as a limitation on coverage, limits or
other requirements, or a waiver of any coverage normally provided by any insurance.
Specific reference to a given coverage feature is for purposes of clarification only as it
pertains to a given issue and is not intended by any party or insured to be all inclusive,
or to the exclusion of other coverage, or a waiver of any type.
ED BUILDING MAINTENANCE SERVICES Page 7
10.11. City's Remedies. City shall have the right to order the Contractor to stop
Work under this Agreement and/or withhold any payment(s) that become due to
Contractor hereunder until Contractor demonstrates compliance with the requirements
of this article. In the alternative, City may purchase the required coverage and charge
Contractor the cost of the premiums or deduct the cost from Contractor's payments.
10.12. Coverage not Limited. All insurance coverage and limits provided by
contractor and available or applicable to this agreement are intended to apply to the full
extent of the policies. Nothing contained in this agreement or any other agreement
relating to the city or its operations limits the application of such insurance coverage.
10.13. Coverage Renewal. Contractor will renew the coverage required here
annually as long as Contractor continues to provide any Services under this or any
other contract or agreement with the City. Contractor shall provide proof that policies of
insurance required herein expiring during the term of this Agreement have been
renewed or replaced with other policies providing at least the same coverage. Proof that
such coverage has been ordered shall be submitted prior to expiration. A coverage
binder or letter from Contractor's insurance agent to this effect is acceptable. A
certificate of insurance and/or additional insured endorsement as required in these
specifications applicable to the renewing or new coverage must be provided to City
within five days of the expiration of the coverages.
11. SUBCONTRACTING
City and Contractor agree that subcontractors may be used to complete the Work
outlined in the Scope of Work provided the Contractor obtains City approval prior to the
subcontractor performing any work. Contractor shall be fully responsible to City for all
acts and omissions of the subcontractors. Nothing in this Agreement shall create any
contractual relationship between City and subcontractor nor shall it create any obligation
on the part of City to pay or to see to the payment of any monies due to any such
subcontractor other than as otherwise required by law.
12. WITHHOLDINGS
City may withhold payment to Contractor of any disputed sums until satisfaction of the
dispute with respect to such payment. Such withholding shall not be deemed to
constitute a failure to pay according to the terms of this Agreement. Contractor shall not
discontinue Work as a result of such withholding. Contractor shall have an immediate
right to appeal to the City Manager or his/her designee with respect to such disputed
sums. Contractor shall be entitled to receive interest on any withheld sums at the rate of
return that City earned on its investments during the time period, from the date of
withholding of any amounts found to have been improperly withheld.
13. CONFLICTS OF INTEREST
13.1. The Contractor or its employees may be subject to the provisions of the
California Political Reform Act of 1974 (the "Act'), which (1) requires such persons to
disclose any financial interest that may foreseeably be materially affected by the Work
ED BUILDING MAINTENANCE SERVICES Page 8
performed under this Agreement, and (2) prohibits such persons from making, or
participating in making, decisions that will foreseeably financially affect such interest.
13.2. If subject to the Act, Contractor shall conform to all requirements of the
Act. Failure to do so constitutes a material breach and is grounds for immediate
termination of this Agreement by City. Contractor shall indemnify and hold harmless
City for any and all claims for damages resulting from Contractor's violation of this
Section.
14. NOTICES
14.1. All notices, demands, requests or approvals to be given under the terms of
this Agreement shall be given in writing, to City by Contractor and conclusively shall be
deemed served when delivered personally, or on the third business day after the
deposit thereof in the United States mail, postage prepaid, first-class mail, addressed as
hereinafter provided. All notices, demands, requests or approvals from Contractor to
City shall be addressed to City at:
