Loading...
HomeMy WebLinkAbout3.0_ Ullman Sails Lofts Mixed-Use and Residential_PA2017-059CITY OF NEWPORT BEACH PLANNING COMMISSION STAFF REPORT July 20, 2017 Meeting Agenda Item No. 3 SUBJECT: Ullman Sails Lofts Mixed -Use and Residential (PA2017-059) SITE LOCATION: 410 and 412 29th Street • Coastal Development Permit No. CD2017-025 • Conditional Use Permit No. UP2017-005 • Minor Site Development Review No. SD2017-003 • Tentative Tract Map No. NT2017-001 (County Tentative Parcel Map No. 18108) APPLICANT: Berk Properties OWNER: Cannery Sail House, LP PLANNER: Makana Nova, Associate Planner (949) 644-3249, mnova@newportbeachca.gov PROJECT SUMMARY A coastal development permit, conditional use permit, minor site development review, and tentative tract map to demolish an existing 9,600 -square -foot commercial building and construct a new mixed-use structure with 1,145 square feet of retail/office floor area and one 2,360 square foot dwelling unit and construct three residential dwelling units ranging from 2,485 square feet to 2,515 square feet. A conditional use permit approval is necessary to reduce the required retail/office parking requirement by four spaces. A deviation of the subdivision design standards is necessary in conjunction with the tentative tract map to allow a lot width of less than 40 feet. RECOMMENDATION 1) Conduct a public hearing; 2) Find this project exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15332, Class 32 (Infill Development Projects) Projects) of the CEQA Guidelines, because it has no potential to have a significant effect on the environment; and 3) Adopt Resolution No. approving Coastal Development Permit No. CD2017-025, Conditional Use Permit No. UP2017-005, Minor Site Development Review No. SD2017-003, and Tentative Tract Map No. NT2017-001 (Attachment No. PC 1). 1 9 3 VICINITY MAP .m r — 410^`N412 Subject Property L 282 �� r `i 112 16 p GENERAL PLAN ZONING LOCATION GENERAL PL F ZONING CURRENT USE MU-H4(Mixed-Use MU-CV/15th St.(Mixed- ON-SITE Horizontal) Use Cannery Village/151h Vacant Commercial Street NORTH MU -H4 MU-CV/15'h St. at yard, Mixed-use develo ment SOUTH MU -H4 MU-CV/15th St. Retail and Mixed-use development EAST MU -H4 MU-CV/15th St. Retail and Mixed-use develo ment WEST CV (Visitor Serving CV (Commercial Visitor- Retail and Mixed-use Commercial Serving) development 3 INTRODUCTION Proiect Setting The project site is relatively flat and is developed with a vacant 9,600 -square -foot commercial building. The property is located in the Cannery Village neighborhood at the southwest intersection of 29th Street and Villa Way. The property consists of three lots totaling 7,686 square feet (0.18 acres). The project site is surrounded by a boat yard and mixed-use development to the north with retail and mixed-use development to the south, east, and west. Site photos are provided as Attachment No. PC 3. Background The existing 9,600 commercial building was originally constructed in 1948. The building was occupied by sail makers since 1960 and most notably by the Ullman Sails business since 1972. The building has been vacant or used for storage since 2012 when the business closed. Proiect Description The proposed project would demolish the existing 9,600 -square -foot commercial building and construct a new mixed-use building with 1,145 square feet of retail/office floor area and one 2,360 square foot dwelling unit on one lot and three residential dwelling units ranging from 2,485 square feet to 2,515 square feet on a second lot. The Municipal Code requires the following discretionary applications for the project: • Coastal Development Permit - to demolish the existing commercial building and construct a new mixed-use development (Lot 1) and 3 -unit condominium (Lot 2) in the Coastal Zone. • Conditional Use Permit - to reduce the non-residential parking requirement through a parking management program; the required on-site parking for the retail/office suites in the mixed-use building (Lot 1) would be reduced by four parking spaces. • Minor Site Development Review — to allow a mixed-use project involving one to four dwelling units and up to 9,999 square feet of nonresidential floor area. • Tentative Tract Map — to re -subdivide three existing lots into two lots and subdivide the buildings for condominium purposes (two commercial units and four residential units). A deviation of the subdivision design standards is necessary in conjunction with the tentative tract map to allow a lot width of less than 40 feet. As shown in the project renderings and the materials board (Attachment No. PC 4), the project design includes two buildings whose footprints encompass the bulk of the site with nonresidential parking and residential garages accessed from the adjacent alley. The 21 design incorporates building materials such as a painted white concrete masonry unit veneer, smooth white stucco, metal panel shed roofs, vertical wood siding, aluminum clad windows, and exposed steel that are consistent with other buildings in the CanneryVillage community and are reminiscent of the historical nautical and marine uses of the area. The building incorporates large rolling "barn style" doors at the fagade and a zero setback at the mixed-use entry along the 29th Street frontage to provide pedestrian connections to the street. The residential portion of the building provides modulation of the fagade along Villa Way by varying setbacks and floor levels and incorporating private patio areas at the first floor level. The existing unused driveway along Villa Way will be closed to create two additional on -street parking spaces. The applicant requests a four parking space reduction in the required parking for the retail/office component where five parking spaces are required. However, two additional on -street public parking spaces will be added with the closure of the Villa Way curb cut, which will help to off -set customer and employee parking demands. Street parking is generally available throughout the Cannery Village neighborhood and a City metered parking facility is available one block to the north at 426 30th Street. All required parking garages and carports for the residential component are provided on-site, are readily accessible from the rear alley, and are screened from Villa Way by the proposed building. Lot 1 (north) is 2,443 square feet in gross floor area and Lot 2 (south) is 5,244 square feet in area. The tentative tract map will combine three lots into two lots and authorize the commercial tenants and residential dwelling units to be sold as condominiums. The Tentative Parcel Map is provided as Attachment No. PC 7 and the project plans are provided as Attachment No. PC 8. The applicant's project description (Attachment No. PC 5) summarizes the applicant's intent to develop a mixed-use (retail/office and 1 residential unit) project on Lot 1 and a 3 -unit condominium development on Lot 2. General Plan Land Use The General Plan Land Use Element designates the site as MU -H4 (Mixed -Use Horizontal), which is intended to establish the character of a distinct and cohesively developed district or neighborhood containing multi -family residential with clusters of mixed-use and/or commercial buildings. Mixed-use or commercial buildings are required on parcels at street intersections and are permissible, but not required on interior parcels. Development of the site will be consistent with General Plan policies as discussed below. The proposed mixed-use development at the corner parcel and multi -family residential development at the interior parcel are consistent with the land use intent for the subject properties. The project complies with the FAR limitations for mixed-use development and multi -unit residential development (0.5 FAR maximum for nonresidential component, 1.0 FAR maximum for residential component of mixed-use, and 1.5 maximum for multi -unit residential). 5 General Plan Policies The following General Plan policies are pertinent to the proposed project: 1. LU 3.3 Opportunities for Change Provide opportunities for improved development and enhanced environments for residents in the following districts and corridors, as specified in Polices 6.3.1 through 6.22.7: ...Balboa Peninsula: ... re -use interior parcels in Cannery Village for residential and limited mixed-use and live/work buildings; and redevelop underperforming properties outside of the core commercial districts along the Balboa Boulevard corridor for residential. Infill development shall be designed and sited to preserve the historical and architectural fabric of these districts. 2. Cannery Village Goal LU 6.10 A pedestrian -oriented residential neighborhood that provides opportunities for live/work facilities and supporting retail uses. 3. LU 6.10.1 Priority Uses Allow multi -family residential and mixed-use buildings that integrate residential above retail or live -work units throughout Cannery Village. Require mixed-use, live -work, or commercial buildings to be developed on corner parcels. (Imp 2.1) DESIGN AND DEVELOPMENT 4. LU 5.3.6 Parking Adequacy and Location Require that adequate parking be provided and is conveniently located to serve tenants and customers. Set open parking lots back from public streets and pedestrian ways and screen with buildings, architectural walls, or dense landscaping. (Imp 2.1) The proposed development matches the priority uses for the Cannery Village area by providing a mixed-use development on the corner parcel with multi -family residential units on the interior parcel. The retail/office uses are intended to serve local residents and will provide a visitor -serving use to the community. The residential dwelling units will further support the retail/office uses and provide a customer base in the neighborhood. The design of the buildings complement the marine and nautical character of the area, which is evocative of the prior sail loft building. All required parking garages and carports for the residential component are provided on- site, are readily accessible from the rear alley, and are screened from Villa Way by the proposed building. Adequate parking will be provided to serve the retail/office tenants and customers where a four -parking space reduction is necessary for the retail/office component. Overall, the project reduces the nonresidential parking demand on the surrounding streets compared to the existing building on-site. The project adds two additional on -street public parking spaces, street parking is generally available throughout the Cannery Village neighborhood, and two City metered parking facilities are available in the area. N Additional discussion related to project compliance with other applicable General Plan policies is included in California Environmental Quality Act (CEQA) Categorical Exemption determination (Attachment No. PC 6). Consistency with the Zoning Code The subject property is located within the Mixed -Use Cannery Village/15th Street (MU- CV/151h St) Zoning District, where it is intended to establish a cohesively developed district or neighborhood containing multi -unit residential dwelling units with clusters of mixed-use and/or commercial structures on interior lots of Cannery Village. Mixed-use or nonresidential structures are required on lots at street intersections and are allowed, but not required, on other lots. Pursuant to Section 20.22.020 (Mixed -Use Zoning Districts Land Uses and Permit Requirements), retail/office uses and residential dwelling units are permitted uses in this Zoning district as configured with the mixed-use development at the street intersection and the residential development on the interior parcel. Pursuant to Section 20.22.020 (Mixed -Use Zoning Districts Land Uses and Permit Requirements), retail/office uses and multi -unit residential dwelling units are permitted in the MU-CV/15th St. zoning district. The proposed mixed-use and residential development complies with the development standards, as shown in the following table: Table 1 -Zoning Compliance Development Required Proposed Standards Lot Size 5,000 square feet minimum for newly Lot 1: 2,443 square feet ( 0.06 acres) created lots Lot 2: 5,244 square feet 0.12 acres Lot Width 40 feet Lot 1: 30 feet* Lot 2: 57.27 Setbacks Front 0 feet 0 feet Side 0 abutting nonresidential 0 feet Rear 10 feet 10 feet 75 square feet of common area per dwelling unit= 300 square feet 334 square feet of common area Open Space required 5% of gross floor area of private area 426-491 square feet of private area per = 126 to 145 square feet per dwelling unit dwelling unit 15 spaces total: • Multi -Unit Dwellings- 4 units or more: 2 per unit covered, 11 spaces total on-site, 2 on -street spaces plus 0.5 space per unit for 0 Multi -Unit Dwellings - 8 unit spaces guest parking, 4 units = 8 and 2 guest spaces Parking unit spaces and 2 guest 0 Retail/Office —1 handicap space .* parking spaces a On -Street Public Parking - 2 spaces • Retail/Office — 1 per 250 added square feet, 1,145 square feet/250 = 5 spaces 7 Table 1 -Zoning Compliance Development Required Proposed Standards 0.25-0.50 FAR nonresidential portion 0.47 FAR nonresidential portion of mixed - Floor Area of mixed-use use Ratio 1.0 FAR for residential portion of 0.97 FAR residential portion of mixed use mixed-use 1.43 FAR residential only 1.5 FAR for residential only 26 feet for flat roofs or parapet walls 31 feet to ridge of sloped roofline Height 31 feet for sloped roofs Nonresidential: Solid Waste 16 square feet refuse and Recyclable 16 square feet recycling Nonresidential: 36 square feet Materials 32 square feet total Residential: 53 square feet Residential: No requirement for 4 or fewer multi -unit residential units <500 square feet of landscaping Landscaping exempt from the requirements of 200 square feet Chapter 14.17 (Water -Efficient Landscaping) Deviation of design standards to waive the minimum lot width for Lot 1 requested under the Tentative Tract Map application * CUP request to reduce the retailloffice parking requirement by four parking spaces Coastal Development Permit The California Coastal Act of 1976 (Coastal Act) was adopted to protect and enhance the resources of the coastal zone. Implementation of Coastal Act policies is accomplished primarily through the preparation of a Local Coastal Program (LCP), reviewed and certified by the California Coastal Commission (Coastal Commission). The City's LCP was certified by Coastal Commission and became effective on January 13, 2017. The Coastal Act and the certified LCP require that development in the coastal zone obtain a coastal development permit, unless the development is exempt or categorically excluded from permit requirements. A coastal development permit shall conform to the applicable sections of the certified LCP. Land Use and Development Standards The City's certified LCP consists of Coastal Land Use Plan (CLUP) and the Implementation Plan (IP). The land use policies of the CLUP and the development regulations of the IP are consistent with those of the General Plan and Zoning Code, respectively. As discussed earlier, the proposed project is consistent with these policies and regulations and are therefore consistent with those of the certified LCP. 0 ►:gym The certified LCP requires development to be sited and designed to minimize risk to life and property in hazardous areas. The finish floor elevation of the proposed dwelling is 9.00 feet (NAVD 88), which complies with the minimum 9.00 feet (NAVD88) elevation standard. The property is located in an area known for the potential of seismic activity and liquefaction. All projects are required to comply with the California Building Code (CBC) and Building Division standards and policies. Geotechnical investigations specifically addressing liquefaction are required to be reviewed and approved prior to the issuance of building permits. Permit issuance is also contingent on the inclusion of design mitigation identified in the investigations. Construction plans are reviewed for compliance with approved investigations and CBC prior to building permit issuance. Water Quality The certified LCP requires development to protect the water quality of the bay and adjacent natural habitats. The property is not located within 200 feet of coastal waters. The project design addresses water quality with a construction erosion control plan and a post -construction drainage system. The project is required to adhere to the City's grading, erosion control, and drainage requirements that include percolation features and retention of dry weather and minor rain event run-off on-site. Any water not retained on-site is directed to the City's storm drain system. Pursuant to Municipal Code Section 21.35.050 (Water Quality and Hvdroloqv Plan), since the project area replaces more than 5,000 square feet of impervious surface area on an already developed site, a Water Quality Management Plan (WQMP) is required. The WQMP has been reviewed by the City's Engineer Geologist. The WQMP includes a project description, potential stormwater pollutants, post -development drainage characteristics, Low Impact Development (LID), best management practices (BMP) selection and analysis, structural and non-structural source control BMPs, site design, and drainage, GIS coordinates for LID and Treatment Control BMPs, and a long term operation and maintenance plan. Construction plans will be reviewed for compliance with the approved WQMP prior to building permit issuance. Public Access The certified LCP requires development not to interfere with the public's right of access to the shoreline. The project site is not located between the nearest public road and the sea or shoreline; the project will not affect the public's ability to gain access to, use, and/or view the coast and 0 nearby recreational facilities. Vertical access to the bay front is available near the project site at the street end of 29th Street, 30th Street, and Villa Way. The project includes one American's with Disabilities Act (ADA) nonresidential parking space where a total of five parking spaces are required under the Zoning Code. Local Coastal Program Section 21.40.1 10.D (Impact to Coastal Access Prohibited) prohibits a reduction in required off-street parking that impacts public parking available for coastal access. The reduction will not significantly impact the supply of parking available for coastal access. The project results in a net decrease in nonresidential parking demand on the street where the current parking demand is 39 spaces and the proposed nonresidential parking demand on the street will be four parking spaces. Additionally, the project will add two public street spaces to the parking supply in the area, street parking is available throughout the Cannery Village area, and there are two municipal parking lots within the vicinity of the project site. The nearest shoreline (Rhine Channel) is primarily a navigation channel with little recreational and visual value. The nearest sandy beach is over 1,000 feet away, which is served by public parking that is closer and more convenient to beach goers than the public parking in Cannery Village. The design, bulk and scale of the development is consistent with the existing neighborhood pattern of development and expected future development. The project meets all development standards of the certified LCP. The property is not located near designated Public View Points or Coastal View Roads and will not impact public coastal views. Parking Modification The existing commercial building requires 39 parking spaces where there is currently no parking on-site. Under the proposed project, 11 of 15 required parking spaces are provided on-site with two on -street public parking spaces added adjacent to the project. A waiver in the off-street parking requirement of four on-site parking spaces is necessary under the Zoning Code requirements. However, the development results in a net reduction in parking demand compared to the existing use. The Table 2 below provides a summary of required parking: Table 2. Code Required Parking Existing Retail Parking Demand (1/250 sq ft of GFA) 39 Proposed Project Code Requirement 15 On -Site Parking Provided 11 Additional Spaces Required 4 On Street Parking Added 2 10 Parking Management Plan A parking management plan is necessary to mitigate impacts associated with a reduction in the number of required parking spaces. The applicant requests a four parking space reduction in the required parking for the retail/office component where five parking spaces are required. In accordance with Section 20.40.110 (Adjustments to Off -Street Parking Requirements), the Planning Commission must also consider whether sufficient data is provided to indicate that parking demand will be less than the required number of spaces or that other parking is available (e.g. City parking lot located nearby, on -street parking available, greater than normal walk-in trade, mixed-use development) in conjunction with a parking management plan. The following conditions are applicable to the proposed project, which reduce the overall parking demand of the proposed retail/office development: • On -Street Parking Available. Cannery Village contains on -street parking along 29' Street and Villa Way that is available to patrons. The proposed project will also add two on -street parking spaces with the closure of the existing driveway along Villa Way. Land uses in Cannery Village are within close proximity of one another generate the opportunity for shared trips. • Promoting pedestrian and bicycle access to the subject property to limit the impact on off-street parking. Cannery Village is characterized by a higher level of pedestrian and bicycle traffic than other areas of the city. • Municipal Parking Facilities Nearby. There are two municipal parking facilities available in the area. The first is the metered City lot at 426 30th Street located one block to the north of the subject property. The second is the metered City lot at the intersection of 30th Street and Newport Boulevard located two blocks to the west. The proximity of these parking facilities provides the opportunity for patron parking in the area. • Residential Parking Provided On-site. All required parking garages and carports for the residential component are provided on-site, are readily accessible from the rear alley, and are screened from Villa Way by the proposed building. As discussed above, the proposed project incorporates a variety of features to ensure neighborhood compatibility. In a dense mixed-use environment with multiple uses within close proximity, each building may not need a full supply of parking. The location of land uses within walking distance of one another generates the opportunity for shared trips and there is a component of walk-in patronage from nearby areas. The retail/office uses would be compatible with the surrounding uses and parking demand would be lower due to shared trips. The proposed retail/office uses are consistent with the City's goals and 11 objectives for Cannery Village. Staff recommends approval of the reduction of required off-street parking. Conditional Use Permit The requested reduction in the parking requirement requires the approval of a conditional use permit in accordance with Section 20.40.110 (Adjustments to Off -Street Parking Requirements). Pursuant to Section 20.52.020.F (Findings and Decision) of the Newport Beach Municipal Code, the Planning Commission must make the following findings in order to approve a conditional use permit: 1. The use is consistent with the General Plan and any applicable specific plan. 2. The use is allowed within the applicable zoning district and complies with all other applicable provisions of the Zoning Code and the Municipal Code. 3. The design, location, size, and operating characteristics of the use are compatible with the allowed uses in the vicinity. 4. The site is physically suitable in terms of design, location, shape, size, operating characteristics, and the provision of public and emergency vehicle (e.g., fire and medical) access and public services and utilities. 5. Operation of the use at the location proposed would not be detrimental to the harmonious and orderly growth of the City, or endanger, jeopardize, or otherwise constitute a hazard to the public convenience, health, interest, safety, or general welfare of persons residing or working in the neighborhood of the proposed use. As demonstrated in the draft resolution (Attachment No. PC 1), staff believes the findings for approval can be made. The proposed project consists of the development of a new mixed-use structure and adjacent 3 -unit residential building consistent with the City's General Plan land use designation MU -H4 (Mixed -Use Horizontal) and Zoning designations MU-CV/15th St (Mixed -Use Cannery Village/15th Street) as it provides multi -unit dwellings on interior parcels and a mixed-use structure at the street intersection. The retail/office uses would be compatible with the surrounding uses and parking demand would be lower due to shared trips in Cannery Village. The applicant requests a four parking space reduction in the required parking for the retail/office component where five parking spaces are required. Street parking is generally available throughout the Cannery Village neighborhood and two City metered parking facilities are available at 426 30th Street and the intersection of 30th Street and Newport Boulevard. All required parking garages and carports for the residential component are provided on-site, are readily accessible from the rear alley, and are screened from Villa Way by the proposed building. The site has pedestrian and vehicular access along Villa Way and 29th Street and vehicle access from the alley will be constructed pursuant to City Standards and reviewed and approved by the Public Works Department. The proposed site design includes the provision of emergency vehicle access and public services and utilities. The proposed use is similar to and compatible with other uses in Cannery Village, and would not be 12 detrimental to the abutting residential uses due to the retail/office nature of the businesses and location of the buildings on-site. Minor Site Development Review Pursuant to Section 20.52.080 (Site Development Review), a Minor Site Development Review is required for mixed-use projects involving one to four dwelling units and up to 9,999 square feet of nonresidential floor area to ensure a quality project with respect to consistency with the General Plan polices, the physical characteristics of the site, and minimizing potential negative visual impacts. The Planning Commission must make the following findings in order to approve a Minor Site Development Review: 1. Allowed within the subject zoning district; 2. In compliance with all of the applicable criteria [below]: i. Compliance with this section, the General Plan, this Zoning Code, any applicable specific plan, and other applicable criteria and policies related to the use or structure; ii. The efficient arrangement of structures on the site and the harmonious relationship of the structures to one another and to other adjacent developments; and whether the relationship is based on standards of good design; iii. The compatibility in terms of bulk, scale, and aesthetic treatment of structures on the site and adjacent developments and public areas; iv. The adequacy, efficiency, and safety of pedestrian and vehicular access, including drive aisles, driveways, and parking and loading spaces; v. The adequacy and efficiency of landscaping and open space areas and the use of water efficient plant and irrigation materials; and vi. The protection of significant views from public right(s)-of-way and compliance with Section 20.30. 100 (Public View Protection); and 3. Not detrimental to the harmonious and orderly growth of the City, nor endangers, jeopardizes, or otherwise constitutes a hazard to the public convenience, health, interest, safety, or general welfare of persons residing or working in the neighborhood of the proposed development. As demonstrated in the draft resolution (Attachment No. PC 1), staff believes the findings for approval can be made. The proposed development matches the priority uses for the Cannery Village area by providing a mixed-use development on the corner parcel with a residential dwelling and office unit over retail and multi -family residential units on the interior parcel. The proposed design would provide for harmonious relationships with one another and with the adjacent surroundings through site layout and positioning of the two buildings. The building scale and architectural style is reminiscent of the existing Ullman Sails building currently on-site. The project site is 0.18 acres in area (7,686.32 square feet) and is generally flat to accommodate redevelopment of the site. The lots would be re -subdivided from three legal 13 lots into two lots with a minor adjustment in the lot widths to accommodate the required parking widths. The proposed buildings would comply with the sloped height limit at 31 feet in height, comply with all setback requirements, and include a common space corridor to separate the buildings. The buildings would be constructed with building materials that are consistent with other buildings in the Cannery Village community and are reminiscent of the previous nautical and marine uses of the area. The building is located adjacent to the street frontage and forms a continuous building wall, improving the pedestrian connection with the street. Two dwelling units provide fenced in patio areas with water -efficient landscaping along the Villa Way frontage. Each unit provides ample private open space areas and a common corridor/patio is provided between units at the first floor level. The mechanical equipment and trash areas are proposed in appropriate locations to be screened from view. Development of the project site does not impact any coastal views or corridors identified in the General Plan or certified LCP. The project has been conditioned to ensure the uses are not detrimental to the harmonious and orderly growth of the City and would not pose a hazard to the general welfare of persons residing or working in the surrounding neighborhood. Tentative Tract Map A Tentative Parcel Map application is requested for the resubdivision of three lots into two lots and for condominium purposes. Lot 1 would be 2,443 square feet and contain the mixed-use building consisting of one 557 -square -foot retail unit, one 588 -square -foot office unit and one 2,360 -square -foot dwelling unit. Lot 2 would be 5,244 square feet in area and contain three condominium dwelling units totaling 7,516 square feet. In accordance with Section 19.12.070 (Required Findings for Action on Tentative Maps), the Planning Commission must make the following findings for approval of a tentative tract map: 1. That the proposed map and the design or improvements of the subdivision are consistent with the General Plan and any applicable specific plan, and with applicable provisions of the Subdivision Map Act and this Subdivision Code; 2. That the site is physically suitable for the type and density of development; 3. That the design of the subdivision or the proposed improvements are not likely to cause substantial environmental damage nor substantially and avoidably injure fish or wildlife or their habitat. However, notwithstanding the foregoing, the decision making body may nevertheless approve such a subdivision if an environmental impact report was prepared for the project and a finding was made pursuant to Section 21081 of the California Environmental Quality Act that specific economic, social or other considerations make infeasible the mitigation measures or project alternatives identified in the environmental impact report; 4. That the design of the subdivision or the type of improvements is not likely to cause serious public health problems; In 5. That the design of the subdivision or the type of improvements will not conflict with easements, acquired by the public at large, for access through or use of property within the proposed subdivision. In this connection, the decision making body may approve a map if it finds that alternate easements, for access or for use, will be provided and that these easements will be substantially equivalent to ones previously acquired by the public. This finding shall apply only to easements of record or to easements established by judgment of a court of competent jurisdiction and no authority is hereby granted to the City Council to determine that the public at large has acquired easements for access through or use of property within a subdivision; 6. That, subject to the detailed provisions of Section 66474.4 of the Subdivision Map Act, if the land is subject to a contract entered into pursuant to the California Land Conservation Act of 1965 (Williamson Act), the resulting parcels following a subdivision of the land would not be too small to sustain their agricultural use or the subdivision will result in residential development incidental to the commercial agricultural use of the land; 7. That, in the case of a "land project" as defined in Section 11000.5 of the California Business and Professions Code: (1) There is an adopted specific plan for the area to be included within the land project; and (2) the decision making body finds that the proposed land project is consistent with the specific plan for the area; 8. That solar access and passive heating and cooling design requirements have been satisfied in accordance with Sections 66473.1 and 66475.3 of the Subdivision Map Act; 9. That the subdivision is consistent with Section 66412.3 of the Subdivision Map Act and Section 65584 of the California Government Code regarding the City's share of the regional housing need and that it balances the housing needs of the region against the public service needs of the City's residents and available fiscal and environmental resources, 10. That the discharge of waste from the proposed subdivision into the existing sewer system will not result in a violation of existing requirements prescribed by the Regional Water Quality Control Board; and 11. For subdivisions lying partly or wholly within the Coastal Zone, that the subdivision conforms with the certified Local Coastal Program and, where applicable, with public access and recreation policies of Chapter Three of the Coastal Act. Staff believes the findings for approval can be made, as demonstrated in the draft resolution (Attachment No. PC 1). The project is consistent with the General Plan, Zoning Code, certified LCP, and Subdivision Code. The Public Works Department has reviewed the proposed tentative tract map and has concluded that it is consistent with the Subdivision Code, and conditions of approval will be included to ensure compliance with applicable requirements. The 0.18 -acre site is trapezoidal in shape, has a slope of less than 20 percent, and is within an area known for the potential of seismic activity and liquefaction. All projects are required to comply with the California Building Code (CBC) and Building Division standards and policies. Geotechnical investigations specifically addressing liquefaction are required to be reviewed and approved prior to the issuance of building 15 permits. The proposed mixed-use building and adjacent residential units would comply with the maximum FAR (0.25 to 0.5 FAR for nonresidential component & 1.0 FAR for residential component of mixed-use, and 1.5 FAR for residential only). The site is suitable for the type and density of development proposed in that the infrastructure serving the site and surrounding area has been designed and developed to accommodate the proposed project. The proposed project is not located near a fish or wildlife habitat and the design of the subdivision will not cause substantial damage to habitat. The site is developed in a highly urbanized area and no significant natural resources exist in the area of the project site. The design of the development will not conflict with any easements acquired by the public at large for access through or use of property within the proposed development as there are no public access easements that are located on the property. Sufficient site access is provided with the proposed parcel map. No backbone facilities (i.e., master -planned roads and/or utilities) will be required to accommodate the proposed project and the existing 8 - inch domestic water main at the alley is more than adequate to handle the increased demand of the proposed development. The project will contribute to the City's share of the regional housing need by adding four new dwelling units as identified in the General Plan. Appropriate conditions of approval are required including the closure of the existing curb cut along Villa Way and the addition of two new street parking spaces, new ADA compliant curb ramps, individual water and sewer connections for each condominium unit, and the dedication of a 10 -foot radius corner cut-off for street purposes at the corner of 29th Street and Villa Way. In accordance with Section 19.24.130 (Deviation from Design Standards), a deviation of the design standards is required to allow a lot width of less than 40 feet as required by the MU- CV/15th Street Zoning District development standards. The Planning Commission must make the following findings for a deviation from the design standards: 1. The requested deviation(s) will create a land plan or development design equal or superior to that under the baseline design standards in this chapter, - 2. The deviation(s) will not negatively impact the carrying capacity of the local vehicular circulation network; 3. The deviation(s) will not negatively impact pedestrian circulation; 4. The resulting subdivision will be compatible with the pattern of surrounding subdivisions; 5. The resulting subdivision design and improvements will be consistent with the General Plan and any applicable specific plan, and will conform to the Subdivision Map Act and all other provisions of this Subdivision Code; and 6. The resulting subdivision design and improvements will not be materially detrimental to the residents or tenants of the proposed subdivision or surrounding properties, nor to public health or safety. The requested deviation results in a superior design to accommodate the development of the site. The modification of the underlying lot configuration does not negatively impact vehicular or pedestrian circulation on-site or in the surrounding subdivision. The proposed 10 lot widths are compatible with surrounding development and are modified slightly (1 -foot) from the underlying lot pattern in order to accommodate the required parking dimensions for each building. The proposed project results in two parcels that would be developed in accordance with the land uses identified by the General Plan and Zoning Map where mixed-use development is located on the corner parcel and residential development is located at interior parcel. The subdivision design and improvements will conform to all other requirements of the Subdivision Map Act and Subdivision Code and the improvements will not be detrimental to residents or tenants in the Cannery Village Community. The proposed project will add two new retail/office tenants and provide residents as a customer base to support existing retail and service uses in the neighborhood. Summary The proposed project would result in the redevelopment of an under-utilized and aging commercial lot with a mixed-use and residential project that implements the goals and policies for Cannery Village. The project successfully improves the transition from commercial uses to residential uses within the Cannery Village neighborhood and reduces the overall commercial parking demand on streets in the area. The project exhibits high quality architectural treatment of the building. The requested lot configuration is appropriate given the development pattern in Cannery Village and the parking width constraints of the project site. The development is also compatible with the surrounding neighborhood in terms of bulk and scale. Altarnafivas 1. The Planning Commission may suggest specific project modifications or operational changes that are necessary to alleviate concerns. If the changes are substantial, the item should be continued to a future meeting to allow redesign of the project. 