HomeMy WebLinkAboutC-6103 - PSA for Newport Center Villas (AKA 150 Newport Center) CEQAD AMENDMENT NO. ONE TO PROFESSIONAL SERVICES AGREEMENT WITH T&B PLANNING, INC. FOR NEWPORT CENTER VILLAS (AKA 150 NEWPORT CENTER) CEQA THIS AMENDMENT NO. ONE TO PROFESSIONAL SERVICES AGREEMENT ("Amendment No. One") is made and entered into as of this 24th day of November, 2015 ("Effective Date"), by and between the CITY OF NEWPORT BEACH, a California municipal corporation and charter city ("City"), and T&B PLANNING, INC., a California corporation ("Consultant'), whose address is 17542 East 17th Street, Suite 100, Tustin, California 92780, and is made with reference to the following: RECITALS A. On May 5, 2015, City and Consultant entered into a Professional Services Agreement ("Agreement') to prepare an Initial Study and Mitigated Negative Declaration in accordance with California Environmental Quality Act (CEQA) requirements for the Newport Center Villas (also known as 150 Newport Center) Project ("Project'). B. City desires to enter into this Amendment No. One to reflect additional Services not included in the Agreement, to extend the term of the Agreement to June 30, 2017, and to increase the total compensation. NOW, THEREFORE, it is mutually agreed by and between the undersigned parties as follows: 1. TERM Section 1 of the Agreement is amended in its entirety and replaced with the following: "The term of this Agreement shall commence on the Effective Date, and shall terminate on June 30, 2017, unless terminated earlier as set forth herein." 2. SERVICES TO BE PERFORMED Exhibit A to the Agreement shall be supplemented to include the Scope of Services, attached hereto as Exhibit A and incorporated herein by reference ("Services" or "Work"). Exhibit A to the Agreement and Exhibit A to this Amendment No. One shall collectively be known as "Exhibit A." The City may elect to delete certain Services within the Scope of Services at its sole discretion. 3. COMPENSATION TO CONSULTANT Exhibit B to the Agreement shall be supplemented to include the Schedule of Billing Rates, attached hereto as Exhibit B and incorporated herein by reference ("Services" or "Work"). Exhibit B to the Agreement and Exhibit B to Amendment No. One shall collectively be known as "Exhibit B." Section 4.1 of the Agreement is amended in its entirety and replaced with the following: "City shall pay Consultant for the Services on a time and expense not -to - exceed basis in accordance with the provisions of this Section and the Schedule of Billing Rates attached hereto as Exhibit B and incorporated herein by reference. Consultant's compensation for all Work performed in accordance with this Agreement, including all reimbursable items and subconsultant fees, shall not exceed One Hundred Seventy Two Thousand Four Hundred Forty Seven Dollars and 00/100 ($172,447.00), without prior written authorization from City. No billing rate changes shall be made during the term of this Agreement without the prior written approval of City." The total amended compensation reflects Consultant's additional compensation for additional Services to be performed in accordance with this Amendment No. One, including all reimbursable items and subconsultant fees, in an amount not to exceed One Hundred Twenty Two Thousand Eight Hundred Two Dollars and 00/100 ($122,802.00). 4. INTEGRATED CONTRACT Except as expressly modified herein, all other provisions, terms, and covenants set forth in the Agreement shall remain unchanged and shall be in full force and effect. [SIGNATURES ON NEXT PAGE] T&B Planning, Inc. Page 2 IN WITNESS WHEREOF, the parties have caused this Amendment No. One to be executed on the dates written below. APPROVED AS TO FORM: CITY ATTORNEY'S OFFICE Date: 1I/_30//,57_ By: Aaron C. Harp City Attorney ATTEST: Date: �a • �/. /�/ By:. zf I ohh ; Leilani I° Brown City Clerk CITY OF NEWPORT BEACH, a California municipal corporation Date:: E l By: Edward D. Selich Mayor CONSULTANT: T&B Planning, Inc., a California corporation Date: By :_� Tracy Zinn, I Vice Preside 1:z -7- air Joel Morse - President / Chief Financial Officer [END OF SIGNATURES] Attachments: Exhibit A — Scope of Services Exhibit B — Schedule of Billing Rates T&B Planning, Inc. Page 3 EXHIBIT A SCOPE OF SERVICES T&B Planning, Inc. Page A-1 .I� PLANNING Tustin, CA I San Diego, CA I Murrysville, PA 17542 East 17th Street, Suite 100 Tustin, CA 92780 p714.505.6360 f714.505.6361 FIRST AMENDMENT TO CONTRACT This FIRST AMENDMENT TO CONTRACT constitutes an amendment to Contract No. 6103, between T&B Planning, Inc. (f&B Planning) and CLIENT herein named as: CLIENT NAME: CITY OF NEWPORT BEACH JOB NUMBER: 923-006 PROJECT NAME: NEWPORT CENTER VILLAS (PA2014-213) DATE: October 29, 2015 All provisions of Contract No. 6013 (Contract) entered into between the Parties on May 5, 2015, shall remain in force and in effect except for the scope of work, budget, and schedule, as modified herein. Dear Ms. Nova: T&B Planning previously prepared a Mitigated Negative Declaration (MND) for the Newport Center Villas Residential Development Project. The City of Newport Beach (City) subsequently determined that an Environmental Impact Report (EIR) is required. Therefore, this proposal provides a scope of work and fee to prepare a Focused EIR in accordance with the California Environmental Quality Act (CEQA). Based your discussion with T&B Planning Senior Project Manager Shawn Nevill about the public comments received on the MND and the scope of the analyses and conclusions in the previously prepared MND, the environmental topics that will require analysis in the Focused EIR include: Aesthetics, Air Quality, Biological Resources, Cultural Resources, Geology and Soils, Hazards and Hazardous Materials, Noise, Land Use and Planning, and Transportation/Traffic. T&B Planning anticipates that only minor revisions will be required to the technical reports that were previously prepared for the MND and that no new technical reports will be required. The Project Applicant may be asked to provide additional view simulations of the proposed Project, if deemed warranted by the City. Expectations T&B Planning's proposed scope of work and fee budget for preparing a Focused EIR for the Newport Center Villas Project is based on the following expectations. If any of these change, we reserve the right to modify the scope of work and fee budget accordingly. The environmental baseline (existing condition) has not/will not change between the time(s) that previously prepared technical reports were published/field work was conducted and the date that the EIR's Notice of Preparation (NOP) is released for public review. The City will obtain letters from the technical report authors confirming this fact, for the Administrative Record. The Project Description has not/will not change from that provided in the MND, other than the addition of a Development Agreement action and identification of construction staging areas. www.rbplanning.com Revised2015-040 PLANNING I DESIGN I ENVIRONMENTAL I GRAPHICS .I� IFirst Amendment to Contract J Newport Center Villas P L A N N I N G October 29, 2015 • The CEQA Consultant will not be required to research cumulative projects, or conduct extensive technical analysis of cumulative impacts for the subject areas supported by a technical report. We anticipate that the City will provide an updated list of cumulative projects and will provide enough information to draw conclusions about the Project's cumulative effects. • The CECIA Consultant will not be required to assist the City in in the tribal consultation process required pursuant to SB -18 and AB -52. • The CEQA Consultant will not be required to conduct public review mailings or to produce or coordinate public review and hearing notices. Those tasks will be performed by City staff. Amended Scope of Work T&B Planning (CEQA Consultant) shall provide the following additional services: TASK 6: PREPARE INITIAL STUDY AND NOTICE OF PREPARATION Sub -Task 6.1: Prepare Initial Study and NOP T&B Planning will prepare a Draft CEQA Initial Study (IS) using the CEQA Appendix G Environmental Checklist Form. This task will utilize the information that was included in the MND previously prepared for the Project. The Draft IS will include: • Statement of the purpose and scope of the IS; • Disclosure of the Lead Agency and any other public agencies that must approve the Project (if any); • Description of the proposed discretionary action(s); • Description of the Project's characteristics; • Description of the Project's location; • Overview of existing site and surrounding conditions/environmental setting; • List of references used; • Environmental evaluation by CEQA subject area (Environmental Checklist); and • Determination as to the required type of CEQA document. The Initial Study (Environmental Checklist and Responses to Environmental Checklist) will be the primary work effort for this task. The Responses to Environmental Checklist section will contain pertinent analysis from the previously prepared MND to conclude that the Project will have a less than significant impact under all environmental issue topics with the exception of Aesthetics, Air Quality, Biological Resources, Cultural Resources, Geology and Soils, Hazards and Hazardous Materials, Noise, Land Use and Planning, and Transportation/Traffic, which will require further analysis in a Focused EIR. The budget for this task assumes a single round of minor revisions to the Initial Study/Environmental Checklist to incorporate comments from the City of Newport Beach. Following completion of any necessary revisions, T&B Planning will resubmit the Initial Study along with a draft Notice of Preparation (NOP) for City review and approval. T&B Planning's fee budget for this task presumes that the City of Newport Beach will conduct the filing, noticing, and distribution of the NOP. www.rbplanning.com Revised 201543-10 PLANNING I DESIGN I ENVIRONMENTAL I GRAPHICS .Ipq IFirst Amendment to Contract J Newport Center Villas P L A N N I N G October 29, 2015 Sub -Task 6.2: Evaluate NOP Comment Letters During the 30 -day public review period of the NOP, T&B Planning will periodically contact City staff and request copies of the public comment letters. We also will request a complete set of original letters at the close of the public comment period. If any comments necessitate an expanded scope of analysis in the EIR and/or technical reports, T&B Planning will immediately reevaluate our scope of work and notify the City. TASK 7: PREPARE ENVIRONMENTAL IMPACT REPORT Sub -Task 7.1: Prepare First Screencheck Draft EIR T&B Planning will commence with preparation of the First Screencheck Draft EIR