Attn: Operations Support Superintendent
City of Newport Beach
3300 Newport Blvd.
PO Box 1768
Newport Beach, CA 92658
Email: jauger@newportbeachca.gov
Phone: 949-644-3477
Fax: 949-650-0747
14.2. All notices, demands, requests or approvals from City to Contractor shall
be addressed to Contractor at:
Attn: Billie Alexander
ED BUILDING MAINTENANCE SERVICES
23441 Golden Springs Drive, Suite 249, Diamond
Bar, CA 91765
Email:
ed buildingmte@aol.com
Phone:
909-988-2346
Fax:
909-391-1471
15. NOTICE OF CLAIMS
15.1. Unless a shorter time is specified elsewhere in this Agreement, before
making its final request for payment under the Agreement, Contractor shall submit to
City, in writing, all claims for compensation under or arising out of this Agreement.
Contractor's acceptance of the final payment shall constitute a waiver of all claims for
compensation under or arising out of this Agreement except those previously made in
writing and identified by Contractor in writing as unsettled at the time of its final request
for payment. The Contractor and the City expressly agree that in addition to all claims
filing requirements set forth in the Agreement, the Contractor shall be required to file
ED BUILDING MAINTENANCE SERVICES Page 9
any claim the Contractor may have against the City in strict conformance with the Tort
Claims Act (Govt. Code §§ 900 et seq.).
16. TERMINATION
16.1. In the event that either party fails or refuses to perform any of the
provisions of this Agreement at the time and in the manner required, that party shall be
deemed in default in the performance of this Agreement. If such default is not cured
within a period of two (2) calendar days, or if more than two (2) calendar days are
reasonably required to cure the default and the defaulting party fails to give adequate
assurance of due performance within two (2) calendar days after receipt of written
notice of default, specifying the nature of such default and the steps necessary to cure
such default, the non -defaulting party may terminate the Agreement forthwith by giving
to the defaulting party written notice thereof.
16.2. Notwithstanding the above provisions, City shall have the right, at its sole
discretion and without cause, of terminating this Agreement at any time by giving seven
(7) calendar days prior written notice to Contractor. In the event of termination under
this Section, City shall pay Contractor for Services satisfactorily performed and costs
incurred up to the effective date of termination for which Contractor has not been
previously paid. On the effective date of termination, Contractor shall deliver to City all
materials purchased in performance of this Agreement.
17. STANDARD PROVISIONS
17.1. Compliance with all Laws. Contractor shall at its own cost and expense
comply with all statutes, ordinances, regulations and requirements of all governmental
entities, including federal, state, county or municipal, whether now in force or hereinafter
enacted.
17.2. Waiver. A waiver by City of any term, covenant, or condition in the
Agreement shall not be deemed to be a waiver of any subsequent breach of the same
or any other term, covenant or condition.
17.3. Integrated Contract. This Agreement represents the full and complete
understanding of every kind or nature whatsoever between the parties hereto, and all
preliminary negotiations and Agreements of whatsoever kind or nature are merged
herein. No verbal Contract or implied covenant shall be held to vary the provisions
herein.
17.4. Conflicts or Inconsistencies. In the event there are any conflicts or
inconsistencies between this Agreement and the Exhibits attached hereto, the terms of
this Agreement shall govern.
17.5. Amendments. This Agreement may be modified or amended only by a
written document executed by both Contractor and City and approved as to form by the
City Attorney.
ED BUILDING MAINTENANCE SERVICES Page 10
17.6. Effect of Contractor's Execution. Execution of this Agreement by
Contractor is a representation that Contractor has visited the Project Site, has become
familiar with the local conditions under which the Work is to be performed, and has
taken into consideration these factors in submitting its Project Proposal and Scope of
Work.
17.7. Controlling Law and Venue. The laws of the State of California shall
govern this Agreement and all matters relating to it and any action brought relating to
this Agreement shall be adjudicated in a court of competent jurisdiction in the County of
Orange.
17.8. Equal Opportunity Employment. Contractor represents that it is an equal
opportunity employer and it shall not discriminate against any subcontractor, employee
or applicant for employment because of race, religion, color, national origin, handicap,
ancestry, sex or age.