2. If the Planning Commission believes that there are insufficient facts to support the findings for approval, the Planning Commission should deny the application request (Attachment No. PC 2). Environmental Review The project is categorically exempt under Section 15332, of the California Environmental Quality Act (CEQA) Guidelines - Class 32 (Infill Development Projects) Projects). This exemption applies to in -fill development projects in urban areas that are consistent with the General Plan and applicable development standards. In addition, the proposed development must occur on a site of no more than five acres, have no value as habitat for endangered, rare or threatened species, be adequately served by all utilities and public services, and must not result in any significant effects relating to traffic, air quality, 17 water quality, or any other significant effect on the environment due to an unusual circumstance. The proposed project site is 0.18 acres in size, is located within an urban area, and can be adequately served by all required utilities and public services. The project is consistent with the General Plan designations and policies, and can be found consistent with all applicable zoning regulations upon approval of the requested applications. A geotechnical report, preliminary Water Quality Management Plan, and water/waste-water generation memorandum have been prepared. An analysis of the currently vacant property indicates that the project site and adjacent areas have no value as habitat for endangered, rare, or threatened species. The project is expected to have a less than significant impacts related to traffic, noise, air quality, and water quality. A more detailed analysis and determination supporting the Class 32 exemption is attached as Attachment No. PC 6. Public Notice Notice of this hearing was published in the Daily Pilot, mailed to all owners of property within 300 feet of the boundaries of the site (excluding intervening rights-of-way and waterways) including the applicant and posted on the subject property at least 10 days before the scheduled meeting, consistent with the provisions of the Municipal Code. Additionally, the item appeared on the agenda for this meeting, which was posted at City Hall and on the City website. Prepared by: Submitted by: Maka a Nova Associate Planner ATTACHMENTS PC 1 Draft Resolution with Findings and Conditions PC 2 Draft Resolution for Denial PC 3 Site Photos PC 4 Project Renderings and Materials Board PC 5 Applicant's Project Description PC 6 Class 32 CEQA exemption PC 7 Tentative Tract Map PC 8 Project plans :\Users\PLN\Shared\PA's\PAs - 2017\PA2017-059\PC\PA2017-059 PC Rpt.docxw18116 M Attachment No. PC 1 Draft Resolution with Findings and Conditions 19 20 RESOLUTION NO. #### A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF NEWPORT BEACH APPROVING COASTAL DEVELOPMENT PERMIT NO. CD2017-025, CONDITIONAL USE PERMIT NO. UP2017-005, MINOR SITE DEVELOPMENT REVIEW NO. SD2017-003, AND TENTATIVE TRACT MAP NO. NT2017-001 FOR A MIXED-USE STRUCTURE (RETAIL/OFFICE AND ONE RESIDENTIAL DWELLING UNIT) AND THREE RESIDENTIAL DWELLING UNITS LOCATED AT 410 AND 412 29TH STREET (PA2017-059) THE PLANNING COMMISSION OF THE CITY OF NEWPORT BEACH HEREBY FINDS AS FOLLOWS: SECTION 1. STATEMENT OF FACTS. 1. An application was filed by Berk Properties (Applicant), with respect to property located at 410 and 412 29th Street, and legally described as Lots 17, 18, and 19 of Block 225 of the Landscasters Addition of Newport Beach. 2. The Applicant requests a coastal development permit, conditional use permit, minor site development review, and tentative tract map to demolish an existing 9,600 -square -foot commercial building to construct: (1) a new mixed-use structure with 1,145 square feet of retail/office floor area and one 2,360 square foot dwelling unit; and (2) three residential dwelling units ranging from 2,485 square feet to 2,515 square feet. A conditional use permit approval is necessary to reduce the required retail/office parking requirement by four spaces. A deviation of the subdivision design standards is necessary in conjunction with the tentative tract map to allow a lot width of less than 40 feet. 3. The subject property is located within the MU-CV/15th St. (Mixed -Use Cannery Village/15th Street) Zoning District and the General Plan Land Use Element category is MU -H4 (Mixed - Use Horizontal). 4. The subject property is located within the coastal zone. The Coastal Land Use Plan category is MU-CV/15th St. (Mixed -Use Cannery Village/15th Street). 5. A public hearing was held on July 20, 2017 in the Council Chambers located at 100 Civic Center Drive, Newport Beach. A notice of time, place and purpose of the public hearing was given in accordance with the Newport Beach Municipal Code (NBMC). Evidence, both written and oral, was presented to, and considered by, the Planning Commission at this public hearing. SECTION 2. CALIFORNIA ENVIRONMENTAL QUALITY ACT DETERMINATION. 1. This project has been determined to be categorically exempt under the requirements of the California Environmental Quality Act (CEQA) under Class 32 (Infill Development 21 Planning Commission Resolution No. #### Paqe 2 of 27 Projects). This exemption applies to in -fill development projects in urban areas that are consistent with the General Plan and applicable development standards. In addition, the proposed development must occur on a site of no more than five acres, have no value as habitat for endangered, rare or threatened species, be adequately served by all utilities and public services, and must not result in any significant effects relating to traffic, air quality, water quality, or any other significant effect on the environment due to an unusual circumstance. 2. An analysis and exemption determination was prepared for this project. CEQA Class 32 consists of projects characterized as in -fill development meeting the conditions described above. The project site is 0.18 acres in size, is located within an urban area, and can be adequately served by all required utilities and public services. Potential development of the project site was considered and analyzed in the City's 2006 General Plan Environmental Impact Report (EIR) for potential environmental impacts. Based on that analysis, there is no reasonable probability that the project will have a significant effect on the environment due to unusual circumstances, nor will the project result in any short-term or long-term impacts that were not previously considered in the Newport Beach General Plan and General Plan EIR. Implementation of the project will not result in any adverse effects on sensitive biological resources, traffic, air quality, noise or water quality. The project is consistent with the General Plan designations and policies, and can be found consistent with all applicable zoning regulations upon approval of the requested applications. A geotechnical report, preliminary Water Quality Management Plan, and water/waste-water generation memorandum have been prepared. An analysis of the currently vacant property indicates that the project site and adjacent areas have no value as habitat for endangered, rare, or threatened species. The project is expected to have less than significant impacts related to traffic, noise, air quality, and water quality. The project site does not exceed five acres in area, is located in an urban area, and can be adequately served by all required utilities and public services. Therefore, the project meets all of the conditions described above for in -fill development and qualifies for a Class 32 exemption. SECTION 3. REQUIRED FINDINGS. Coastal Development Permit A coastal development permit is required to allow nonresidential development within the coastal zone. In accordance with NBMC Section 21.52.015(F) (Coastal Development Permits, Findings and Decision), the following findings and facts in support of such findings are set forth: Finding: A. Conforms to all applicable sections of the certified Local Coastal Program. Facts in Support of Finding: 1. The development complies with applicable residential development standards including, but not limited to, floor area limitation, setbacks, height, and parking. 01-03-17 22 Planning Commission Resolution No. #### Page 3 of 27 a. The project complies with the FAR limitations for mixed-use development and multi- unit residential development (0.5 FAR maximum for nonresidential portion of the mixed-use component, 1.0 FAR maximum for residential component of mixed-use, and 1.5 maximum for residential). The project complies with 0.47 FAR for the non- residential portion of mixed-use, 0.97 FAR for the residential portion of mixed-use, and 1.43 FAR for the multi -family residential component. b. The development complies with the required setbacks, which are 0 feet along the front and side property lines and 10 feet along the rear property line abutting the alley. c. The highest guardrail is less than 26 feet from established grade and the highest ridge is approximately 31 feet from established grade, which comply with the maximum height requirements. d. The project includes residential garage and carport parking for a total of 10 vehicles, complying with the minimum two -car garage parking requirement for residential dwelling units and 0.5 space guest parking for residential units. e. The project includes one American's with Disabilities Act (ADA) nonresidential parking space where a total of five parking spaces are required under the Zoning Code. Local Coastal Program Section 21.40.110.D (Impact to Coastal Access Prohibited) prohibits a reduction in required off-street parking that impacts public parking available for coastal access. The reduction will not significantly impact the supply of parking available for coastal access. The project results in a net decrease in nonresidential parking demand on the street where the current parking demand is 39 spaces and the proposed nonresidential parking demand on the street will be four parking spaces. Additionally, the project will add two public street spaces to the parking supply in the area, street parking is available throughout the Cannery Village area, and there are two municipal parking lots within the vicinity of the project site. The nearest shoreline (Rhine Channel) is primarily a navigation channel with little recreational and visual value. The nearest sandy beach is over 1,000 feet away, which is served by public parking that is closer and more convenient to beach goers than the public parking in Cannery Village. 2. The neighborhood is predominantly developed with a mix of nonresidential uses, mixed- use structures, and multi -unit dwellings. The design, bulk, and scale of the development is consistent with the existing neighborhood pattern of development and expected future development. 3. The property is located in an area known for the potential of seismic activity and liquefaction. All projects are required to comply with the California Building Code (CBC) and Building Division standards and policies. Geotechnical investigations specifically addressing liquefaction are required to be reviewed and approved prior to the issuance of building permits. Permit issuance is also contingent on the inclusion of design mitigation identified in the investigations. Construction plans are reviewed for compliance with approved investigations and CBC prior to building permit issuance. 01-03-17 23 Planning Commission Resolution No. #### Paqe 4 of 27 4. The property is not located within 200 feet of coastal waters. A construction erosion control plan has been provided to implement temporary Best Management Practices (BMPs) during construction and minimize erosion and sedimentation and to minimize pollution of runoff and coastal waters derived by construction chemicals and materials. Pursuant to Municipal Code Section 21.35.050 (Water Quality and Hydrology Plan), since the project area replaces more than 5,000 square feet of impervious surface area on an already developed site, a Water Quality Management Plan (WQMP) is required. A WQHP prepared by CORE Structure Inc, dated May 15, 2017, has been reviewed by the City's Engineer Geologist. The WQMP includes a project description, potential stormwater pollutants, post -development drainage characteristics, Low Impact Development (LID) BMP selection and analysis, structural and non-structural source control BMPs, site design, and drainage, GIS coordinates for LID and Treatment Control BMPs, and a long term operation and maintenance plan. Construction plans will be reviewed for compliance with the approved WQMP prior to building permit issuance. The property is not located near designated Public View Points or Coastal View Roads and will not impact public coastal views. Finding: B. Conforms with the public access and public recreation policies of Chapter 3 of the Coastal Act if the project is located between the nearest public road and the sea or shoreline of any body of water located within the coastal zone. Fact in Support of Finding: The project site is not located between the nearest public road and the sea or shoreline; the project will not affect the public's ability to gain access to, use, and/or view the coast and nearby recreational facilities. Vertical access to the bay front is available near the project site at the street ends of 29"' Street, 30"' Street, and Villa Way. Conditional Use Permit A conditional use permit is required to reduce the on-site parking requirement. In accordance with NBMC Section 20.52.020(F) (Conditional Use Permit, Findings and Decision) of the Newport Beach Municipal Code, the following findings and facts in support of such findings are set forth: Finding C. The use is consistent with the General Plan and any applicable specific plan: 01-03-17 7 Planning Commission Resolution No. #### Paqe 5 of 27 Facts in Support of Finding 1. The General Plan Land Use Element designates the site as MU -H4 (Mixed -Use Horizontal), which is intended to establish the character of a distinct and cohesively developed district or neighborhood containing multi -family residential with clusters of mixed-use and/or commercial buildings. Mixed-use or commercial buildings are required on parcels at street intersections and are permissible but not required on other parcels. Development of the site will be consistent with General Plan policies as discussed below. The proposed mixed-use development at the corner parcel and multi- family residential development at the interior parcel are consistent with the land use intent for the subject properties. 2. Land Use Policy LU6.10.1 (Priority Uses) allows multi -family residential and mixed-use buildings that integrate residential above retail or live -work units throughout Cannery Village. Mixed-use, live -work, or commercial buildings are required on corner parcels. The proposed development matches the priority uses for the Cannery Village area by providing a mixed-use development on the corner parcel with multi -family residential units on the interior parcel. The retail/office uses are intended to serve local residents and will provide a visitor -serving use to the community. The residential dwelling units will further support the retail/office uses and provide a customer base in the neighborhood. The design of the buildings complement the marine and nautical character of the area, which is evocative of the prior sail loft building on-site. 3. Land Use Policy 5.3.6 (Parking Adequacy and Location) requires adequate parking be provided and that it is conveniently located to serve tenants and customers. All required parking garages and carports for the residential component are provided on-site, are readily accessible from the rear alley, and are screened from Villa Way by the proposed building. Adequate parking will be provided to serve the retail/office tenants and customers where a four parking space reduction is necessary for the retail/office component. Overall, the project reduces the nonresidential parking demand on the surrounding streets compared to the existing building on-site. The project adds two additional on -street public parking spaces, street parking is generally available throughout the Cannery Village neighborhood, and two City metered parking facilities are available in the area. 4. The subject properties are not part of a specific plan area. Finding D. The use is allowed within the applicable zoning district and complies with all other applicable provisions of this Zoning Code and the Municipal Code: Facts in Support of Finding 1. The proposed retail use on the ground floor and office and residential unit at the second floor level within the mixed-use component are consistent with the MU-CV/15th St zoning district. 01-03-17 2.5 Planning Commission Resolution No. #### Page 6 of 27 2. Multi -unit residential condominiums are permitted uses within the MU-CV/15th St zoning district along interior parcels as proposed. 3. A parking management plan is necessary to mitigate impacts associated with a four space reduction in the number of required parking spaces for the nonresidential portion of mixed-use where five parking spaces are required. The development results in a net reduction in parking demand compared to the existing use, street parking is available on the adjacent streets in Cannery Village, and two municipal parking facilities are available in the vicinity. 4. All required residential parking is provided on-site. Finding E. The design, location, size, and operating characteristics of the use are compatible with the allowed uses in the vicinity: Facts in Support of Finding 1. The project incorporates a variety of features to ensure neighborhood compatibility. The proposed retail/office portion of the mixed-use component are consistent with the City's goals and objectives for Cannery Village. The design incorporates building materials that are consistent with other buildings in the Cannery Village community and are compatible with the nautical and marine uses of the area. The mixed-use entry and residential structures along the 29th Street and Villa Way frontages are designed with a zero setback at to enhance pedestrian connections with the street frontage. 2. All residential parking is provided on-site. 3. In a dense mixed-use environment with multiple uses within close proximity, each building may not need a full supply of parking. The location of land uses within walking distance of one another generates the opportunity for shared trips and there is a component of walk-in patronage from nearby areas. The retail/office uses would be compatible with the surrounding uses and parking demand would be lower due to shared trips. 4. Cannery Village contains on -street parking along 29th Street and Villa Way that is available to patrons. The project will also add two on -street parking spaces with the closure of existing driveways along Villa Way. Land uses in Cannery Village are within close proximity of one another and would generate the opportunity for shared trips. 5. Cannery Village is characterized by a higher level of pedestrian and bicycle traffic than other areas of the city. 6. There are two municipal parking facilities available in the area. The first is the metered City lot at 426 30th Street located one block to the north of the subject property. The second is the metered City lot at the intersection of 30th Street and Newport Boulevard 01-03-17 20 Planning Commission Resolution No. #### Page 7 of 27 located two blocks to the west. The proximity of these parking facilities provides the opportunity for patron parking in the area. 7. The project has been reviewed and found to be compliant with the parking area requirements and landscaping standards as provided in Section 20.40.070 (Development Standards for Parking Areas) and the outdoor lighting standards in Section 20.30.070 (Outdoor Lighting). Finding F. The site is physically suitable in terms of design, location, shape, size, operating characteristics, and the provision of public and emergency vehicle (e.g., fire and medical) access and public services and utilities: Facts in Support of Finding 1. The parking configuration provides adequate vehicle access and parking spaces for patrons and residents. 2. Adequate public and emergency vehicle access, public services, and utilities are provided. 3. The development of the project site will comply with all Building, Public Works, and Fire Codes. All ordinances of the City and all conditions of approval will be complied with. Finding G. Operation of the use at the location proposed would not be detrimental to the harmonious and orderly growth of the City, or endanger, jeopardize, or otherwise constitute a hazard to the public convenience, health, interest, a safety, or general welfare of persons residing or working in the neighborhood of the proposed use. Facts in Support of Finding 1. The project has been reviewed and includes conditions of approval to ensure that potential conflicts with the surrounding land uses are minimized to the greatest extent possible. The project has been conditioned to provide two additional on -street public parking spaces. 2. The mixed-use and residential development will serve the surrounding residential and retail community. This will revitalize the project site and provide an economic opportunity for the property owner to improve the visual character of Cannery Village. Minor Site Development Review A minor site development review is required for the construction of a mixed-use project involving 1 to 4 dwelling units and up to a maximum of 9,999 square feet of gross floor area. 01-03-17 27 Planning Commission Resolution No. #### Paqe 8 of 27 In accordance with NBMC Section 20.52.080(F) (Site Development Review), the Planning Commission must also make the following findings for approval of a site development review: Finding: H. Allowed within the subject zoning district; Facts in Support of Finding: The property is located in the Mixed -Use Cannery Village/15th Street (MU-CV/15th St) Zoning District, where it is intended to establish a cohesively developed district or neighborhood containing multi -unit residential dwelling units with clusters of mixed-use and/or commercial structures on interior lots of Cannery Village. Mixed-use or nonresidential structures are required on lots at street intersections and are allowed, but not required, on other lots. The mixed-use development at the corner parcel and multi- family residential development at the interior parcel are consistent with the Zoning district for the subject properties. The subject property is not part of a specific plan area. Finding: In compliance with all of the applicable criteria [below].- a. below]. a. Compliance with this Section, the General Plan, this Zoning Code, any applicable specific plan, and other applicable criteria and policies related to the use or structure; b. The efficient arrangement of structures on the site and the harmonious relationship of the structures to one another and to other adjacent development, and whether the relationship is based on standards of good design; c. The compatibility in terms of bulk, scale, and aesthetic treatment of structures on the site and adjacent developments and public areas; d. The adequacy, efficiency, and safety of pedestrian and vehicular access, including drive aisles, driveways, and parking and loading spaces; e. The adequacy and efficiency of landscaping and open space areas and the use of water efficient plant and irrigation materials; and f. The protection of significant views from public right(s)-of-way and compliance with Section 20.30. 100 (Public View Protections); and Facts in Support of Finding: a-1. The mixed-use and multi -unit residential condominiums are permitted uses within the MU -H4 General Plan land use designation and MU-CV/15th St. zoning district. The 01-03-17 22 Planning Commission Resolution No. #### Paqe 9 of 27 development matches the priority uses for the Cannery Village area by providing a mixed-use development on the corner parcel with multi -family residential units on the interior parcel. a-2 As required by the Zoning Code, a conditional use permit has been requested for a parking management plan and subsequent reduction of four required parking for the nonresidential portion of the mixed-use development and a deviation of design standards has been requested to allow a lot width of less than 40 feet for the corner parcel to accommodate the required parking widths on the site. a-3. Land Use Policy LU6.10.1 (Priority Uses) allows multi -family residential and mixed-use buildings that integrate residential above retail or live -work units throughout Cannery Village. Mixed-use, live -work, or commercial buildings are required on corner parcels. The development matches the priority uses for the Cannery Village area by providing a mixed-use development on the corner parcel with multi -family residential units on the interior parcel. The retail/office uses are intended to serve local residents and will provide a visitor -serving use to the community. The residential dwelling units will further support the retail/office uses and provide a customer base in the neighborhood. The design of the buildings complement the marine and nautical character of the area, which is evocative of the prior sail loft building. a-4. The project is not located in a specific plan area. b-1. The mixed-use and residential components of the project are integrated as a unified development through the use of similar architectural style and design elements. The neighborhood is predominantly developed with a mix of retail/office and residential uses. The design would provide for harmonious relationships with one another and with the adjacent surroundings through site layout and positioning of the two buildings. Both the mixed-use and residential components of the project provide separate and well-defined entries. b-2. The mixed-use entry and residential structures along the 29th Street and Villa Way frontages are designed with a zero setback to enhance pedestrian connections with the street frontage. The residential portion of the building provides modulation of the fagade along Villa Way by varying setbacks at each floor level and incorporating adequate common and private open space areas in the form of large balconies, patio areas, and common corridor areas to provide a pleasant living environment. b-3. The project has been designed to improve the aesthetics of the site and improve the retail presence at the corner of 29th Street and Villa Way. b-4. Land Use Policy 5.3.6 (Parking Adequacy and Location) requires adequate parking be provided and that it is conveniently located to serve tenants and customers. All required parking garages and carports for the residential component are provided on-site, are readily accessible from the rear alley, and are screened from Villa Way by the proposed building. Adequate parking will be provided to serve the retail/office tenants and customers where a four parking space reduction is necessary for the retail/office 01-03-17 �9 Planning Commission Resolution No. #### Paqe 10 of 27 component. Overall, the project reduces the nonresidential parking demand on the surrounding streets compared to the existing building on-site. The project adds two additional on -street public parking spaces, street parking is generally available throughout the Cannery Village neighborhood, and two City metered parking facilities are available in the area. b-5. All mechanical equipment for the mixed-use and residential components would be screened within mechanical equipment enclosures at the lower levels or in designated equipment areas at the third floor deck area. c-1. The design, bulk, and scale of the development is consistent with the existing neighborhood pattern of development and expected future development. The unified design theme of the mixed-use and residential components of the project provides for an architectural consistency between these uses and other structures in the Cannery Village neighborhood. c-2 The size, density, and character of the residential dwelling units complement the existing land uses in the project area and include design elements consistent with Land Use Element Policy 5.1.9 (Character and Quality of Multi -Family Residential) that requires multi -family dwellings to be designed to convey a high quality architectural character. Consistent with this policy, the architectural treatment of the building includes high quality finishes and incorporates building materials such as large rolling style doors, a painted white concrete masonry unit (CMU) veneer, smooth white stucco, metal panel shed roofs, vertical wood siding, aluminum clad windows, and exposed steel that are consistent with other buildings in the Cannery Village community and are reminiscent of the nautical and marine uses of the area. c-3. The height and bulk of the mixed-use building is consistent in scale with other structures in the Cannery Village neighborhood. The front fagade of the mixed-use building utilizes a variation of building materials to provide enhanced visual relief. The residential building is located adjacent to the street frontage and forms a continuous building wall, improving the pedestrian connections with the adjacent streets, thereby implementing the General Plan policies to foster pedestrian activity within Cannery Village. The residential units are designed with both vertical and horizontal off -sets with patio areas at the ground level and pop -outs at the second floor level to provide visual interest along the Villa Way frontage. Likewise, the carports and garages located at the rear alley are consistent with the development pattern for the area and vary the building bulk from the second and third floor levels above. d-1. The parking garages and carports accessed from the rear are designed to maintain privacy for the residential tenants and protection from vehicular impacts. The project provides adequate setbacks at the rear alley and sight distance at the intersection of the alley and 29th Street, as determined by the City Traffic Engineer. d-2. The project would close an existing unused driveway along Villa Way, thereby increasing the number of on -street parking spaces along the project frontage from two spaces to a total of four spaces (two new spaces). 