immediately following distribution of the NOP. The First Screencheck Draft EIR will be prepared in accordance with State and City of Newport Beach guidelines and will generally include the following sections: Executive Summary. This introductory section will provide a synopsis of the proposed Project; a summary of the Project alternatives, including an identification of the "Environmentally Superior Alternative," and a brief discussion of any areas of controversy and issues to be resolved by the decision- making body. The Executive Summary also will include an environmental impact and mitigation summary table that will be prepared as part of Sub -Task 7.3, which will identify the significance of each impact, mitigation measures, the party responsible for implementing each mitigation measure, and the timeframe in which each measure should be completed. Introduction. The Introduction will explain the purpose of the EIR, the legal authority for preparation of the EIR, and the EIR process. The Project's complete CEQA process will be explained, including discussion about the prior MND and the City's decision to prepare an EIR. The relationship of the Project to the City's General Plan and General Plan EIR will be disclosed as well. This section will also identify other applicable planning documents that apply to the Project area. In addition, the Introduction will identify the Lead Agency (City of Newport Beach), Responsible Agencies, and/or Trustee Agencies (Regional Water Quality Control Board). Future Project -related approvals and/or permits to allow construction and operation of the Project also will be described. Environmental Setting. The Environmental Setting will describe the Project's location, geographic and physical setting, surrounding land uses, and the physical environmental conditions of the property as they existed on the date of the EIR's NOP issuance. A brief overview of the environmental conditions of the Project area also will be provided, including any unique or rare resources in the area (proximityto Newport Bay and the Pacific Ocean). In addition, a summary of the existing planning and policy context will be presented, including the property's relationship to the General Plan, zoning, and other applicable regional plans and policy documents. The Environmental Setting section will utilize information identified in the MND's Environmental Setting section, but will be updated to include any changes to the Project Site and surrounding area since the MND was prepared. The Environmental Setting section will also include a more expansive discussion of the existing conditions for most environmental topics. www.r6planning.com PLANNING I DESIGN I ENVIRONMENTAL I GRAPHICS x�Kamis�-Io 'dIpq L I First Amendment to Contract J Newport Center Villas P L A N N i N G October 29, 2015 Project Description. The Project Description, which will be based on the Project Description prepared as part of the IS/NOP and prior MND, will be used as the basis for the impact analysis throughout the EIR. Compared to the MND's project description, added elements will include a Development Agreement and information about construction equipment staging. This section will include a brief description of the Project's location and setting. This section also will identify the Project's objectives, which will form the basis for subsequent analysis of Project alternatives. An extensive description of the proposed Project will be included, including construction and operational details, and areas that would be impacted by off- site improvements and construction. Finally, the Project Description will list the anticipated subsequent approvals to construct and operate the proposed Project. Exhibits will be included in this section to describe the Project proposal, taken directly from the Project's application materials on file with the City of Newport Beach. Environmental Analysis. The analysis of environmental effects section will address each environmental issue required by CEQA, in the following general manner. The existing conditions/environmental setting as it relates specifically to the environmental topic under evaluation will be described to establish a baseline for conducting the environmental analysis. As necessary and appropriate, a description of key terminology and concepts associated with the environmental issue area will be presented, followed by a discussion of any regulatory requirements that may apply. Next, the significance criteria will be listed and will be accompanied by a justification as to the appropriateness of the criteria selected for evaluation. An analysis will then be presented for each significance criteria, and the analysis will provide a clear description and conclusion as to the level of significance of Project impacts, prior to mitigation. The analysis also will include a discussion of potential cumulative impacts, which are defined as those which by themselves may not result in significant impacts but when combined with similar impacts from existing, approved -but -not -yet -built or planned projects would be cumulatively significant. T&B Planning rely on City staff to confirm the list of surrounding projects to be included in the cumulative impacts analysis. For each significant impact identified, feasible and enforceable mitigation measures will be presented. Finally, each chapter in this section will provide a conclusion as to the level of significance following implementation of recommended mitigation measures. This proposal assumes the following environmental issue areas will be addressed in the EIR: Aesthetics, Air Quality, Biological Resources, Cultural Resources, Geology and Soils, Hazards and Hazardous Materials, Noise, Land Use and Planning, and Transportation/Traffic. This assumption is based on the previously prepared MND for the Newport Center Villas Residential Development Project and in consideration of public comment received by the City on the MND. Other CEQA Considerations. The EIR will summarize unavoidable impacts of the Project and will identify whether or not the impacts will be mitigated to below a level of significance. The EIR also will disclose significant irreversible environmental changes which would be involved in the proposed action should it be implemented. A discussion of Growth Inducement will focus on elements of the proposed Project that could potentially spur growth (and density intensification) in the area, such as the construction of a seven -story building on a parcel in Newport Center that is immediately surrounded by lower -stature buildings. This section also will contain a discussion of the Project's energy consumption in accordance www.rbplanning.com Revised 2015 -D3 -IO PLANNING I DESIGN I ENVIRONMENTAL I GRAPHICS .I� IFirst Amendment to Contract J Newport Center Villas P L A N N i N G October 29, 2015 with CEQA Guidelines Appendix F and determine if the Project would result in an inefficient or wasteful use of energy. Project Alternatives. The Project Alternatives section will be based on a description of reasonable Project alternatives defined in consultation with City staff. Each alternative identified in this section will be designed meet the Project's primary objectives while minimizing or eliminating significant environmental effects associated with the proposed Project. For purposes of budgeting for this task, it is anticipated that three (3) alternatives will be presented in the EIR, including the No Project Alternative (retention of the site as a car wash with ancillary gas station). A subsection will be included in the Project Alternatives analysis that identifies alternatives that were considered but not evaluated, which will include a brief discussion of the reason(s) why these alternatives were not evaluated. References. This required section will identify all reference sources used and persons contacted in order to prepare the EIR. T&B Planning will submit three (3) printed, bound copies and one (1) CD (Word and PDF files) of the First Screencheck Draft EIR to the City for review and comment. Sub -Task 7.2: Prepare Second Screencheck Draft EIR Following City review of the First Screencheck Draft EIR, T&B Planning will revise the document to respond to any comments or questions received from City staff and any comments or questions that the Applicant and/or its legal counsel may pose to the City. This proposal anticipates that comments will be moderate in scope and complexity. All document revisions will be indicated in highlight or strikeout/underline format. For the purpose of creating a budget for this task, we anticipate that the City will not require substantial changes to the Project Description or request substantial expansions to any technical studies prepared in support of the EIR. Upon completion of the revised Screencheck Draft EIR, T&B Planning will submit one (1) printed, bound copy and one (1) CD (Word and PDF files) of the Second Screencheck Draft EIR to the City for review and comment. Following City review of the Second Screencheck Draft EIR document, it is anticipated that the City would clear the EIR for public review. However, if the City requests a third review, T&B Planning would arrange a meeting with appropriate City staff and Project team members to discuss the City's comments and recommend appropriate ways to address their concerns. Additional budget would be required to revise the Screencheck Draft EIR should a third review of the document be necessary. Sub -Task 7.3: Prepare Mitigation Monitoring and Reporting Program (MMRP) T&B Planning will prepare a Mitigation Monitoring and Reporting Program (MMRP) in accordance with State law and City requirements to ensure implementation of mitigation measures, standard conditions, and Project design features assumed in the EIR's analysis of impacts. The MMRP will be provided as part of the First Screencheck Draft EIR. The MMRP will identify the conclusions drawn by the EIR, identify the level of impact significance for each significance threshold, and list every Project requirement and mitigation measure listed in the body of the EIR, with the implementation timing and responsible parties noted. T&B Planning staff is experienced in www.tbplanning.com >t sea2015o3-10 PLANNING I DESIGN I ENVIRONMENTAL I GRAPHICS 'AIpq L I I First Amendment to Contract J Newport Center Villas P L A N N I N G October 29, 2015 preparing practical, easily -implemented mitigation monitoring plans for a wide range of mitigation requirements. This proposal includes one round of moderate revisions to the MMRP in strikeout/underline format based on comments provided by City staff. Sub -Task 7.4: Prepare Public Review Draft EIR Upon