17.9. Interpretation. The terms of this Agreement shall be construed in
accordance with the meaning of the language used and shall not be construed for or
against either party by reason of the authorship of the Agreement or any other rule of
construction which might otherwise apply.
17.10. Severability. If any term or portion of this Agreement is held to be invalid,
illegal, or otherwise unenforceable by a court of competent jurisdiction, the remaining
provisions of this Agreement shall continue in full force and effect.
17.11. No Attorney's Fees. In the event of any dispute or legal action arising
under this Agreement, the prevailing party shall not be entitled to attorney's fees.
17.12. Counterparts. This Agreement may be executed in two or more
counterparts, each of which shall be deemed an original and all of which together shall
constitute one and the same instrument.
[SIGNATURES ON NEXT PAGE]
ED BUILDING MAINTENANCE SERVICES Page 11
IN WITNESS WHEREOF, the parties have caused this Agreement to be
executed on the dates written below.
APPROVED AS TO FORM: CITY OF NEWPORT BEACH,
CITY ATTORNEY'§ OFFICE A California municj �'al corporate n
Date: Date: /S
By:
Aaron a
City Attorney f,
ATTEST:
Date: 6 0�5 �—
By:
Leilani I. Brown
City Clerk _
c�-%�r
�'i�
�1
By: _.
Mark Har on
Municipal Operations irector
CONSULTANT: ED BUILDING
MAINTENANCE SERVICES, a General
Partnership
Date:
By:
Billie Alexander
Owner/Operator
[END OF SIGNATURES]
Attachments: Exhibit A - Scope of Work/ Schedule
Exhibit B - Schedule of Billing Rates
ED BUILDING MAINTENANCE SERVICES Page 12
EXHIBIT A
SCOPE OF WORK/ SCOPE OF SERVICES
Restroom Portering Services
1. Contractor Duties & Responsibilities
Contractor shall:
1.1. Perform duties as directed by the City of Newport Beach/Operations
Support team.
1.2. Fill all paper dispensers.
1.3. Fill all soap dispensers.
1.4. Empty trash containers if needed and replace liners.
1.5. Keep all restroom clean and presentable.
1.6. Remove urinal/toilet clogs.
1.7. Litter pick the surrounding area.
1.8. Remove graffiti.
1.9. Report any and all plumbing, flooding, electrical issues to MOD Staff right
away
1.10. Provide a crew of up to eight (8), (7 Janitors and 1 Supervisor), up to eight
(8) hours per day, seven (7) days per week.
1.11. Provide a crew of up to eight (8), (7 Janitors and 1 Supervisor), up to ten
(10) hours per day on holiday weekends.
2. City Duties and Responsibilities
City shall:
2.1. Unless otherwise specified, City shall provide all relevant supplies and
materials as related to the requested services.
A-1IPage
EXHIBIT B
SCHEDULE OF BILLING RATES
Standard Rate:
Weekly Restroom Portering Services: $ 92.00 Per Hour
B-1 I Page
CERTIFICATE OF INSURANCE
CHECKLIST
City of Newport Beach
This checklist is comprised of requirements as outlined by the City of Newport Beach.'`
Date Received: 5-30-12
Date Completed: 6-22-12
Dept./Contact Received From: Raymund
Sent to: Raymund By:
Company/Person required to have certificate: Ed Building Maintenance
Type of contract: All Other
Joel
GENERAL LIABILITY
EFFECTIVE/EXPIRATION DATE: 6-22-12/6-22-13
A. INSURANCE COMPANY: Financial Pacific Insurance
B. AM BEST RATING (A-: VII or greater): A: X
C. ADMITTED Company (Must be California Admitted):
Is Company admitted in California? ® Yes ❑ No
D. LIMITS (Must be $1 M or greater): What is limit provided? 1,000,000
E.
ADDITIONAL INSURED ENDORSEMENT—please attach
® Yes ❑ No
F.