01-03-17 so Planning Commission Resolution No. #### Paqe 11 of 27 d-3. Each residential unit has separate and independent access to required garage and/or carport parking for the unit via the rear alley with direct interior access to their units. d-4. The project results in a total code required parking demand of 15 parking spaces (five spaces for the nonresidential retail/office floor area, eight residential parking spaces, and two residential guest parking spaces). All residential parking is provided on-site and the nonresidential component of the mixed-use component provides one ADA handicapped parking stall on-site. A waiver of four parking spaces is requested for the nonresidential portion of the mixed-use development. Overall, the nonresidential parking demand on the street has been reduced compared to the existing use, the presence of street parking in the area, the availability of two municipal parking lots in the neighborhood, and the pedestrian and bicycle character of the neighborhood make the waiver of four parking spaces compatible with the surrounding neighborhood. e-1. The project includes limited landscaped areas to soften the massing along 29th Street and provide additional common area amenities for the condominium units. e-2. The project is subject to the City's Water Efficient Landscape Ordinance (Chapter 14.17 of NBMC). e-3. The residential component of the project includes a common outdoor living corridor of 870 square feet that includes landscape planters, bicycle racks, and bench seating. In addition, each residential unit is afforded private outdoor living space in the form of large balconies and/or private patio areas at the ground level. f-1. The project location is not a designated coastal view road and is not considered a public view corridor. Finding: J. The proposed development is not detrimental to the harmonious and orderly growth of the City, or endanger jeopardize, or otherwise constitute a hazard to the public convenience, health, interest, safety, or general welfare of persons residing or working in the neighborhood of the proposed development. Facts in Support of Finding: 1. The project has been conditioned to ensure that potential conflicts with surrounding land uses are minimized to the extent possible to maintain a healthy environment for both businesses and residents. 2. The project provides separate screened trash enclosures for the mixed-use and residential components, which would be located at the rear of the project site near the parking areas. The size, design, location, and screening of the refuse enclosures comply with the requirements of NBMC Section 20.30.120 (Solid Waste and Recyclable Materials Storage), ensuring compatibility with the on-site and adjacent uses. 01-03-17 31 Planning Commission Resolution No. #### Paqe 12 of 27 3. The project is subject to the City's Outdoor Lighting requirements contained with NBMC Section 20.30.070 of the Zoning Code. 4. Mechanical equipment would be fully screened and would not be visible from the adjacent streets. All mechanical equipment for the mixed-use and multi -unit residential components would be screened within mechanical equipment enclosures at the lower levels or in designated equipment areas at the third floor deck area. 5. Tenant improvements to the new retail/office portion of the mixed-use component will comply with all Building, Public Works, and Fire Codes. All ordinances of the City and all conditions of approval will be complied with. Tentative Tract Map A tentative tract map is requested to subdivide three existing legal lots into two legal lots and to create six airspace commercial and residential condominium units. In accordance with NBMC Section 19.12.070(A) (Required Findings for Action on Tentative Maps), the following findings and facts in support of a tentative tract map are set forth: Finding: K. That the proposed map and the design or improvements of the subdivision are consistent with the General Plan and any applicable specific plan, and with the applicable provisions of the Subdivision Map Act and the City Subdivision Code. Facts in Support of Finding: 1. The project is consistent with the MU -H4 (Mixed -Use Horizontal) General Plan designation of the project site. 2. The Public Works Department has reviewed the tentative map and found it consistent with the Newport Beach Subdivision Code (Title 19) and applicable requirements of the Subdivision Map Act. 3. Conditions of approval have been included to ensure compliance with Title 19. Finding: L. That the site is physically suitable for the type and density of development. Facts in Support of Finding: 1. The 0.18 -acre site is trapezoidal in shape, has a slope of less than 20 percent, and is within an area known for the potential of seismic activity and liquefaction. It is currently developed with a vacant commercial building. 01-03-17 32 Planning Commission Resolution No. #### Paqe 13 of 27 2. The site where construction will occur is relatively flat and based on the geologic investigation, the development is feasible with appropriate site preparation and construction. The geologic investigation includes recommendations for removal and recommendation of loose surface materials and use of a structural mat foundation system. Finding: M. That the design of the subdivision or the proposed improvements are not likely to cause substantial environmental damage nor substantially and avoidably injure fish or wildlife or their habitat. However, notwithstanding the foregoing, the decision-making body may nevertheless approve such a subdivision if an environmental impact report was prepared for the project and a finding was made pursuant to Section 21081 of the California Environmental Quality Act that specific economic, social, or other considerations make infeasible the mitigation measures or project alternatives identified in the environmental impact report. Facts in Support of Finding: The project site to be developed does not support any environmental resources. As such, there would be no significant impacts to fish or wildlife or their habitat associated with the project. There would be no impacts to wetland vegetation associated with the project. Finding: N. That the design of the subdivision or the type of improvements is not likely to cause serious public health problems. Facts in Support of Finding: 01-03-17 The project consists of two parts: 1) a mixed-use development consisting of one retail unit at the ground floor, one office unit at the second floor, and one residential unit at the second floor level and 2) three residential condominiums. The land uses and development area comply with the maximum floor area ratios for each land use as allowed by the Zoning Code and the General Plan. No evidence is known to exist that would indicate that the planned subdivision pattern will generate any serious public health problems. All construction for the project will comply with Building, Public Works, and Fire Codes. Public improvements will be required of the developer per Section 19.28.10 (General Improvement Requirements) of the Municipal Code and Section 66411 of the Subdivision Map Act. All ordinances of the City and all Conditions of Approval will be complied with. 33 Planning Commission Resolution No. #### Pape 14 of 27 Finding: O. That the design of the subdivision or the type of improvements will not conflict with easements, acquired by the public at large, for access through or use of, property within the proposed subdivision. In this connection, the decision-making body may approve a map if it finds that alternate easements, for access or for use, will be provided and that these easements will be substantially equivalent to ones previously acquired by the public. This finding shall apply only to easements of record or to easements established by judgment of a court of competent jurisdiction and no authority is hereby granted to the City Council to determine that the public at large has acquired easements for access through or use of property within a subdivision. Facts in Support of Finding: There are no easements on-site so the design of the development will not conflict with any easements acquired by the public at large for access through or use of property within the development. Public improvements will be required of the applicant per the Municipal Code and the Subdivision Map Act. Conditions of approval require the closure of the existing curb cut along Villa Way to accommodate two new street parking spaces, new ADA compliant curb ramps, individual water and sewer connections for each condominium unit, and the dedication of a 10 -foot radius corner cut-off for street purposes at the corner of 29th Street and Villa Way. Finding: P. That, subject to the detailed provisions of Section 66474.4 of the Subdivision Map Act, if the land is subject to a contract entered into pursuant to the California Land Conservation Act of 1965 (Williamson Act), the resulting parcels following a subdivision of the land would not be too small to sustain their agricultural use or the subdivision will result in residential development incidental to the commercial agricultural use of the land. Fact in Support of Finding: The site is not subject to a Williamson Act contract. Finding: Q. That, in the case of a "land project' as defined in Section 11000.5 of the California Business and Professions Code: (a) there is an adopted specific plan for the area to be included within the land project; and (b) the decision-making body finds that the proposed land project is consistent with the specific plan for the area. 01-03-17 Planning Commission Resolution No. #### Paqe 15 of 27 Fact in Support of Finding: 1. The subject property does not qualify as a "land project" and is not located within the boundaries of a specific plan. Finding: R. That solar access and passive heating and cooling design requirements have been satisfied in accordance with Sections 66473.1 and 66475.3 of the Subdivision Map Act. Fact in Support of Findinq: 1. Title 24 of the Uniform Building Code requires new construction to meet minimum heating and cooling efficiency standards depending on location and climate. The Newport Beach Building Division will enforce Title 24 compliance through the plan check and field inspection processes for the construction of the residential units. Finding: S. That the subdivision is consistent with Section 66412.3 of the Subdivision Map Act and Section 65584 of the California Government Code regarding the City's share of the regional housing need and that it balances the housing needs of the region against the public service needs of the City's residents and available fiscal and environmental resources. Fact in Support of Finding: 1. There are no existing dwelling units on the project site. Rather the project includes the construction of four new condominium units to contribute to the City's share of the regional housing need. The applicant will be responsible for the payment of appropriate fair share, park, and housing in -lieu fees for the development of these new dwelling units. Finding: T. That the discharge of waste from the proposed subdivision into the existing sewer system will not result in a violation of existing requirements prescribed by the Regional Water Quality Control Board. Facts in Support of Findin-g: 1. There is adequate sewer system capacity to serve the requirements of the project. The project would be able to tie into the existing sewer system without adversely affecting the system, causing any water quality affects, or violating existing requirements prescribed by the Regional Water Quality Control Board. Wastewater from the project will be generated by residential build -out. 01-03-17 S5 Planning Commission Resolution No. #### Paqe 16 of 27 2. As conditioned, sewer connections will be installed per City Standards, the applicable provisions of Chapter 14.24 (Sewer Connection, Permits) of the Newport Beach Municipal Code, and the latest revision of the Uniform Plumbing Code. 3. The project design addresses water quality with a construction erosion control plan and a post -construction drainage system. The project is required to adhere to the City's grading, erosion control, and drainage requirements that includes percolation features and retention of dry weather and minor rain event run-off on-site. Any water not retained on- site is directed to the City's storm drain system will not violate Regional Water Quality Control Board (RWQCB) requirements. Finding: U. For subdivisions lying partly or wholly within the Coastal Zone, that the subdivision conforms with the certified Local Coastal Program and, where applicable, with public access and recreation policies of Chapter Three of the Coastal Act. Facts in Support of Finding: 1. The project site is located in the MU -H (Mixed -Use Horizontal) land use category within the Coastal Zone. The MU -H land use category continues to provide opportunities for coastal -related, coastal -dependent, and/or visitor -serving land uses in the Lido Village neighborhood in the retail and office suites. The project is also consistent with this land use designation in that residential units will only be provided at the interior parcel and on the second floor level for the corner parcel. Coastal access is not inhibited as the project site is an inland parcel and is not designated for present or future horizontal or lateral coastal access in the Coastal Land Use Plan. 2. Existing public street parking is maintained and the project will provide two additional public parking spaces along Villa Way. The project results in a net reduction in nonresidential parking demand on surrounding streets. The existing commercial building requires 39 parking spaces that are not provided on-site whereas the project requires four parking spaces that are not provided on-site. Deviation of Subdivision Desiqn Standards A deviation of the design standards is required to allow a lot width of less than 40 feet as required by the MU-CV/15th Street Zoning District development standards. In accordance with NBMC Section 19.24.130(C) (Deviation from Design Standards) of the Newport Beach Municipal Code, the following findings and facts in support of the deviation of design standards are set forth: Finding: V. The requested deviation(s) will create a land plan or development design equal or superior to that under the baseline design standards in this chapter. 01-03-17 so Planning Commission Resolution No. #### Paqe 17 of 27 Facts in Support of Finding: 1. The requested lot subdivision would form two lots where three underlying legal parcels currently exist. Lot 1, where the deviation of designs standard is requested, would have a resulting lot width of 27 feet 7 inches where the current lot with is 25 feet 9 inches. The resulting lot width would be closer to achieving the minimum 40 -foot lot width than the current parcel configuration of the underlying tract. 2. Lot 2 has a lot width of 58.3 feet, which complies with the minimum 40 -foot lot width as required by the MU-CV/15th Street zoning district standard. Finding: W. The deviation(s) will not negatively impact the carrying capacity of the local vehicular circulation network; Facts in Support of Finding: 1. The proposed lot widths are compatible with surrounding development and are modified slightly (1 -foot) from the underlying lot pattern in order to accommodate the required parking dimensions for each building. 2. All on-site parking will be accessed from the rear alley in conformance with minimum parking dimensions and setback development standards. 3. The proposed lot configuration will accommodate two additional public parking spaces along the Villa Way frontage and will not negatively impact the local vehicular circulation network. Finding: X. The deviation(s) will not negatively impact pedestrian circulation; Fact in Support of Finding: 1. The reduced parcel width will not negatively impact pedestrian circulation where sidewalks will continue to be available along the 29th Street and Villa Way street frontages. Finding: Y. The resulting subdivision will be compatible with the pattern of surrounding subdivisions; 01-03-17 37 Planning Commission Resolution No. #### Paqe 18 of 27 Facts in Support of Finding: The development matches the priority uses for the Cannery Village area by providing a mixed-use development on the corner parcel with a residential dwelling and office unit over retail and multi -family residential units on the interior parcel. The subdivision is compatible with the surrounding development pattern where lot widths vary between less than 30 feet in width at street ends up to 60 feet in width where the underlying 30 -foot wide legal lots in the tract have been combined into a single building site. Finding: Z. The resulting subdivision design and improvements will be consistent with the General Plan and any applicable specific plan, and will conform to the Subdivision Map Act and all other provisions of this Subdivision Code; and Facts in Support of Finding: The project results in two parcels that would be developed in accordance with the land uses identified by the General Plan and Zoning Map where mixed-use development is located on the corner parcel and residential development is located at interior parcel. The subdivision design and improvements will conform to all other requirements of the Subdivision Map Act and Subdivision Code. Finding: AA. The resulting subdivision design and improvements will not be materially detrimental to the residents or tenants of the proposed subdivision or surrounding properties, nor to public health or safety Facts in Support of Finding: The improvements will not be detrimental to residents or tenants in the Cannery Village Community. The required improvements will improve the community with the addition of two new street parking spaces, new ADA compliant curb ramps, structures that comply with sight distance requirements at the intersection, and the dedication of a 10 - foot radius corner cut-off for street purposes at the corner of 291' Street and Villa Way. The project will result in the redevelopment of an under-utilized and aging commercial lot with a mixed-use and residential project that implements the goals and policies for Cannery Village. 01-03-17 38 Planning Commission Resolution No. #### Paqe 19 of 27 SECTION 4. DECISION. NOW, THEREFORE, BE IT RESOLVED: 1. The Planning Commission of the City of Newport Beach hereby approves Coastal Development Permit No. CD2017-025, Conditional Use Permit No. UP2017-005, Minor Site Development Review No. SD2017-003, and Tentative Tract Map No. NT2017-001 subject to the conditions set forth in Exhibit A, which is attached hereto and incorporated by reference. 2. The Coastal Development Permit, Conditional Use Permit, and Site Development Review actions shall become final and effective 14 days following the date this resolution was adopted and the Tentative Tract Map action shall become final and effective 10 days following the date this resolution was adopted, unless within such time an appeal or call for review is filed with the Community Development Director in accordance with the provisions of Title 19, Title 20, and Title 21 of the Newport Beach Municipal Code. PASSED, APPROVED, AND ADOPTED THIS 20TH DAY OF JULY, 2017. AYES: NOES: ABSTAIN ABSENT: M Peter Koetting, Chairman Erik Weigand, Secretary 01-03-17 39 Planning Commission Resolution No. #### Paqe 20 of 27 EXHIBIT "A" CONDITIONS OF APPROVAL (Project -specific conditions are in italics) PLANNING 1. The development shall be in substantial conformance with the approved site plan, floor plans and building elevations stamped and dated with the date of this approval. (Except as modified by applicable conditions of approval.) 2. All proposed signs shall be in conformance with an approved Comprehensive Sign Program for the project site and provisions of NBMC Chapter 20.42 (Signs). 3. The project is subject to all applicable City ordinances, policies, and standards, unless specifically waived or modified by the conditions of approval. 4. The applicant shall comply with all federal, state, and local laws. Material violation of any of those laws in connection with the use may be cause for revocation of this Use Permit. 5. Any change in operational characteristics, expansion in area, or other modification to the approved plans, shall require an amendment to this Coastal Development Permit, Conditional Use Permit, Site Development Review, and Tentative Tract Map or the processing of a new application. 6. A copy of the Resolution, including conditions of approval Exhibit "A" shall be incorporated into the Building Division and field sets of plans prior to issuance of the building permits. 7. Prior to issuance of building permits, the applicant shall submit to the Planning Division an additional copy of the approved architectural plans for inclusion in the project file. The plans shall be identical to those approved by all City departments for building permit issuance. The approved copy shall include architectural sheets only and shall be reduced in size to 11 inches by 17 inches. The plans shall accurately depict the elements approved by this Site Development Review and shall highlight the approved elements such that they are readily discernible from other elements of the plans. 8. Prior to the issuance of a building permit, the applicant shall pay any unpaid administrative costs associated with the processing of this application to the Planning Division. 9. Prior to the issuance of building permits, Fair Share Traffic Fees shall be paid for four new dwelling units (currently $1,792 per new additional dwelling unit) in accordance with NBMC Chapter 15.38. 01-03-17 W Planning Commission Resolution No. #### Paqe 21 of 27 10. Prior to the recordation of the Final Tract Mapa park dedication fee for four dwelling units (currently $26,125.00 per new additional dwelling unit) shall be paid in accordance with NBMC Chapter 19.52. This fee shall be paid upon submittal of the map to the Public Works Department for plan check and deposited into the appropriate Service Area account as identified in the Recreation and Open Space Element of the General Plan. 11. Prior to issuance of final building permits, the applicant shall prepare a written disclosure statement prior to sale, lease, or rental of a residential unit in the proposed mixed-use development consistent with Section 20.48.130.H (Notification to Owners and Tenants) of the Municipal Code. 12. Prior to issuance of final building permits, the applicant shall record a deed notification with the County Recorder's Office approved as to form by the Office of the City Attorney consistent with Section 20.48.130.1(Deed Notification). The deed notification shall state that the residential units are located in a mixed-use project or in a mixed-use zoning district and that an owner may be subject to impacts, including inconvenience and discomfort, from lawful activities occurring in the project or zoning district (e.g. noise, lighting, odors, high pedestrian activity levels,. etc.). 13. A minimum of 11 parking spaces shall be provided on-site (one ADA nonresidential space, eight residential spaces, and two residential guest parking spaces). 14. All mechanical equipment shall be screened in accordance with NBMC Section 20.30.020 (Buffering and Screening). Screening materials shall comply with the Zoning Code height limit (26 feet for flat roof structures and 31 feet for pitched rool). 15. Prior to the issuance of a building permits, the applicant shall submit a landscape and irrigation plan prepared by a licensed landscape architect. These plans shall incorporate drought tolerant plantings and water efficient irrigation practices, and the plans shall be approved by the Planning Division. 16. All landscape materials and irrigation systems shall be maintained in accordance with the approved landscape plan. All landscaped areas shall be maintained in a healthy and growing condition and shall receive regular pruning, fertilizing, mowing and trimming. All landscaped areas shall be kept free of weeds and debris. All irrigation systems shall be kept operable, including adjustments, replacements, repairs, and cleaning as part of regular maintenance. 17. The site shall not be excessively illuminated based on the luminance recommendations of the Illuminating Engineering Society of North America, or, if in the opinion of the Director of Community Development, the illumination creates an unacceptable negative impact on surrounding land uses or environmental resources. The Director may order the dimming of light sources or other remediation upon finding that the site is excessively illuminated. 01-03-17 M Planning Commission Resolution No. #### Paqe 22 of 27 18. Prior to the issuance of a building permit, the applicant shall pay any unpaid administrative costs associated with the processing of this Coastal Development Permit to the Planning Division. 19. Construction activities shall comply with NBMC Section 10.28.040, which restricts hours of noise -generating construction activities that produce noise to between the hours of 7:00 a.m. and 6:30 p.m., Monday through Friday and 8:00 a.m. and 6:00 p.m. on Saturday. Noise -generating construction activities are not allowed on Sundays or Holidays. 20. No outside paging system shall be utilized in conjunction with this establishment. 21. All trash shall be stored within the building or within dumpsters stored in the trash enclosure (three walls and a self -latching gate) or otherwise screened from view of neighboring properties, except when placed for pick-up by refuse collection agencies. The trash enclosure shall have a decorative solid roof for aesthetic and screening purposes. 22. Trash receptacles for patrons shall be conveniently located both inside and outside of the establishment, however, not located on or within any public property or right-of-way. 23. The exterior of the business shall be maintained free of litter and graffiti at all times. The owner or operator shall provide for daily removal of trash, litter debris and graffiti from the premises and on all abutting sidewalks within 20 feet of the premises. 24. The applicant shall ensure that the trash dumpsters and/or receptacles are maintained to control odors. This may include the provision of either fully self-contained dumpsters or periodic steam cleaning of the dumpsters, if deemed necessary by the Planning Division. Cleaning and maintenance of trash dumpsters shall be done in compliance with the provisions of Title 14, including all future amendments (including Water Quality related requirements). 25. Deliveries and refuse collection for the retail/office suites shall be prohibited between the hours of 10:00 p.m. and 7:00 a.m. on weekdays and Saturdays and between the hours of 10:00 p.m. and 9:00 a.m. on Sundays and Federal holidays, unless otherwise approved by the Director of Community Development, and may require an amendment to this Use Permit. 26. Storage outside of the building in the front or at the rear of the property shall be prohibited, with the exception of the required trash container enclosure. 27. A Special Events Permit is required for any event or promotional activity outside the normal operational characteristics of the approved use, as conditioned, or that would attract large crowds, involve the sale of alcoholic beverages, include any form of on-site media broadcast, or any other activities as specified in the Newport Beach Municipal Code to require such permits. 01-03-17 RNJ Planning Commission Resolution No. #### Paqe 23 of 27 28. Trash and debris shall be disposed in proper trash and recycling receptacles at the end of each construction day. Solid waste, including excess concrete, shall be disposed in adequate disposal facilities at a legal disposal site or recycled at a recycling facility. 29. Should the property be sold or otherwise come under different ownership, any future owners or assignees shall be notified of the conditions of this approval by either the current business owner, property owner or the leasing agent. 30. This approval shall expire and become void unless exercised within 24 months from the actual date of review authority approval, except where an extension of time is approved in compliance with the provisions of Title 20 Planning and Zoning of the Newport Beach Municipal Code. 31. To the fullest extent permitted by law, applicant shall indemnify, defend and hold harmless City, its City Council, its boards and commissions, officials, officers, employees, and agents from and against any and all claims, demands, obligations, damages, actions, causes of action, suits, losses, judgments, fines, penalties, liabilities, costs and expenses (including without limitation, attorney's fees, disbursements and court costs) of every kind and nature whatsoever which may arise from or in any manner relate (directly or indirectly) to City's approval of the Ullman Sail Lofts including, but not limited to, Coastal Development Permit No. CD2017-025, Conditional Use Permit No. UP2017-005, Site Development Review No. SD2017-003, and Tentative Tract Map No. NT2017-001 (PA2017-059). This indemnification shall include, but not be limited to, damages awarded against the City, if any, costs of suit, attorneys' fees, and other expenses incurred in connection with such claim, action, causes of action, suit or proceeding whether incurred by applicant, City, and/or the parties initiating or bringing such proceeding. The applicant shall indemnify the City for all of City's costs, attorneys' fees, and damages which City incurs in enforcing the indemnification provisions set forth in this condition. The applicant shall pay to the City upon demand any amount owed to the City pursuant to the indemnification requirements prescribed in this condition. Fire Department Conditions 32. New elevator shall be gurney -accommodating in accordance with Article 30 of the California Building Code (2001 edition). 33. Automatic fire sprinklers shall be required for all new construction. The sprinkler system shall be monitored by a UL certified alarm service company. A NFPA 13 system is required due to mixed -occupancy in accordance with CFC 9.3.3.1.1. 34. Prior to the issuance of building permits, the project plans shall remove keynote number four referencing a NFPA 13D system and OCFA notes on Sheet A-2.0. Buildinq Division Conditions 01-03-17 RE Planning Commission Resolution No. #### Paqe 24 of 27 35. The applicant is required to obtain all applicable permits from the City's Building Division and Fire Department. The construction plans must comply with the most recent, City - adopted version of the California Building Code. The construction plans must meet all applicable State Disabilities Access requirements. Approval from the Orange County Health Department is required prior to the issuance of a building permit. 36. Prior to the issuance of building permits, the project plans shall reflect a fire rated wall that extends to the furthest projection between the mixed-use and residential buildings at each floor level. 37. The applicant shall employ the following best available control measures (`BACMs') to reduce construction -related air quality impacts: Dust Control • Water all active construction areas at least twice daily. • Coverall haul trucks or maintain at least two feet of freeboard. • Pave or apply water four times daily to all unpaved parking or staging areas. • Sweep or wash any site access points within two hours of any visible dirt deposits on any public roadway. • Cover or water twice daily any on-site stockpiles of debris, dirt or other dusty material. • Suspend all operations on any unpaved surface if winds exceed 25 mph. Emissions Require 90 -day low-NOx tune-ups for off road equipment. Limit allowable idling to 30 minutes for trucks and heavy equipment Off -Site Impacts • Encourage car pooling for construction workers. • Limit lane closures to off --peak travel periods. • Park construction vehicles off traveled roadways. • Wet down or cover dirt hauled off-site. • Sweep access points daily. • Encourage receipt of materials during non -peak traffic hours. • Sandbag construction sites for erosion control. Fill Placement • The number and type of equipment for dirt pushing will be limited on any day to ensure that SCAQMD significance thresholds are not exceeded. • Maintain and utilize a continuous water application system during earth placement and compaction to achieve a 10 percent soil moisture content in the top six-inch surface layer, subject to review/discretion of the geotechnical engineer. 38. No demolition or construction materials, equipment debris, or waste, shall be placed or stored in a location that would enter sensitive habitat, receiving waters, or a storm drain, 01-03-17 W Planning Commission Resolution No. #### Paqe 25 of 27 or result in impacts to environmentally sensitive habitat areas, streams, wetland or their buffers. 39. Best Management Practices (BMPs) and Good Housekeeping Practices (GNP's) shall be implemented prior to and throughout the duration of construction activity as designated in the Erosion Control Plan. 40. The discharge of any hazardous materials into storm sewer systems or receiving waters shall be prohibited. Machinery and equipment shall be maintained and washed in confined areas specifically designed to control runoff. A designated fueling and vehicle maintenance area with appropriate berms and protection to prevent spillage shall be provided as far away from storm drain systems or receiving waters as possible. 41. Debris from demolition shall be removed from work areas each day and removed from the project site within 24 hours of the completion of the project. Stock piles and construction materials shall be covered, enclosed on all sites, not stored in contact with the soil, and located as far away as possible from drain inlets and any waterway. 42. Prior to issuance of grading permits, the applicant shall prepare and submit a Water Quality Management Plan (WQMP) for the proposed project, subject to the approval of the Building Division and Code and Water Quality Enforcement Division. The WQMP shall provide appropriate Best Management Practices (BMPs) to ensure that no violations of water quality standards or waste discharge requirements occur. 43. A list of `good house -keeping" practices will be incorporated into the long-term post - construction operation of the site to minimize the likelihood that pollutants will be used, stored or spilled on the site that could impair water quality. These may include frequent parking area vacuum truck sweeping, removal of wastes or spills, limited use of harmful fertilizers or pesticides, and the diversion of storm water away from potential sources of pollution (e.g., trash receptacles and parking structures). The Stage 2 WQMP shall list and describe all structural and non-structural BMPs. In addition, the WQMP must also identify the entity responsible for the long-term inspection, maintenance, and funding for all structural (and if applicable Treatment Control) BMPs. Public Works Conditions 44. A Tract Map shall be recorded. The Map shall be prepared on the California coordinate system (NAVD88). Prior to recordation of the Map, the surveyor/engineer preparing the Map shall submit to the County Surveyor and the City of Newport Beach a digital -graphic file of said map in a manner described in Section 7-9-330 and 7-9-337 of the Orange County Subdivision Code and Orange County Subdivision Manual, Subarticle 18. The Map to be submitted to the City of Newport Beach shall comply with the City's CADD Standards. Scanned images will not be accepted. 