receiving City authorization to publish the Draft EIR, T&B Planning will prepare and print for public distribution the Public Draft EIR and its Technical Appendices per City direction and State requirements. T&B Planning will provide the City with up to 50 printed, bound copies of the Public Review Draft EIR (with Technical Appendices on CD), as well as 35 CDs (PDF file only) with the Public Review Draft EIR and Technical Appendices. This proposal assumes that the City will post the EIR on its website and prepare an advertisement for publication in the local newspaper as required by CEQA and ensure publication of the newspaper advertisement. We also assume that the City will conduct the mailing; if T&B Planning is requested to conduct the mailing, additional budget will be required. During the 45 -day review period, written public comment will be directed to the City. We recommend that the City forward copies of the comment letters to T&B Planning as they are received, and then send us the complete set of original letters at the close of the public comment period. If any comments necessitate an expanded scope of analysis in the Final EIR, we will immediately evaluate our scope -of -work and notify the City. Sub -Task 7.5: Prepare Draft Responses to Public Comments and Draft Final EIR Upon completion of the 45 -day public review period, T&B Planning will prepare written responses to all comment letters received. All comments received in response to the Public Review Draft EIR will be discussed with City staff as necessary and an approach to the responses will be agreed upon prior to preparation of the draft Responses to Comments. The draft Response to Comments will be submitted to the City for review and approval. The budget for this task assumes that up to 96 hours of T&B staff time will be required in order to respond to each of the comments received on the Draft EIR. Concurrently, we also will identify revisions to the Draft EIR that were made as part of the Final EIR in an Errata table. These revisions would be necessary to clarify or amplify information to reflect the draft Response to Comments. If any public comments necessitate an expanded scope of analysis in the Final EIR or additional technical analysis, T&B Planning will immediately evaluate our scope -of -work and notify the City. A new section "Final EIR" will be drafted to document the public review process for the EIR, summarize the comment letters received, and identify the nature, location, and reason for any and all revisions incorporated into the final document. This new section also will provide a discussion and rationale for why recirculation of the Public Review Draft EIR for an additional 45 -day public review period is not required pursuant to CEQA Guidelines Section 15088.5. One (1) CD with the first draft of the Response to Comments and draft Final EIR will be submitted to the City for review. Following receipt of comments from City staff and any comments or questions that the Applicant and/or its legal counsel may pose to the City, T&B Planning will incorporate revisions to the draft Response to Comments and draft Final EIR and re -submit the documents for a second iteration of City review. www.rbplanning.com Rev W201543 -I0 PLANNING I DESIGN I ENVIRONMENTAL I GRAPHICS .AIPq First Amendment to Contract Newport Center Villas P L A N N I N G October 29, 2015 Following the City's second review of the draft Response to Comments and draft Final EIR, it is assumed that the document will either be approved by City staff for consideration by the Planning Commission, or that only minor revisions would be necessary. Major revisions are not expected, nor budgeted. Sub -Task 7.6: Prepare Findings of Fact and Statement of Overriding Considerations Using a format supplied by the City of Newport Beach, T&B Planning will prepare the CEQA documents required for the Final EIR public hearings, including the draft Statement of Overriding Considerations (if required) and the Section 15091 CEQA Findings of Fact (requiring a summary of each effect, identification of one or more of the required CEQA findings, listing of the associated mitigation measures, and the rationale for implementing the measures). This document will be submitted to the City for review and approval via CD (Word and PDF format). Following review of the first draft, it is anticipated that the City may request minor revisions to clarify or expand on the findings and/or rationale for adopting a Statement of Overriding Considerations. The budget for this task assumes one round of revisions to the Findings of Fact/Statement of Overriding Considerations. Sub -Task 7.7: Prepare Final EIR Pursuant to receiving the City's approval of the Response to Comments, T&B Planning will finalize the draft Final EIR document and will produce 25 printed, bound copies (with Technical Appendices on CD) and 25 CDs (PDF format) for use by the decision makers during the public hearing stages. Additionally, a minimum of ten (10) days before public hearings, T&B Planning will coordinate with the City to ensure that copies of the Responses to Comments have been distributed to all Responsible and Trustee Agencies that commented on the Public Review Draft EIR via certified mail. The budget for this proposal anticipates that the City will conduct the mailing. Sub -Task 7.8: Project Management and Meeting Attendance This task covers coordination tasks associated with T&B Planning's work, including time spent by T&B Planning preparing/updating Project schedules and all external coordination including but not limited to communication via phone, e-mail, letter, memo, and/or web -based conferencing with City staff, public agencies, legal counsel, Project Applicant representatives, and the technical report preparers (as needed). Sub -Task 7.9: CEQA Public Notice Coordination T&B Planning understands that City staff will prepare, distribute, and file all CEQA-required public notices for the Project, including the Notice of Preparation (NOP), Notice of Availability (NOA), and Notice of Determination (NOD). During City staffs preparation of the draft CEQA-required public notices, T&B Planning will review the draft notices for CEQA compliance adequacy. If revisions are required to any public notice to comply with CEQA, T&B Planning will send recommended revisions to City staff via electronic mail. Sub -Task 7.10: Attend Public Meetings & Hearings A T&B Planning Principal (Tracy Zinn) or Senior Project Manager (Shawn Nevill) will attend an EIR Scoping Meeting and up to three (3) public hearings before City of Newport Beach decision-making bodies. Time www.rbplanning.com t iN 201543-10 PLANNING I DESIGN I ENVIRONMENTAL I GRAPHICS 'A 114 L .� I -A First Amendment to Contract Newport Center Villas PLANNING October 29, 2015 preparing for, attending, and traveling to/from meetings and public hearings will be billed on a Time and Materials basis against the not -to -exceed budget for this task. If less time is required, we will only bill for the time actually spent. If preparation time required exceeds three (3) hours per hearing or if the public hearings are longer than four (4) hours each, the additional time will be billed against Sub -Task 7.8. A brief PowerPoint presentation is budgeted to present the EIR. In the event that T&B Planning's attendance is required at more than three (3) public hearings, additional budget may be required. Sub -Task 7.11: Compilation of Administrative Record Before the Draft EIR is released for public review, and again prior to first public hearing, T&B Planning will prepare a comprehensive electronic record of all relevant documentation in our possession for transfer to the City as part of the Administrative Record. Relevant documentation will include final versions of the Draft EIR (before public review), Final EIR (before first public hearing), supporting technical reports, all information sources cited in the EIR's references section, and pertinent written correspondence related to the EIR analysis methodologies and findings. The budget for this task assumes that up to 48 staff hours will be necessary to prepare the Administrative Record. However, if less time is required, T&B Planning will only bill for the time actually spent. T&B Planning will provide the City with one (1) CD containing these materials for inclusion in the Administrative Record. Sub -Task 7.12: Document Publishine and Coordination Work conducted under this task includes compilation of the First Screencheck EIR, Second Screencheck EIR, Public Review Draft EIR, Final EIR and Findings of Facts/Statement of Overriding Considerations for printing and distribution. These documents are required to be distributed in both electronic and hard copy formats. Work efforts include creating master PDFs, burning documents to CDs, creating custom CD labels, coordinating hard copy printing, and document distributions via mail, delivery service, or other methods. www.tbplanning.com PLANNING I DESIGN I ENVIRONMENTAL I GRAPHICS Rrvittd 2015A3-10 EXHIBIT B SCHEDULE OF BILLING RATES T&B Planning, Inc. Page B-1 'AIpq L I L First Amendment to Contract INewport Center Villas FLANNING October 29, 2015 Budget The proposed budget provided in this proposal includes labor fees as well as reproduction, delivery and other reimbursable related costs. The budget required for these additional services is provided below. The budget Identified above includes the following deliverables: • Initial Study: One (1) electronic copy (Word and PDF) and thirty-five (35) hard copies (appendices on CD) • First Screencheck Draft EIR: One (1) electronic copy (Word and PDF) and three (3) hard copies (including the appendices). • Second Screencheck Draft EIR: One (1) electronic copy (Word and PDF) and three (3) hard copies (Note: Hard copies of the appendices will only need to be provided if they have changed). • Public Review Draft EIR: Fifty (50) hard copies (appendices on CD) and thirty-five (35) CD copies. • Draft Final EIR: One (1) electronic copy (Word and PDF). www.rbplanning.com PLANNING I DESIGN I ENVIRONMENTAL I GRAPHICS kcv and M1543.10 TOTAL Task COST �=Task6. Pre`plaareinitialStudyandNoticeofPreparation Sub -Task 6.1: Prepare Initial Study and NOP $ 3,955.00 Sub -Task 6.2: Evaluate NOP Comment Letters 5 1,850.00 Task 6 Subtotal $ 5,805.00 Task 7: Prepare Environmental Impact Report Sub -Task 7.1: Prepare First Screencheck Draft EIR $ 44,840.00 Sub -Task 7.2: Prepare Second Screencheck Draft EIR $ 8,750.00 Sub -Task 7.3: Prepare Mitigation, Monitoring, and Reporting Program (MMRP) $ 1,170.00 Sub -Task 7.4: Prepare Public Review Draft EIR $ 2,050.00 Sub -Task 7.5; Prepare Draft Responses to Public