Laserfiche WebLink
• <br />40 <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />21 <br />22 <br />23 <br />24 <br />25 <br />26 <br />27 <br />• 28 <br />40 29 <br />30 <br />31 <br />32 <br />C(,FY <br />RESOLUTION NO. 11+4 <br />CCF Y <br />A RESOLUTION BY THE BOARD OF TRUSTEES OF THE CITY OF NEWPORT <br />BEACH, AS THE LEGISLATIVE BRANCH THEREOF, DETERMINING THAT THE <br />PUBLIC INTEREST AND NECESSITY DEMANDS TIME COMPLETION OF THE <br />MUNICIPAL WATER WORKS OF THE CITY OF NEWPORT BEACH, AND THAT <br />THE SAME IS NECESSARY AND CONVENIENT TO CARRY OUT THE OBJECTS, <br />PURPOSES AND POWERS OF SAID CITY; THE COST OF WHICH WILL BE <br />TOO GREAT TO BE PAID OUT OF THE ORDINARY ANNUAL INCOINE AND <br />REVENUE OF THE CITY OF NEWPORT BEACH. <br />The Board of Trustees of the City of Newport Beach, as the <br />legislative branch thereof, do resolve and determine as follows:- <br />Section One. <br />Resolved, that the public interest and necessity demands <br />the completion by the City of Newport Beach of the municipal <br />water works thereof, which completion shall consist in the <br />acquisition of approximately four (4) acres of water - bearing <br />land adjacent to the land upon which there is now constructed <br />the water wells and pumping plant used in the municipal water <br />works of said City; also the acquisition of a right of way <br />sufficient in width upon which to construct and maintain a main <br />water pipeline, extending from the present water wells and <br />pumping plant to the water storage reservoir of the City of <br />Newport Beach, also the acquisition of a pump with the capacity <br />to pump approximately one thousand gallons of water per minute, <br />and a Bessemer oil or gas engine, of approximately 85 horsepower,) <br />to operate said pump. and the installation of said pump and <br />engine; also the acquisition of the necessary twelve (12) inch <br />diameter cast iron water pipe, with which to construct and the <br />construction of a force main water pipeline on the above men- <br />tioned right of way, connecting the pumping plant with the <br />storage reservoir, and also the acquisition of the necessary <br />six (6) inch diameter cast iron water pipe with which to con- <br />struct and the construction of a distributing main, extending <br />from the water storage reservoir to the intersection of <br />-1- <br />