45. Prior to recordation of the tract map, the surveyor/engineer preparing the map shall tie the boundary of the map into the Horizontal Control System established by the County surveyor in a manner described in Sections 7-9-330 and 7-9-337 of the Orange County 01-03-17 RE Planning Commission Resolution No. #### Page 26 of 27 Subdivision Code and Orange County Subdivision Manual, Subarticle 18. Monuments (on -inch iron pipe with tag) shall be set on each lot corner unless otherwise approved by the Subdivision Engineer. Monuments shall be protected in place if installed prior to completion of the construction project. 46. Prior to the final tract map approval, a subdivision agreement and bonds (Labor and material, performance, and warranty) in the form and amount acceptable to the Director of Public Works for the estimated improvement costs as prepared by a Registered Civil Engineer and approved by the Director of Public Works. 47. The final tract map shall dedicate for street purposes a 10 -foot radius corner cut-off at the corner of 29th Street and Villa Way. 48. All improvements shall be constructed as required by Ordinance and the Public Works Department. 49. Prior to final building permits, the applicant shall reconstruct the concrete sidewalk, curb, and gutter along the 29th Street and Villa Way project frontage per City Standard. 50. Prior to issuance of final building permits, the applicant shall plug unused driveway approaches per City Standard STD -165-L. 51. Prior to issuance of final building permits, curb drains shall be installed per City Standard STD -184-L. 52. Prior to issuance of final building permits, the applicant shall install an ADA compliant curb ramp per City Standard at the corner of 29th Street and Villa Way. 53. Prior to issuance of final building permits, the applicant shall remove the existing power poles along the Villa Way and 29th Street frontages and relocate all overhead utilities underground, unless the utilities companies determine that the removal is infeasible. 54. Prior to issuance of final building permits, all existing overhead utilities shall be undergrounded. 55. No above ground improvements shall be installed within the 10 -foot alleys setback. The 10 -foot alley setback shall be constructed of a drivable surface. 56. Each unit shall be served by its individual water meter, sewer lateral, and cleanout. Each water meter and sewer cleanout shall be installed with a traffic grade box and cover. The water meter and the sewer cleanout shall be located within the public right-of-way. 57. An encroachment permit is required for all work activities within the public right-of-way. 58. In case of damage done to public improvements surrounding the development site by the private construction, additional reconstruction within the public right-of-way could be required at the discretion of the Public Works Inspector. 01-03-17 40 Planning Commission Resolution No. #### Paqe 27 of 27 59. All on-site drainage shall comply with the latest City Water Quality requirements. 60. All unused water services to be abandoned shall be capped at the main (corporation stop) and all unused sewer laterals to be abandoned shall be capped at the property line. If the sewer lateral to be abandoned has an existing cleanout, abandonment shall include removal of the cleanout riser, the 4TT box and wye. The sewer lateral shall then be capped where the wye used to be. 61. Prior to issuance of final building permits, the applicant shall create a minimum of two new on -street parking spaces along Villa Way, including installation of parking meter posts. 62. County Sanitation District fees shall be paid prior to the issuance of any building permits. 01-03-17 40b Attachment No. PC 2 Draft Resolution for Denial 47 42 RESOLUTION NO. #### A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF NEWPORT BEACH DENYING COASTAL DEVELOPMENT PERMIT NO. CD2017-025, CONDITIONAL USE PERMIT NO. UP2017-005, MINOR SITE DEVELOPMENT REVIEW NO. SD2017-003, AND TENTATIVE TRACT MAP NO. NT2017-001 FOR A MIXED-USE STRUCTURE (RETAIL/OFFICE AND ONE RESIDENTIAL DWELLING UNIT) AND THREE RESIDENTIAL DWELLING UNITS LOCATED AT 410 AND 412 29TH STREET (PA2017-059) THE PLANNING COMMISSION OF THE CITY OF NEWPORT BEACH HEREBY FINDS AS FOLLOWS: SECTION 1. STATEMENT OF FACTS. 1. An application was filed by Berk Properties (Applicant), with respect to property located at 410 and 412 29th Street, and legally described as Lots 17, 18, and 19 of Block 225 of the Landscasters Addition of Newport Beach. 2. The Applicant requests a coastal development permit, conditional use permit, minor site development review, and tentative tract map to demolish an existing 9,600 -square -foot commercial building to construct: (1) a new mixed-use structure with 1,145 square feet of retail/office floor area and one 2,360 square foot dwelling unit; and (2) three residential dwelling units ranging from 2,485 square feet to 2,515 square feet. A conditional use permit approval is necessary to reduce the required retail/office parking requirement by four spaces. A deviation of the subdivision design standards is necessary in conjunction with the tentative tract map to allow a lot width of less than 40 feet. 3. The subject property is located within the MU-CV/15th St. (Mixed -Use Cannery Village/15th Street) Zoning District and the General Plan Land Use Element category is MU -H4 (Mixed - Use Horizontal). 4. The subject property is located within the coastal zone. The Coastal Land Use Plan category is MU-CV/15th St. (Mixed -Use Cannery Village/15th Street). 5. A public hearing was held on July 20, 2017 in the Council Chambers located at 100 Civic Center Drive, Newport Beach. A notice of time, place and purpose of the public hearing was given in accordance with the Newport Beach Municipal Code (NBMC). Evidence, both written and oral, was presented to, and considered by, the Planning Commission at this public hearing. SECTION 2. CALIFORNIA ENVIRONMENTAL QUALITY ACT DETERMINATION. 1. Pursuant to Section 15270 of the California Environmental Quality Act (CEQA) Guidelines, projects which a public agency rejects or disapproves are not subject to CEQA review. 49 Planning Commission Resolution No. #### Paqe 2 of 4 SECTION 3. REQUIRED FINDINGS. 1. The Planning Commission may approve a Coastal Development Permit only after making each of the required findings set forth in Section 21.52.015 (Coastal Development Permits, Findings and Decision) of the Newport Beach Municipal Code. In this case, the Planning Commission was unable to make the required findings based upon the following: a. The Coastal Development Permit is not consistent with the legislative intent of Chapter 21.52 of the Municipal Code. 2. The Planning Commission may approve a Conditional Use Permit only after making each of the required findings set forth in Section 20.52.020 (Conditional and Minor Use Permits). In this case, the Planning Commission was unable to make the required findings based upon the following: 01-03-17 a. The Planning Commission determined, in this case, that the proposed use permit to reduce the on-site parking requirement for the project is inconsistent with the legislative intent of Title 20 of the NBMC. b. The design, location, size, and operating characteristics of the development are not compatible with the allowed uses in the vicinity. c. The site is not physically suitable in terms of design, location, shape, size, operating characteristics. The property does not provide on-site parking to accommodate the proposed use. The Planning Commission does not consider the existing parking demand on the subject property a unique circumstance resulting in any necessity to warrant approval for a reduction in the off-site parking requirement through the approval of a parking management program. d. The proposed development is neither required by code nor necessary for the enjoyment of the property. If desired, and as shown through previously approved building permits, the subject property can be utilized to comply with the requirements of the NBMC and be used for general commercial or retail uses. e. The subject property is consistent in orientation, size and shape with typical lots in this neighborhood which are designed with commercial, mixed-use, and residential development. Less parking than what the Zoning Code provides for could prove detrimental to Cannery Village. Parking is already deficient in this district. Operation of the use at the location proposed would be detrimental to the harmonious and orderly growth of the City. f. Granting of the use permit would provide special privileges to the subject property as the City has required the minimum parking provided by the Zoning Code in similar circumstances for nonresidential uses. 50 Planning Commission Resolution No. #### Paqe 3 of 4 3. The Planning Commission may approve a Site Development Review only after making each of the required findings set forth in Section 20.52.080 (Site Development Review). In this case, the Planning Commission was unable to make the required findings based upon the following: a. The Site Development Review application for the proposed project's design is not consistent with the legislative intent of Title 20 of the Municipal Code and the findings required by Section 20.52.080 are not supported in this case. The proposed project is not consistent with the applicable criteria may prove detrimental to the community for the following reasons: 4. The Planning Commission may approve a Tentative Tract Map only after making each of the required findings set forth in Sections 19.12.070 of the Municipal Code. In this case, the Planning Commission was unable to make the required findings based upon the following: b. The Tentative Tract Map is not consistent with the legislative intent of Title 19 of the Municipal Code. The proposed parcel map is not consistent with the applicable regulations may prove detrimental to the community. SECTION 4. DECISION. NOW, THEREFORE, BE IT RESOLVED: 1. The Planning Commission of the City of Newport Beach hereby denies without prejudice Coastal Development Permit No. CD2017-025, Conditional Use Permit No. UP2017-005, Minor Site Development Review No. SD2017-003, and Tentative Tract Map No. NT2017- 001 subject to the conditions set forth in Exhibit A, which is attached hereto and incorporated by reference. 2. The Coastal Development Permit, Conditional Use Permit, and Site Development Review actions shall become final and effective 14 days following the date this resolution was adopted and the Tentative Tract Map action shall become final and effective 10 days following the date this resolution was adopted, unless within such time an appeal or call for review is filed with the Community Development Director in accordance with the provisions of Title 19, Title 20, and Title 21 of the Newport Beach Municipal Code. PASSED, APPROVED, AND ADOPTED THIS 20TH DAY OF JULY, 2017. AYES: NOES: ABSTAIN: ABSENT: 01-03-17 .51 m Peter Koetting, Chairman BY: Erik Weigand, Secretary 01-03-17 Planning Commission Resolution No. #### Paqe 4 of 4 52 Attachment No. PC 3 Site Photos 53 M. Project site viewed from the intersection of Villa Way and 29" Street. Project site viewed from the intersection of 29" Street and rear alley. Existing nonresidential and mixed-use development west of the�p�doject site. 50 Attachment No. PC 4 Project Renderings and Materials Board 5g BRANDON SMART DESIGN I B ` w 410 29TH STREET NEWPORT BEACH, CA 926251<11 BRANDON ,�CHITECTS MATERIAL BOARD/CONCEPT IMAGERY PERSPECTIVE PERSPECTIVE CONCEPT FRONT CORNER PERSPECTIVE CONCEPT FRONT SIDE 151 KALMUS DR., SUITE Gl COSTA MESA, CA 92626 PHONE: )714) 754-4040 WWW.BRANDONARCHITECTS.COM 60 Attachment No. PC 5 Applicant's Project Description ME 02 PROJECT DESCRIPTION AND JUSTIFICATION This is an application to subdivide an existing parcel consisting of three lots with an existing commercial/industrial building of approximately 9,962 square feet into two new parcels and construct one mixed use project with two small commercial spaces and one residential unit, and the second parcel consisting of three (3) residential condominiums, as more fully described herein. The application requires the approval of a Subdivision Tract Map (Tentative), a Conditional Use Permit, a Minor Site Plan Review and a Coastal Development Permit. The existing site at 410-412 291" Street in Cannery Village currently is the site of what used to be the Ullman Sail Building at the southwest corner of 291" Street and Villa Way. The lot is trapezoidal and is approximately 108' wide on the alley, 62' wide on Villa Way, 101' wide on 29th street, and 90' deep from Villa Way to the alley, it is zoned MU-CV/15th St. (Mixed Use Cannery Village/15th st.). The building has been vacant for a number of years and although the applicant's first choice was to renovate the existing building, this option was determined to be not feasible by the obstacles presented by the current building code. The Applicant is proposing a subdivision which would include a smaller parcel on the southeast corner of 291" and Villa Way of approximately 2,452 square feet (Parcel A) and a second parcel immediately east of the corner lot which would consist of approximately 5,241 square feet (Parcel B). Constructed on Parcel A would be two small commercial condominiums consisting of 559 square feet and 611 square feet, respectively, and a residential condominium of 2,153 square feet which would have 3 bedrooms, 3.5 baths with required parking consisting of a 207 square foot 1 -car garage and a tandem covered parking spot. The commercial parking would be a guest parking standard space and an ADA van accessible space. The following attributes are for Parcel 1: Lot Coverage - 78% Building Height - varies to 31' Landscaping - 1.5% Alley setback -10' Front setback - 0' Side setback - 0' Hard Scape - 61% Gross Floor Area - 3,518 square feet Floor Area Ratio - 1.43 On Parcel B would be constructed separate buildings containing three (3) residential condominiums, each containing between 2,100 and 2,300 square feet, depending on the final configuration. All three (3) units would have three (3) bedrooms and three and a half (3.5) baths. Two of the residential units will have an approximate 200 square foot one (1) car garage and, in addition, a covered open carport space. The third unit will have a 2 car, 400 square foot covered garage. There will also be an extra guest space on Parcel B. All of the parking will be taken off of the alley behind the buildings. The following attributes are for Parcel 2: o3 Lot Coverage - 71% Building Height - varies to 31' Landscaping - 3% Alley setback - 10' Front setback - 0' Side setback - 0' Hard Scape - 46% Gross Floor Area -7,516 square feet Floor Area Ratio - 1.43 The approval of the Tentative Subdivision Tract Map would slightly alter the size of the corner lot (Parcel A) to accommodate parking for both lots as well as allowances for walls and separations. The subdivision would allow for the creation of condominium units on both Parcel A and Parcel B. The Accompanying Written Statement required with the Tentative Subdivision Tract Mapwill be submitted concurrently with this Project Description and Justification. The approval of the Conditional Use Permit is required because of a waiver of parking standards for the project. The Applicant believes that the waiver is justified as the project as a whole, given the increase in residential square footage and other factors of the project will create less demand for onsite parking. Applicant believes that the overall favorable impacts of the project outweigh slight deviation for "code"' parking in this particular case, especially in the City's current view concerning parking requirements on in the older parts of Newport Beach with smaller lot sizes. With respect to the findings that the Planning Commission must make in order to grant a Conditional Use Permit, the following facts are submitted: 1. The use is certainly consistent with the General Plan as it is exactly what the General Plan calls for in Cannery Village. 2. The same can be said about the zoning as this project fits exactly with the zoning designation in the zoning code, namely MU-CV/15 St., which allows mixed use on the corner lots and residential on the non -corner lots. 3. It is submitted that The design, location, size, and operating characteristics of the use are compatible with the allowed uses in the vicinity, as completely similar in all respects to the surrounding neighbors. 4. As can be ascertained by the drawings, the site is physically suitable in terms of design, location, shape, size, operating characteristics. In addition there is a the provision of public and vehicle (e.g., fire and medical) access to the parcel. 5. Finally, it is easy to make a finding that proposed project would not be detrimental to the harmonious and orderly growth of the City, or endanger, jeopardize, or otherwise constitute a hazard to the public convenience, health, interest, safety, or general welfare of persons residing or working in the neighborhood of the proposed project and use. The approval of the Minor Site Development Review is required by Section 20.52.080 of the Zoning Code, as it is a mixed use development with 4 or fewer residential units. IM, Pursuant to subdivision F of that section, the reviewing authority must find all of the following concerning the project: 1. Allowed within the subject zoning district, 2. In compliance with all of the following applicable criteria: a. Compliance with this Section, the General Plan, this Zoning Code, any applicable specific plan, and other applicable criteria and policies related to the use or structure; b. The efficient arrangement of structures on the site and the harmonious relationship of the structures to one another and to other adjacent developments, and whether the relationship is based on standards of good design; c. The compatibility in terms of bulk, scale, and aesthetic treatment of structures on the site and adjacent developments and public areas; d. The adequacy, efficiency, and safety of pedestrian and vehicular access, including drive aisles, driveways, and parking and loading spaces; e. The adequacy and efficiency of landscaping and open space areas and the use of water efficient plant and irrigation materials; and f. The protection of significant views from public right(s)-of-way and compliance with Section 20.30.100 (Public View Protection). 3. Not detrimental to the harmonious and orderly growth of the City, or endanger, jeopardize, or otherwise constitute a hazard to the public convenience, health, interest, safety, or general welfare of persons residing or working in the neighborhood of the proposed development. The Applicant submits that all of these findings can be made upon review of the project and the materials submitted herewith. The Approval of a Coastal Development Permit is Coastal Zone of the city's Local Coastal Plan. T conforms to all applicable sections of the Certified no issues created which would cause the project Coastal Act. required as this project lies within the Th Respectfully Submitted �t DAVID DAVUT LU, GENERAL PARTNER CANNERY SAIL HOUSE, LP Applicant submits that the project Local Coastal Plan and that there are not to conform to Chapter 3 of the 05 ACCOMPANYING WRITTEN STATEMENT FOR TENTATIVE SUBDIVISION TRACT MAP APPLICATION FOR 410291h STREET, NEWPORT BEACH a. The existing use of the property is commercial/industrial (now vacant, former manufacturing of Ullman Sails). The purpose of the subdivision is to create two parcels, which include a smaller parcel on the southeast corner of 291" and Villa Way of approximately 2,452 square feet (Parcel 1) and a second parcel immediately east of the corner lot which would consist of approximately 5,241 square feet (Parcel 2). b. A newly constructed building on Parcel 1 would be two small commercial condominiums consisting of 559 square feet and 611 square feet, respectively, and a residential condominium of 2,153 square feet which would have 3 bedrooms, 3.5 baths with required parking consisting of a 207 square foot 1 -car garage and a tandem covered parking spot. The commercial parking would be a guest parking standard space and an ADA van accessible space. On Parcel 2 would be three newly constructed separate buildings containing three (3) residential condominiums, each containing between 2,100 and 2,300 square feet, depending on the final configuration. All three (3) units would have three (3) bedrooms and three and a half (3.5) baths. Two of the residential units will have an approximate 200 square foot one (1) car garage and, in addition, a covered open carport space. The third unit will have a 2 car, 400 square foot covered garage. There will also be an extra guest space on Parcel B. All of the parking will be taken off of the alley behind the buildings. The public utilities will be built in compliance with the building code and each unit will a separate service for water, gas, electricity and sewage. c. Each unit will have a separate sanitary sewage line to the main sewage line in the public right of way. d. No public areas are proposed unless imposed by the City of Newport Beach. e. No trees are to be planted except as shown on the landscape plan and/or imposed as a condition of approval by the City of Newport Beach. f. There are no restrictive covenants to be imposed except for the Units' CC&R's, concerning the occupation and use of the property, which will be imposed on the property subsequent to the recording of the Parcel Map requested. This statement was signed this 15" day of February, 2017, at Newport Beach, California �e David Davutog u, eral Partner Cannery Sail Ho6ee, LP 00 Attachment No. PC 6 Class 32 CEQA Determination 07 02 Class 32 Exemption Determination Ullman Sails Lofts 410 and 412 29th Street Newport Beach, CA CEQA Section 15332. In -Fill Development Proiects Class 32 exemptions for in -fill development projects are required to meet the following conditions: (a) The project is consistent with the applicable general plan designation and all applicable general plan policies as well as with applicable zoning designation and regulations. The General Plan Land Use Element designates the site as MU -H4 (Mixed -Use Horizontal), which is intended to establish the character of a distinct and cohesively developed district or neighborhood containing multi -family residential with clusters of mixed-use and/or commercial buildings. Mixed-use or commercial buildings are required on parcels at street intersections and are permissible but not required on other parcels. Development of the site will be consistent with General Plan policies as indicated below. The proposed mixed-use development at the corner parcel and multi -family residential development at the interior parcel are consistent with the limitations for the subject properties. Land Use Policies Policy LU2.1 Resident -Serving Land Uses. Accommodate uses that support the needs of Newport Beach's residents including housing, retail, services, employment, recreation, education, culture, entertainment, civic engagement, and social and spiritual activity that are in balance with community natural resources and open spaces. Policy LU2.2 Sustainable and Complete Community. Emphasize the development of uses that enable Newport Beach to continue as a self-sustaining community and minimize the need for residents to travel outside of the community for retail, goods and services, and employment. Policy LU 2.8 Adequate Infrastructure. Accommodate the types, densities, and mix of land uses that can be adequately supported by transportation and utility infrastructure (water, sewer, storm drainage, energy, and so on) and public services (schools, parks, libraries, seniors, youth, police, fire, and so on). LU 2.6 Visitor Serving Uses Provide uses that serve visitors to Newport Beach's ocean, harbor, open spaces, and other recreational assets, while integrating them to protect neighborhoods and residents. (Imp 1. 1, 2.1, 5.1, 24.1) 09 LU 3.3 Opportunities for Change Provide opportunities for improved development and enhanced environments for residents in the following districts and corridors, as specified in Polices 6.3.1 through 6.22.7.- ... Balboa .22.7: ...Balboa Peninsula: ...re -use interior parcels in Cannery Village for residential and limited mixed-use and live/work buildings; and redevelop underperforming properties outside of the core commercial districts along the Balboa Boulevard corridor for residential. Infill development shall be designed and sited to preserve the historical and architectural fabric of these districts. Policy LU 4.1 Land Use Diagram. Accommodate land use development consistent with the Land Use Plan. Figure LU1 depicts the general distribution of uses throughout the City and Figure LU2 through Figure LU15 depict specific use categories for each parcel within defined Statistical Areas. Table LU1 (Land Use Plan Categories) specifies the primary land use categories, types of uses, and, for certain categories, the densities/intensities to be permitted. The permitted densities/intensities or amount of development for land use categories for which this is not included in Table LU1, are specified on the Land Use Plan, Figure LU4 through Figure LU15. These are intended to convey maximum and, in some cases, minimums that may be permitted on any parcel within the designation or as otherwise specified by Table LU2 (Anomaly Locations). LU 6.2.1 Residential Supply Accommodate a diversity of residential units that meets the needs of Newport Beach's population and fair share of regional needs in accordance with the Land Use Plan's designations, applicable density standards, design and development policies, and the adopted Housing Element. (Imp 1. 1, 2.1, 25.1) Cannery Village Goal LU 6.10 A pedestrian -oriented residential neighborhood that provides opportunities for live/work facilities and supporting retail uses. LU 6. 10.1 Priority Uses Allow multi -family residential and mixed-use buildings that integrate residential above retail or live -work units throughout Cannery Village. Require mixed-use, live -work, or commercial buildings to be developed on corner parcels. (Imp 2.1) DESIGN AND DEVELOPMENT The proposed development matches the priority uses for the Cannery Village area by providing a mixed-use development on the corner parcel with a residential dwelling unit over retail/office and multi -family residential units on the interior parcel. The subject property is located within the Mixed -Use Cannery Village/15th Street (MU- CV/15th St) Zoning District, where it is intended to establish a cohesively developed district or neighborhood containing multi -unit residential dwelling units with clusters of mixed-use and/or commercial structures on interior lots of Cannery Village. Pursuant to jD Section 20.22.020 (Mixed -Use Zoning Districts Land Uses and Permit Requirements), retail/office uses and residential dwelling units are permitted uses in this Zoning district. The retail/office uses are intended to serve local residents and will provide visitor - serving use to the community. The residential dwelling units will further support the retail/office uses in the neighborhood. These uses complement the existing type and character of the nearby development, which includes a variety of commercial and residential development. As further discussed in part (e) of this analysis, there is adequate capacity in the sewer and water facilities, circulation, and other public services and facilities to provide an adequate level of service to the proposed development. The project (i.e., mixed-use and multi -family residential dwelling units) represent "in fill' development that can be served by the existing infrastructure. Project Design Policies LU 5.1.9 Character and Quality of Multi -Family Residential Require that multi -family dwellings be designed to convey a high quality architectural character in accordance with the following principles (other than the Newport Center and Airport Area, which are guided by Goals 6.14 and 6.15, respectively, specific to those areas): Buildinq Elevations • Treatment of the elevations of buildings facing public streets and pedestrian ways as the principal fagades with respect to architectural treatment to achieve the highest level of urban design and neighborhood quality • Architectural treatment of building elevations and modulation of mass to convey the character of separate living units or clusters of living units, avoiding the appearance of a singular building volume • Provide street- and path -facing elevations with high-quality doors, windows, moldings, metalwork, and finishes Ground Floor Treatment • Where multi -family residential is developed on large parcels such as the Airport Area and West Newport Mesa: • Set ground -floor residential uses back from the sidewalk or from the right-of-way, whichever yields the greater setback to provide privacy and a sense of security and to leave room for stoops, porches and landscaping • Raise ground -floor residential uses above the sidewalk for privacy and security but not so much that pedestrians face blank walls or look into utility or parking spaces • Encourage stoops and porches for ground -floor residential units facing public streets and pedestrian ways • Where multi -family residential is developed on small parcels, such as the Balboa Peninsula, the unit may be located directly along the sidewalk frontage and entries should be setback or elevated to ensure adequate security (as shown below). 72 Roof Design • Modulate roof profiles to reduce the apparent scale of large structures and to provide visual interest and variety. Parking Design covered and enclosed parking areas to be integral with the architecture of the residential units' architecture. Open Space and Amenity Incorporate usable and functional private open space for each unit. Incorporate common open space that creates a pleasant living environment with opportunities for recreation. (Imp 2.1) LU 5.3.1 Mixed -Use Buildings Require that mixed-use buildings be designed to convey a high level of architectural and landscape quality and ensure compatibility among their uses in consideration of the following principles: • Design and incorporation of building materials and features to avoid conflicts among uses, such as noise, vibration, lighting, odors, and similar impacts • Visual and physical integration of residential and nonresidential uses • Architectural treatment of building elevations and modulation of their massing • Separate and well-defined entries for residential units and nonresidential businesses • Design of parking areas and facilities for architectural consistency and integration among uses • Incorporation of extensive landscape appropriate to its location; urbanized streetscapes, for example, would require less landscape along the street frontage but integrate landscape into interior courtyards and common open spaces (Imp 2.1) LU 5.3.5 Pedestrian -Oriented Architecture and Streetscapes Require that buildings located in pedestrian -oriented commercial and mixed-use districts (other than the Newport Center and Airport Area, which are guided by Goals 6.14 and 6.15, respectively, specific to those areas) be designed to define the public realm, activate sidewalks and pedestrian paths, and provide "eyes on the street" in accordance with the following principles: • Location of buildings along the street frontage sidewalk, to visually form a continuous or semi -continuous wall with buildings on adjacent parcels • Inclusion of retail uses characterized by a high level of customer activity on the ground floor, to insure successful retail -type operations, provide for transparency, elevation of the first floor at or transitioning to the sidewalk, floor -to -floor height, depth, deliveries, and trash storage and collection • Articulation and modulation of street -facing elevations to promote interest and character 72 • Inclusion of outdoor seating or other amenities that extend interior uses to the sidewalk, where feasible • Minimization of driveways that interrupt the continuity of street facing building elevations, prioritizing their location to side streets and alleys where feasible (Imp 2.1) The proposed development includes a new mixed-use structure with 1,145 square feet of retail/office floor area and one 2,360 square foot dwelling unit on Lot 17, and three new residential dwelling units ranging from 2,484 square feet to 2,515 square feet over Lots 18 and 19. The building scale and architectural style is reminiscent of the existing Ullman Sails building currently on-site. The design incorporates building materials such as a painted white CMU veneer, smooth white stucco, metal panel shed roofs, vertical wood siding, aluminum clad windows, and exposed steel that are consistent with other buildings in the Cannery Village community and are reminiscent of the previous nautical and marine uses of the area. The building incorporates large rolling style doors at the fagade. The mixed-use entry and residential structures along the 29th Street and Villa Way frontages are designed with a zero setback at to enhance pedestrian connections with the street frontage. The residential portion of the building provides modulation of the fagade along Villa Way by varying setbacks and floor levels and incorporates adequate common and private open space areas. The existing driveway at Villa Way will be closed to create two additional street parking spaces. Neighborhood Compatibility Policies LU 5.3.6 Parking Adequacy and Location Require that adequate parking be provided and is conveniently located to serve tenants and customers. Set open parking lots back from public streets and pedestrian ways and screen with buildings, architectural walls, or dense landscaping. (Imp 2.1) LU 6.10.2 Residential Character and Architecture Require that residential buildings be designed to contribute to an overall neighborhood character, locating buildings along the street frontage to form a continuous or semi -continuous building wall. (Imp 2.1) LU 6.10.3 Specific Plan Guidelines Utilize design and development guidelines for Cannery Village identified in the Cannery Village/McFadden Square Specific Plan. (Imp 3.1) The proposed project incorporates a variety of features to ensure neighborhood compatibility. Adequate parking will be provided to serve the retail/office tenants and customers. The applicant requests a four parking space reduction in the required parking for the retail/office component where five parking spaces are required. However, two additional on -street public parking spaces will be added with the closure of the Villa Way curb cut, which will help to accommodate customer and employee demands. Street parking is generally available throughout the Cannery Village neighborhood and a City metered parking facility is available one block to the north at 426 30th Street. All required parking garages and carports for the residential component are provided on-site, are readily accessible from the rear alley, and are screened from 73 Villa Way by the proposed building. The multi -family residential portion of the project is designed in such a way as to architecturally blend in with the adjacent mixed-use development and pay homage to the prior land use at this location (Ullman Sails). The building is located adjacent to the street frontage and forms a continuous building