Comments and Draft Final EIR $ 11,940.00 Sub -Task 7.6: Prepare Findings of Fact and Statement of Overriding Considerations $ 4,000.00 Sub -Task 7.7: Prepare Final EIR $ 2,410.00 Sub -Task 7.8: Project Management and Meetings $ 5,150.00 Sub -Task 7.9: CEQ4 Public Notice Coordination $ 1,450.00 Sub -Task 7.10: Attend Public Meetings and Hearings $ 9,000.00 Sub -Task 7.11: Compilation of Administrative Record $ 3,895.00 Sub -Task 7.12: Document Publishing and Coordination $ 4,400.00 Task 7 Subtotal $ 99,05s.00 LABOR FEES $104,860.00 REIMBURSABLE COSTS: $22,442.00 TOTAL BUDGET ESTIMATE $127,302.00 The budget Identified above includes the following deliverables: • Initial Study: One (1) electronic copy (Word and PDF) and thirty-five (35) hard copies (appendices on CD) • First Screencheck Draft EIR: One (1) electronic copy (Word and PDF) and three (3) hard copies (including the appendices). • Second Screencheck Draft EIR: One (1) electronic copy (Word and PDF) and three (3) hard copies (Note: Hard copies of the appendices will only need to be provided if they have changed). • Public Review Draft EIR: Fifty (50) hard copies (appendices on CD) and thirty-five (35) CD copies. • Draft Final EIR: One (1) electronic copy (Word and PDF). www.rbplanning.com PLANNING I DESIGN I ENVIRONMENTAL I GRAPHICS kcv and M1543.10 A Pq L I First Amendment to Contract J Newport Center Villas P L A N N I N G October 29, 2015 • Final EIR: Twenty-five (25) hard copies (appendices on CD) and 25 CD copies. • Findings of Fact/Statement of Overriding Considerations: One (1) electronic copy (Word and PDF). These services shall be provided for an estimated fee of $127,302.00, which shall increase the total Agreement budget from $49,645. 00 to $176,947 00, excluding prepaid expenses. CLIENT hereby authorizes T&B Planning to proceed with the work herein described and T&B Planning agrees it shall provide such services in a timely and efficient manner. If the job is canceled prior to completion, CLIENT agrees to pay for that portion of work performed prior to cancellation. IN WITNESS WHEREOF, the parties to this Agreement have executed this agreement effective as of the date and the year first above written. T&B PLANNING, INC. a California Corporation By: lMn'U Tracy Zinn Its: Vice President Dated: October 29, 2015 CITY OF NEWPORT BEACH Its: Dated: www.tbplanning.com tte.md2015-03-10 PLANNING I DESIGN I ENVIRONMENTAL I GRAPHICS C C6 PROFESSIONAL SERVICES AGREEMENT WITH T&B PLANNING, INC. FOR U NEWPORT CENTER VILLAS CEQA THIS PROFESSIONAL SERVICES AGREEMENT ("Agreement") is made and entered into as of this 5th day of May, 2015 ("Effective Date"), by and between the CITY OF NEWPORT BEACH, a California municipal corporation and charter city ("City"), and T&B PLANNING, INC., a California corporation ("Consultant"), whose address is 17542 East 17th Street, Suite 100, Tustin, California 92780, and is made with reference to the following: RECITALS A. City is a municipal corporation duly organized and validly existing under the laws of the State of California with the power to carry on its business as it is now being conducted under the statutes of the State of California and the Charter of City. B. City desires to engage Consultant to prepare an Initial Study and Mitigated Negative Declaration in accordance with California Environmental Quality Act (CEQA) requirements for the Newport Center Villas Project ("Project"). C. Consultant possesses the skill, experience, ability, background, certification and knowledge to provide the professional services described in this Agreement. D. City has solicited and received a proposal from Consultant, has reviewed the previous experience and evaluated the expertise of Consultant, and desires to retain Consultant to render professional services under the terms and conditions set forth in this Agreement. NOW, THEREFORE, it is mutually agreed by and between the undersigned parties as follows: 1. TERM The term of this Agreement shall commence on the Effective Date, and shall terminate on December 31, 2015, unless terminated earlier as set forth herein. 2. SERVICES TO BE PERFORMED Consultant shall diligently perform all the services described in the Scope of Services attached hereto as Exhibit A and incorporated herein by reference ("Services" or "Work"). City may elect to delete certain Services within the Scope of Services at its sole discretion. 3. TIME OF PERFORMANCE 3.1 Time is of the essence in the performance of Services under this Agreement and Consultant shall perform the Services in accordance with the schedule IN WITNESS WHEREOF, the parties have caused this Agreement to be executed on the dates written below. APPROVED AS TO FORM: CITY ATTORNEY'S OFFICE Date:���� By: l 'j Aaron C. H p CAJA 0sl0.rJ1C City Attorney ATTEST: Date: '54./ CITY OF NEWPORT BEACH, a Californ' runicipal corporation Date: 5 D(S _ 11-0 rly Brat, AICP unity evelopmen Director CONSULTANT: T&B Planning, Inc., a California corporation Date: S -12- - 215 By: By: Leilani I. Brown Tracy inn, AIC City Clerk Vice President Date: By: -'-.- Joe rse P si nt / CFO [END OF SIGN(�TURES] Attachments: Exhibit A - Scope of Services Exhibit B - Schedule of Billing Rates Exhibit C - Insurance Requirements T&B Planning, Inc. Page 11 EXHIBIT A SCOPE OF SERVICES T&B Planning, Inc. Page A-1 'AI� L�� P I A N N I N G Tustin, CA I San Die`;o, CA I Murrvsville, PA JN: 923-006 17542 East I7th Street, Suite 100 Tustin, CA 92750 p714.505.6360 1714.505.6361 March 17, 2015 [REVISED March 31, 2015] CITY OF NEWPORT BEACH Community Development Department, Planning Division c/o Makana Nova, Associate Planner 3300 Newport Boulevard, Building C Newport Beach, CA 92663 RE: PROPOSAL TO PROVIDE CEQA CONSULTING SERVICES FOR THE NEWPORT CENTER VILLAS PROJECT (PA2014-213) Dear Ms. Nova: T&B Planning, Inc. is pleased to submit this proposal to serve as the California Environmental Quality Act (CEQA) consultant for the "Newport Center Villas" project. As you may know, T&B Planning has previously served as the City of Newport Beach's CEQA consultant on three occasions, for the Balboa Marina West MND, the Lido Villas Residential MND, and the North Newport Center Community Development Plan Amendment EIR Addendum. We look forward to the opportunity to continue our working relationship with the City. As specified by the City's Request for Proposal (RFP) dated February 24, 2015, this proposal includes a scope of work, estimated timeframe, and budget for the preparation of an Initial Study (IS) and Mitigated Negative Declaration (MND) for the proposed 49 -Unit Residential Condominium project, located at 150 Newport Center Drive, in the Fashion Island area of Newport Beach. T&B Planning has been in business since 1974 and has proudly served many public and private sectors clients throughout our 41 -year history. We have extensive experience managing the CEQA compliance process and preparing comprehensive and legally defensible CEQA documents. The enclosed exhibits concisely set forth our professional methodology for completing the proposed services in a timely and efficient manner. • Qualifications —SECTION A • Scope of Work —SECTION B • Estimated Schedule and Project Budget — SECTION C • Hourly Rates and Billing Policy—SECTION D • Project Managers' Resumes—SECTION E The business philosophy at T&B Planning is for our Principals and Senior Managers to be directly involved in project management. For this project, Randy Nichols will serve as Senior Project Manager and Tracy Zinn will be Principal -in -Charge. We will be supported by our in-house staff of environmental analysts and graphics specialists. TJW Engineering will serve as the technical expert for preparation of a limited traffic analysis. Urban Crossroads, Inc. will serve as the technical expert for preparation of a focused air WWW.tbplanning.coni PLANNING DESIGN I ENVIRONMENTAL ( GRAPHICS 'd i L� . P L A N N I N G Proposal for City of Newport Beach -Newport Center Villas Project March 17, 2015 Page 2 of 2 quality study and a greenhouse gas emissions analysis to confirm that construction phase and long-term emissions would be below SCAQMD significance thresholds, and to evaluate the Project's GHG footprint with respect to the SCAQMD's recommended project -level threshold and consistency with the City's Energy Action Plan. Thank you for your time and careful consideration. We look forward to working with the City of Newport Beach and the project applicant. If you should need any additional information, please contact Tracy Zinn at (714) 397-4224, or via email at tzinn@tbplanning.com or Randy Nichols at (714) 505-6360 X 155, or via e-mail at rnichols@tbplanning.com. Sincerely, T&B PLANNING, INC. Tracy Zinn, AICP Vice President www.tbpIanning.com PLANNING I DESIGN I ENVIRONMENTAL j GRAPHICS Proposal for City of Newport Beach -Newport Center Villas Project SECTION B: SCOPE OF WORK SCOPE OF WORK Project Understanding R L�'J Based on information provided in the City's RFP dated February 24, 2015, it is our understanding that the project applicant is seeking to redevelop the property located at 150 Newport Center Drive. Under existing conditions, the approximately 1.3 -acre site contains a car wash and a gasoline fueling station. The project applicant is seeking to demolish the existing site improvements and develop 49 condominium dwelling units and related site improvements. The City is processing the following applications for the proposed project: General Plan Amendment, Zoning Code Amendment, Planned Community Development Plan, Site Development Review, Tract Map, and Development Agreement. The General Plan Amendment would change the site's land use designation from CO- R (Regional Commercial Office) to RM (Multi -Unit Residential). The Zoning Code Amendment would change the zoning designations from OR (Office Regional Commercial) to establish development standards for a planned community development plan classification over the entire project site. The Planned Community Development Plan would create the proposed development plan, in accordance with the proposed zoning standards, for 49 new condominium units. This would also involve issuance of a waiver of the minimum site area of 10 acres, and authorize an increase in the height limit to 87 feet. The Site Development Review would authorize construction of 49 multi -family dwelling units, in accordance the Planned Community Plan. The Tentative Tract Map would create an air space subdivision for the proposed 49 -unit condominium project. The Development Agreement would authorize certain development rights beyond the 450 residential units identified in Table LU2, per Land Use Policy 6.14.8 (Development Agreements) of the