PRODUCTS AND COMPLETED OPERATIONS (Must
® N/A ❑ Yes ❑ No
G. HIRED AND NON -OWNED AUTO ONLY:
include): Is it included? (completed Operations status does
H. NOTICE OF CANCELLATION:
0 N/A ® Yes ❑ No
not apply to Waste Haulers or Recreation)
® Yes ❑ No
G.
ADDITIONAL INSURED FOR PRODUCTS AND
COMPLETED OPERATIONS ENDORSEMENT (completed
Operations status does not apply to Waste Haulers)
® Yes ❑ No
H.
ADDITIONAL INSURED WORDING TO INCLUDE (The City
its officers, officials, employees and volunteers): Is it
included?
® Yes ❑ No
I.
PRIMARY & NON-CONTRIBUTORY WORDING (Must be
included): Is it included?
® Yes ❑ No
J.
CAUTION! (Confirm that loss or liability of the named insured
is not limited solely by their negligence) Does endorsement
include "solely by negligence" wording?
❑ Yes ®No
K.
ELECTED SCMAF COVERAGE (RECREATION ONLY):
® N/A ❑ Yes ❑ No
L.
NOTICE OF CANCELLATION:
❑ N/A ® Yes ❑ No
H. AUTOMOBILE LIABILITY
EFFECTIVEIEXPIRATION DATE: 6-22-12/6-22-13
A.
INSURANCE COMPANY: Financial Pacific insurance
B. AM BEST RATING (A-: VII or greater) A: X
C. ADMITTED COMPANY (Must be California Admitted):
Is Company admitted in California? ® Yes ❑ No
D. LIMITS - If Employees (Must be $1 M min. BI & PD and $500,000
UM, $2M min for Waste Haulers): What is limits provided? 1,000,000
E LIMITS Waiver of Auto Insurance / Proof of coverage (if individual)
(What is limits provided?)
N/A
F. PRIMARY & NON-CONTRIBUTORY WORDING (For Waste
Haulers only):
® N/A ❑ Yes ❑ No
G. HIRED AND NON -OWNED AUTO ONLY:
❑ N/A ❑ Yes ® No
H. NOTICE OF CANCELLATION:
0 N/A ® Yes ❑ No
III. WORKERS' COMPENSATION
EFFECTIVE/EXPIRATION DATE: 6-22-12/6-22-13
A.
INSURANCE COMPANY: State Fund
B.
AM BEST RATING (A-: VII or greater): Not Rated
C.
ADMITTED Company (Must be California Admitted):
® Yes
❑ No
D.
WORKERS' COMPENSATION LIMIT: Statutory
❑ Yes
❑ No
E.
EMPLOYERS' LIABILITY LIMIT (Must be $1M or greater)
1,000,000
F.
WAIVER OF SUBROGATION (To include): Is itincluded?
® Yes
❑ No
G.
SIGNED WORKERS' COMPENSATION EXEMPTION FORM:
® N/A ❑ Yes
❑ No
H.
NOTICE OF CANCELLATION:
❑ N/A N Yes
❑ No
ADDITIONAL COVERAGE'S THAT MAYBE REQUIRED
N. PROFESSIONAL LIABILITY
V POLLUTION LIABILITY
V BUILDERS RISK
® N/A ❑ Yes ❑ No
® N/A ❑ Yes ❑ No
® N/A ❑ Yes ❑ No
HAVE ALL ABOVE REQUIREMENTS BEEN MET? ® Yes ❑ No
IF NO, WHICH ITEMS NEED TO BE COMPLETED?
Approved:
6-22-12
Agent of Alliant Insurance Services Date
Broker of record for the City of Newport Beach
RISK MANAGEMENT APPROVAL REQUIRED (Non -admitted carrier rated less than _
Self Insured Retention or Deductible greater than $ ) ❑ N/A ❑ Yes ❑ No
Reason for Risk Management approval/exception/waiver:
Approved:
Risk Management Date
* Subject to the terms of the contract.