wall, improving the pedestrian connection with the street. The residential portion of the project provides a close interface with the street frontage that is characteristic of buildings throughout Cannery Village. Two units provide fenced in patio areas along the Villa Way frontage. Separate screened trash areas are provided for the commercial and residential portions of the project adjacent to the parking areas accessed from the rear alley. The specific plan no longer exists for Cannery Village. However, the project will adhere to the general design guidelines specified in the Zoning Code for new development. (b) The proposed development occurs within city limits on a project site of no more than five acres substantially surrounded by urban uses. The combined project site is within the Newport Beach city limits, and consists of 7,720 square feet or 0.18 -acres of land area. The project site is bounded by commercial office, retail, mixed-use, and residential uses in Cannery Village. (c) The project site has no value, as habitat for endangered, rare or threatened species. The subject property is a (0.18 acre) vacant site occupied by an existing building with no landscaping or native vegetation/habitat. The site is currently developed with a commercial building and is within a fully developed urbanized neighborhood. There is no potential for special -status plants or animals to exist on the lot. The project would not encroach into any jurisdictional waters or areas that support native and/or sensitive habitat. The property does not provide any wetland area and fully complies with current City policy (Coastal Land Use Policy 4.2.2.3). Thus, there would be no significant indirect impacts to wetland ESHA associated with the project. For these reasons, the project site has no value as habitat for endangered, rare or threatened species. Given the urban character of the surrounding area, no significant impacts to biological resources would occur. (d) Approval of the project would not result in any significant effects relating to traffic, noise, air quality, or water quality. Construction of the project is anticipated to be completed in 2018. The City Traffic Engineer expects the project will generate 37 additional average daily trips on a typical weekday, with a reduction of 6 morning peak hour trips and a reduction of 3 evening peak hour trips. The trip calculations indicate that the project will neither cause nor make worse an unsatisfactory level of service at any impacted primary intersection, and all intersections studied are forecasted to continue to operate at acceptable Levels of Service. As such, the project -related traffic would not cause or contribute to an unacceptable level of service with the circulation network adjacent to the project site. The project will provide adequate, convenient parking for residents, employees, and 74 customers based upon the review of the City's Traffic Engineer. Approval of the project would not result in any significant effect related to traffic or circulation. Neither short-term nor long-term air pollutant emissions will exceed significance thresholds established by the SCAQMD1. Nonetheless, the proposed project is required to comply with applicable SCAQMD regulations. Therefore, approval of the project would not result in any significant effects relating to air quality. A preliminary Water Quality Management Plan (Exhibit A) has been reviewed by the City of Newport Beach and implementation of the proposed project would not result in potentially significant impacts to the drainage patterns on-site. Project storm water must comply with all applicable Municipal Separate Storm Systems (MS4) requirements to ensure that impacts to surface and ground water quality do not occur. Water quality objectives will be achieved through the incorporation of Best Management Practices (BMPs) identified in the preliminary Water Quality Management Plan during construction and post -project implementation. Half of the current on-site drainage flows across the site and into a catch basin at the alley to the west and half of the drainage flows across the site and into a catch basin to the east along Villa Way. Under the proposed project, the drainage system follows the existing drainage pattern. Storm water west of the property is collected by a bottomless trench drain through downspouts and surface flows. Storm water east of the property is collected by a French drain through downspouts and discharged to Villa Way through a curb outlet. Approval of the project would not result in any significant effect related to water quality. Furthermore, the existing drainage facilities have adequate capacity to accommodate the minor increase in surface runoff generated by the proposed project based upon the review by the project's engineer. (e) The site can be adequately served by all required utilities and public services. All required utilities, including sewer, water, energy, telephone, etc., exist within the project site. An existing 8 -inch VCP sewer pipe is located along the alley and four 4 -inch sewer laterals and two 6 -inch sewer laterals are proposed to connect to the existing 8 - inch lateral. Each unit will be served by an individual water meter, sewer lateral, and cleanout within the public right-of-way. A water/waste water calculation has been prepared for the proposed development (Exhibit B). Project implementation is estimated to utilize more water and waste water than the prior commercial business. Development of a mixed-use development (retail/office and one dwelling unit) and multi -unit residential unit consisting of three dwelling units are estimated to result in an increase of 1,077 GPD of water demand and 632 GPD of waste water. No backbone facilities (i.e., master -planned roads and/or utilities) will be required to accommodate the proposed project and the existing 8 -inch domestic water main at the alley is more than adequate to handle the increased demand of the proposed development. The increase in demand for the 8 -inch sewer main line was found to be negligible due to the size and slope of the pipe and the connections have enough capacity to carry sewer to the main line. The nearest fire station is less than one quarter mile north of the project site at 32nd Street i htto://www.agmd.gov/docs/default-source/cega/handbook/seagmd-air-quality-significance-thresholds.12dPsfvrsn=2 715 and Villa Way. Furthermore, all of the public services, including police and fire protection, schools, and parks & recreation, etc., are adequate to accommodate the proposed project. Thus, the site can be adequately served by all required utilities and public services. Determination CEQA Class 32 consists of projects characterized as in -fill development meeting the conditions described above. The proposed project consists of the development of a new mixed-use structure and adjacent 3 -unit residential building consistent with the City's General Plan land use designation MU -H4 (Mixed -Use Horizontal) and Zoning designations MU-CV/15Th St (Mixed -Use Cannery Village/15th Street) as it provides multi -unit dwellings on interior parcels and a mixed-use structure at the street intersection. There is no reasonable probability that the proposed project will have a significant effect on the environment due to unusual circumstances, nor will the project result in any short-term or long-term impacts that were not previously considered in the Newport Beach General Plan and General Plan EIR. As described above, implementation of the proposed project will not result in any adverse effects on sensitive biological resources, traffic, air quality, noise or water quality. Therefore, the proposed project meets all of the conditions described above for in -fill development and qualifies for a Class 32 exemption. 70 Exhibit A Preliminary Water Quality Management Plan 77 Water Quality Management Plan (WQMP) Project Name: 410 Life Work Lott 410 2911 Street, Newport Beach CA 92663 Prepared for: Canny Sail House Lp 428 Old Newport Blvd. Newport Beach, CA Prepared by: Core Structure Inc. 23172 Plaza Pointe Dr, Suite #145 Laguna Hills, CA 949-954-7244 C RE Engineer: Wai Lin Maung Chen Registration No. C-83487 04/19/2017 05/15/2017 Updated M 11 Project Owner's Certification — 11 Permit/Application No. Grading Permit No. Block 225 Tract/Parcel Map No. Building Permit No. 1 Lot -17-18-19 CUP, SUP, and/or APN (Specify Lot Numbers if Portions of Tract) APN-047-052-01 This Water Quality Management Plan (WQMP) has been prepared for Jim Collins by S.J.W. Engineering Inc. The WQMP is intended to comply with the requirements of the local NPDES Stormwater Program requiring the preparation of the plan. The undersigned, while it owns the subject property, is responsible for the implementation of the provisions of this plan and will ensure that this plan is amended as appropriate to reflect up-to-date conditions on the site consistent with the current Orange County Drainage Area Management Plan (DAMP) and the intent of the non -point source NPDES Permit for Waste Discharge Requirements for the County of Orange, Orange County Flood Control District and the incorporated Cities of Orange County within the Santa Ana Region. Once the undersigned transfers its interest in the property, its successors -in -interest shall bear the aforementioned responsibility to implement and amend the WQMP. An appropriate number of approved and signed copies of this document shall be available on the subject site in perpetuity. Owner: Canny Sail House Lp. Title Owner Company Canny Sail House Lp Address 428 Old Newport Blvd Email ne #ature [7e,ph0 Date 7Q Contents Page No. Section I Discretionary Permit(s) and Water Quality Conditions.....................................3 SectionII Project Description..........................................................................................5 SectionIII Site Description...........................................................................................30 Section IV Best Management Practices(BMPs).............................................................12 Section V Inspection/ Maintenance Responsibility for BMPs..........................................24 Section VI Site Plan and Drainage Plan.........................................................................25 SectionVII Educational Materials..................................................................................26 Attachments Attachment ..................................................................................Educational Materials Attachment B............................................................... Infiltration Feasibility Worksheet AttachmentC.................................................................................................BMP Details 20 Section I Discretionary Permit(s) and Water Quality Conditions Provide discretionary permit and water quality information. Refer to Section 2.1 in the Technical Guidance Document (TGD) available from the Orange County Stormwater Program (ocwatersheds.com). N Project Infomation Permit/Application No Tract/ Parcel Map No Block 225 Lot17,18,19 AdditionalInformation/ ------------------------------- - _------- --Additional Address: 410 29th Street, Newport Beach Comments: Water Quality Conditions [WQoi] WATER QUALITY MANAGEMENT PLAN Prior to the issuance of any grading or building permits, the applicant shall submit for review and approval by the Manager, Permit Services, a Water Quality Management Plan (WQMP) specifically identifying Best Management Practices (BMPs) that will be used onsite to control predictable pollutant runoff. The applicant shall utilize the Orange County Drainage Area Management Plan (DAMP), Model WQMP, and Technical Guidance Manual for reference, and the County's WQMP template for submittal. This WQMP shall include the following: Water Quality • Detailed site and project description Conditions • Potential stormwater pollutants (list verbatim) • Post -development drainage characteristics • Low Impact Development (LID) BMP selection and analysis • Structural and Non -Structural source control BMPs Site design and drainage plan (BMP Exhibit) • GIS coordinates for all LID and Treatment Control BMPs • Operation and Maintenance (O&M) Plan that (r) describes the long- term operation and maintenance requirements for BMPs identified in the BMP Exhibit; (2) identifies the entity that will be responsible for long-term operation and maintenance of the referenced BMPs; and (3) N describes the mechanism for funding the long-term operation and maintenance of the referenced BMPs The BMP Exhibit from the approved WQMP shall be included as a sheet in all plan sets submitted for plan check and all BMPs shall be depicted on these plans. Grading and building plans must be consistent with the approved BMP exhibit. Watershed -Based Plan Conditions Provide applicable conditions from watershed TMDLS - Chlordane, DDT, Nutrients, PCBs, Pesticides. - based plans including WIHMPs and TMDLS. Section II Project Description II.1 Project Description The subject property is located in Newport Beach, CA on the corner of 29th avenue and villa way, south of Pacific Coast Highway. The lot is trapezoidal and is approximately 108' wide on the Alley, 62' wide on Villa Way, 101' wide on 29th Street, and 90' deep from Villa Way to the Alley. It is zoned NIU- CU/15th St. (mixed use Cannery Village/15th St.). The property consists of 3 lots and is currently an unoccupied commercial space. The building was once the home for Ullman Sails. The client wants to maintain the history and characteristics of the previous structure and of Ullman sails. Client proposes to separate lot 17 and do a mixed used development. The remaining 2 lots (18 & 19) will consist of 3 condos. Include attributes relevant to determining applicable source controls. Refer to Section 2.2 in the TGD that must tie mcluaea in the Development Category (Verbatim from WQNW): Project Area (ft2): 7693 Narrative Project Description: Project Area Pre -Project Conditions Post -Project Conditions Drainage Patterns/ Connections Description of Proposed Project Category 8. Significant redevelopment projects, where significant redevelopment is defined as the addition or replacement of 5,000 or more square feet of impervious surface on an already developed site. Number of Dwelling Units: 4 1 SIC Code: 1522 A redevelopment of a mixed used 1 commercial and 3 residential condos. Removed the existing commercial building and paved parking lot. Pervious .......................... r ........................ Area (sq ft) Percentage ................................................. 3 0% R.YI 2.2% Impervious ................................ r ........................ Area(ft) Percentage ......................................................... 7692.97 E 100% 7,525.97 : 97.8% In the existing condition, half of the storm water flow west toward Alley which carries water north toward 24t' Street, and another half flows east toward Villa Way, where a catch basin is located. All the drainage flows are surface sheet flows. The proposed drainage system, follows existing drainage pattern. Storm water west of the property is collected by a bottomless trench drain through downspouts and surface flows. Storm water east of the property is collected by a French drain through downspouts and discharge to Villa Way through a curb outlet. M II.2 Potential Stormwater Pollutants Determine and list expected stormwater pollutants based on land uses and site activities. Refer to Section 2.2.2 and Table 2.1 in the TGD for guidance. Pollutants of Concern E=Expected to be of concern Pollutant Additional Information and Comments N=Not Expected to be of concern Suspended -Solid/ Sediment E Nutrients E Heavy Metals N Pathogens (Bacteria/ Virus) ... ...... E --------------------------------------------------- Pesticides .................................:........................................................................................................................................................................ E ......... ......... ...------ Oil and Grease - ----------------- ------------------------------------------------------------------------------------------------------------------------------------------------------------------------ I E Toxic Organic Compounds N Trash and Debris E II.3 Hydrologic Conditions of Concern Determine if streams located downstream from the project area are deterrnined to be potentially susceptible to hydromodification impacts. Refer to Section 2.2.3.1 in the TGD for NOC or Section 2.2.3.2 for <SOC>. ® No - Show map ❑ Yes - Describe applicable hydrologic conditions of concern below. Refer to Section 2.2.3 in the TGD. Pre -development 2 -yr, 24 -hr storm Q = 0.321 cfs. Post -development 2 -yr, 24 -hr storm Q = 0.332 cfs. The flow increase about 3.4% post development, which is less then increase in 5%, so the area is not susceptible to hydromodification. Pre -development time of concentration Tc=7.75min. Post -development time of concentration Tc=7.5omin. The time of concentration decreases by 0.25 min., which is 3.2% decrease and less than 5%, so the area is not susceptible to hydromodification. Since the site is very small and both pre and post development has same impervious area, it is acceptable that hydromodification is not required. In addition, based on the Orange County Hydromodification Susceptibility Maps, the proposed project site is not susceptible to hydromodification. N a �ouv�ma: vva:�� a a�aH ®e�oa mVid mmsvm� -- •••••�•� � 3 W"A"gym GEH&HEIVAk - n 3 ge r 20 IIA Post Development Drainage Characteristics Describe post development drainage characteristics. Refer to Section 2.2.4 in the TGD. In the proposed drainage system, all the water from the property will collected z drainage system. One at the West of the property, and one at the East of the property. The system on the West is a bottomless trench drain, which discharges water to the Alley. The system flows to east flows through bioretention (planter boxes) and is discharged into Villa Way. IIS Property Ownership/ Management Describe property ownership/ management. Refer to Section 2.2.5 in the TGD. The property is a mixed used unit with a management company, so the management company bare the responsibility to maintain all the drainage facility on-site. 1A Section III Site Description III.1 Physical Setting Fill out table with relevant information. Refer to Section 2.3.1 in the TGD. Planning Area/ n/a Community Name i................ ......... ......... .......- ................................................................................................................................................................................................................... 410 29th Street Location/ Address --------- Newport Beach Land Use ^Mixed Use Cannery Village Zoning t MU -CV Acreage 0.18 ------------------------------------.. Predominant Soil Type ........................................................................................................ Sand H12 Site Characteristics Fill out table with relevant information and include information regarding BMP sizing, suitability, and feasibility, as applicable. Refer to Section 2.3.2 in the TGD. Precipitation Zone To o ra h Flat area. From the middle of the property is high point. The general terrain p g p y is sloping down toward north. Surface flow. txistmg ana proposea area are au iuu/o impervious. vvate Drainage will flow into bottomless trench drain along western driveway and Patterns/Connections discharge to the Alley. Downspouts discharges into planter boxes, which drain to Villa Way. Soil Type, Geology, and Infiltration Properties Sand. Hydrologic Soil Group Type A. Site Characteristics (continued) Hydrogeologic (Groundwater) Conditions Geotechnical Conditions (relevant to infiltration) Off -Site Drainage Utility and Infrastructure Information Based on Soil Report, ground water is 4-5ft below surface. Infiltration is not recommended due to shallow groundwater, but the storm water will be pretreated downspout filter before infiltrating. There is no offsite storm water flowing into the project site. n/a III.3 Watershed Description Fill out table with relevant information and include information regarding BMP sizing, suitability, and feasibility, as applicable. Refer to Section 2.3.3 in the TGD. Receiving Waters 303(d) Listed Impairments Applicable TMDLs Pollutants of Concern for the Project Environmentally Sensitive and Special Biological Significant Areas Newport Bay, Lower Chlordane, DDT, Nutrients, PCBs, Pesticides Nutrient and Pesticides Nutrient and Pesticides Yes. 29 Section IV Best Management Practices (BMPs) IV. 1 Project Performance Criteria Describe project performance criteria. Several steps must be followed in order to determine what performance criteria will apply to a project. These steps include: • If the project has an approved WIHMP or equivalent, then any watershed specific criteria must be used and the project can evaluate participation in the approved regional or sub - regional opportunities. The local Permittee planning or NPDES staff should be consulted regarding the existence of an approved WIHMP or equivalent. • Determine applicable hydromodification control performance criteria. Refer to Section 7.II- 2.4.2.2 of the Model WQMP. • Determine applicable LID performance criteria. Refer to Section 7.11-2.4.3 of the Model WQMP. • Determine applicable treatment control BMP performance criteria. Refer to Section 7.II-3.2.2 of the Model WQMP. • Calculate the LID design storm capture volume for the project. Refer to Section T H-2.4.3 of the Model WQMP. (NOC Permit Area only) Is there an approved WIHMP or equivalent for the project area that includes more stringent LID feasibility YES ❑ NO ❑ criteria or if there are opportunities identified for implementing LID on regional or sub -regional basis? If yes, describe WIHMP feasibility criteria or n/a regional/sub-regional LID opportunities. Project Performance Criteria (continued) If HCOC exists, list applicable hydromodification control performance n/a criteria (Section 7.II-2.4.2.2 in MWQMP) Bottomless trench is proposed for the infiltration. INF -7 List applicable (Due to high ground water level, storm water will be pre-treated with downspout filter before discharging into bottomless infiltration trench) LID performance criteria (SectionClosed bottom planter box (Bio -treatment) BMP proposed for treatment BMP. BIO -i 7.II-2.4.3 from INF -7 Underground Infiltration (Vde:ig- = 115 cu -ft) MWQMP) BIO -r Bioretention with underdrains (V&,ig. = 26o cu -ft) List applicable treatment control BMP performance The underground infiltration and bioretention satisfied DCV requirement. criteria (Section N/A 7.II-3.2.2 from MWQMP) Calculate LID C=0.75*imp+0.15=0.75*1+0.15 =0.90 design storm capture volume d=o.65 in, A=7693 sq -ft for Project. DCV= C*d*A = o.9 * o.65 * 7693 *r/rz = 375 cu -ft 91 IV.2. SITE DESIGN AND DRAINAGE PLAN Describe site design and drainage plan including • A narrative of site design practices utilized or rationale for not using practices; • A narrative of how site is designed to allow BMPs to be incorporated to the MEP • A table of DMA characteristics and list of LID BMPs proposed in each DMA. • Reference to the WQMP plot plan. • Calculation of Design Capture Volume (DCV) for each drainage area. • A listing of GIS coordinates for LID and Treatment Control BMPs (unless not required by local jurisdiction). Refer to Section 2.4.2 in the TGD. 93' long bottom less trench drain is proposed based on space availability. Bioretention with underdrains are proposed at the planter areas. (150 sq -ft) In addition, downspout filters are proposed to pre -treat storm water. 92 AC / f,453i�4Fipac r �I eP REMOVE EX 5'FS Q M. BODY OD (Incbes) Jlono a COGoc' Ico. ac) Phm, I GPM) FS 71 FS wM4 I IIr19 x>.s Ods co 6.13INV ]60% a ® FS 0 es p� 8.17 FS i6.61NV'�� EP ZI – ].8� =8.1]Sil� QJ ] . 8 FS' 1 7.30! ] i � s 6_2% F 9Ob, xA JI I m I i's J ! 62 IN `!. ].80 FS GARAGE Y4,FS 7.35 fiw, /^ � R N 0 I IlPmgs I e nFs r GARAGE INV t 2% BIO -2 8.33 FG 2% --I ' , 8.2% GARAGE � 15% ( BI08 1.2 zsc)_ Nb BJiO FS II 8.10 7.26 Jl ?'` 1 11 i EPSA2, R N62O 561461FE 9.951 J WQMP EXHIBIT SCALE 1 "=8' GRATE Z I I Z (CMIN. WIDE PEDESTRIAN SAFE DIMENSIONS DETERMINED BY PLAN FRAME& GRATE II' SLOT GRATE FRAME DIMENSIONS. OPENING. EASE JORDAN IRON USEFRAMEASAFORM� T— WORKS OR EQUAL 800.874.4100 FF=900 89.94' - 'L Al REBAR T&B FILL THIS PORTION WITH CRUSHED ROCK AFTER POURING GRATE 8^ SUPPORT CURB a'CRUSHEO ROCK 24" DIRECT OVERFLOW DISCHARGE W1 FILET CLOTH SECTION ZZ DETAIL BOTTOMLESS TRENCH DRAIN NOT TO SCALE AY -N \wIy FF=9.00 FF=9.00 AC ^Z4, A, � qC 0 elan FS I CONSTRUCTION NOTE INSTALL 6”DIA. ATRIUM DRAIN NDS 90 WI RISER AND ADAPTOR OR EQUAL. O INSTALL 6" DIA. DRAIN NDS 40 VA RISER AND ADAPTOR OR EQUAL. O CONSTRUCT BOTTOMLESS TRENCH DRAIN PER DETAIL ON SHEET Cd. O4- INSTALL 4" DIA. PVC SCHEDULE 40 OR SDR 35 PIPE BRAIN SYSTEM. a J� O INSTALL NEW SEWER LATERAL WITH CLEAN OUT PER CITY STANDARD PLANSTO-0061. (D INSTALL DOWNSPOUT WITH 4"DIA. FLOGARD DOWNSPOUT FILTER PER ARCHITECT PLAN. ctO INSTALL OVERFLOW DRAIN PER ARCHITECT PLAN �[, 712" ONC 0 INSTALL CLOSED BOTTOM BIO -RETENTION PLANTER BOX WITH UNDER DRAIN. 11L 1 O INSTALL NEW I' WATER METER AND LATERAL PER CITY STANDARD PLAN STD -5024-. �� – F�`, O INSTALL NEW GAS METER AND LATERAL. INSTALL CURB DRAIN PER CITY STANDARD PLAN STO-184-L. S 11 PLUG EXISTING DRIVEWAY APPROACHES PER CITY STANDARD PLAN STO-1654-. Is6jJ 1a RECONSTRUCT SIDEWALK PER CITY STANDARD PLAN STD-180-1- CONSTRUCT TD-180-1CONSTRUCT CURB ACCESS RAMP PER CITY STANDARD PLAN STD -181-1-43. CASE 7. .0CATE1EXIST FIRE BMP SUMMARY TABLE BMP NAME TYPE TREATED AREAIS04'T) BI04 INFILTRATION TRENCH 115 gBIO-2-11 CLOSED 8070M PLANTER BOX 260 ' RELOCATE EXIST'I O'CyRB PROJECT SITE SUMMARY SQ—FT 73ITO PROJECTAREA 7693 651 FS EXISTING IMPERVIOUS AREA 7,693 '�F5gT1 PROPOSED IMPERVIOUS AREA 7,527 I°34'1 NEW IMPERVIOUS AREA (166) 3-�0..00'L R N2P0640" W 56.29' 'G I BT, OVERFLOW DRAIN, 4' DIA. PVC PIPE WITH ATRIUM GRATE INLET AT 6" ABOVE FINISH GRACE OOWNSPOUT WITH COBBLE OR SPLASHBLOCK BELOW OVERFL ATRIUM GATE I �A C DIA. PVC PIPE SOR 35 OR SCHD. 40 LONGITUDINAL 4' DIA. PERFORATED PVC PIPE WRAPPED IN NO -WOVEN GEOTEXTILE MEMBRANE, PLACED OVER I- GRAVEL LAYER PLAN INLEfID MOOfl I01ncM1asf BODY OD (Incbes) Jlono a COGoc' Ico. ac) Phm, I GPM) Bypass GIGFM�N wM4 I IIr19 x>.s Ods 30 145 wD55 a llxz9 x>s pas es 12$ 0000' OR WWNSPoIrt FILLER BODY, FILLER Bl9(S XhF EMPM CO". a ACCESS COVER GASKU.. \ A.Ou. COVER. .. COVER MDUMING SCBE .� 14.00. OR 0..00' SPOUT.I tai p 0 Imo_ 18.00' J_ FloGard@ Downspout Filter 04.00"& 06.00" Sizes DOWNSPOUT DIRECT OVERFLOW DISCHARGE SECTION NOTES: 1. FlOGerba OOwnapout Fllter is avalfl,a to fhmast ldano,,1and9m down,ocule (BCS T.bul.t.n). 2. FoNr Imens shall have ad"ane bypass capadoo allow do,as oun to A" uNmpeba0 at ell Lines. S. Fllter aasemdY.hWI ba w Rated from stalMess peel (Type 30Q. 4. Fllter medium shall bs Insfisled8 melnWned In lamdanW Yoh menufacounor mcommendakns. 0 Oldcastlee SMwwater Bolufione � � mq„r BSFAfA1 TA �n P v",R I. OF REINFORCED CMU BLOCK OR PRE -CAST CONCRETE WITH WATERPROOF MEMBRANE THROUGHOUT UNIFORM MIX OF SAND AND ORGANIC MATERIAL (EX'. COMPOST); MIN INFILTRATION RATE OF 51NCHES PER HOUR. (DO NOT COMPACT) NONOWOVEN GEOTEXTILE MEMBRANE LONGITUDINAL 4' DIA. PERFORATED PVC PIPE WRAPPED IN NO -WOVEN GEOTEXTILE MEMBRANE. PLACED OVER I' GRAVEL LAYER DETAIL STORM WATER PLANTER NOT TO SCALE 16 12 B 4 0 8 16 SCALE V=8' R] CoreInc. 23172 C... Points Dr. SU!te #145 Lo9una Hills, CA 92653 Phone: 949-954-7244 info@corestructure.com www. rorestrudure.com PROJECT NAME: 410 LIFE WORK LOFT Z O H DOU DO z O U O u– IIEO Z Q Z J W d ARCHITECT BRANDON ARCHITECT 3001 RED HILL AVE COSTA MESA DEVELOPER: CANNY SAIL HOVE LP 428 OLD NEWPORT BLVD NEWPORT BEACH ADDRESS: 410 29TH ST. NEWPORT BEACH CA 92663 REVISIONS NO. DATE twILIJ11AN 1 SHEET NAME: WQMP EXHIBIT PROJECT NUMBER: 70050 PLOT DATE: 0511512017 SHEET NUMBER: WW -193 IV.3 LID BMP SELECTION AND PROJECT CONFORMANCE ANALYSIS Each sub -section below documents that the proposed design features conform to the applicable project performance criteria via check boxes, tables, calculations, narratives, and/or references to worksheets. Refer to Section 2.4.2.3 in the TGD for selecting ISD BMPs and Section 2.4.3 in the TGD for conducting conformance analysis with project performance criteria. IV.3.1 Hydrologic Source Controls If required HSCs are included, fill out applicable check box forms. If the retention criteria are otherwise met with other LID BMPs, include a statement indicating HSCs not required. Name Included? Localized on -lot infiltration ❑ Impervious area dispersion (e.g. roof top El Street trees (canopy interception) ❑ Residential rain barrels (not actively managed) ❑ Green roofs/Brown roofs ❑ Blue roofs ❑ Impervious area reduction (e.g. permeable pavers, site design) ❑ Other: ❑ Other: ❑ Other: ❑ Other: ❑ Other: ❑ Other: ❑ Other: ❑ Other: ❑ HSC is not required for the project. 9-/+ IV.3.2 Infiltration BMPs 6 dry wells (NDS Flo -Well) is proposed. Based on the manufacturer sizing calculation, it is enough to handle the water quality for the site. Name Included? Bioretention without underdrains ❑ Rain gardens ❑ Porous landscaping ❑ Infiltration planters ❑ Retention swales ❑ Infiltration trenches Infiltration basins ❑ Drywells ❑ Subsurface infiltration galleries ❑ French drains ❑ Permeable asphalt ❑ Permeable concrete ❑ Permeable concrete pavers ❑ Show calculations below to demonstrate if the LID Design Strom Capture Volume can be met with infiltration BMPs. If not document how much can be met with infiltration and document why it is not feasible to meet the full volume with infiltration BMPs. Infiltration Trench Capacity Rock Volume =10*q1*1/12 + 14*91*2/12 = 288 cu -ft Total captured volume = 288 * 0.40 = 115 cu -ft IV.3.3 Evapotranspiration, Rainwater Harvesting BMPs If the full Design Storm Capture Volume cannot be met with infiltration BMPs, describe any evapotranspiration, rainwater harvesting BMPs. 95 Name Included? All HSCs; See Section IV.3.1 ❑ Surface -based infiltration BMPs ❑ Biotreatment BMPs ❑ Above -ground cisterns and basins ❑ Underground detention ❑ Rainwater harvesting and reuse is not applicable since there are no landscaping area. IV.3.4 Biotreatment BMPs If the full Design Storm Capture Volume cannot be met with infiltration BMPs, and/or evapotranspiration and rainwater harvesting BMPs, describe biotreatment BMPs. Include sections for selection, suitability, sizing, and infeasibility, as applicable. <Delete or leave blank if not used> Name Included? Bioretention with underdrains 11 Stormwater planter boxes with underdrains ❑ Rain gardens with underdrains ❑ Constructed wetlands ❑ Vegetated swales ❑ Vegetated filter strips ❑ Proprietary vegetated biotreatment systems ❑ Wet extended detention basin ❑ Dry extended detention basins ❑ Show calculations below to demonstrate if the LID Design Strom Capture Volume can be met with infiltration, evapotranspiration, rainwater harvesting and/or biotreatment BMPs. If not document how much can be met with either infiltration BMPs, evapotranspiration, rainwater harvesting BMPs, or a combination, and document why it is not feasible to meet the full volume with either of these BMPs categories. Bioretention with underdrain is proposed around the property as planter box. Total of 150 sq -ft of planter area is provided. Treatment Capacity Calculation cl&l ive = (dp + nmdm + ncdc) = ( 9 + 0.35*18 + 0.45 * 12 ) /12 =1.73 ft dp = 9 -in, nm = 0.35, dm =18", nc = 0.45, do = 12" Vt, s.ent = cl,n Live * Area = 1.73 * 150 = 26o cu -ft. 97 IV.3.5 Hydromodification Control BMPs Describe hydromodification control BMPs. See Section 5 TGD. Include sections for selection, suitability, sizing, and infeasibility, as applicable. Detail compliance with Prior Conditions of Approval Hydromodification Control BMPs BMP Name BMP Description IV.3.6 Regional/Sub-Regional LID BMPs Describe regional/ sub -regional LID BMPs in which the project will participate. Refer to Section 7.II- 2.4.3.2 of the Model WQMP. Regional/Sub-Regional LID BMPs n/a IV.3.7 Treatment Control BMPs Treatment control BMPs can only be considered if the project conformance analysis indicates that it is not feasible to retain the full design capture volume with LID BMPs. Describe treatment control BMPs including sections for selection, sizing, and infeasibility, as applicable. Treatment Control BMPs BMP Name BMP Description No IV.3.8 Non-structural Source Control BMPs Fill out non-structural source control check box forms or provide a brief narrative explaining if non- structural source controls were not used. Non -Structural Source Control BMPs Check One If not applicable, state brief Not Identifier Name Included reason Applicable NI Education for Property Owners, ® ❑ Tenants and Occupants ................................................................................................................................................................. N2 Activity Restrictions ❑ ® Private Residence ................................................................................................................................................................. N3 Common Area Landscape E]® Private Residence Management ................................................................................................................................................................. N4 BMP Maintenance N ❑ ................................................................................................................................................................. N5 Title 22 CCR Compliance (How ❑ ® Private Residence development will comply) ................................................................................................................................................................. N6 Local Industrial Permit Compliance ❑ ® Private Residence .............................................................................................. N7 Spill Contingency Plan ❑ ................................................................... ® Private Residence. .............................................................................................. N8 Underground Storage Tank ❑ ................................................................... Private Residence Compliance ................................................................................................................................................................. N9 Hazardous Materials Disclosure ❑ ® Private Residence Compliance ................................................................................................................................................................. N10 Uniform Fire Code Implementation ❑ ® Private Residence .............................................................................................. N11 Common Area Litter Control ❑ ................................................................... ® Private Residence. .............................................................................................. N12 Employee Training ❑ ................................................................... ® Private Residence .............................................................................................. N13 Housekeeping of Loading Docks ❑ ................................................................... ® Private