General Plan, in exchange for public benefits. Key environmental concerns identified by City staff include aesthetic impacts associated with a much taller building on this site, the change from commercial to residential land use, and possibly issues involving remediation of hazardous materials associated with the existing gas station. Due to the relatively deep excavation required to construct three levels of subterranean parking, there may also be issues of concern with respect to geological or soils constraints and required construction methods. It is our understanding that the proposed project would not generate sufficient net new vehicle trips to trigger a standard traffic impact assessment involving analysis of intersection levels of service, but the City does want a review of the existing trip generation and an evaluation of the design of the proposed site access points, based on the projected amount of traffic generated by the 49 condominium homes. The City of Newport Beach will retain the services of a CEQA consultant to prepare the appropriate CEQA compliance document(s) on behalf of the City and manage the CEQA process in compliance with City procedures and California state law. Based on the assumption that all environmental effects associated with the project would be less than significant or mitigated to a level below significance, City staff has determined that a Mitigated Negative Declaration (MND) will be required. Thus, this proposal provides a scope of work and budget for the preparation and processing of a MND in support of the project. Page 10 T&B Planning, Inc. Proposal for City of Newport Beach -Newport Center Villas Project '. SECTION B: SCOPE OF WORK , ! Scope of Work Provided below is TO Planning's proposed Scope of Work. Please note that the Scope of Work described below will likely not be undertaken chronologically as presented. To expedite the schedule, there may be considerable overlap on the timing of each task. Additionally, all meetings and coordination efforts are included under Task 4.1, although these efforts will occur throughout the entire scope of work. Refer to SECTION C, Estimated Schedule and Project Budget. It is our understanding that application materials and several technical studies have been or will be prepared by the project applicant and will be provided to T&B Planning for use in preparing the project's MND. Technical studies and support documents noted in our telephone conversation with the City include: Vicinity Map, Project Description, Project Plans and Visual Perspectives, Planned Community Development Plan, Preliminary Water Quality Management Plan, Preliminary Geotechnical Feasibility Study, and Phase I and Phase II Environmental Site Assessments. The adequacy of these plans and reports for the purpose of the assessment of environmental impacts in the CEQA document has not been determined, and these materials may need to be revised to provide sufficient information and analysis. T&B Planning will review these materials and provide the City with recommendations on any supplemental information that may be deemed necessary to support the IS/MND. We will conduct a field visit and collect GPS -referenced photographs to confirm that the project site is not visible or minimally visible within important viewing corridors identified in the City's General Plan. As part of this proposal, T&B Planning will contract with Urban Crossroads, Inc., for the preparation of an air quality study and an analysis of the project's greenhouse gas footprint, and will contract with TJW Engineering, Inc. for preparation of a limited traffic study. The scope of work and budget provided below assume that no additional technical studies would be required to support the IS/MND. If such studies are determined necessary, we will revise our scope of work and budget as necessary and appropriate. TASK 1: PREPARE SCREENCHECK IS/MND Sub -Task 1.1 Research, Data Acquisition, and Review During this task, T&B Planning will collect and review applicable information about the proposed project and environmental conditions of the subject property to gain a basic, working knowledge of the project site. T&B Planning will conduct a cursory field visit and take photographs to document existing site conditions, surrounding development, visibility of the site from public roads and General Plan view corridors, and other aspects of the site's physical and environmental setting that will warrant consideration in the environmental analysis. The photos will be GPS -referenced and will be used as the baseline for analysis in the MND and the aesthetics evaluation as required by CEQA. Sub -Task 1.2 Prepare Project Description Prior to initiating any substantive work and following Sub -Task 1.1, T&B Planning will prepare a formal Project Description to be used throughout the CEQA compliance process. The Project Description will include both text and exhibits and describe the proposed project and its associated applications and characteristics. We expect that a majority of the exhibits will be taken from the application materials, with minimal graphic manipulation work required by T&B Planning to support the CEQA process. If application materials are revised after the Project Description is prepared, additional budget would be required for Project Description updates. Page 11 T&B Planning, Inc. Proposal for City of Newport Beach-Newport Center Villas Project tJ SECTION B: SCOPE OF WORK t,1 ,! Sub -Task 1.3 Prepare Screencheck IS/MND T&B Planning will prepare a Screencheck IS/MND using the CEQA Environmental Checklist Form. The Draft IS/MND will include: • Introduction. The Introduction will explain the purpose of the MND, describe the format and content of the MND, and provide an overview of CEQA requirements for preparation and processing of MNDs; • Environmental Setting. The Environmental Setting will identify the project's location and describe the physical environmental conditions in the vicinity of the project site, including, but not limited to: site access; site conditions; existing and surrounding land uses; and existing environmental characteristics (e.g., hydrology/drainage, etc.); and • Protect Description. The Project Description will provide a description of the Project and future discretionary and/or ministerial approvals needed to implement the project, and the project's construction and operational characteristics. It is anticipated that a majority of the text within this section will be taken from the Project Description prepared as part of Sub -Task 1.2. • Environmental Analysis. This section will include: — Statement of the purpose and scope of the IS; — Disclosure of the Lead Agency and any other public agencies that must approve the project; — Description of the proposed discretionary actions; — Description of the project's characteristics; — Description of the project's location; — Overview of existing site and surrounding conditions/environmental setting; — Examination of project consistency with the site's proposed zoning, plans, and any other applicable land use controls; — List of references used; — Environmental evaluation by CEQA subject area (Environmental Checklist); — Review of pertinent sections of the Newport Beach General Plan and General Plan EIR — Determination as to the required type of CEQA document. The Environmental Checklist and Responses to Environmental Checklist will be the primary work effort for this task. The Responses to Environmental Checklist section will contain a thorough analysis and determine the significance of impacts to the following environmental resources. — Aesthetics — Air Quality — Geology/Soils — Greenhouse Gas Emissions — Hazards and Hazardous Materials — Hydrology & Water Quality — Land Use and Planning — Noise — Population and Housing — Public Services — Recreation — Transportation/Traffic — Utilities/Service Systems — Mandatory Findings of Significance Because the site is fully developed, we anticipate that only nominal analysis will be required for: Agriculture and Forestry Resources; Biological Resources; Cultural Resources; and Mineral Resources. Page 12 T&B Planning, Inc. Proposal for City of Newport Beach -Newport Center Villas Project 'I ! SECTION B: SCOPE OF WORK `�' Each of the environmental issue areas will be assigned a significance rating of "No Impact," "Less than Significant Impact," or "Less than Significant with Mitigation Incorporated." For each issue area, a detailed rationale will be provided within the Responses to Environmental Checklist section to provide substantive evidence for the conclusion drawn. Where necessary, mitigation measures will be identified to reduce any potentially significant impacts to a level below significant. References will be cited and relied upon as appropriate. Sub -Task 1.4 Revise Screencheck IS/MND At the completion of Sub -Task 1.3, T&B Planning will supply a copy of the IS/MND to the City of Newport Beach and meet with City staff to discuss the outcome of the IS and the recommended type of CEQA document, which for purposes of this proposal, is assumed to be an MND. One round of revision to the Screencheck IS/MND is budgeted to respond to all reasonable comments made by City staff. If additional revisions are required, they will be addressed as part of our Sub -Task 2.1 work efforts. TASK 2: PREPARE MMRP, PUBLIC REVIEW DRAFT MND, AND FINAL MND This proposal assumes that the results of the IS/Environmental Checklist will determine that all project -related impacts are either less than significant, or would be reduced to a level below significant with the incorporation of mitigation measures. In the event that the analysis conducted pursuant to Sub -Task 1.3 identifies impacts that cannot be mitigated to a level below significant, then an Environmental Impact Report (EIR) would be required. Preparation of an EIR is not accounted for by this Scope of Work, and is not anticipated to be needed. Sub -Task 2.1 MMRP As part of the IS/MND, T&B Planning will clearly identify all significant impacts and recommend feasible mitigation measures to reduce those impacts to below a level of significance. T&B Planning also will prepare a Mitigation Monitoring and Reporting Program (MMRP) in accordance with State law and City of Newport Beach requirements to ensure implementation of mitigation measures, standard conditions, and project design features required as part of specific project approvals. The MMRP will be provided to the City for review. One round of revision to the MMRP is budgeted to respond to all reasonable comments made by City staff. We anticipate that one review cycle will be sufficient; however, if the City requests a second review, T&B