Residence .............................................................................................. N14 Common Area Catch Basin Inspection ❑ ................................................................... ® Private Residence ................................................................................................................................................................. N15 Street Sweeping Private Streets and ® ❑ Parking Lots ................................................................................................................................................................. N16 Retail Gasoline Outlets El® Private Residence 99 IV.3.9 Structural Source Control BMPs Fill out structural source control check box forms or provide a brief narrative explaining if Structural source controls were not used. Structural Source Control BMPs Check One Identifier Name If not applicable, state brief Included Not reason Applicable Sl Provide storm drain system stenciling ❑ ® Private Residence and signage Design and construct outdoor material S2 storage areas to reduce pollution ❑ E Private Residence introduction Design and construct trash and waste S3 storage areas to reduce pollution ❑ ® Private Residence introduction Use efficient irrigation systems & S4 landscape design, water conservation, ® ❑ smart controllers, and source control SS Protect slopes and channels and El ® Private Residence provide energy dissipation Incorporate requirements applicable to individual priority project categories ® ❑ (from SDRWQCB NPDES Permit) 56 Dock areas ❑ ® Private Residence S7 Maintenance bays ❑ ® Private Residence S8 Vehicle wash areas ❑ ® Private Residence S9 Outdoor processing areas ❑ ® Private Residence S10 Equipment wash areas ❑ ® Private Residence Sil Fueling areas ❑ ® Private Residence S12 Hillside landscaping ❑ ® Private Residence S13 Wash water control for food ❑ Private Residence preparation areas S14 Community car wash racks ❑ ® Private Residence 100 IV.4 ALTERNATIVE COMPLIANCE PLAN (IF APPLICABLE) IV.4.1 Water Quality Credits Determine if water quality credits are applicable for the project. Refer to Section 3.1 of the Model WQMP for description of credits and Appendix VI of the TGD for calculation methods for applying water quality credits. II Description of Proposed Project II 11 Project Types that Qualify for Water Quality Credits (Select all that apply): 11 projects that reduce the overall impervious footprint of the project site. use redevelopment, expansion, or reuse of real property which may be complicated by the presence or potential presence of hazardous substances, pollutants or contaminants, and which have the potential to contribute to adverse ground or surface WQ if not redeveloped, as a combination of residential, commercial, industrial, office, institutional, or other land uses which incorporate design principles that can demonstrate environmental benefits that would not be realized through single use projects (e.g. reduced vehicle trip traffic with the potential to reduce sources of water or air pollution). ❑Developments with dedication of undeveloped El Developments portions to parks, in a city center preservation areas and area. other pervious uses. Calculation of Water Quality I Credits n/a I (if applicable) j include two distinct categories (credits can only be taken for one category): those with more than seven units per acre of development (lower credit allowance); vertical density developments, for example, those with a Floor to Area Ratio (FAR) of 2 or those having more than 18 units per acre (greater credit allowance). LJ transit-orientea aevetopments, sucn as a mixea 1 LJ tceaevetopment use residential or commercial area designed to I projects in an established maximize access to public transportation; similar to I historic district, historic above criterion, but where the development center is preservation area, or within one half mile of a mass transit center (e.g. bus, similar significant city rail, light rail or commuter train station). Such area including core City projects would not be able to take credit for both Center areas (to be categories, but may have greater credit assigned i defined through development; would not be able I mapping). ❑ L_J Live -work developments, a I UIn-fill projects, the Developments variety of developments designed conversion of empty lots in historic to support residential and and other underused districts or vocational needs together - spaces into more historic similar to criteria to mixed use beneficially used spaces, preservation development; would not be able such as residential or areas. to take credit for both categories. commercial areas. IV.4.2 Alternative Compliance Plan Information Describe an alternative compliance plan (if applicable). Include alternative compliance obligations (i.e., gallons, pounds) and describe proposed alternative compliance measures. Refer to Section 7.11 3.0 in the WQMP. 101 n/a 102 Section V Inspection/ Maintenance Responsibility for BMPs Fill out information in table below. Prepare and attach an Operation and Maintenance Plan. Identify the mechanism through which BMPs will be maintained. Inspection and maintenance records must be kept for a minimum of five years for inspection by the regulatory agencies. Refer to Section 7.114.0 in the Model WQMP. BMP Inspection/ Maintenance Inspection/ Reponsible Maintenance Minimum Frequency BMP Party(s) Activities of Activities Required Bottom Less Trench Drain Owner Yes 1 per year FloGard Downspout Filter Owner Yes 1 per year Planter Box Owner Yes Per -landscape schedule 103 Section VI Site Plan and Drainage Plan VI.1 SITE PLAN AND DRAINAGE PLAN Include a site plan and drainage plan sheet set containing the following minimum information: • Project location • Site boundary • Land uses and land covers, as applicable • Suitability/feasibility constraints • Structural BMP locations • Drainage delineations and flow information • Drainage connections • BMP details VI.2 ELECTRONIC DATA SUBMITTAL <optional -delete if not used> The minimum requirement is to provide submittal of PDF exhibits in addition to hard copies. Format must not require specialized software to open. If the local jurisdiction requires specialized electronic document formats (CAD, GIS) to be submitted, this section will be used to describe the contents (e.g., layering, nomenclature, georeferencing, etc.) of these documents so that they may be interpreted efficiently and accurately. Ii Section VII Educational Materials Refer to the Orange County Stormwater Program (ocwatersheds.com) for a library of materials available. For the copy submitted to the Permittee, only attach the educational materials specifically applicable to the project. Other materials specific to the project may be included as well and must be attached. Education Materials Residential Material Check If Business Material Check If (http://www.ocwatersheds.com) Applicable (http://www.ocwatersheds.com) Applicable The Ocean Begins at Your Front Door ® Tips for the Automotive Industry ❑ Tips for Car Wash Fund-raisers ❑ Tips for Using Concrete and Mortar ❑ Tips for the Home Mechanic ® Tips for the Food Service Industry ❑ Homeowners Guide for Sustainable ® Proper Maintenance Practices for Your El Use Business Household Tips ® Other Material Check If Attached Proper Disposal of Household ® Hazardous Waste Recycle at Your Local Used Oil ® El Center (North County) Recycle at Your Local Used Oil El El Center (Central County) Recycle at Your Local Used Oil El El Center (South County) Tips for Maintaining a Septic Tank El El Responsible Pest Control ❑ ❑ Sewer Spill ❑ ❑ Tips for the Home Improvement Projects ® ❑ Tips for Horse Care ❑ ❑ Tips for Landscaping and Gardening ® ❑ Tips for Pet Care ❑ ❑ Tips for Pool Maintenance ❑ ❑ Tips for Residential Pool, Landscape and ❑ El Drains Tips for Projects Using Paint ® ❑ 105 Attachment A loo Did you know that just Ixl='VV -,r one quart of oil can pollute 250,000 gallons of water? A clean ocean and healthy creeks, rivers, bays and beaches are important to Orange County. However, not properly disposing of used oil can lead to water pollution. If you pour or drain oil onto driveways, sidewalks or streets, it can be washed into the storm drain. Unlike water in sanitary sewers (from sinks and toilets), water in storm drains is not treated before entering the ocean. Help prevent water pollution by taking your used oil to a used oil collection center. Included in this brochure is a list of locations that will accept up to five gallons of used motor oil at no cost. Many also accept used oil filters. Please contact the facility before delivering your used oil. This listing of companies is for your reference and does not constitute a recommendation or endorsement of the company. Please note that used oil filters may not be disposed of with regular household trash. They must be taken to a household hazardous waste collection or recycling center in Anaheim, Huntington Beach, Irvine or San Juan Capistrano. For information about these centers, visit www.oclandfills.com. Please do not mix your oil with other substances! I For more information, please call the Orange County Stormwater Program at 1 -877 -89 -SPILL (1-877-897-7455) or visit www.watersheds.com. For information about the proper disposal of household hazardous waste, call the Household Waste Hotline at (714)834-6752 or visit www.ociandfills.com. *S BLCYCLL LsLD OIL For additional information about the nearest oil recycling center, call the Used Oil Program at 1 -800 -CLEANUP or visit www.cleanup.org. DID113 Rav 8103 Alk prinletl an recycled paper The Ocean Begins at Your Front Door P R OS J E C T P033 10n P R E V E N T I O N A he Wagers Auto Parts #1582 Cypress Kragen Auto Palle #4133 Firestone Store #2736 WA 10 Minute Oil Change All Seasons Tire and Auto Center Inc. 3420 W Linmin Ave., Anaheim, CA 92801 AutoZone #5521 904 W Oran,rdl o der Ave., Fullerton. CA 9211 1071 Beach BIv6, La Habra, CA 90631 8100 Lampeon Ave., Same , CA 92841 8173 B-1doest St, Anaheim, CA 92804 (714)828-7977O 5471 Llnwln Ave, Cypreas CA 90630 (]14)526-35]00 (562)691-17310 (]14)3]344320 (714)17@£0900 CIWMB#:300,04103 (714)99546440 CIWMB#: 30-C-06256 CIWMB#. 30.0-01169 CIWMB#.30-C-05909 CIWMB#: 30,0-31]] CIWMB#: 3NC408M Pep Boys#613 Pep Boys ASO Kragen Aorto Parts #1569 NbLfIMMifK AuloZ... 0317 10912Kdria Ave., A-hm.,CA92804 Big OTi— 1nl)SHarbor BNd_Fd1mL.gCA92832 1621 W Wnittier BNtl_ La Habra, CA 90631 Muni one#5543 423 N Anaheim Blvd, Anaheim, CA 92805 (714)638-08830 STOCenitos Ave., C,mrss,CA90830 (]14)870-01) (562)905-25380 6611 Wesband., Blvd, Westminster CA 92683 (714)78-07870 CIWMB#:30-01]56 (714)826£3340 CIWMM 30-C-01755 CIWMB#'.30.6070]8 (714)896-28980 CIWMB#: 30-CA5263 CIWMB#: 36C-04245 CMMSH: 300.04964 Pep Boys #683 Sunnyside 76 Car Care Center Pd, Boys M97 AutoZone #5226 3030 W Lincoln Anaheim. CA 92MI Econo Lube N'Tum #213 2701 N Brea Blvd,. Fullerton. CA 92835 125 W Imperial Hwy., La Habra. CA 90631 Auta until #3544 2145 W Linmin Ave., Anaheim, CA 92801 (714)8264810O 5497Cama Ave., Cypress, CA 90630 (714)258-0773O (714yW]-0601 O 8481 Westmimter Blvd, Westranskr, CA 926133 (714)533-65990 CIWMB#: 30C-0341] (714)7814456( CIWMB#: 30-001381 CIWMB#'. 36C-04026 (714)891-3511() CIWMB#: 30-0-04604 CIWMB#: 30-C-06240 CIWMB#: 30-C44966 No Bays#809 Garden Geove Shell Olt Change&Tuns Betlar Automotive 8205 E Sante Ane Cyn Rd. Anaheim, CA 92808 Jiffy Lube M51 76 Pm Lube Plus 1580 W Imperial Hwy, to Hebra, CA 90631 City of Westminster Composts Yar W01 E Mbaloma Ave., Mahaim, CA 92006 (714)974-01050 4942 Linmin Ave.,. Cypress, CA 90HO 9001 Trask Ave., Garden Grove, CA 92844 (562)697-35130 14381 Olive St, Wesbninati,, CA 92683 (713)520-13800 CIWMB#, 30C-03443 (826)865-9659() (714)393-0590() (]14)&95-28]8(292) CIWMB#: 30-0-02205 Civil 30,C -061B2 CIWMB#: 30-C-05276 LOl AYIMfe, CIWM6#: W -C-02000 Plck Youf Part JIM Luba #1740 Classic Chevrolet 1235 S Beach Blvd., Anaheim, CA 92007 M 8 N Coastline Auld Is TOO Servlet AutoZone #5527 3311 Kati , Lee Ammer, CA 90720 Honda Wetld 1 M Weir Canyon Rd, Anaheim, CA 92807 (714)52748450 4005 Ball Rd, Cypress, CA 90630 13190 Harbor Blvd, Garden Gmvq CA 92843 (562)5951B27O 13600 Beach Blvd., Wervar, inter, CA 92883 (714)283-54000 CIWMBffi 30-0-03744 (714)026-10010 (714)636-56650 CIWM13#'. 30.0-03529 (714)890.8900() CIWMB#: 30.C-05223 CIWMB#: 30.0-04387 CIWMB#: 30.604780 CIWM&f: 30-C-03639 PK Auto Performed. MidWHY CA) Econo Lube N'Tune #1 3106 W. Lincoln Ave., Anaheim, CA92801 Mastedube#103 David Mumy Shell Bolsa Tmeamiselon Jiffy Luba#1579 3201 W Lenoir Ave., Arca aim, CA 92801 (714)82621410 59M Lincoln Cypress, CA 90630 12571 My Vlew 34 Golden Grove, CA 92845 8331 Bear Ave., Midway Cdy, CA 92655 SMI Westerlies, Blvd, Wreara ter CA 92683 (714)8210128() CIWMB#:300-05628 (714)826-23230 (714)898-0170() (714)799-61580 (]14)899-272]0 CIWMB#: 30,0-1485 CIWMB#: 3NC41071 CIWMM 30-C-00547 CIWMB#'. 30..05768 CM'MB#: 30,042745 Buick Change Luba antl Oil EZ Lube Inc - Send Roach Sol 2731 WLinmin Ave., Mahaim, CA 92801 Masledube#104 Erymax Luba &leader N.Min John's Banks &Arm Repair 905 N Weir Canyon Rd, Anaheim, CA 9280] (714)82144640 5971 Ball Rd., Cypreas, CA90630 8100 Lem cmn Ave., Garan Gmve, CA92841 Advanced A. Is Bill 13050 Hoover SL, Westminster, CA 92683 (714)65&13120 CIWMB#130--04363 (714)220-15550 (909)31682810 144 S Bral Planta CA 928M (714)379-MRS8 ) CIWMB#: 30-606011 CIWMB#: 36C-04682 CIWMB#: 301 (714)9911 CMMS#:30-.0561] Santum of Amhelm CIWMB#'. 36606242 Firestone Stare MIC] 1380 S Auto Caner Dc, Anaheim. CA 92806 Metric Motors of Cyprass Firestone Store #Ti SO limited Auto Parts 0762 1200 S Magnolia Ave., Anaheim. CA 92804 (714)648-24440 6042Cemfs Ave., CypreSs,CA90830 10081 Chapman Ave., Garden Gro, CA 92840 Castner9 Auto Same. 6562 Westminster Blvd, Westminster. CA 926133 (949)598-5520() CIWMB#. 30C-08332 (714)82147020 (714)53646300 2143 Bredff Ave.. PI ... mia, CA 92870 (]14)898-0810() CIWMB#: 30-0-05743 CIWMB#:3DC-05157 CIWMB#: 30-601224 (714)528-1311() CIWhl 30-C-02590 Sun Tech Aub S.M. CIWMB#: 36C-06452 Great Wester Lube Express 105 S Stat-0ollege Blvd. Anaheim. CA 92806 NAerfon Flrrratons Store #T1073 Midway City Sanitary District 125 N Smell St., Anaheim, CA 92801 (714)956-1389O Amw... #2898 13961 Brockhumt SL. Garen Grove, CA 92843 Emno Luba N' Tune 14451 Cedarwood St., Westmin ce5 CA 92683 (714)250.13000 CIWMB#:30-C-06455 146 N. Raymond Ave., FulleMn, CA 92831 (]14)5962741( ) 100 W Chapman Ave., Placcum, OA W870 (714)893-35531 ) CIWMB#: 30-0-05542 (714)070-97720 CIWMB#: 30-603690 (714)524-04240 CIWMB#: W -C-01626 Wnlc Truck Borden CIWMB#: 30.0-04408 CIWMB#'. 30.0-08454 HR Pro Auto Service Cenfo 515 S Rose BL, Anaheim, CA 921305 Jiffy Lube 91991 Pep Boys NO 3180 W Lincoln Ave., Anaheim, CA W801 (714)533-33330 AuWaser #5522 13970 Hamor Blvd, Garden Game, CA 92843 Relay, FOM 15221 Beach Blvd., Westminster, CA 92683 (714)76143430 CIWMB#: 30 C-01142 1801 Orangethorpa W. Fullerfry CA92633 (714)554-06100 1350 E Yorbe Linda BlW., Placentia, CA 92870 (714)89385440 CIWMB#: 30.1 (]14)0]0-2860 CIWMB#: 30.0-05400 (714)524-1200() CIWM&f: 30-603415 AndefthBI 14ift CIWMB#: 3DC46062 CIWMB#'. 30.0-01863 Ira Newman Automo5ve Services Anaheim Hill. Corsair 8 Luba K2ger Auto pard 91251 YOrbi LIMi 1507 N 3tete College Blvd. Anaheim. CA 92806 5810 E La Palma Ave., Anaheim Hills, CA 92807 AutoZone #5523 13933 N Harbor Blvtl_Gromea Grove CA 92843 SBi/ BBiCh AutoZone #5545 (714 35-23920 (714)]/]-68050 102 N Euclid FulleMn, CA 92832 (]14)5543]800 M Is N Coastline Auto 8 Tire Service 18528 YON. Linda Ri., Yore Linda, CA 92506 CIWMB#: 30,0-1482 CIWMBik 300-01387 (]14)8]0-2860 CIWMM 30-C-02683 12239 Seal Beach Blvd, Seal Beach, CA W740 (714)970.89330 CIWMB#: 36C-04755 (714)82840010 CM'MS#: 30-044971 Jiffy Lube#1028 BrGI Kragen Auto Pard M555 CIWMB#. 30.0-04433 2400 W Bell Rd. Anaheim. CA 92804 Firestone Store MAS EZ Luba 017 9851 Chapman Ave., Garden Grove, CA 92MI Econo Lotus N'Tune (714)761-5211() 091 E Imperial Hwy. Bora, CA 92821 4002 N Harbor Blvd, Fullerton, CA 92835 (714)741-0300 Seal Beach Chevron 22270 La Palma Ave., YoNa Linda, CA 92887 CIWMB#: 30-C-00870 (714)529-8404( ) (714)871-9980( ) CIWMB#: 30-6040]9 12541 Seal Beach Blvd, Seel Beech. CA 90740 (]14)692-8394( ) CIWMB# 30C-01221 CIWMB#:3DC-03741 (949°95-07]4(14) CIWMB#: 30-C46513 Jiffy Lube 41903 Nissan of Graren Grove CIWMB#: 36C-06425 2505 E Lincoln Ave, Amheim, CA 928M Oil Co. Hanry'6 Flandi Share #PEH 9670 Tresk Ave., Garen Grove, CA 92884 EZ Lube Inc. #4 (]14)]7240700 230 N Brea Blvd., Brea, CA 92821 1933 N Placentia Ave, FulleMn, CA 92831 (714)537-09000 scant" 17511 Yoke Linda BIW., Yoke Linde, CA 928M CIWMB4k: 30-0-05511 (714)99619000 (714)993-71000 CIWMB#: 30-3-06553 Audi 02806 (714)556-1312O CIWMB#: 30C-04273 CIWMB#. 30,C-02122 11320 Beam Blvd, Bente, CA 90680 CIWMB#, X -C-05739 Jiffy Luba #2340 Toyota of Gordon Gmve (714)89-5]665( ) 2181 W Lincoln Ave., Anaheim, CA 92801 S. pearld Fox Servlet Center M44 Trask Ave., Garen Gmvs, CA 92844 CIWMB#'. 30.0-04563 Flmbne St.. 02M (714)533-1 WOO Firestone Store ill 1010 W Orangemorye Falkland, CA 92&93 (]14)8955595( ) 18500 Yams Linda BIW., Yams. Linda, CA 92886 CIWMB#:30-C-04647 6011 Orangethorpe Buena Park, CA 90520 (714)079-14300 CIWMB#: 30-C-06555 Joe's Auto Clinic (714)279-19660 (714)6]0-]9120 CIWMB#: 30.0-02318 11783 Beach Blvd., Braden, CA 90680 CIWM&f: 30-601222 Waged Auto Paris 91303 CIWMBk 30L-01218 LJO HHGH (714)891-7715() 1086 N State College BIM„Anaheim, CA 92806 Fullerton College Automotive Technology AutoZone #5532 CIWMB#. 30.0-03253 Jiffy Luba #102 (]14)956]3510 Firestone Store WITS 321 E Chapman Ave.. Fullism, CA 92832 1200 W Imperial Hwy, Le Habra, CA 90631 1B751 Yams Linda BIW., Yaba Linda, CA 92886 CIWMB#:30.0-3438 8600 Beach Blvd, Buena Park CA 90820 (]14)992)2750 (562)69453370 Kmged Added Parts M742 (714)528-28000 (714h2]-5300) CIWMB#: 3DC43165 CIW1MB#:30-C-04734 11951 Beach Blvd, Stamen CA 90680 Civai 3OC43M ebal Aro Pard#1399 CIWMB#3GC-02121 (]14)793]5740 2245 W Ball Rtl_Arem ,CA 92804 Wegen Auto pard M731 Burch Ford CIWMB#. 30.0-05231 Mike Sahuld lmmr[ Service (714890-1274() Kragen Auto Pard #1204 2978 Yorba Undo Fullarrq CA92831 201 N Hak., Blvd.. Le Habra, CA 90631 4832 Eureka Ave., Yorba Linda, CA 92886 CIWMB#: 300-4094 5303 Beech Blvd., Buena Park, CA 90621 (]14)9964]800 (582)69132250 ScherTlre #20 (714)528441() (714)984-13200 CIWMB#: 3NC42628 CIWMB#: 30-.05179 7000 Karelia Ave., Seal CA 90680 CI1NMSk 30044313 Kragen Auto Parts M563 CIWMB#30C-02623 (714)09299240 2072 Lincom Ave., Anaheim, CA 92806 CIWMB#. 3NC-05907 (714)602LSMGO CIWMB#: 30-C-04078 This information was provided by the County of Orange Integrated Waste Management Department and the California Integrated Waste Management BoIQ�IWMB) lean beaches and healthy creeks, rivers, bays and ocean are important to Orange County. However, not properly disposing of used oil is illegal and can lead to fines. If you pour or drain oil onto driveways, sidewalks or streets, it can be washed into the storm drain. Help prevent water pollution by taking your used oil and oil filters to a used oil collection center. Most major automotive maintenance centers will accept up to five gallons of used motor oil at no cost. For a fist of locations, please visit www.cleanup.org. p Prevent Ocean Pollution: . for the Mechanic WORK SITE • Locate the storm drains on or near your property. Do not allow used oil or any materials to flow into these drains. • Examine your home for sources of pollution. • Perform automotive projects under cover and in a controlled area to prevent stormwater runoff. • Sweep or vacuum your automotive workspace regularly • Use a damp mop to clean work areas. Never hose down surfaces into the street, gutter or storm drain. • Pour mop water into a sink or toilet. Never dispose of water in a parking lot, street, gutter or storm drain. PREVENT LEAKS AND SPILLS • Keep absorbent materials such as rags and/or cat litter in the work area • Empty drip pans into a labeled, seal container before they are full • Wipe up any spills or repair leaks as they happen. Don't let them sit. • Place large pans under any wrecked cars until all fluids are drained. • Promptly dispose of collected fluids into a hazardous waste drum or deliver them to an oil recycling center. Used oil recycling locations can be found at http://www. ochealthinfo.com/regulatory/usedoil.htm CLEANING SPILLS Clean up spills immediately by using absorbent material such as rags, cat litter or sand. If the material spilled is hazardous, dispose of the rag, litter or sand in the same manner as hazardous waste. If the material spill is non- hazardous, dispose of it in the trash. • Immediately report spills that have entered the street, gutter or storm drain to the County's 24 -Hour Water Pollution Problem Reporting Hotline at 1 -877 -89 -SPILL (1-877-897-7455) or visit www.ocwatersheds.com to fill out an incident report. • Report emergencies to 911. VEHICLE FLUID MANAGEMENT • Vehicle fluids are hazardous waste and must be stored and disposed of in accordance with all local, state and federal laws. • Designate an area to drain vehicle fluids away from storm drains and sanitary drains. • When possible, drain vehicle fluids indoors or within covered areas, and only over floors that are constructed of a non- porous material such as concrete. Asphalt and dirt floors absorb spilled or leaked fluids, making the cleanup extremely difficult. P E O 1 E E T PREVENTION 1.a Houshold Activities -v8 -sue 9/26/03 12:01 AM Page 1 Do your part to prevent water pollution in our creeks, rivers, bays and ocean. A clean ocean and healthy creeks, rivers, bays and beaches are important to Orange County. However, many common household activities can lead to water pollution if you're not careful. Litter, oil, chemicals and other substances that are left on your yard or driveway can be blown or washed into storm drains that flow to the ocean. Over -watering your lawn and washing your car can also flush materials into the storm drains. Unlike water in sanitary sewers (from sinks and toilets), water in storm drains is not treated. You would never pour soap, fertilizers or oil into the ocean, so don't let them enter streets, gutters or storm drains. Follow the easy tips in this brochure to help prevent water pollution. For more information, please call the Orange County Stormwater Program at(714)567-6363 or visit www.ocwatersheds.com. To report spills, call the Orange County 24 -Hour Water Pollution Problem Reporting Hotline at (714) 567-6363. For emergencies call 911. F A 1 Y I N S I 0" 111 Houshold Activities -v8 -sue 9/26/03 12:01 AM Page 2 Household Activities ■ Sweep outdoor spills and dispose in the trash. For wet spills like oil, apply cat litter or another absorbent material, then sweep and bring to a household hazardous waste collection center (HHWC). Do not rinse spills with waterl ■ Securely cover trash cans. ■ Take household hazardous to a household hazardous waste collection center. ■ Store household hazardous waste in closed, labeled containers inside or under a cover. ■ Do not hose down your driveway, sidewalk or patio. Sweep up debris and dispose in trash. ■ Always pick up after your pet. Flush waste down the toilet or dispose in the trash. ■ Bathe pets indoors or have them professionally groomed. Household Hazardous Wastes include. ♦ Batteries ♦ Paint thinners, paint strippers and removers ♦ Adhesives ♦ Drain openers ♦ Oven cleaners ♦ Wood and metal cleaners and polishes ♦ Herbicides and pesticides ♦ Fungicides/wood preservatives ♦ Automotive fluids and products ♦ Grease and rust solvents ♦ Thermometers and other products containing mercury ♦ Fluoresent lamps ♦ Cathode ray tubes, e.g. TVs, computer monitors ♦ Pool and spa chemicals Gardening Activities ■ Follow directions on pesticides and fertilizers, (measure, do not estimate amounts) and do not use if rain is predicted within 48 hours. ■ Water your lawn and garden by hand to control the amount of water you use. Set irrigation systems to reflect seasonal water needs. If water flows off your yard and onto your driveway or sidewalk, your system is over -watering. ■ Mulch clippings or leave them on the lawn. If necessary, dispose in a green waste container. ■ Cultivate your garden often to control weeds. Washing and Maintaining Your Car ■ Take your car to a commercial car wash whenever possible. ■ Choose soaps, cleaners, or detergents labeled "non-toxic," "phosphate free" or "biodegradable." Vegetable and citrus - based products are typically safest for the environment, but even these should not be allowed into the storm drain. ■ Shake floor mats into a trash can or vacuum to clean. ■ Do not use acid -based wheel cleaners and "hose off' engine degreasers at home. They can be used at a commercial facility, which can properly process the wash water. ■ Do not dump wash water onto your driveway, sidewalk, street, gutter or storm drain. Excess wash water should be disposed of in the sanitary sewers (through a sink, or toilet) or into an absorbent surface like your lawn. ■ Use a nozzle to turn off water when not actively washing down automobile. ■ Monitor vehicles for leaks and place pans under leaks. Keep your car well maintained to stop and prevent leaks. ■ Use cat litter or other absorbents and sweep to remove any materials deposited by vehicles. Contain sweepings and dispose of at a HHWCC. ■ Perform automobile repair and maintenance under a covered area and use drip pans or plastic sheeting to keep spills and waste material from reaching storm drains. ■ Never pour oil or antifreeze in the street, gutter or storm drains. Recycle these substances at a service station, HHWCC, or used oil recycling center. For the nearest Used Oil Collection Center call 1 -800 -CLEANUP or visit www. 1800CLEANUP.ORG. For locations and hours of Household Hazardous Waste Collection Centers in Anaheim, Huntington Beach, Irvine and San Juan Capistrano, call (714)834-6752 or visit www.oclandfills.com. 112 01 ORANGE COUNTY Waste&,Recycling Our Community. Our Commitment How to use Orange County's Household Hazardous Waste Collection Centers Collection Center Hours: 9:00 a.m. to 3:00 p.m. Tuesday through Saturday Closed major holidays and rainy days. More information about household hazardous waste disposal is available at Visit the 714-834-6752 and at www.oclandfills.com. Material Anaheim Huntington Irvine San Juan Beach must remain Capistrano 1071 N. Blue Gum Street 17121 Nichols Street -Gate 6 6411 Oak Canyon 32250 La Pata Avenue Anaheim, CA 92806 Huntington Beach, CA Irvine, CA 92618 San Juan Capistrano, CA material for 92647 you. 92675 At CVT Recycling Center, on At Rainbow Disposal, south of Next to City of Irvine Corporate Yard & Bark Park. Exit 1-5 at Ortega Highway Southwest Corner of La Palma Ave. & Blue Gum Sc. near warner Ave. between Beach Blvd. From 1-5 exit Sand Canyon. Go (SR -74), Go east to La Pata Ave. junction of 57 and 91 Freeways, and Gothard Sc. west to Oak Canyon and turn Turn right and continue co landfill entrance. right. For your safety, please observe the following regulations in preparing for your visit to the HHWCC: A maximum of 15 gallons or 125 pounds may be transported per vehicle, per trip (Department of Transportation Requirement). It is illegal to exceed these limits. • Containers larger than five gallons will not be accepted. • Containers will NOT be returned, except for oil containers, upon request. • Materials should be in original containers (except motor oil, fuels and antifreeze). All containers must have lids, be sturdy, non -leaking, labeled and protected from breakage. Do not combine different types of waste. • Do not mix oil -base paint with latex paint. • Empty containers with lids removed can be discarded in trash. Notice Household Hazardous Waste Collection Centers are not permitted to accept waste from businesses, churches, schools, nonprofit organizations or government agencies. Visit the When you Material arrive at the Exchange Center, you Program must remain in your where you can choose vehicle while a up to five items per technician week from a selection of removes the partially used containers material for of household, yard and you. car -care products to take home FREE! Notice Household Hazardous Waste Collection Centers are not permitted to accept waste from businesses, churches, schools, nonprofit organizations or government agencies. What to bring to the Household Hazardous Waste Collection Center Cleaning Products Bleach (laundry) Drain cleaners Oven cleaners Pool chemicals Toilet cleaners Tub, tile, shower cleaners Wood and metal cleaners and polishes Lawn and Garden Products Fungicides/wood preservatives Herbicides Insecticides Automotive Products Air conditioning refrigerants Antifreeze Automotive batteries Carburetor and fuel injection cleaners Fuel additives Motor oil Starter fluids Transmission and brake fluid Alarm clocks Blood glucose monitors (sterilized) Camcorders CD players Cell phones Computer monitors (CRTs & flat screens) Com puters/CPUs/I aptops* Copiers (home use, desktop) Digital cameras'' Workshop/Painting Supplies Adhesives and glues Aerosol cans Fixatives and other solvents Furniture strippers Oil or enamel -based paint Paint strippers and removers Paint thinners and turpentine Photographic chemicals Stains and finishes Indoor Pesticides Ant sprays and baits Bug sprays Cockroach sprays and baits Flea repellents and shampoos Houseplant insecticides Moth repellents Mouse and rat poisons and baits e -waste Digital thermometers Display boards on exercise equipment DVD players Hand-held electronic devices Home -use medical monitors I -Pods & MP3 players* Microwave ovens (home use) PDAs* Miscellaneous Batteries Compact Fluorescent Tubes Driveway sealer Fluorescent light bulbs Mercury thermostats or thermometers Sharps in puncture -proof containers (hypodermic needles, pen needles, intravenous needles, lancets) Other Flammable Products CO, cartridges (lecture bottle or smaller) Diesel fuel Fire Extinguishers under 40 lbs. Gas/oil mix Helium tanks Home heating oil Kerosene Lighter fluid Propane tanks (5 -gallon or smaller) Programmable kitchen appliances Pagers Printer/scanner/fax Radios of all types (car & home) Stereos (no speakers) Telephones & answering machines Televisions (CRTs & flat screens) VCRs Video game consoles & accessories Walkie-talkies HHW Collection Centers cannot accept the following items: Asbestos Commercial Waste High-pressure cylinders (acetylene, Ammunition Explosives oxygen, air tanks—SCUBA or SOBA) Biological waste Radioactive materials Tires Visit www.ociandfllls.com for disposal information of these items. What is Household Hazardous Waste? Leftover household products that contain corrosive, toxic, ignitable, or reactive ingredients are considered to be "household hazardous waste" or "HHW." Products, such as paints, cleaners, oils, batteries, and pesticides that contain potentially hazardous ingredients require special care when you dispose of them. Improper disposal of household hazardous wastes can include pouring them down the drain, on the ground, into storm sewers, or in some cases putting them out with the trash. The dangers of such disposal methods might not be immediately obvious, but improper disposal of these wastes can pollute the environment and pose a threat to human health. Additional HHW services may be available through your City. Contact your City's Recycling Coordinator to find out other ways to dispose of your household hazardous waste items in your community. Note Regarding Disposal of Expired and Unused Medicine Most medicines used in a home are not considered hazardous waste. They can be disposed of in the trash after being secured in durable packaging. Specific disposal instructions can be found at www.oclandfills.com. Click on Hazardous Waste. Rev TTO_� California Environmental Protection Agency www.calepa.ca.gov • Air Resources Board www.arb.ca.gov • Department of Pesticide Regulation www.cdprca.gov • Department of Tonic Substances Control www.dtsc.ca.gov • Integrated Waste Management Board www.ciwmb.ca.gov • Office of Environmental Health Hazard Assessment www.oehha.ca.gov • State Water Resources Control Board www.waterboards. ca. gov Earth 911 - communityspecific environmental information 1 -800 -cleanup or visit www. 1800cleanup.org Health Care Agency's Ocean and Bay Water Closure and Posting Hotline 714-433-6400 or visit wvsysv.ocbeaduinfo.com Integrated Waste Management/Dept. of Orange County - information on household hazardous waste collection centers, recycling centers and solid waste collection 714-834-6752 or visit www.oclandfills.com O.G. Agriculture Commissioner 714-447-7100 or visit www.ocagcomm.com Stormwater Best Management Practice Handbook Visit www.cabmphandbooks.com UC Master Gardener Hotline 714-708-1646 or visit www.uccemg.org The Orange County Stormwater Program has created and moderates an electronic mailing list to facilitate communications, take questions and exchange ideas among its users about issues and topics related to stortnwater and urban runoff and the implementation of progratn elements. To join the list, please send an email to ocstormwaterinfo-join@liscomw rsheds.com Orange County Stormwater Program Aliso Viejo ..... ...... ...... ..... (949) 425-2535 Anaheim Public Works Operations ........ (714) 7666860 Brea Engineering ..................(714) 990-7666 Buena Park Public Works . ... .. . . . . ... (714) 562-3655 Costa Mesa Public Services ... . .. . . . . ... (714) 7545323 Cypress Public Works . .. . . . . .. . . . . ... (714) 229-6740 Dana Point Public Works .............. (949) 248-3584 Fountain Valley Public Works . . .. . ... ... (714) 5931441 Fullerton Engineering Dept ............ (714) 738-6853 Garden Grove Public Works . . . . . . . . . . . . (714) 741-5956 Huntington Beach Public Works . . . . . . . . . (714) 536-5431 Irvine Public Works ................. (949) 7246315 La Habra Public Services .............. (562) 9069792 La Palma Public Works ............... (714) 690-3310 Laguna Beach Water Quality . . . . . . . . . . . . (949) 497-0378 Laguna Hills Public Service . . . . . . . . . . . . (949) 707-2650 Laguna Niguel Public Works . . . . . . . . . . . (949) 362-4337 Laguna Woods Public Works............ (949) 639-0500 Lake Forest Public Works . . . . .. . . . . ... (949) 461-3480 Los Alamitos Community Dev ........... (562) 431-3538 Mission Viejo Public Works ............ (949) 470-3056 Newport Beach, Code & Water Quality Enforcement . .. . . . . .. . .. . ...(949) 6443215 Orange Public Works ................ (714) 532-6480 Placentia Public Works ...............(714) 993-8245 Rancho Santa Margarita .............. (949) 635-1800 San Clemente Environmental Programs .. ... (949) 361-6143 San Juan Capistrano Engineering.. .... ... (949) 234-4413 Santa Ana Public Works . . ... .. . ... ... (714) 647-3380 Seal Beach Engineering ........... (562) 431-2527 x317 Stanton Public Works ............. (714) 379-9222 x204 Tustin Public Works Engineering .. . ... ... (714) 573-3150 Villa Park Engineering ...............(714) 998-1500 Westminster Public Works Engineering... (714) 898-3311 x446 Yorba Linda Engineering . . .. . . . .... . . (714) 961-7138 Orange County Stormwater Program . . . . .. . (714) 567-6363 Orange County 24 -Hour Water Pollution Problem Reporting Hotline (714)-567-6363 On-line Water Pollution Problem Reporting form www.omatersheds.com a ' 1 I A P R O J E C R E V E N T I 1 Did You Know? ■Most people believe that the largest source of water pollution in urban areas comes from specific sources such as factories and sewage treatment plants. In fact the largest source of water pollution comes from city streets, neighborhoods, construction sites, and parking lots. This type of pollution is sometimes called "non -point source" pollution. ■There are two types of non -point source pollution: stormwater and urban runoff pollution. ■ Stormwater runoff refers to runoff resulting from rainfall. It is very noticeable during heavy rainstorms when large volumes of water drain off the urban landscape picking up pollutants along the way. ■ Urban runoff can happen anytime of the year when excessive water use from irrigation, vehicle washing and other sources carries trash, lawn clippings and other urban pollutants into storm drains. Where Does It Go? ■Anything we use outside homes, vehicles and businesses — like motor oil, paint, pesticides, fertilizers, and cleaners — can be blown or washed into the storm drains. ■A little water from a garden hose or rain can also send materials into the storm drains. ■Storm drains are separate from our sanitary sewer systems; unlike water in sanitary sewers (from sinks or toilets) water in the storm drains is not treated before entering our waterways. Sources of Non -Point Source Pollution ■Automotive leaks and spills. ■Improper disposal of used oil and other engine fluids. ■Metals found in vehicle exhaust, weathered paint, rust, metal plating, and tires. ■Pesticides and fertilizers from lawns, gardens and farms. ■Improper disposal of cleaners, paint and paint removers. ESoil erosion and dust debris from landscape and construction activities. ■Litter, lawn clippings, animal waste, and other organic matter. ■ Oil stains on parking lots and paved surfaces. The Effect on the Ocean Non -point source pollution can have a serious impact on water quality in Orange County. Pollutants from the storm drain system can harm marine life as well as coastal and wetland habitats. They can also degrade recreation areas such as beaches, harbors and bays. Stormwater quality management programs have been developed by the Orange County Stormwater Program under National Pollutant Discharge Elimination System (NPDES) permits. The program educates and encourages the public to protect water quality, monitor runoff in the storm drain system, manage NPDES permit process for municipalities, investigate illegal disposals, and maintain storm drains. The support of Orange County residents, businesses and industries is needed to improve water quality and reduce the threat of stormwater and urban runoff pollution. Proper use and disposal of materials we use everyday will help stop this form of pollution before it reaches the storm drain and the ocean. Follow these simple steps to help reduce water pollution: Household Activities ■Do not rinse spills with water. Use dry cleanup methods such as applying cat litter or another absorbent material, sweep and dispose of in trash. Take items such as used or excess batteries, oven cleaners, automotive fluids, painting products, and cathode ray tubes, like TVs and computer monitors, to a Household Hazardous Waste collection center. ■For a household hazardous waste collection center near you call (714) 834-6752 or visit www.oclandfills.com. ■Do not hose down your driveway, sidewalk or patio to the street, gutter or storm drain. Sweep up debris and dispose of in trash. Automotive ■Take your vehicle to a commercial car wash whenever possible. If you wash your vehicle at home, choose soaps, cleaners, or detergents labeled non-toxic, phosphate free or biodegradable. Vegetable and citrus - based products are typically safest for the environment. ■Do not allow washwater from vehicle washing into the street, gutter or storm drain. Excess washwater should be disposed of in the sanitary sewer (through a sink or toilet) or onto an absorbent surface like your lawn. ■Monitor vehicle for leaks and place a pan under leaks. Keep your vehicles well maintained to stop and prevent leaks. ■Never pour oil or antifreeze in the street, gutter or storm drain. Recycle these substances at a service station, a waste oil collection center or used oil recycling center. For the nearest Used Oil Collection Center call 1 -800 -CLEANUP or visit www.1800cleantip.org. Pool Maintenance ■ Pool and spa water must be dechlorinated and be free of excess acid, alkali or color to be allowed in the street, gutter or storm drain. ■Whenever possible, drain dechlorinated pool and spa water directly into the sanitary sewer but only when it is not raining. ■ Some cities may have ordinances that do not allow pool water to be disposed into the storm drain. Check with your city. Landscape and Gardening ■ Do not over -water. Water your lawn and garden by hand to control the amount of water you use or set irrigation systems to reflect seasonal water needs. If water flows off your yard onto your driveway or sidewalk, your system is over - watering. Periodically inspect and fix leaks and misdirected sprinklers. ■ Do not rake or blow leaves, clippings or pruning waste into the street, gutter or storm drain. Instead dispose of waste by composting, hauling it to a permitted landfill, or as green waste through your city's recycling program. ■ Follow directions on pesticides and fertilizer, (measure, do not estimate amounts) and do not use if rain is predicted with 48 hours. ■Take unwanted pesticides to a Household Hazardous Waste Collection Center to be recycled. For locations and hours of Household Hazardous Waste Collection Centers call 714-834-6752 or visit www.oclandfills.com. Trash ■ Place trash and litter that cannot be recycled in securely covered trash cans. ■Whenever possible, buy recycled products. ■Remember: Reduce, Reuse, Recycle Pet Care ■Always pick up after your pet. Flush waste down the toilet or dispose in the trash. Pet waste, if left outdoors, can wash into the street, gutter or storm drain. ■ If possible, bathe your pets indoors. If you must bathe your pet outside, wash it on your lawn or another absorbent/permeable surface to keep the washwater from entering the street, gutter or storm drain. ■Follow directions for use of pet care products and dispose of any unused products at a Household Hazardous Waste Collection Center. 1 lean beaches r a and healthy creeks, rivers, bays and ocean are important to Orange County. However, many common activities can lead to water pollution if you're not careful. Home improvement projects and work sites must be maintained to ensure that building materials do not enter the street, gutter or storm drain. Unlike water in sanitary sewers (from sinks and toilets), water in storm drains is not treated before entering our waterways. You would never dump building materials into the ocean, so don't let them enter the storm drains. Follow these tips to help prevent water pollution. Help Prevent Ocean Pollution: Tips for Improvement Projects Home improvement projects can cause significant damage to the environment. Whether you hire a contractor or work on the house yourself, it is important to follow these simple tips while renovating, remodeling or improving your home: General Construction ■ Schedule projects for dry weather. ■ Keep all construction debris away from the street, gutter and storm drain. ■ Store materials under cover with temporary roofs or plastic sheets to eliminate or reduce the possibility that rainfall, runoff or wind will carry materials from the project site to the street, storm drain or adjacent properties. Building Materials ■ Never hose materials into a street, gutter or storm drain. ■ Exposed piles of construction material should not be stored on the street or sidewalk. ■ Minimize waste by ordering only the amount of materials needed to complete the job. ■ Do not mix more fresh concrete than is needed for each project. ■ Wash concrete mixers and equipment in a designated washout area where the water can flow into a containment area or onto dirt ■ Dispose of small amounts of dry excess materials in the trash. Powdery waste, such as dry concrete, must be properly contained within a box or bag prior to disposal. Call your local trash hauler for weight and size limits. Paint ■ Measure the room or object to be painted, then buy only the amount needed. ■ Place the lid on firmly and store the paint can upside- down in a dry location away from the elements. ■ Tools such as brushes, buckets and rags should never be washed where excess water can drain into the street, gutter or storm drain. All tools should be rinsed in a sink connected to the sanitary sewer. ■ When disposing of paint, never put wet paint in the trash. ■ Dispose of water-based paint by removing the lid and letting it dry in the can. Large amounts must be taken to a Household Hazardous Waste Collection Center (HHWCC). ■ Oil-based paint is a household hazardous waste. All leftover paint should be taken to a HHWCC. ■ For HHWCC locations and hours, call (714) 834-6752 or visit www oclandfills.com. Erosion Control ■ Schedule grading and excavation projects for dry weather. ■ When temporarily removing soil, pile it in a contained, covered area where it cannot spill into the street, or obtain the required temporary encroachment or street closure permit and follow the conditions instructed by the permit. ■ When permanently removing large quantities of soil, a disposal location must be found prior to excavation. Numerous businesses are available to handle disposal needs. For disposal options, visit www.dwmb.ca.gov/SWIS. ■ Prevent erosion by planting fast-growing annual and perennial grasses. They will shield and bind the soil. Recycle ■ Use a construction and demolition recycling company to recycle lumber, paper, cardboard, metals, masonry (bricks, concrete, etc.), carpet, plastic, pipes (plastic, metal and clay), drywall, rocks, dirt and green waste. ■ For a listing of construction and demolition recycling locations in your area, visit www.ciwmb.ca.gov/recycle. spills ■ Clean up spills immediately by using an absorbent material such as cat litter, then sweep it up and dispose of it in the trash. ■ Immediately report spills that have entered the street, gutter or storm drain to the County's 24 -Hour Water Pollution Problem Reporting Hotline at (714) 567-6363 or visit www.ocwatenheds.com to. fill out an incident reporting form. O PteO 1 E C T ^ BEA10" PREVENTION lean beaches and healthy creeks, rivers, bays and ocean are important to Orange County. However, many common activities can lead to water pollution if you're not careful. Fertilizers, pesticides and other chemicals that are left on yards or driveways can be blown or washed into storm drains that flow to the ocean. Overwatering lawns can also send materials into storm drains. Unlike water in sanitary sewers (from sinks and toilets), water in storm drains is not treated before entering our waterways. You would never pour gardening products into the ocean, so don't let them enter the storm drains. Follow these easy tips to help prevent water pollution. Help Prevent Ocean Pollution: Tips for Landscape & Gardening Never allow gardening products or polluted water to enter the street, gutter or storm drain. General Landscaping Tips ■ Protect stockpiles and materials from wind and rain by storing them under tarps or secured plastic sheeting. ■Prevent erosion of slopes by planting fast-growing, dense ground covering plants. These will shield and bind the soil. ■Plant native vegetation to reduce the amount of water, fertilizers, and pesticide applied to the landscape. ■Never apply pesticides or fertilizers when rain is predicted within the next 48 hours. Garden & Lawn Maintenance ■Do not overwater. Use irrigation practices such as drip irrigation, soaker hoses or micro spray systems. Periodically inspect and fix leaks and misdirected sprinklers. ■ Do not rake or blow leaves, clippings or pruning waste into the street, gutter or storm drain. Instead, dispose of green waste by composting, hauling it to a permitted landfill, or recycling it through your city's program. ■ Use slow-release fertilizers to minimize leaching, and use organic fertilizers. ■ Read labels and use only as directed. Do not over -apply pesticides or fertilizers. Apply to spots as needed, rather than blanketing an entire area. ■ Store pesticides, fertilizers and other chemicals in a dry covered area to prevent exposure that may result in the deterioration of containers and packaging. ■ Rinse empty pesticide containers and re -use rinse water as you would use the product. Do not dump rinse water down storm drains. Dispose of empty containers in the trash. ■ When available, use non-toxic alternatives to traditional pesticides, and use pesticides specifically designed to control the pest you are targeting. For more information, visit www.ipm.ucdavis.edu. ■ If fertilizer is spilled, sweep up the spill before irrigating. If the spill is liquid, apply an absorbent material such as cat litter, and then sweep it up and dispose of it in the trash. ■Take unwanted pesticides to a Household Hazardous Waste Collection Center to be recycled. Locations are provided below. 14 Ed For more information, please call the Orange County Stormwater Program at 1 -877 -89 -SPILL (1-877-897-7455) or visit www.ocwatersheds.com To report a spill, call the Orange County 24 -Hour Water Pollution Problem Reporting Hotline at 1 -877 -89 -SPILL (1-877-897-7455). For emergencies, dial 911. The tips contained in this brochure provide useful information to help prevent water pollution while using, storing and disposing of paint. If you have other suggestions, please contact your city's stormwater representatives or call the Orange County Stormwater Program. Printed on Recycled Paper Paint can cause significant damage to our environment. Whether you hire a contractor or do it yourself, it is important to follow these simple tips when purchasing, using, cleaning, storing and disposing of paint. Purchasing Paint ■ Measure the room or object to be painted, then buy only the amount needed. ■ Whenever possible, use water-based paint since it usually does not require hazardous solvents such as paint thinner for cleanup. Painting ■ Use only one brush or roller per color of paint to reduce the amount of water needed for cleaning. ■ Place open paint containers or trays on a stable surface and in a position that is unlikely to spill. ■ Always use a tarp under the area or object being painted to collect paint drips and contain spills. Cleaning ■ Never clean brushes or rinse paint containers in the street, gutter or storm drain. ■ For oil-based products, use as much of the paint on the brushes as possible. Clean brushes with thinner. To reuse thinner, pour it through a fine filter (e.g. nylon, metal gauze or filter paper) to remove solids such as leftover traces of paint. ■ For water-based products, use as much of the paint on the brushes as possible, then rinse in the sink. ■ Collect all paint chips and dust. Chips and dust from marine paints or paints containing lead, mercury or tributyl tin are hazardous waste. Sweep up and dispose of at a Household Hazardous Waste Collection Center (HHWCC). Storing Paint ■ Store paint in a dry location away from the elements. ■ Store leftover water-based paint, oil-based paint and solvents separately in original or clearly marked containers. ■ Avoid storing paint cans directly on cement floors. The bottom of the can will rust much faster on cement. ■ Place the lid on firmly and store the paint can upside- down to prevent air from entering. This will keep the paint usable longer. Oil-based paint is usable for up to 15 years. Water-based paint remains. usable for up to 10 years. Alternatives to Disposal ■ Use excess paint to apply another coat, for touch-ups, or to paint a closet, garage, basement or attic. ■ Give extra paint to friends or family. Extra paint can also be donated to a local theatre group, low-income housing program or school. ■ Take extra paint to an exchange program such as the "Stop & Swap" that allows you to drop off or pick up partially used home care products free of charge. "Stop & Swap" programs are available at most HHWCCs. ■ For HHWCC locations and hours, call (714) 834-6752 or visit www.oclandfills.com. Disposing of Paint ■ Never put wet paint in the trash. For mater -based paint: ■ If possible, brush the leftover paint on cardboard or newspaper. Otherwise, allow the paint to dry in the can with the lid off in a well -ventilated area protected from the elements, children and pets. Stirring the paint every few days will speed up the drying. ■ Large quantities of extra paint should betaken to a HHWCC. ■ Once dried, paint and painted surfaces maybe disposed of in the trash. When setting a dried paint can out for trash collection, leave the lid off so the collector will see that the paint has dried. For oil-based paint: ■ Oil-based paint is a household hazardous waste. All leftover paint should be taken to a HHWCC. Aerosol paint: ■ Dispose of aerosol paint cans at a HHWCC. Spills ■ Never hose down pavement or other impermeable surfaces where paint has spilled. ■ Clean up spills immediately by using an absorbent material such as cat litter. Cat litter used to clean water-based paint spills can be disposed of in the trash. When cleaning oil-based paint spills with cat litter, it most be taken to a HHWCC. ■ Immediately report spills that have entered the street, gutter or storm drain to the County's 24 -Hour Water Pollution Problem Reporting Hotline at (714) 567-6363 or visit www oewatersheds.com to fill out an incident reporting form. P R O l! C T Mkffl0n PREVENTION 1 C]� The Pollution Solution Several residential activities can result in water pollution. Among these activities are car washing and hosing off driveways and sidewalks. Both activities can waste water and result in excess runoff. Water conservation methods described in this pamphlet can prevent considerable amounts of runoff and conserve water. By taking your car to a commercial car wash and by sweeping driveways and sidewalks, you can further prevent the transport of pollutants to Orange County waterways. Here are some of the common pollutants for which you can be part of the solution: Pesticides and Fertilizer The same pesticides that are designed to be toxic to pests can have an equally lethal impact on our marine life. The same fertilizer that promotes plant growth in lawns and gardens can also create nuisance algae blooms, which remove oxygen from the water and clog waterways when it decomposes. • Never use pesticides or fertilizer within 48 hours of an anticipated rainstorm. Use only as much as is directed on the label and keep it off driveways and sidewalks. 2 Dirt and Sediment • Dirt or sediment can impede the flow of the stormwater and negatively impact stream habitat as it travels through waterways and deposits downstream. Pollutants can attach to sediment, which can then be transported through our waterways. • Protect dirt stockpiles by covering them with tarps or secure plastic sheets to prevent wind or rain from allowing dirt or sediment to enter the storm drain system. Metals • Metals and other toxins present in car wash water can harm important plankton, which forms the base of the aquatic food chain. • Take your car to a commercial car wash where the wash water is captured and treated at a local wastewater treatment plant. YOU KNOW9 Did you know that most of the pollutionLfoundurwaterways is not from a single source, "non•point" source meaning the accumulatioon fromresidents and businesses throughout the Pet Waste • Pet waste carries bacteria through our watersheds and eventually will be washed out to the ocean. This can pose a health risk to swimmers and surfers. • Pick up after your pets! Trash and Debris • Trash and debris can enter waterways by wind, littering and careless maintenance of trash - receptacles. Street sweeping collects some of this trash; V however, much of what isn't captured ends up in our storm drain system where it flows untreated out to the ocean. Don't litter and make sure trash containers are properly covered. It is far more expensive to clean up the litter and trash that ends up in our waterways than it is to prevent it in the first place. Come out to one of Orange County's many locations for Coastal and Inner -Coastal Cleanup Day, which is held in September. Motor Oil 1 Vehicle Fluids • Oil and petroleum products from our vehicles are toxic to people, wildlife and plants. Fix any leaks from your vehicle and keep the maintenance ; upon your car. Use w absorbent material such as cat litter on oil spills, then sweep it up and dispose of it in the trash. Recycle used motor oil at a local Household Hazardous Waste Collection Center. For • -inrormation, pLease visit www.ocwatersheds. ,4t * The Ocean Begins at Your Front Door p;,•o,; i xwxuwAN,e .I ltp .•p®18n.N.SPILL .s.X= It's easy to protect our waterways from pollution. Click here to learn how' Homeowners Guide for Sustainable Water Use Low Impact Development, Water Conservation & Pollution Prevention The Ocean Begins at Your Front Door 70111 79 4 RUf10FF, RRinWATER RnD Where Does Water Runoff Go? Stormwater, or water from rainfall events, and runoff from outdoor water use such as sprinklers and hoses flows from homes directly into catch basins and the storm drain system. After entering the storm drain, the water flows untreated into streams, rivers, bays and ultimately the Pacific Ocean. Runoff can come from lawns, gardens, driveways, sidewalks and roofs. As it flows over hard, impervious surfaces, it picks up pollutants. Some pollutants carried by the water runoff include trash, pet waste, pesticides, fertilizer, motor oil and more. Water Conservation Pollution not only impairs the water quality for habitat and recreation, it can also reduce the water available for reuse. Runoff allowed to soak into the ground is cleaned as it percolates through the soil, replenishing depleted groundwater supplies. Groundwater provides at least 50% of the total water for drinking and other indoor household activities in north and central Orange County. When land is covered with roads, parking lots, homes, etc., there is less land to take in the water and more hard surfaces over which the water can flow. In Orange County, 60-70% of water used by residents and businesses goes to irrigation and other outdoor uses. Reusing rainwater to irrigate our lawn not only reduces the impact of water pollution from runoff, but it also is a great way to conserve our precious water resources and replenish our groundwater basin. — PWhat is Low Impact Development (LID)? Low Impact Development (LID) is a method of development that seeks to maintain the natural hydrologic character of an area. LID provides a more sustainable and pollution -preventative approach to water management. New water quality regulations require implementation of LID in larger new developments and encourage implementation of LID and other sustainable practices in existing residential areas. Implementing modifications to your lawn or garden can reduce pollution in our environment, conserve water and reduce your water bill. REUSE Permeable pavement allows water runoff to infiltrate through the soil and prevents most pollutants from reaching the storm drain system. , OPTIn FOR RninWATER HRRVESTInG AnD REUSE Rainwater harvesting is a great way to save money, prevent pollution and reduce potable water use. To harvest your rainwater, simply redirect the runoff from roofs and downspouts to rain barrels. Rain gardens are another option; these reduce runoff as well as encourage infiltration. Downspout Disconnection/Redirection Disconnecting downspouts from pipes running to the gutter M"Sum prevents runoff from transporting pollutants to the storm drain. Once disconnected, downspouts can be redirected to rain gardens or other vegetated areas, or be connected to a rain barrel. Rain Gardens Rain gardens allow runoff to be directed from your roof downspout into a landscaped area. Vegetation and rocks in the garden will slow the flow of water to allow for infiltration into the soil. Plants and soil particles will absorb pollutants from the roof runoff. By utilizing a native plant palate, rain gardens can be maintained all year with minimal additional irrigation. These plants are adapted to the semi -arid climate of Southern California, require less water and can reduce your water bill. —Downspout Rain Barrels Rain barrels capture rainwater flow from roofs for reuse in Larrelt— of landscape irrigation. Capacity rain barrels needed for your home will depend on the amount of roof area and rainfall received.When purchasing your rain barrel, make sure it includes a screen, ao spigot to siphon water for use, an overflow tube to allow for excess water to run out and a connector if you wish to connect multiple barrels to add capacity of water storage. Mosquito growth prevention is very important when installing a rain barrel. The best way to prevent mosquito breeding is to eliminate entry points by ensuring all openings are sealed tightly. If these methods are unsuccessful, products are available to kill mosquito larvae, but that are harmless to animals and humans. Regular application of these products is essential. Please visit the Orange County Vector Control website for more information at www.ocvcd.org/mosquitoes3.php. Before modifying your yard to install a rain garden, please consult your local building and/or planning departments to ensure your garden plan follows pertinent building codes and ordinances. Besides codes and ordinances, some home owner associations also have guidelines for yard modifications. If your property is in hill areas or includes engineered slopes, please seek professional advice before proceeding with changes. Overflow Valve For information on how to disconnect a downspout or to install and maintain a rain barrel or rain garden at your home, please see the Los Angeles Rainwater Harvesting Program, A Homeowner's "How -To" Guide, November 2009 at www.larainwaterharvesting.org/ CI�! OTHER WATER COf1SERVATIon AnD IRRIGATE POLLUTIon PREVEnTIon TECHnIQUES EFFICIEnTLY Native Vegetation and Maintenance "California Friendly" plants or native vegetation can significantly reduce water use. These plants often require far less fertilizers and pesticides, which are two significant pollutants found in Orange County waterways. Replacing water "thirsty" plants and grass types with water efficient natives is a great way to save water and reduce the need for potentially harmful pesticides and fertilizer. Please see the California Friendly Garden Guide produced by the Metropolitan Water District of Southern California and associated Southern California Water Agencies for a catalog of California friendly plants and other garden resources at www.bewaterwise.com/Gardensoft, Weed Free Yards "'U01 I 00TV 410t. Weeds are water thieves. runoff,p your They often reproduce quickly and rob your yard of both the water they ne, water and nutrients. Weed minutes of turninis your yard by hand if possible. sprinklers; when v If you use herbicides to lawn, you control the weeds, use only to water ' ur lawr the amount recommended on Water at Sunrise the label and never use it if rain is forecast within the next -Additionally,, 48 hours. „I a I. • I- A. Soil Amendments Soil amendments such as green waste (e.g. grass clippings, S Water by hand compost, etc.) can be a significant source of nutrients and can help ,t keep the soil near the roots of plants moist. However, they can cause algal booms if they get into our waterways, which reduces , the amount of oxygen in the water and impacts most aquatic . organisms. It is important to apply soil amendments more than 48 hours prior to predicted rainfall. Attachment B 120 Table 2.7: Infiltration BMP Feasibility Worksheet :L27 Infeasibility Criteria Yes No Would Infiltration BMPs pose significant risk for groundwater related concerns? Refer to Appendix VIII X 1 (Worksheet 1) for guidance on groundwater -related infiltration feasibility criteria. Provide basis: Summarize findings of studies provide reference to studies, calculations, maps, data sources, etc. Provide narrative discussion of study/data source applicability. Would Infiltration BMPs pose significant risk of increasing risk of geotechnical hazards that cannot be X mitigated to an acceptable level? (Yes if the answer to any of the following questions is yes, as established by a geotechnical expert): • The BMP can only be located less than 50 feet away 2 from slopes steeper than 15 percent • The BMP can only be located less than eight feet from building foundations or an alternative setback. • A study prepared by a geotechnical professional or an available watershed study substantiates that stormwater infiltration would potentially result in significantly increased risks of geotechnical hazards that cannot be mitigated to an acceptable level. Provide basis: Summarize findings of studies provide reference to studies, calculations, maps, data sources, etc. Provide narrative discussion of study/data source applicability. 3 Would infiltration of the DCV from drainage area violate X downstream water rights? Provide basis: Summarize findings of studies provide reference to studies, calculations, maps, data sources, etc. Provide narrative discussion of study/data source applicability. :L27 Table 2.7: Infiltration BMP Feasibility Worksheet (continued) 122 Partial Infeasibility Criteria Yes No Is proposed infiltration facility located on HSG D soils or the site geotechnical investigation identifies presence of x 4 soil characteristics which support categorization as D soils? Provide basis: Summarize findings of studies provide reference to studies, calculations, maps, data sources, etc. Provide narrative discussion of study/data source applicability. Is measured infiltration rate below proposed facility 5 less than 0.3 inches per hour? This calculation shall be x based on the methods described in Appendix VII. Provide basis: Summarize findings of studies provide reference to studies, calculations, maps, data sources, etc. Provide narrative discussion of study/data source applicability. Would reduction of over predeveloped conditions cause impairments to downstream beneficial uses, X 6 such as change of seasonality of ephemeral washes or increased discharge of contaminated groundwater to surface waters? Provide citation to applicable study and summarize findings relative to the amount of infiltration that is permissible: Summarize findings of studies provide reference to studies, calculations, maps, data sources, etc. Provide narrative discussion of study/data source applicability. Would an increase in infiltration over predeveloped conditions cause impairments to downstream X 7 beneficial uses, such as change of seasonality of ephemeral washes or increased discharge of contaminated groundwater to surface waters? Provide citation to applicable study and summarize findings relative to the amount of infiltration that is permissible: Summarize findings of studies provide reference to studies, calculations, maps, data sources, etc. Provide narrative discussion of study/data source applicability. 122 Table 2.7: Infiltration BMP Feasibility Worksheet (continued) Infiltration Screening Results (check box corresponding to result): Is there substantial evidence that infiltration from the no project would result in a significant increase in I&I to the sanitary sewer that cannot be sufficiently mitigated? (See Appendix XVII) 8 Provide narrative discussion and supporting evidence: Summarize findings of studies provide reference to studies, calculations, maps, data sources, etc. Provide narrative discussion of study/data source applicability. If any answer from row 1-3 is yes: infiltration of any volume is not feasible within the DMA or equivalent. no g Provide basis: Summarize findings of infeasibility screening If any answer from row 4-7 is yes, infiltration is permissible but is not presumed to be feasible for the entire DCV. Criteria for designing biotreatment BMPs to no achieve the maximum feasible infiltration and ET shall 10 apply. Provide basis: Summarize findings of infeasibility screening If all answers to rows 1 through 11 are no, infiltration of the 11 full DCV is potentially feasible, BMPs must be designed to infiltrate the full DCV to the maximum extent practicable. Harvest and Use Infeasibility Harvest and use infeasibility criteria include: If inadequate demand exists for the use of the harvested rainwater. See Appendix X for guidance on determining harvested water demand and applicable feasibility thresholds. If the use of harvested water for the type of demand on the project violates codes or ordinances most applicable to stormwater harvesting in effect at the time of project application and a waiver of these codes and/or ordinances cannot be obtained. It is noted that codes and ordinances most applicable to stormwater harvesting may change i29 Attachment C 130 Krt�STAIt GENERAL SPECIFICATIONS FOR MAINTENANCE OF FLOGARD® DOWNSPOUT FILTERS SCOPE: p0.orzcngt, Federal, State and Local Clean Water Act regulations and those of insurance carvers require that stormwater filtration systems be maintained and serviced on a recurring basis. The intent of the regulations is to ensure that the systems, on a continuing basis, efficiently remove pollutants from stormwater runoff thereby preventing pollution of the nation's water resources. These Specifications apply to the FloGard® Downspout Filter. FREQUENCY OF SERVICE: Drainage Protection Systems (DPS) recommends that installed FloGardo Downspout Filters be serviced on a recurring basis. Ultimately, the frequency depends on the amount of runoff, pollutant loading and interference from debris (leaves, vegetation, cans, paper, etc.); however, it is recommended that each installation be serviced a minimum of three times per year, with a change of filter medium once per year. DPS technicians are available to do an on-site evaluation, upon request. TIMING OF SERVICE: DPS guidelines for the timing of service are as follows: 1. For areas with a definite rainy season: Prior to, during and following the rainy season. 2. For areas subject to year-round rainfall: On a recurring basis (at least three times per year). 3. For areas with winter snow and summer rain: Prior to and just after the snow season and during the summer rain season. 4. For installed devices not subject to the elements (washracks, parking garages, etc.): On a recurring basis (no less than three times per year). SERVICE PROCEDURES: 1. The FloGard® Downspout Filter shall be visually inspected for defects and possible leakage. 2. The FloGard® Downspout Filter access door shall be opened. The filter tray shall be carefully pulled out using the handle and set on the floor over a drop cloth. 3. The collected materials in the upper filter shall be inspected, and then removed from the liner using an industrial vacuum or by dumping into an appropriate DOT approved container. 4. When all of the collected materials have been removed from the upper filter, it shall be removed to allow access to the lower filter medium. 5. The filter liner, gaskets, stainless steel frame and mounting brackets, etc. shall be inspected for continued serviceability. Minor damage or defects found shall be corrected on -the -spot and a notation made on the Maintenance Record. More extensive deficiencies that affect the efficiency of the filter (torn liner, door gasket damage, etc.), if approved by the customer representative, will be corrected and an invoice submitted to the representative along with the Maintenance Record. 