Planning would arrange a meeting with the appropriate City staff to discuss the City's comments and recommend appropriate ways to address any concerns. Sub -Task 2.2 Prepare Public Review MND for Distribution Upon receiving the City's authorization to finalize the Draft MND, T&B Planning will prepare and print the document for public distribution and work with City staff to compile the MND's distribution mailing list. This proposal assumes that the applicant's Title Company will provide mailing labels for property owners within the City's required notification radius. This proposal also assumes that the City of Newport Beach will provide their standard public agency notification list as a basis from which to compile the MND's distribution mailing list. T&B Planning will conduct the required mailing, in both hard copy and electronic (CD) formats. It is assumed that a majority of recipients would receive either only a Notice of Intent (NOI), or copies of the MND on CDs, with minimal hard copies needed. The MND will be packaged with all of the supporting technical studies serving as MND Appendices. For purposes of budgeting, it is assumed that all supporting technical studies will be provided in electronic format on CDs, and that there would be no more than 25 recipients of the draft MND document (in CD format with hard copies supplied for public libraries and City use). As part of this task, T&B Planning also will prepare the CEQA-required Notice of Intent (NOI) to adopt a Mitigated Negative Declaration. Page 13 T&B Planning, Inc. Proposal for City of Newport Beach -Newport Center Villas Project SECTION B: SCOPE OF WORK Sub -Task 2.3 Consider Public Comment on MND Upon completion of the public review period, T&B Planning will review all comment letters, and evaluate the MND for CEQA adequacy in consideration of the submitted comments. In response to letters of comment, revisions may be necessary to the MND which will be discussed with the City and authorized prior to changes being made to the document. For purposes of this proposal, our budget assumes that only minor MND changes would be necessary to prepare the Final MND for consideration by City decision -makers. Formal written responses to comments are not required by CEQA for a MND; nonetheless, we have budgeted to supply written responses for up to 20 substantive comments. Sub -Task 2.4 Prepare Final MND and Notice of Determination (NOD) T&B Planning will prepare a Final MND in the form of an Errata Table of Changes/Additions to the Draft MND for review and approval by City staff. Pursuant to receiving the City's approval, T&B Planning will package the Final MND with the Draft MND for use by the decision makers during the public hearing stages. After adoption of the MND by the City Council, T&B Planning will prepare a Notice of Determination (NOD) form pursuant to Section 15075 of the State CEQA Guidelines. Once reviewed and approved by City staff, T&B Planning will post the NOD with the County Clerk and submit the required fees. We expect a check for the filing fees to be supplied by the project applicant. Timely filing of the NOD (within five (5) working days of final decision) reduces the statute of limitations on court challenges to the approval under CEQA to 30 calendar days. TASK 3: PREPARE TECHNICAL STUDIES Based on the information provided in the RFP, it is our understanding that all CEQA-required technical studies will be provided by the Project Applicant, with exception of a traffic study, an air quality study and an assessment of the project's greenhouse gas emissions. Urban Crossroads, Inc., will prepare the assessment of air quality and GHG impacts, as a subconsultant to T&B Planning. The Traffic Study will be prepared by TJW Engineering, as a subconsultant to T&B Planning. Additional technical studies that may be required in support of the project are not budgeted at this time. The scopes of work for the air quality, greenhouse gas and traffic impact studies are summarized below. The budget for these tasks assumes one (1) round of revisions to a first draft report address both topics, based on comments provided by the City or Project Applicant. Sub -Task 3.1 Air Quality and Greenhouse Gas Emissions Impact Analyses Existing air quality conditions will be documented and described, along with the impact significance thresholds recommended by the South Coast Air Quality Management District (SCAQMD). Emissions associated with the existing car wash and gasoline fuel island activities will be estimated and compared to emissions that would be generated by the proposed project. Project impacts will be assessed based on the net increase in criteria pollutant emissions, compared to the SCAQMD localized and regional emissions thresholds. Impacts will be assessed for construction activities and for the long-term operations of the completed project. Greenhouse gas emissions (GHGs) associated with the existing car wash and gasoline fuel island will be quantified and compared to the levels of GHGs associated with construction and operations of the proposed project. Net new GHGs will be examined for a determination of significance with respect to SCAQMD's recommended interim thresholds for project -level assessments, and with respect to GHG reduction measures identified in the City's Energy Action Plan and General Plan EIR. Page 14 T&B Planning, Inc. Proposal for City of Newport Beach -Newport Center Villas Project SECTION B: SCOPE OF WORK Urban Crossroads will submit one draft report, respond to one set of review comments by T&B and City staff, and then submit a final report. Sub -Task 3.2 Traffic and Site Access Study TJW Engineering, Inc., as a subconsultant to T&B Planning, will prepare a limited analysis of the project's trip generation and site access features, based on direction provided to TJW by Mr. David Keely of the City's Public Works Department. The proposed scope of work includes collecting peak hour traffic counts for the existing land uses over a consecutive three day weekday period, then calculating the project's net new traffic generation. If the Applicant provides sufficient existing traffic count data, collection of the three days of peak hour counts will be eliminated from TJW's scope of work and budget. An analysis of the proposed site access locations and design features will be conducted, based on a 24-hour average daily traffic count to be taken by TJW on Anacapa Drive, adjacent to the project site. Site access will be analyzed with respect to turning volumes at the proposed Anacapa Drive driveways, based on 2010 Highway Capacity Manual methodology, and will also address sight distance considerations. Access design features will be evaluated with respect to standard engineering design factors and any standard specifications established by the City of Newport Beach. TJW will respond to one consolidated set of review comments by T&B Planning and the City, and will prepare a final memorandum documenting results of the field work, traffic counts, trip generation calculations, site access recommendations. TASK 4: MEETINGS, HEARINGS, AND PROJECT MANAGEMENT It is our intent to anticipate the meetings, hearings, coordination and correspondence which might be required as part of this task. However, because working on entitlement projects is so often "reactive," it is impossible to know exactly what work will be needed. Therefore, while we have provided budgets for each of the tasks below, these budgets should be considered estimates only, because all work performed under this Phase of work by T&B Planning will be on a Time and Materials basis in accordance with our HOURLY RATES AND BILLING POLICY, which is included herein within SECTION D. Certain tasks can be anticipated and have been identified, but we also realize that a client's needs sometimes require additional meetings, unanticipated correspondence, etc. As the work efforts associated with these tasks are identified, we can provide updated budget estimates for their completion. Sub -Task 4.1 Meetings, Correspondence, and Coordination All time spent by T&B Planning in attending meetings, preparing/updating project schedules, or in coordinating/communicating via phone, e-mail, letter and/or web -based conferencing with City staff, public agencies, the project proponent, and technical consultants (as needed) will be billed on a Time and Materials basis against the budget for this task. As part of this Sub -Task, T&B Planning also will provide quality control services for the project's air quality and GHG reports, and for critical review of technical studies prepared for the Applicant. Accordingly, we will review the various supporting documents prepared for the Applicant to determine if sufficient information and analysis is provided to support our response to the Initial Study Checklist questions. If we should identify additional information needs, the Applicant will direct their consultants to provide that information, to the satisfaction of City staff and T&B Planning. In addition, T&B Planning will prepare and submit the appropriate application form with the CDFW to request a waiver of their filing fee under the "No Effect Determination" provision. Attendance by a T&B Planning Principal or Senior Project Manager at up to two (2) meetings with City staff also is included in the budget for this sub - task. The amount of effort required for this task is highly dependent on the level of controversy that may arise Page 15 T&B Planning, Inc. Proposal for City of Newport Beach -Newport Center Villas Project SECTION B: SCOPE OF WORK ,I J over the course of the project. The actual number of hours associated with this task may be higher or lower than the estimated budget; which is set at $6,475.00. We will only bill for the actual number of hours required for this task. Attendance at Public Hearings is budgeted separately as part of Sub -Task 4.2. Sub -Task 4.2 Public Hearings A T&B Senior Project Manager will attend up to three (3) public hearings before the City Planning Commission and City Council. If additional public hearings are required, then attendance at such hearings will instead be invoiced based on the additional hours and expenses involved. Sub -Task 4.3 Publication and Print Coordination This sub -task covers work efforts that are required to prepare, publish, and quality -control proofread the IS and MND and other materials for review and distribution, as hard and/or electronic copies. As per the request of the City's RFP for this project, T&B Planning will provide electronic copies of the draft and complete MND and 14 hard copies prior to public hearings. The actual number of hours associated with this task may be higher or lower than the estimated budget; however, we will only bill for the actual number of hours required. Sub -Task 4.4 Administrative Record (Optional Task; Not Budgeted) If requested by the City, T&B will be provide an administrative record of reports and communications pertaining to the preparation of the MND. This would facilitate the City's efforts to comply with requests for such a record in the event of a legal challenge or satisfy the City's desire to maintain this documentation as a matter of practice. This task is described below. Before the Draft MND is released for public review, and again before the first public hearing, T&B Planning will prepare a comprehensive electronic record, with a corresponding index, of all relevant documentation in our possession for transfer to the Lead Agency as part of the Administrative Record. Relevant documentation will include final versions of the Initial Study/NOP, Draft MND (before public review), Final MND (before first public hearing), supporting technical reports, all information sources cited in the MND's references section, and pertinent written correspondence related to the MND analysis methodologies and findings. T&B Planning will provide the Lead Agency with one (1) CD containing these items for the Administrative Record. TASK 5: REIMBURSABLE COSTS Sub -Task 5.1 Reimbursable Costs The following provides an estimate of the direct costs that are anticipated to be incurred in association with the project, based on the Scope of Work described herein and the expected number of document pages and copies that will be required. Reimbursable fees will be billed at -cost. Sub -Task Deliverable Item Quantity I Unit Cost Total Cost 1.2 Project Description (Electronic Only) N/A N/A N/C 1.3 Hard Copies 1st Screencheck IS (b/w) 3 $35.00 $105.00 CDs containing IS' 3 $10.00 $30.00 2.1 Hard Copies MND/MMRP (b/w) 3 $40.00 $120.00 CDs containing MND 3 $10.00 $30.00 Page 16 T&B Planning, Inc. EXHIBIT B SCHEDULE OF BILLING RATES T&B Planning, Inc. Page B-1 Proposal for City of Newport Beach -Newport Center Villas Project SECTION C: ESTIMATED SCHEDULE AND PROJECT BUDGET ESTIMATED SCHEDULE AND PROJECT BUDGET The following provides an estimate of costs that are anticipated to be incurred in association with the project, based on the Scope of Work described herein. The timing of Subtasks 1.1- 1.4 and Task 3 run concurrent. We will deliver the Draft Initial Study to the City of Newport Beach approximately six (6) weeks after initiation of our work. Task Task Description Staff Type Hourly Rate Staff Hours Fee Schedule TASK 1 PREPARE SCREENCHECK INITIAL STUDY/MITIGATED NEGATIVE DELCARATION 6 WEEKS 1.1 Research, Data Acquisition, and Review Senior Project Manager $125.00 8.0 $1,000.00 1 week Environmental Analyst $80.00 10.0 $800.00 Sub -Total Task 1.1: $1,800.00 1.2 Prepare Project Description Principal $175.00 1.0 $175.00 2 weeks Senior Project Manager $125.00 6,0 $750.00 Graphics Manager $95.00 8.0 $760.00 Environmental Analyst $80.00 12.0 $960.00 Sub -Total Task 1.2: $2,645.00 1.3 Prepare Screencheck IS/MND Principal $175.00 8.0 $1,400.00 4 weeks Senior Project Manager $125.00 36.0 $4,500.00 Graphics Manager $95.00 10.0 $950.00 Environmental Analyst $80.00 95.0 $7,600.00 Sub -Total Task 1.3: $14,450.00 1.4 Revise Screencheck IS/MND Principal $175.00 1.0 $175.00 1 week Senior Project Manager $125.00 8.0 $1,000.00 Environmental $80.00 12.0 $960.00 Page 18 T&B Planning, Inc. Proposal for City of Newport Beach -Newport Center Villas Project SECTION C: ESTIMATED SCHEDULE AND PROJECT BUDGET Page 19 T&B Planning, Inc. Analyst Sub -Total Task 1.4:1 $2,135.00 TASK 2 PREPARE MMRP, DRAFT MND, FINAL MND 8 WEEKS 2.1 Prepare MMRP 2 weeks Senior Project Manager $125.00 2.0 $250.00 Environmental Analyst $80.00 6.0 $480.00 Sub -Total Task 2.1: $730.00 2.2 Prepare Public Review MND for Distribution Senior Project Manager $125.00 4.0 $500.00 1 week Graphics Manager $95.00 4.0 $380.00 Environmental Analyst $80.00 8.0 $640.00 Graphics/Printing Staff $65.00 8.0 $520.00 Sub -Total Task 2.2: $2,040.00 Public Review 20 days 2.3 Consider Public Comments on MND Principal 1 $175.001 4.0 $700.00 1 week Senior Project Manager $125.00 20.0 $2,500.00 Sub -Total Task 2.3: $3,200.00 2.4 Prepare Final MND and NOD Senior Project Manager $125.00 4.0 $500.00 1 week Environmental Analyst $80.00 8.0 $640.00 Graphics/Printing Staff $65.00 6.0 $390.00 Sub -Total Task 2.4:1 $1,530.00 TASK 3 PREPARE TECHNICAL STUDIES 1 4 Weeks Page 19 T&B Planning, Inc. Proposal for City of Newport Beach -Newport Center Villas Project SECTION C: ESTIMATED SCHEDULE AND PROJECT BUDGET 3.1 Air Quality and Greenhouse Gas Impact Analysis $5,000.00 4 Weeks 3.2 Traffic Impact Analysis $3,700.00 Sub -Total Task 3: $8,700.00 TASK 4 MEETINGS, HEARINGS, PROJECT MANAGEMENT** As Needed 4.1 Meetings, Correspondence, Coordination Principal $175.00 8.0 $1,400.00 As needed Senior Project Manager $125.00 35.0 $4,375.00 Sub -Total Task 4.1: $5,775.00 4.2 Public Hearings (Three) As needed Senior Project Manager $125.00 15.0 $1,875.00 Sub -Total Task 4.2: $1,875.00 4.3 Publication and Print Coordination Graphics Manager $95.00 4.0 $380.00 As needed Graphics/Printing Staff $65.00 20.0 $1,300.00 Sub -Total Task 4.3: $1,680.00 BUDGET ESTIMATE- LABOR FEES: $46,560.00 TASK 5 REIMBURSABLE COSTS: 3,085.00 As Needed TOTAL►$49,645.001 4-5 Months Notes: 1. Budget amounts shown are Fixed Fee, except for Tasks 4 and 5, which will be billed as Time and Materials. Time and Materials tasks will be billed based on the amount of time spent working on the task, to the maximum indicated, in accordance with our HOURLY RATESAND BILLING POLICY. When and if the allocated budget for these tasks becomes fully drawn down, T&B Planning will cease all work on the task unless additional funding is authorized by the Client. 2. Schedule indicates Consultant time only and does not account for time needed by the City of Newport Beach and/or the project proponent to conduct its reviews. 3. Schedule assumes no State Responsible or Trustee Agencies, thus no distribution to the State Clearinghouse and a 20 -day public review period on the Draft MND. ** An additional budget of $3,500 is estimated for the costs of preparing an Administrative Record, as described in Optional Task 4.4 Page 20 T&B Planning, Inc. Proposal for City of Newport Beach -Newport Center Villas Project SECTION D: HOURLY RATES AND BILLING POLICY HOURLY RATES AND BILLING POLICY If at any time during the completion of this project, we are requested to perform services beyond the Scope of Work or if T&B Planning, Inc. is authorized to provide services on a Time and Materials basis, we will invoice for such work in accordance with the hourly rates provided below: • Principal...................................................................................................$175.00/Hour • Senior Associate...................................................................................... $125.00/Hour • Senior Manager/Senior Planner.............................................................. $125.00/Hour • Project Manager....................................................................................... $ 95.00/Hour • Project Planner.......................................................................................... $ 80.00/Hour • Environmental Analyst.............................................................................. $ 80.00/Hour • Staff Planner.............................................................................................. $ 65.00/Hour • Graphic Artist/GIS Technician................................................................... $ 65.00/Hour • Administrative Assistant/Assistant Planner .............................................. $ 40.00/Hour T&B Planning's hourly rates do not include out-of-pocket expenses (including, but not limited to, blueprinting, duplicating/copying, reproduction, GIS data acquisition fees, aerial photography, site photos and delivery services). These expenses will be billed at cost. Expert testimony and litigation support services will be billed at double the above rates. We invoice on a monthly basis in proportion to the time spent on the project to date. Time and materials labor is rounded to the one-quarter hour. Fixed fee labor is invoiced based on the percentage of task complete. Unless pre -arranged, all billing statements are due and payable within thirty (30) days of invoice approval. A finance charge of 1Y2 per month will be charged on all invoices not paid within thirty (30) days of invoice approval. Outside professional services performed by other individuals/firms that are sub -contracted through T&B Planning will be performed only following authorization by you. Billing for any services that are sub -contracted will be billed at our actual cost. The Client acknowledges that despite our best efforts, certain aspects of the work to be performed involve processing and discretionary approvals by politically influenced agencies and elected officials for which we can provide no guarantee of success. The compensation for T&B Planning, its sub -consultants and vendors is not dependent on agency concurrence or approvals. All work products, including but not limited to correspondence, reports and maps, generated for this project and retained by T&B Planning in its files shall be stored for a period of five years after completion of the project and then discarded, unless T&B Planning is advised in writing by the Client to retain or transfer such files. Page 21 T&B Planning, Inc. EXHIBIT C INSURANCE REQUIREMENTS — PROFESSIONAL SERVICES 1. Provision of Insurance. Without limiting Consultant's indemnification of City, and prior to commencement of Work, Consultant shall obtain, provide and maintain at its own expense during the term of this Agreement, policies of insurance of the type and amounts described below and in a form satisfactory to City. Consultant agrees to provide insurance in accordance with requirements set forth here. If Consultant uses existing coverage to comply and that coverage does not meet these requirements, Consultant agrees to amend, supplement or endorse the existing coverage. 2. Acceptable Insurers. All insurance policies shall be issued by an insurance company currently authorized by the Insurance Commissioner to transact business of insurance in the State of California, with an assigned policyholders' Rating of A- (or higher) and Financial Size Category Class VII (or larger) in accordance with the latest edition of Best's Key Rating Guide, unless otherwise approved by the City's Risk Manager. 