6. The filter medium shall be inspected for defects and continued serviceability and replaced as necessary. See below for disposal. 7. The filter components and tray shall be replaced in the housing and the door closed and secured. 131 REPLACEMENT AND DISPOSAL OF EXPOSED FILTER MEDIUM AND COLLECTED DEBRIS The frequency of filter medium exchange will be in accordance with the existing DPS -Customer Maintenance Contract. DPS recommends that the medium be changed at least once per year. During the appropriate service, or if so determined by the service technician during a non-scheduled service, the filter medium will be replaced with new material. Once the exposed pouches and debris have been removed, DPS has possession and must dispose of it in accordance with local, state and federal agency requirements. DPS also has the capability of servicing all manner of storm drain filters, catch basin inserts and catch basins without inserts, underground oil/water separators, stormwater interceptors and other such devices. All DPS personnel are highly qualified technicians and are confined space trained and certified. Call us at (888) 950.8826 for further information and assistance. 132 0 O 0 C0 0 MODEL INLET ID BODY OD Solids Storage Filtered Flow Bypass Capacity (0 Inches) (Inches) Capacity (GPM) (GPM) (Cu. Ft.) FG-DS4 4 14 x 29 x 7.5 0.35 30 145 FG-DS6 6 14 x 29 x 7.5 0.35 85 425 04.00" OR 06.00" INLET. DOWNSPOUT FILTER BODY. FILTER BASKET WITH BYPASS COLLAR. ACCESS COVER GASKET. ACCESS COVER. ACCESS COVER MOUNTING SCREWS. 04.00" OR 06.00" SPOUT. 14.00" 7.50" 7 29.00" 04.00" OR 06.00" OUTLET. NOTES: 1. FloGard® Downspout Filter is available to fit most industry standard downspouts (See Tabulation). 2. Filter Inserts shall have adequate bypass capacity to allow downspout to flow unimpeded at all times. 3. Filter assembly shall be constructed from stainless steel (type 304). 4. Filter medium shall be installed & maintained in accordance with manufacturer recommendations. • RoGard® 0Hdc29tje®R Downspout Filter Stormwater Solutions 7921 Southpark Plaza, Suite 2001 Littleton, CO180120 1 Ph: 800.579.88191 oldcastlestormwateccom THIS DOCUMENT IS THE PROPERTY OF OLDCASTLE PRECAST, INC. IT IS SUBM17ED FOR REFERENCE PURPOSES ONLY AND SHALL NOT BE /�( I USED IN ANY WAY INJURIOUS TO THE INTERESTS OF SAID COMPANY .COPYRIGHT 02010 OLDCASTLE PRECAST. INC. ALL RIGHTS RESERVED. Inlet (/�/I.00rr 06. 00 �1Ze^ DRAWING NO RD' Ec° ECO -0127 Dare Filtration JC/T ww J DSF-0001 A JPR 5/18/15 JPR 2/11/09 SHEET 1 OF 1 DOWNSPOUT OVERFLOW DRAIN: 4" DIA. PVC PIPE WITH COBBLE COBBLE OR OR ATRIUM GATE INLET AT 6' ABOVE FINISH GRADE S 4"-8"TYP.--i I 2'-0"MIN. REINFORCED CMU BLOCK OR 3" MIN. PRE-CAST CONCRETE WITH Fm6b.hd _ WATERPROOF MEMBRANE THROUGHOUT 6"MIN. PONDING (3' mulch layarwilhm) UNIFORM MIX OF SAND AND ORGANIC MATERIAL (EX: COMPOST); MIN INFILTRATION RATE OF 5 INCHES PER HOUR. i (DO NOT COMPACT) 18" MIN. TOP SOIL (PLANTING MIX f y NON-WOVEN GEOTEXTILE / ::: = MEMBRANE (OPTIONAL) 3"MIN. CHOKER: "- WASHED P-GRAVEL �* RESERVOIR COURSE 9" MIN, 7" WASHED GRAVEL LAYER 2% TYP. f� tee.A 1 .005 MIN COMPACTED BASE PER PROJECT PLAN ' LONGITUDINAL 4"DIA. PERFORATED PVC PIPE DIRECT OVERFLOW DISCHARGE PER WRAPPED IN NON-WOVEN GEOTEXTILE MEMBRANE. BUREAU OF ENGINEERING 8 LADBS PLACED OVER 1' GRAVEL LAYER. REQUIREMENTS SECTION NOT TO SCALE PER PLAN Min 2'-0" FROM DOWNSPOUT OVERFLOW DRAIN: 4" DIA. PVC PIPE WITH ) ATRIUM GATE INLET AT 6" ABOVE FINISH GRADE DOWNSPOUT WITH COBBLE OR SPLASHBLOCK BELOW z w a � v a w ¢ 9 w ur a z z 4 4' DIA. PVC PIPE 4" DIA. PERFORATED PVC PIPE WRAPPED IN NON-WOVEN GEOTEXTILE MEMBRANE CAPPED AT ENDS DIRECT OVERFLOW DISCHARGE PER BUREAU OF ENGINEERING 8 LADBS REQUIREMENTS PLAN NOTTOSCALE NOTES: 1. AT LEAST 9INCHES SHALL BE PROVIDED BETWEEN THE PLANTING SURFACE AND THE CREST OF EACH PLANTER 2. PLANTERS SHALL NOT BE LOCATED ON UNEVEN OR SLOPED SURFACES. 3. TOP SOILIPLANTING MIX IS AT LEAST 18' DEEP. 4. TOP SOIL CONTAINS NO MORE THAN 30% COMPOST. 5. MINIMUM GRAVEL LAYER SHALL BE 12' DEEP. 6. DIRECT OVERFLOW DISCHARGE PER BUREAU OF ENGINEERING AND BUILDING AND SAFETY REQUIREMENTS. 7. PLANTING IS REQUIRED. CONSULT LANDSCAPE ARCHITECT FOR SPECIFIC PLANT TYPES. STORMWATER PLANTER FOR SMALL SCALE RESIDENTIAL 13 { REVISED 5/10/16 Exhibit B Water and Wastewater Generation Memorandum 2315 Water and Sewer Study for 410 291h Street Sewer Generation Study Introduction The subject site is currently a commercial storage facility on a 7,702 sq -ft lot located on the corner of 291h street and Villa Way. The proposed site consists of separating the lot into 2 lot with Lot 1 consists of 2,452 sq -ft mixed use lot with 1 residential 2 commercial units. Lot 2 is a 5,241 sq -ft lot with 3 residential condos. An existing 8" VCP sewer pipe is located along the Alley, and 44" sewer laterals and 2-6" sewer laterals are proposed to connect to the existing 8" lateral. Existin¢ Sewer Mainline Condition The existing building is a 7,702 sq -ft lot used as a commercial space. Based on Orange County Sanitation District (OCSD) design criteria, average daily flow for commercial area is 2,262 GPD/Acre. Existing offsite area contributing to the main line is 0.28 acre of high density residential area. The flow factor is 7,516GPD/Acre for high density residential area. Onsite existing average daily sewer flow = 2262*7702/43560 = 400 GPD The total existing average daily sewer flow = 400 + 7516*0.28 = 2,504 GPD = 0.004 cfs The 0.004 cfs calculated to be about 0.031 ft depth, 4.7% of the depth to diameter total main capacity. Proposed Sewer Mainline Condition The proposed project site consists of 2 lots. Lot 1 is a 2,452 sq -ft mixed used lot with 1 residential unit and 2 commercial units. Lot 1 OCSD flow factor is 2,262 GPD/Acre for commercial area. Lot 2 is a 5,241 sq -ft high density residential area. Lot 2 OCSD flow factor is 7,516 GPD/Acre for high density residential. Onsite proposed average daily sewer flow Total proposed average daily sewer flow _ (2262*2452/43560) + (7516*5241/43560) =1,032 GPD. = 1032+7516*0.28 = 3,136 GPD = 0.005 cfs The 0.005 cfs calculated to be about 0.034 ft depth, 5.1 % of the depth to diameter total main capacity. 130 Proposed Sewer Lateral DesiEn 2-6" sewer laterals are proposed for 2 commercial units, and 44" sewer laterals are proposed for 4 residential units. Based on as -built S-5101-5, the main 8" sewer line is located 3.89' below surface with slope of 0.75%. All the new sewer lateral is proposed connection to main line with minimum of 2% slope. Proposed average daily flow for each unit is 344 GPD (0.0005 cfs). Design flow is 2.3% of the depth to diameter total for 6" lateral and 8.4% of the depth to diameter total for 4" lateral. Capacity Assessment and Conclusion The project demand for the proposed development will have no adverse impact on any downstream facility. The increase in demand for the 8" main line was found to be negligible due to the size and slope of the pipe. The proposed 4" and 6" diameter lateral connections have enough capacity to carries sewer to main line. 137 1.38 Worksheet for ExisitngMainFlow Project Description Friction Method Manning Formula ft Solve For Normal Depth Input Data 0.00 ft Roughness Coefficient 0.00 0.014 Channel Slope 4.69 0.00750 ft/ft Diameter Infinity 0.67 ft Discharge Infinity 0.004 ft -/s Results 0.031 ft Normal Depth 0.03 0.031 ft Flow Area 0.00750 0.01 ft2 Wetted Perimeter 0.01136 0.29 ft Hydraulic Radius 0.020 ft Top Width 0.28 ft Critical Depth 0.03 ft Percent Full 4.7 Critical Slope 0.01136 ft/ft Velocity 0.67 ft/s Velocity Head 0.01 ft Specific Energy 0.04 ft Froude Number 0.81 Maximum Discharge 1.06 ft3/s Discharge Full 0.98 ft3/s Slope Full 0.00000 ft/ft Flow Type SubCritical GVF Input Data Downstream Depth 0.000 ft Length 0.00 ft Number Of Steps 0 GVF Output Data Upstream Depth 0.000 ft Profile Description Profile Headloss 0.00 ft Average End Depth Over Rise 0.00 /o Normal Depth Over Rise 4.69 /o Downstream Velocity Infinity fUs Upstream Velocity Infinity fUs Normal Depth 0.031 ft Critical Depth 0.03 ft Channel Slope 0.00750 ft/ft Critical Slope 0.01136 ft/ft Bentley Systems, Inc. Haestad Methods SaBaidlef;FtderMaster Val (SELECTseries 1) [08.11.01.03] 4/18/2017 3:41:54 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 139 Results Normal Depth Worksheet for ProposedMainFlow Flow Area Project Description Wetted Perimeter 0.31 ft Friction Method Manning Formula Top Width Solve For Normal Depth 0.03 ft Input Data 5.1 Critical Slope Roughness Coefficient Velocity 0.014 Channel Slope 0.01 ft 0.00750 ft/ft Diameter Froude Number 0.67 ft Discharge 1.06 ft3/s 0.005 ft -/s Results Normal Depth 0.034 ft Flow Area 0.01 ft2 Wetted Perimeter 0.31 ft Hydraulic Radius 0.022 ft Top Width 0.30 ft Critical Depth 0.03 ft Percent Full 5.1 Critical Slope 0.01109 ft/ft Velocity ft/s Velocity Head 0.01 ft Specific Energy 0.04 ft Froude Number 0.84 Maximum Discharge 1.06 ft3/s Discharge Full 0.98 ft3/s Slope Full 0.00000 ft/ft Flow Type SubCritical GVF Input Data Downstream Depth 0.000 ft Length 0.00 ft Number Of Steps 0 GVF Output Data Upstream Depth 0.000 ft Profile Description Profile Headloss 0.00 ft Average End Depth Over Rise 0.00 /o Normal Depth Over Rise 5.14 /o Downstream Velocity Infinity ft/s Upstream Velocity Infinity ft/s Normal Depth 0.034 ft Critical Depth 0.03 ft Channel Slope 0.00750 ft/ft Critical Slope 0.01109 ft/ft Bentley Systems, Inc. Haestad Methods SoBaialtejGiderMaster V6i (SELECTseries 1) [06.11.01.03] 4/16/2017 3:42:46 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 140 Worksheet for SewerLateralV Project Description Friction Method Manning Formula ft Solve For Normal Depth Input Data 0.00 ft Roughness Coefficient 0.00 0.010 Channel Slope 2.35 0.02000 ft/ft Diameter Infinity 0.50 ft Discharge Infinity 0.001 ft -/s Results 0.012 ft Normal Depth 0.02 0.012 ft Flow Area 0.02000 0.00 ft2 Wetted Perimeter 0.00690 0.15 ft Hydraulic Radius 0.008 ft Top Width 0.15 ft Critical Depth 0.02 ft Percent Full 2.3 Critical Slope 0.00690 ft/ft Velocity 0.84 ft/s Velocity Head 0.01 ft Specific Energy 0.02 ft Froude Number 1.67 Maximum Discharge 1.11 ft/s Discharge Full 1.03 ft3/s Slope Full 0.00000 ft/ft Flow Type Supercritical GVF Input Data Downstream Depth 0.000 ft Length 0.00 ft Number Of Steps 0 GVF Output Data Upstream Depth 0.000 ft Profile Description Profile Headloss 0.00 ft Average End Depth Over Rise 0.00 /o Normal Depth Over Rise 2.35 /o Downstream Velocity Infinity ft/s Upstream Velocity Infinity ft/s Normal Depth 0.012 ft Critical Depth 0.02 ft Channel Slope 0.02000 ft/ft Critical Slope 0.00690 ft/ft Bentley Systems, Inc. Haestad Methods SoBlidteQFNwMaster Vili (SELECTseries 1) [08.11.01.03] 4/18/2017 3:43:05 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 -1 2 Worksheet for SewerLateral4m Project Description Friction Method Manning Formula ft Solve For Normal Depth Input Data 0.00 ft Roughness Coefficient 0.00 0.010 Channel Slope 8.44 0.02000 ft/ft Diameter Infinity 0.33 ft Discharge Infinity 0.005 ft3/s Results 0.028 ft Normal Depth 0.04 0.028 ft Flow Area 0.02000 0.00 ft2 Wetted Perimeter 0.00561 0.19 ft Hydraulic Radius 0.018 ft Top Width 0.18 ft Critical Depth 0.04 ft Percent Full 8.4 Critical Slope 0.00561 ft/ft Velocity 1.44 ft/s Velocity Head 0.03 ft Specific Energy 0.06 ft Froude Number 1.85 Maximum Discharge 0.37 ft3/s Discharge Full 0.34 ft3/s Slope Full 0.00000 ft/ft Flow Type Supercritical GVF Input Data Downstream Depth 0.000 ft Length 0.00 ft Number Of Steps 0 GVF Output Data Upstream Depth 0.000 ft Profile Description Profile Headloss 0.00 ft Average End Depth Over Rise 0.00 /o Normal Depth Over Rise 8.44 /o Downstream Velocity Infinity ft/s Upstream Velocity Infinity ft/s Normal Depth 0.028 ft Critical Depth 0.04 ft Channel Slope 0.02000 ft/ft Critical Slope 0.00561 ft/ft Bentley Systems, Inc. Haestad Methods SoBlidteQFNwMaster Vili (SELECTseries 1) [08.11.01.03] 4/16/2017 3:43:18 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of/ 1 1-f 2 Domestic Water Demand Study Existine Water Demand The existing building is a 7,702 sq -ft lot used as a commercial space. Based on Orange County Sanitation District (OCSD) design criteria, average daily flow for commercial area is 2,262 GPD/Acre. 2262 GPD/Acre * 7702/43560 Acre * 110% = 440 GPD = 0.31 GPM Peak Demand factor number is 1.55 for Costal Newport based on Newport Bach Design Criteria Manual. 0.31 GPM * 1.55 = 0.48 GPM Proposed Water Demand The proposed project site consists of 2 lots. Lot 1 is a 2,452 sq -ft mixed used lot with 1 residential unit and 2 commercial units. Lot 1 OCSD flow factor is 2,262 GPD/Acre for commercial area. Lot 2 is a 5,241 sq -ft high density residential area. Lot 2 OCSD flow factor is 7,516 GPD/Acre for high density residential. (2262 GPD/Acre * 2452 sq -ft + 7516 GPD/Acre * 5241 sq -ft) * 1 Acre / 43560 sq -ft * 110% =1135 GPD = 0.79 GPM Peak Demand factor number is 1.55 for Costal Newport based on Newport Bach Design Criteria Manual. 0.79 GPM * 1.55 = 1.22 GPM Calculation and Analysis The fire hydrant flow test for downstream fire hydrant is done by the City of Newport Beach on 02/16/2017. The flow from the test is used as available flow for the main 8" system on city Alley. It is a conservative assumption, since the fire hydrant is further downstream of the pipe system. Given: Q mst = 1021 + 0.48 = 1021.48 GPM = 2.28 cfs, Ps = 70psi, c = 140, dh = 8 in Q proposed = 1021.48 — 1.22 = 1020.26 GPM = 2.27cfs h = 0.2083* (100 / c)'.852*Q 1.852/ dh4.8655 It (frictional head loss in feet of water per 100 feet of pipe) v = Q/A 1-43 Result: Existing It = 1.687 ft = 0.725 psi v = 6.53 ft/sec Conclusion Proposed Proposed pressure at fire hydrant = 69.82 psi v = 6.50 ft/sec The proposed development will connect additional 6-6" diameter water pipe with water meters to existing 8" diameter pipe on alley. The velocity drops of 0.03 ft/sec and pressure change of less than 0.2 psi which can be considered negligible. Therefore, it is determined that the 8" domestic water main on Alley is more than adequate to handle the increased demand of the proposed development. Proposed 8" Water Main LinePressure Project Description Friction Method Solve For Input Data Pressure 1 Elevation 1 Elevation 2 Length Roughness Coefficient Diameter Discharge Results Manning Formula Pressure at 2 70.725 psi 0.00 ft 0.00 ft 100.00 ft 0.010 0.67 ft 2.27 ft2/s Pressure 2 1 69.822 psi Headloss 2.08 ft Energy Grade 1 163.79 ft Energy Grade 2 161.71 ft Hydraulic Grade 1 163.13 ft Hydraulic Grade 2 161.05 ft Flow Area 0.35 ft2 Wetted Perimeter 2.10 ft Velocity 6.50 fUs Velocity Head 0.66 ft Friction Slope 0.02083 Wit Bentley Systems, Inc. Haestad Methods SoRdidleg:Ftd rMaster V8i (SELECTseries 1) [08.11.01.031 4/18/2017 6:59:40 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 1-45 i al I AC =L� -7 i '\ \ (6.51!)FL F� r6 LEGEND \1/1Tr. 100 EXISTING CONTOUR ' v " ' " -100- PROPOSED CONTOUR REMOVE ALL POWER POLE ALONG THE PROJECT FRONTAGE AND UNDERGROUND ALL - 10OFS SPOT ELEVATION APPLICABLE UTILITIES, UNLESS DETERMINE INFEASIBLE BY UTILITY COMPANY. PROPOSED CONCRETE PAD RECONSTRUCT SIDEWALK PER CITY STANDARD PLAN STD -180-L ALONG FRONTAGE OF PROPOSED STORM DRAIN 29TH STREET AND VILLA WAY. -r sr EXIST SCREEN WALL PROPOSED SCREEN WALL ® PROPOSED RETAINING WALL ~--~-- FLOW LINE ® STORM DRAIN INLET PAD PROPOSED PAD ELEVATION FS PROPOSED FINISHED SURFACE FG PROPOSED FINISHED GROUND FF PROPOSED FINISHED FLOOR INV INVERT OF PIPE TG TOP OF GRATE PL PROPERTY LINE TC TOP OF CURB TW TOP OF WALL TF TOP OF FOOTING TR TOP OF RAIL FENCE HP HIGH POINT LP LOW POINT DP DEEPENED FOOTING �- 8.30 TG _(�L _ 662 a�-----8.17 FS- - .--EXISTING- 7 7.551NV o ° -1 4 \I_N�l 5.6 /° -CONSTRUCTION NOTE EP o Huii . ---- --M ----------------- ------_7.42FS GINSTALL 6"DIA. ATRIUM DRAIN NDS 90W/RISER AND ADAPTOR OR EQUAL. 75 FS 1111111 r o 7.80 FS 4 8..17 FS N GARAGE 4 II oN .� S< O INSTALL 6" DIA. DRAIN NDS 40 W/ RISER AND ADAPTOR OR EQUAL. 6.271NV �'� -- �l > z 1:- LL 1�5% -oN 8.35 TG - -- I a, ? (D CONSTRUCT BOTTOMLESS TRENCH DRAIN PER DETAIL ON SHEET C-3. o I M8.33 FG Q 8.70 TGN 2 �JAC PAVEMENTINSTALL 4 DIA. PVC SCHEDULE 40 OR SDR 35 PIPE DRAIN SYSTEM. 6 8.42 TG 47 INV I JI O INSTALL NEW SEWER LATERAL WITH CLEAN OUT PER CITY STANDARD PLAN STD -406-L. 8.50 FS - TT - 2 °- 1 = 7.25 INV 8.96 FS 4 ' 1 i6.26 INV _ 1 � 8.20 TG II -02% 0 O INSTALL DOWNSPOUT PER ARCHITECT PLAN. 63 IINV 2% 8.50 FS 7.20 INV FF= 9.00 .2% `" 4'' 6 7.21INV 8.33 7.84 TG 2 I %Z O INSTALL OVERFLOW DRAIN PER ARCHITECT PLAN. EP ie ° �� 1 8.50 FFG 6.8 INV 8.90 FS' _ 4-iV O INSTALL 5" TRENCH DRAIN WITH FLOGARD TRENCH DRAIN FILTER. SEE DETAILS ON SHEET C-3. ° - 6 7.66 FS + 8.2 /° p FG i 4 y V O INSTALL NEW WATER METER. Z 1 FS f 8.17 FS FF=9.00 -11 I I/eaaEYE ,7.19 S� s F� 7.47 T �� �`l/ (6 6,7) aq ,MATCH EXIST A T �o INSTALL NEW GAS METER. 9.00 FS % 2% - - - 127 DF 41 -III=I�' �� -� o�� o o . 1O j x$.50 FS II _ . 1 N GARAGE P II '� - - 82 IN i is �� INSTALL CURB DRAIN PER CITY STANDARD PLAN STD -184-L. I i _ 32)FL 00 LO 0 8.1. -II __ iy �/ %��\\/ \6:97 INV%\/ $ /�\�/%1 '4'1 tr 7.34%4 i 12 PLUG EXISTING DRIVEWAY APPROACHES PER CITY STANDARD PLAN STD -165-L. C7 1.5% �� 8a11 TG7_h-'L '__ �{� o 4-7 'i Rl/ �gi I \� FSI 8.17 FS 8 6 BIO 2 N 2% 7.1 TG 7138 FS 7.53 TG -Ilk NI '5!12 INV _ 1 -1li=i AG O-'1 / EG 13 RECONSTRUCT SIDEWALK PER CITY STANDARD PLAN STD -180-L. 6.7 INV 7.5% II III II - F 4 0' 1.2T DF - _ 14 CONSTRUCT CURB ACCESS RAMP PER CITY STANDARD PLAN STD -181 -L-A. CASE "C". { EP II ° ( �Ih I 9.00 FS ON _ I M� 1=11 8.33 FG 7.40 FS 2 8. 01 G Ill I _ - 8.50 S 8.90 FS 8.40 TG 8.1 TG 371f�V I (0 6.4 INU %/i,A�'� s �- r I �. ,.,,, - - 1 7.291N I (6 37) PRECISE GRADING PLAN SCALE I'=8' FL 207 IF Rei AC A' C a mmmmmi 16 12 8 4 0 8 16 SCALE 1"=8' Co RE roin a rouid c!y Core Structure, Inc. 23172 Plaza Pointe Dr. Suite #145 Laguna Hills, CA 92653 Phone: 949-954-7244 info@corestructure.com www.corestructure.com PROJECT NAME: 410 LIFE WORK LOFT 0 U Li N Z 0 U 0 U.0 Q m W CL ARCHITECT BRANDON ARCHITECT 3001 RED HILL AVE COSTA MESA DEVELOPER: CANNY SAIL HOUE LP 428 OLD NEWPORT BLVD NEWPORT BEACH ADDRESS: 410 29TH ST. NEWPORT BEACH CA 92663 SHEET NAME: PRECISE GRADING PLAN PROJECT NUMBER: 70050 DESIGNED BY:CHECKED BY: PLOT DATE: 02/17/2017 SHEET NUMBER: C-2 140 147 Attachment No. PC 7 Tentative Tract Map 142 149 LEGAL DESCRIPTION: SHEET 1 OF 1 THE LAND REFERRED TO HEREIN BELOW IS / TENTATIVE TRACT SITUATED IN THE COUNTY OF ORANGE, STATE ,�/ OF CALIFORNIA, AND DESCRIBED AS FOLLOWS: MAP NO. 18108 LOTS 17,18 AND 19 IN BLOCK 225 OF THE FEBRUARY 2017 LANCASTER'S ADDITION TO NEWPORT BEACH, / IN THE CITY OF NEWPORT BEACH, AS SHOWN%l/�J SITE ADDRESS ON A MAP RECORDED IN BOOK 5, PAGE 14 OF 410 29TH STREET MISCELLANEOUS MAPS, IN THE OFFICE OF THE NEWPORT BEACH, CA 92663 COUNTY RECORDER OF SAID COUNTY. (APN: 047-052-01) OWNER/DEVELOPER: SCALE = 1" = 20' LOTS 17,18 & 19, BLOCK 225 CANNERY SAIL HOUSE, LP LANCASTER'S ADDITION TO NEWPORT BEACH 6.83 �(s.s7)rc \a M.M. 5/14 R dQ FI aTf. 6.9 S - .� �'R�. CURVE DATA TABLE FS (7.07)TC 7.22 ° SFT (7.01) # DELTA RADIUS LENGTH � 7.15 i viii. 6.57 FL�� Cl 51009'58" 90.00' 8.93' ,. 7 41 C2 11-3453- 10.00' 2.02' 6.93° 6.62 FL \ 0 7.27 (7.16)TC�` A N FS 9506, 6.64 FL � EXISTINGLOT 1 \ (� 39) ° ° Ar C BUILDING 7.29 7p 0 2,442.56 SF S 7&1 (7.07)TC (7.04) (7.24) 10' RADIUS CORNER CUT-OFF 6.51 FL rt :IU P F DEDICATED TO THE CITY OF NEWPORT _ Ja BEACH FOR STREET PURPOSES. Cl ^' Lu -- 0- J M N62°5420 E 89.74' C2 C-4 LOT 2 o N 7.31) EXISTING 7.42 ° 7'09 ZS 5,243.76 SF BUILDING FF EP N cNQ U� Irv. U (7.64) m N a o _h 7.34 AC O m M FS 7.71 _ ❑O 7.11 " F (7.60) 7.19 EP (8.00) AC FS NG7.23 736FS a NG (7.55) r\ 6.37 ° d' (7.58) 7.83 AC 7.15 2 FL C a (7.20)U. FS (8.06) (7.76) FS (6`97) :. . (7.22) N62.5646E 89.95' EP (3.42) BUILDING AC 02) (7.93 (7.10) 6.41 STATEMENT OF PURPOSE: REPARED BY: ��w per`"""'�� O J 6/16/2017 °- °' No. 8516 Exp. 12/31/18 PA L D. FT, P.L.S. 8516 s LICENS XPIRES 12/31/18 Tqr A TRACT MAP FOR CONDOMINIUM PURPOSES, BEING SIX CONDOMINIUMS (TWO COMMERCIAL AND FOUR RESIDENTIAL) OVER TWO LOTS. LAND SUIMMY E:. HUNTINGTON BEACH, CALIFORNIA 92646 PHONE:(714)488-5006 FAX:(714)333-4440 APEXLSINCOQ GMAIL.CqF0 Attachment No. PC 8 Project Plans 151 152 SHEET# DRAWING TITLE T-10 TRLE SHEET T-1.1 GWERALARCSRCECTURAL NOTES r A -0S ARCHITECTURAL SRE PIAN tz C-1 ..1. TITLE SHEET G2 PRECISE GRA°IN°PLPN Z V Ca sECTI.NS A DETAILS Q BRANDON ARCHITECTS, INC. o °°°�°E°H�MENa °N°°ETAIL$ ~ - 11 S HALv1Ews A-20 FN CODE SF PIAN . \ \ ■ 1 1FIRST FLOOR PLAN A-22 SECONC FLOOR FU A-3$ FAIRE FLOOR DETAILS A-36 ROOF ELAN I.C.A-0.0 EXTERIOR ELEVATIONB MATEFS 6LXEOULE EXTERIOR ELEVATIONS. I- IS. BUIL°ING III TIO., 9d A-51 RUILOING SECTIONS EXISTING COMMERCIAL SPACE 112 BUIL°INGSECTION$ z - `l Z lm ' Ytls• su ASS BUILOINGSECTION$ 0.1 AREA PIAN sua TOPocRAPxlcsuR4Ev L%STING 0ONEMONS `\\ 1REs10ENITALcou°o.Ea$) �2 J €Q Q PARCEL'A-ElG1 I \ COMMERCIAL CQN°Q_'6 EMSD) ` N IF MI!°i� PR°P°6E➢LOi SPLIT O USE AS DIMENSIONED vO C? C\ GFi W]i ULLMAN SAILS LOFTS 41029TH ST. NEWPORT BEACH, CA 92663 RJ SEE DEVELOPMENT __ tirvcRfr 5^.m.x....... > q .:a re m'...^.. •n P"keA�m m ..,Y "�^'"'"""' SPECIAL INSPECTION$ fi vacx ,,gcM wrtR d ugm�^.. i iigg�l1 SUNITLONOOs LOTIlallIn sP3RtM. jlCi 'ri ET! y=R�i mni Tillt3 AGENCIE66 PU°LIOSERVICEs 1 PROJECT DIRECTORY 2 x000 r mmv A ZfEpeI°"$ ZSltiit�! MATERIAL LEGEND 1° EFERRE°sU°MITTALS 8iuw xoneervc Mµ.XE°USE MT1] 'fin n '. PROJECT DESCRIPTIONX. rveFno 1. ¢nnw'nn'urm '� emw Ve A+vvavem'm"s'in'�"' MIM WARS USS .1—Illr E m rno uan a n m 0 110amssn�xe n omen >ss menm.wm > mmn> . M 2 O�=8TAlR mnx ns vm wou uaRc1 _ me.ry . .. m,w ., ry WAV o _T-1 .0 VICINITY MAPI PROTECT DESCRIPTION ANNOTATION LEGEND 11 OUTDOOR AREA 9 RUILOINGAREA i SITE INFORMATION 5 L°OE REVIEW 3 SHEET LIST 1 :�; CN a. -r — W BE - :� ..•� . _ter=_�=:_.•rc-- i _ a z .•_... ._.. -...•- ...^.- _.__.-_-_-.� I _r_n_c_=_rte._• =rr --_ -- - - ..-_...e..;•<c:max-r.°�..:.�e.:c:�_..,.s.._.,.. s v•Y--uW-- CAL GREEN RESIDENTIAL MANDATORY MEASURES 22 S€ Com•_— _-- - ,—w� _ _ _ __ _ ILL m _�c�r ���.�:_:�®•a=.•d �• a•� ��.wr.._ _____________ s_—�__: rT[�e-f'�I _ __ __ =_cx= _ _- __� _--_ r�- :_tz-• - RESIDENTIAL CONSTRUCPON MINIMUM REQUIREMENTS F"AE1R. w —SUN— hP �u IYy Zi:i ESS lt ll MU e m RIS -..._.__-... TTr% .�.. wmxs•• mei s tM;E IRK �.. p RE> A R� REM bYa.. w BIa- T-1.1 GENERAL NOTES 5 ABBREVIATIONS - 3 0 i I 2 0 w�, r e rk _ W COMMERCIAL IL 9C RESIDENTIAL' tl 8 ( A-510952 R=10.00' L=&93 - N62 -54 20-E =893'N62"54'29"E 89.94 f J r use ®ei A om n: — =11°34'59' R =10. - I u a ue m P I g § I� t "vi :5 I - rr� " I ORT 6FACN NOTES � '�i'Ifl _rew eemwxa ,•�• ! �'"•^'- i'�'Y3ii+ UNIT -B' arm �m H .. z ^N62"56'46"E 8995'—��-�°^ �MLHITECTIiRALSRE PIAN _ __ `^ _ _ _ A-0.0 Y SREPIANNOTE PRECISE GRADING PLAN FOR 410 LIVE WORK LOFT 41029TH STREET, NEWPORT BEACH. CA 92663 NOTICE TO CONTRACTOR NOTE TO SURVEYOR AOONIONAL NOTE xm msn.mxma SKEET INDEX IN EA WORK QUANTITY ON 1,50 NO ucw.auv.ouOFF uunw. THE EFFIFT OF 04 , ��E"+rv+wwrE.wuam�. .IND w NONO N Ens"1—' e. I w.«mnxcuno rtrttw. NOTE „am,.�. n......a, �a,..m IF ror ExExINOTIN, .-4(x ¢yp.--N= NNNTL IN NNNN OR uv xwwm­,,.xi+ 1,50 NOTE 12 1. 1177 m up— a N 50:37"W,9508 �`°"` R. 10.00 L 8 8 v ao a w}wt� xa GARAGE -- T.. iv.wV us�� R N62' 29�' 89 94 O '"' CONSTRUCTION NOTE _ a GARAGE a II„ 1,p M7 3459" o 0.00'L=2 .02' o GARAGE N27905'40"W 56291' j JI—u.,. R N62°56'467E 9.9�V . r PRECISE GRADING PLAN SCALE I'=8' 4 15 SECTION A SECTION SECTION B -S PLAN tea¢ L DETAIL ��ss ao orv�Poui�:J sD'iE F�IWAtERPUNfEKO rvc a..0 rm n ` a.,ewxmz`o5 x ooxm¢i.c.mpmswsorve, sat PP"S�TA OETAL OETTpiOyMLE66 TRENCH pRPI 4 e EIA uAN T BUILD OpRNNAOF •. r,.,xEnu,ws�ixwxwmiuwsauwuiu. rm„na,xxx 158 9�5 1 m EROSION CONTROL PLAN K""v srssw muwexrslms,asuiy m xnmx veouixsnexswM�reess.l P4 = 11 °34'59" �R = p0.00' L=2.01 I> Yx� '13 J —R N27?0540"W 56.29' x DDTmsw[ N I'. engwiS E] zmuu_xwem. E] is n�xu�moamxuw,emmn�es. 410 LIFE WORK LOFT v' rNYV­ ate_ 111 I'll 1 EROSION CONTROL PLAN /J//t^�T� )OO60r a xxwFn er_ V Wn ®s iFEyrvLL:PSa: C-4 n�l wI GARAGE g GARAGE z',; GARAGE 1 m EROSION CONTROL PLAN K""v srssw muwexrslms,asuiy m xnmx veouixsnexswM�reess.l P4 = 11 °34'59" �R = p0.00' L=2.01 I> Yx� '13 J —R N27?0540"W 56.29' x DDTmsw[ N I'. engwiS E] zmuu_xwem. E] is n�xu�moamxuw,emmn�es. 410 LIFE WORK LOFT v' rNYV­ ate_ 111 I'll 1 EROSION CONTROL PLAN /J//t^�T� )OO60r a xxwFn er_ V Wn ®s iFEyrvLL:PSa: C-4 0 100 y !. a - z 30 l� ■ III ,VIII m3 ul yL� � III t res 5 334e I—IA%ONOMEIRIC�W6T �A%ONOMEIRIC-NOfRH u u (/� F LL 0 0 J Q €a N z 'o J J 7 rlAxoNOMETPIc-EAST A "o-METNIc-Sd1iH u. u III l III ✓� i � r K x * E�iZgHii A-1.0 161 � sic \��,i`����V��'• Ql u�IR3i FLOOR LOVEPLAN � occwununsa .0 '�$ '"' qi BVILOWWI - I x 9 i 1 i eaxxixo 1' I sumo u3E CANO RCORCODE%AN IiY _-- Ql u�IR3i FLOOR LOVEPLAN � occwununsa .0 '�$ '"' qi BVILOWWI -- - - Ty OW W ST y Rummswg 9 Re. [ax,wuisv vn nxox N 5 .rax ® r�Ernmnmxmww-aEr oR xw�x J Fa JA1 �TED LEGEND FIRLST FLOOR PLAN q9 REO9 NO.OFE%VR REO9SE qP RgTIOM& c3GVPAM LO��STION NIT A' xasxxw ar L - xmx urvlT e Lill, �s E swNACE SCXEVULE c cooE AMgLvs 4 2 - O2Q 6 w 9Qk \ 43 s a d a i LL q O N �m u UNIT A Z 'o z _ ------------- a � / / It, i- a 11NITVC 1 nw a wp LLI o i �it ii` �.. es[axc[xwnu� cwozo a s I�EZu3�f /� axmxv I •a e uM — .,, s :.. a UNIT'B' � _ �• .qg' �. i r ® vux"wvoopv. smumu.uvwvz vn ' L ® i�, Fmsr v�oagvwl o m IN a z ' k UNIT'X' k k � —I o 4 C rte, a ' p UNIIT'C' Fe Ik I u � I UNIT'B' fill I4,lkiii' m - A-2.2 rwi�[ceNOW 0 ■ Sqk I s9i. a- FLL Q �< � m � a z � mamm ° Y19°E/i3S. ❑ s $I$il:i$$ rwi�acaNOW �cd n i Is� _ i � ' V Hill 11 W i 'EM 9g� iG nN \I LL El _l, V m �!EE .. __ I' i 8 !: �„ <till o o El ro till Y 1 i v 4e 5 p F,i'�F3E $$ u WOOF PLW --- -- GJ A-3. A-3.0 � wrern�aooriry o� ----- ------------------ -4__= i---- --- -- - ------------------------Y - - -- - 0 0 4 Y 4 -------- --------- ---- ---- - ------ - ------ -- -- - --- - -------------------------------- ~------- --------- - G ON791�E ELEVaiION-FAST L L J J L J u ILGMtlELE ATM NORTH A-4.0 ...._... ............ ------- ----------- ----------------- - x L L J J L J u ILGMtlELE ATM NORTH A-4.0 L L L L L [,iRUDE E EVAnoN-WEST J J J I n LMMVATION-SGUTH 168 1 A-4.1 .. Y Y ---- ---- -- - ; a O --- - - - --- --- - - -- — - - - ---- - r - - - -`-- - --- - - - - -- ? _ �_._._. _ ___._. _.—._. _ _ _._._. ----- ---------------------------------- L L L L L [,iRUDE E EVAnoN-WEST J J J I n LMMVATION-SGUTH 168 1 A-4.1 EIRPNRv�reseseenoN rn1 T3RPNSVERSE 9ECilON rm O ��wmuc Wiwmsunvu•mwnw miss -• m0 �s u e wnu-x,.sxumy �e'acuno . O wanrnsrsxssn.nssws iv ec ux w (��+ I o n x I 9@ I��IIKRIIIm I_ FCAfdIIGll-CIEI 11—J1�1154I--11"�`R'�.II'�II�I�IL I. rn1 T3RPNSVERSE 9ECilON rm O ��wmuc Wiwmsunvu•mwnw miss -• m0 �s u wnu-x,.sxumy �e'acuno O wanrnsrsxssn.nssws iv ec ux w (��+ rvm"E rxr.xixsw.u.ns�mwcrvw o n A-5.0 I WI_ FjIC I L -- u'..RAaveRSe SeOTON t MmR%6Vs RSEs CTlON rvasv on.mwx.n[..ort «,o: ° �iliilf7l o w, nwEvcxffn mw.o�.o««�..a m rvm"Erxr.xixcw.u.�mwnwu o m A-5.1 �IIIIIIII, 'Ira II[ol[ � WI_ FjIC I L -- u'..RAaveRSe SeOTON t MmR%6Vs RSEs CTlON rvasv on.mwx.n[..ort «,o: ° �iliilf7l o w, nwEvcxffn mw.o�.o««�..a m rvm"Erxr.xixcw.u.�mwnwu o m A-5.1 T a 0 _______ _____ ___ _____ _____ ___ ____ . m �• --xu wac xrnexosx .. m 2mG MUM® O amara. _ x � — Q--------------._ _ _ _._.��p F IrLl11 III IIIA II fil Ih � III Ili: J u TM5 PER3E 6ECTIGN % �Q Z 'o J J 7 ti p D cox�xrm _ 7 i If 1: � 0 YPEI $f I e• a nqy • xx . v •z oanx[xe cednl f A$ ilS _ _ pyq,,a,�. '. -—�rasemmu®1PfeB i�i_.1 v.� ANNOTATION LEGEND G lijl i�1 ® as .........nwn�a� nTRP rER3E3EOTO u v � uur s insuunwsamu�miss O wua.a.esrues �vecurvn wnu-x�se,umy�tacuno O waarwsrarusn.nsruos iv ec ux w Q vxs,crxr.xixcw.0.xsi mwcrvw o mx na. A-5.2 9 SEPAPATION IE Ell, �0�7001N�SE�ION A-5.3 'Lr�w.vxmwwn+ww�w�m� F Ld r�ly�.xnwwwi�wwu�M11H Iglplp 16J �4111(1JJIp'�... i I C l41 I �����i��i��ll I 1 °Ay q_IlLlllli I FFiZ`i917tl � � 1���t�l �I IIII IL' ® R rte■ ■�_IIIIIIIII o A-5.4 �MONON n IIIIe sIIII' IIIIE IIII ® = °iii. I INN Ietlh nI u LONG,PON SEC ON L u LONGgJDN SECTION naExa�. m. w,..E..o2 «,0: FFiZ`i917tl o A-5.4 6 SEPAPAPON LE I 9 u LNONGTUOI L�ECM naExa�. m. w,..E.o2 «,0: na. FFiZ`i9f7tl rxn� n A IE �■iy^ rCOMEI :ii—'. �� I�F III_�il��l�llhrgvts, vq Mo.9I�T.I I �, I�I��i Illllli� u u LNONGTUOI L�ECM ��oNciTuoiw.�sEmiox o naExa�. m. w,..E.o2 «,0: na. FFiZ`i9f7tl A-5.5 A IE ��oNciTuoiw.�sEmiox o naExa�. m. w,..E.o2 «,0: na. FFiZ`i9f7tl A-5.5 6 SEPAPATION IE 3 UNIT CONDOO S - LOT 18 918 mw eY MIXEO USE - LOT 17 L T— u veI T=S7R T O:&. SE�LONNOELMR O51 u LPNosOME ME 0P 5EME -1a. -rte I D WWLOOR iOS. ELo mvERSGE m:r� E P_1:51 aaaawwvmrcawrsa f — ua,wxxxio�xonmimnarmwws m0fwae,nuerc wrr�iex•,V�nrnr�ruwa�rw ��rcor-omsnmszwuwr Y Z�1111 1., vivewmieiuz�xmsar.zrc,xccrvxrvn,mvmwwove�xr. � ���p` 4 � 5(�S � _ lC\ VICINITY MAP m-ry `a� � Tc�nsAvon� ✓�9 \,o uw LOT 77 - LOT 18 LOT 79 ;& m 000.3 222299 6GIGOJMMNITI L1D0 E 04000 m , GRAPHIC SCALE L J Q ,.�Q' //i/// mme.rzvc_a9ss A•�..�. I U ¢ N IFF a M09 wmlK i 6004 30 � Z ¢ 2 m w l m N H Z I � o ma- az w Ullman Sails Lofts lip Planning Commission Public Hearing (PA2017-059) July 20, 2017 r it t M _ILJ Planning Commission - July 20, 2017 Item No. 3a Additional Materials Presented at Meeting Planning Commission - July 20, 2017 Item No. 3a Additional Materials Presented at Meeting Project Site boa? .1 r I�nlei►t "'f-'rir"'"r�� 1 � m rr 'tea _ Planning Commission - July 20, 2017 Item No. 3a Additional Materials Presented at Meeting P 10IR 4 A Planning Commission - July 20, 2017 Item No. 3a Additional Materials Presented at Meeting Planning Commission - July 20, 2017 Item No. 3a Additional Materials Presented at Meeting Ullman Sails Lofts Mixed -Use and Resident i -059) 29ryST Site Plan R=10.00' L=SA I R=10.00' L=Y.( ------------------------- I y O I N82'W48'E 89.95' N .mcond Floor F ��d i Planning Commission - July 20, 2017 Item No. 3a Additional Materials Presented at Meeting I �.oastal Development Permit ■ Land Use -Development complies with GP land use and FAR limitations (MU -H4 and MU-CV/15TH ST) Hazards — New development will be constructed to 9.o -foot finished floor elevation and designed to address liquefaction Water Quality —A preliminary WQMP has been prepared and reviewed by the City's Engineer Geologist ■ Public Access —Does not interfere with the public's right to access the shoreline. 07/20/2017 Community Development Department - Planning Division 9 Planning Commission - July 20, 2017 Item No. 3a Additional Materials Presented at Meeting Ullman Sails Lofts Mixed -Use and Resident i -059) _ 29ryST Site Plan �'` 9g0g �•t '%'COMMERCIAL II 4=SP09'S2' R=10.00' L=B.E �N62"64'20'E 8994' � � I 0-11'34'59' R=10.00' L-21 4 -Ir 1111i a _ UNIT'A' �. _....-� UNIT C I nncr.rrnmr � i 1 'y. . I�.. UNIT'B' i< I[9 N62'56'46•E 89.95' I 10 Planning Commission - July 20, 2017 Item No. 3a Additional Materials Presented at Meeting • • M O1' Planning Commission - July 20, 2017 Item No. 3a Additional Materials Presented at Meeting w � Jul l�l MN 11 f� r KA Ali +2 public street , spaces a 'Ir:= Project SiteWlk E, a D er, Parking Map - Designations + Blue Pole -.Annual & Master Parking Permits • Silver Pole- MasterParkingPermits Paid Parking Lot — Street Parking Meters Planning Commission - July 20, 2017 Item No. 3a Additional Materials Presented at Meeting .o a..."Cannery k a ? e o r � N � Nig p T T.' 9 '69p5�y j Newport o BlvI ?a12p s at ?. 9B "aG � n v� r� •- � n n , 2 � I y� ,9 1ga4 Type:IPS t, ,1 gZS Rate: $L30/Hr""2HR New ort Hours of Operation: Mon -Sun 8:00-18:00 > Pq,1 « p was z 0,� el,<cl Lott_1$i9 Mobile Parking Zones: 4776 se U i 18 28igP Peak Rate: 1.30 zo .s tea, Q pp • Bei a� �4 Off-peak Rate: 1.30 07l',- z 3 • Planning Commission - July 20, 2017 Item No. 3a Additional Materials Presented at Meeting c DPvP1nnment ReviF Required for mixed-use projects with 1-4 dwelling units and up to 9,999 -sq -ft of nonresidential floor area Land Use/Zoning-MU-H4 and MU-CV/1.5T" St Bulk/scale/aesthetic treatment Pedestrian and vehicle access Landscape and open space areas Public view protection 07/20/2017 Community Development Department - Planning Division 14 Planning Commission - July 20, 2017 Item No. 3a Additional Materials Presented at Meeting t.-_-_-.-_-_ T------------- u�-w i 4 H 07/20/2017 -- --------------, ----------------------------------------------------------- ----- ' ---- rr--------- ---- - --- -, ........ .... ---- T- --- ----- ------ ------ ---- ----- - -- 26 feet �' � ° � ray ------------.-----------.---"- -_-_- I __�__.-_'._-.-'I _-_-_-._--I--_ -------- -_------------------------------ -------------L..�.�t... �..�..�.�..�..�.�..� ....�..�.�..�...�.�..�r. :i- i 19.o feet (finished floor elevation) I I Community Development Department - Planning Division 15 Planning Commission - July 20, 2017 Item No. 3a Additional Materials Presented at Meeting S --- -1 --- - - - -- 31 feet -- �----- _ _ -------- --- -- -------- --- ------------------ y �+ � 99.W'a63 3Y.1B' N11' nbe _�----- —---- ---------------------MAEflI RMV- HT MW RED'0 ---------------------------------- ---sa• _��������__`_ --• a� ------------ –---- —------------------------------------------------------------ ----------------- ------ _----- -- - ,�c 1311TW 4� 's ---------------------------------------- _— 26 feet Y ----------fi------ LLl—LI - I i �I� I g.o feet (finished floor elevation) -------------- 07/20/2017 Community Development Department - Planning Division O y �+ � 99.W'a63 3Y.1B' N11' nbe _�----- —---- ---------------------MAEflI RMV- HT MW RED'0 ---------------------------------- ---sa• _��������__`_ --• a� ------------ –---- —------------------------------------------------------------ ----------------- ------ _----- -- - ,�c 1311TW 4� 's ---------------------------------------- _— 26 feet Y ----------fi------ LLl—LI - I i �I� I g.o feet (finished floor elevation) -------------- 07/20/2017 Community Development Department - Planning Division Planning Commission - July 20, 2017 Item No. 3a Additional Materials Presented at Meeting r , .-.JI FF N62.56'46 -E 89.95' — + I 18 :Ti 07/20/2017 93 4 7. (7.22) Planning Commission - July 20, 2017 Item No. 3a Additional Materials Presented at Meeting ?gay M.M. 5/14 6.97 TC 6.49 7.22 \ CURVE DATA TABLE 7.07 ?C ' �` 7.01 # DELTA RADIUS LEN Ng9° 6.57 FL, C2 11 3453" 10.00' 2t 7.41 S 7.12 TC 'ems 7.12 6.62 FL i 7.27 7.16 TCS F 9SOB• 6.64 FL ` \' \s) BUILDING LOT 1 7.29 1p, ° AC 2,442 56 SIF (7.07)TC 6.51 FL 7 24 10' RADIUS CORNER CUT-OFF DEDICATED TO THE CITY OF NEWPORT 13ErH"FM ST!Ttr PMPaSET7 C1 F d N62`5420"E 89.74' C2 c LOT 2 7,42 7.31 EXISTING 2 FS 5,243.76 SF BUILDING FF N (7.64) ~ 1e 7.34AC O °S i� 0o w • 7.71 q' FF7.60 FS 7.19 8.00 � �' 7.23 a 0 6.37 i e 7.56 7.83 A 7.15 tLZ (8.06) 7.76 (6rb7 ion N62°5646 E 89.95' Planning Commission - July 20, 2017 Item No. 3a Additional Materials Presented at Meeting -059) QA Review The project is categorically exempt under Section 15332, of the California Environmental Quality Act (CEQA) Guidelines - Class 32 (Infill). The proposed project involves the development of a new mixed-use and 3 -dwelling unit residential structure located in a developed area that is adequately served by existing infrastructure, which is within the thresholds identified in CEQA Guidelines Section 15332. 07/20/2017 Community Development Department - Planning Division 21 Planning Commission - July 20, 2017 Item No. 3a Additional Materials Presented at Meeting For more information contact: Makana Nova 949-644-3249 m nova 0 newportbeachca.gov www.newportbeachca.gov