3. Coverage Requirements. A. Workers' Compensation Insurance. Consultant shall maintain Workers' Compensation Insurance, statutory limits, and Employer's Liability Insurance with limits of at least one million dollars ($1,000,000) each accident for bodily injury by accident and each employee for bodily injury by disease in accordance with the laws of the State of California, Section 3700 of the Labor Code. Consultant shall submit to City, along with the certificate of insurance, a Waiver of Subrogation endorsement in favor of City, its officers, agents, employees and volunteers. B. General Liability Insurance. Consultant shall maintain commercial general liability insurance, and if necessary umbrella liability insurance, with coverage at least as broad as provided by Insurance Services Office form CG 00 01, in an amount not less than one million dollars ($1,000,000) per occurrence, two million dollars ($2,000,000) general aggregate. The policy shall cover liability arising from premises, operations, personal and advertising injury, and liability assumed under an insured contract (including the tort liability of another assumed in a business contract). C. Automobile Liability Insurance. Consultant shall maintain automobile insurance at least as broad as Insurance Services Office form CA 00 01 covering bodily injury and property damage for all activities of Consultant arising out of or in connection with Work to be performed under this Agreement, including coverage for any owned, hired, non -owned or rented vehicles, in an amount not less than one million dollars ($1,000,000) combined single limit each accident. T &B Planning, Inc. Page C -1 D. Professional Liability (Errors & Omissions) Insurance. Consultant shall maintain professional liability insurance that covers the Services to be performed in connection with this Agreement, in the minimum amount of one million dollars ($1,000,000) per claim and two million dollars ($2,000,000) in the aggregate. Any policy inception date, continuity date, or retroactive date must be before the Effective Date of this Agreement and Consultant agrees to maintain continuous coverage through a period no less than three years after completion of the Services required by this Agreement. 4. Other Insurance Requirements. The policies are to contain, or be endorsed to contain, the following provisions: A. Waiver of Subrogation. All insurance coverage maintained or procured pursuant to this Agreement shall be endorsed to waive subrogation against City, its elected or appointed officers, agents, officials, employees and volunteers or shall specifically allow Consultant or others providing insurance evidence in compliance with these requirements to waive their right of recovery prior to a loss. Consultant hereby waives its own right of recovery against City, and shall require similar written express waivers from each of its subconsuitants. B. Additional Insured Status. All liability policies including general liability, excess liability, pollution liability, and automobile liability, if required, but not including professional liability, shall provide or be endorsed to provide that City and its officers, officials, employees, and agents shall be included as insureds under such policies. C. Primary and Non Contributory. All liability coverage shall apply on a primary basis and shall not require contribution from any insurance or self - insurance maintained by City. D. Notice of Cancellation. All policies shall provide City with thirty (30) calendar days notice of cancellation (except for nonpayment for which ten (10) calendar days notice is required) or nonrenewal of coverage for each required coverage. 5. Additional Agreements Between the Parties. The parties hereby agree to the following: A. Evidence of Insurance. Consultant shall provide certificates of insurance to City as evidence of the insurance coverage required herein, along with a waiver of subrogation endorsement for workers' compensation and other endorsements as specified herein for each coverage. Insurance certificates and endorsement must be approved by City's Risk Manager prior to commencement of performance. Current certification of insurance shall be kept on file with City at all times during the term of this Agreement. City reserves the right to require complete, certified copies of all required insurance policies, at any time. T &B Planning, Inc. Page C -2 B. City's Right to Revise Requirements. City reserves the right at any time during the term of the Agreement to change the amounts and types of insurance required by giving Consultant sixty (60) calendar days advance written notice of such change. If such change results in substantial additional cost to Consultant, City and Consultant may renegotiate Consultant's compensation. C. Enforcement of Agreement Provisions. Consultant acknowledges and agrees that any actual or alleged failure on the part of City to inform Consultant of non - compliance with any requirement imposes no additional obligations on City nor does it waive any rights hereunder. D. Requirements not Limiting. Requirements of specific coverage features or limits contained in this Section are not intended as a limitation on coverage, limits or other requirements, or a waiver of any coverage normally provided by any insurance. Specific reference to a given coverage feature is for purposes of clarification only as it pertains to a given issue and is not intended by any party or insured to be all inclusive, or to the exclusion of other coverage, or a waiver of any type. If the Consultant maintains higher limits than the minimums shown above, the City requires and shall be entitled to coverage for higher limits maintained by the Consultant. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the City. E. Self- insured Retentions. Any self- insured retentions must be declared to and approved by City. City reserves the right to require that self- insured retentions be eliminated, lowered, or replaced by a deductible. Self - insurance will not be considered to comply with these requirements unless approved by City. F. City Remedies for Non - Compliance. If Consultant or any subconsultant fails to provide and maintain insurance as required herein, then City shall have the right but not the obligation, to purchase such insurance, to terminate this Agreement, or to suspend Consultant's right to proceed until proper evidence of insurance is provided. Any amounts paid by City shall, at City's sole option, be deducted from amounts payable to Consultant or reimbursed by Consultant upon demand. G. Timely Notice of Claims. Contractor shall give City prompt and timely notice of claims made or suits instituted that arise out of or result from Contractor's performance under this Contract, and that involve or may involve coverage under any of the required liability policies. City assumes no obligation or liability by such notice, but has the right (but not the duty) to monitor the handling of any such claim or claims if they are likely to involve City. H. Consultant's Insurance. Consultant shall also procure and maintain, at its own cost and expense, any additional kinds of insurance, which in its own T &B Planning, Inc. Page C -3 judgment may be necessary for its proper protection and prosecution of the Work. T &B Planning, Inc. Page C -4 CERTIFICATE OF INSURANCE CHECKLIST City of Newport Beach This checklist is comprised of requirements as outlined by the City of Newport Beach. * Date Received: 3/10/15 Dept. /Contact Received From: Terresa Date Completed: 3/10/15 Sent to: Teresa By: Chris /Alicia CompanylPerson required to have certificate: T &B Planning Inc. Type of contract: All Other I. GENERAL LIABILITY EFFECTIVE /EXPIRATION DATE: 2/1/15 to 2/1116 A. INSURANCE COMPANY: Citizens Insurance Co of America B. AM BEST RATING (A-: VII or greater): A; XIV C. ADMITTED Company (Must be California Admitted): Is Company admitted in California? ® Yes ❑ No D. LIMITS (Must be $1 M or greater): What is limit provided? 2,000,000/4,000,000 E. ADDITIONAL INSURED ENDORSEMENT— please attach N Yes ❑ No F. PRODUCTS AND COMPLETED OPERATIONS (Must (What is limits provided ?) include): Is it included? (completed Operations status does F. PRIMARY & NON - CONTRIBUTORY WORDING (For Waste not apply to Waste Haulers or Recreation) N Yes ❑ No G. ADDITIONAL INSURED FOR PRODUCTS AND G. HIRED AND NON -OWNED AUTO ONLY: COMPLETED OPERATIONS ENDORSEMENT (completed H. NOTICE OF CANCELLATION: Operations status does not apply to Waste Haulers) N Yes ❑ No H. ADDITIONAL INSURED WORDING TO INCLUDE (The City its officers, officials, employees and volunteers): Is it included? N Yes ❑ No I. PRIMARY & NON - CONTRIBUTORY WORDING (Must be included): Is it included? N Yes ❑ No J. CAUTION! (Confirm that loss or liability of the named insured is not limited solely by their negligence) Does endorsement include "solely by negligence" wording? ❑ Yes N No K. ELECTED SCMAF COVERAGE (RECREATION ONLY): N N/A ❑ Yes ❑ No L. NOTICE OF CANCELLATION: ❑ N/A N Yes ❑ No II. AUTOMOBILE LIABILITY EFFECTIVE /EXPIRATION DATE: 2/1/15 to 2/1/16 A. INSURANCE COMPANY: Allmerica Financial Benefit Ins Co B. AM BEST RATING (A-: VII or greater) A; XIV C. ADMITTED COMPANY (Must be California Admitted): Is Company admitted in California? ® Yes ❑ No D. LIMITS - If Employees (Must be $1M min. BI & PD and $500,000 UM, $2M min for Waste Haulers): What is limits provided? 1,000,000 E LIMITS Waiver of Auto Insurance / Proof of coverage (if individual) (What is limits provided ?) NIA F. PRIMARY & NON - CONTRIBUTORY WORDING (For Waste Haulers only): N NIA ❑ Yes ❑ No G. HIRED AND NON -OWNED AUTO ONLY: ❑ N/A ❑ Yes N No H. NOTICE OF CANCELLATION: ❑ N/A N Yes ❑ No III. WORKERS' COMPENSATION EFFECTIVE /EXPIRATION DATE: 2/1/15 to 2/1/16 A. INSURANCE COMPANY: Hanover American Insurance Co B, AM BEST RATING (A-; VII or greater): A; XIV C. ADMITTED Company (Must be California Admitted): ® Yes ❑ No D. WORKERS' COMPENSATION LIMIT: Statutory ® Yes ❑ No E. EMPLOYERS' LIABILITY LIMIT (Must be $1 M or greater) 1,000,000 F. WAIVER OF SUBROGATION (To include): Is it included? ® Yes ❑ No G. SIGNED WORKERS' COMPENSATION EXEMPTION FORM: ® NIA ❑ Yes ❑ No H. NOTICE OF CANCELLATION: ❑ N/A IN Yes ❑ No ADDITIONAL COVERAGE'S THAT MAYBE REQUIRED IV. PROFESSIONAL LIABILITY V POLLUTION LIABILITY ® N/A ❑ Yes ❑ No V BUILDERS RISK M N/A ❑ Yes ❑ No G ■ Approved: eoAk 3/10/15 Agent of Alliant Insurance Services Date Broker of record for the City of Newport Beach RISK MANAGEMENT APPROVAL REQUIRED (Non- admitted carrier rated less than _; Self Insured Retention or Deductible greater than $ ) ❑ N/A ❑ Yes ❑ No Reason for Risk Management approval /exception /waiver: Approved: Risk Management * Subject to the terms of the contract.