Loading...
HomeMy WebLinkAboutN2017-0424� wrog 00 0ivic CNeWenter Drive, BNewport Beach, CA 92660 III II III IIIII IIIII III 7 III�I0 II IIIIII4 II Permit Counter Phone (949)644-3311 _u �* Online Inspection Request- www.newportbeachea.gov/Online Services ra«as Permit No: N2017-0424 Project No : 2545-2016 SCA V I V ED' Inspection Requests Phone (949)644-3255 Job Address: 1909 E BAY AVE NB Thomas:Guide: 919B2 Description: INSTALL SEWER CLEAN OUT PER STD 406-L. Parcel # : 0482-404-3 - Q e Legal Desc : BALBOA BAY FRONT TR LOT 5 BLK S AND EAST SIDE ADD LOT 5 BLK �� 11 /„ . �® 28 FOR Owner: Phone: BARTZHOWARD 443-667-9229 E.it Contractor: Phone: SHORELINE DEVELOPERS 949-697-3993 Address : 1515 OCEAN AVE. Address: P O BOX 551 NEWPORT BEACH, CA 92661 NEWPORT BEACH CA 92661 Contractor State Lic: 890871 Applicant: SHORELINE DEVELOPERS License Expire: 01 31, 2019 Phone: 949-697-3993 [ Address: P O BOX 551 NEWPORT BEACH CA 92661 Business License: BT30041079 Business Expire: 10 31, 2017 Special Cond.: PRE -CONSTRUCTION MEETING REQUIRED Workers' Compensation Insurance -- Carrier : STATE COMP Policy No: 9038773 W. C. Expire: 01 01, 2018 Permit Processing Fee: $241.00 Sewer Connection : $0.00 Total Fee $635.00 Agreement Fee: $0.00 4TT Box Cover: $64.00 Paid : $635.00 Traffic control Plan Check : $0.00 Total Water Meters : $0.00 Balance: $0.00 Inspection Fee : $330.00 Water Meter Connection : $0.00 Receipt No: Refundable Deposit: $0.00 Total Water Meter Box: $0.00 Street Tree Fee : $0.00 Adjustment : $0.00 Processed By: Date: _/ / Other Department : Date Utilities Approval : Date : _/_/_ Permit Denied Date : Traffic Approval : Date : _/_/_ Issued Permit : Date : 3/ / /^^-7 General Services Approval : Date: _/_/ ;... _ARM R L :E: Low.,J PROJECT ADDRESS: S DETAILED D SCRIPTION OF PROPOSED INOR{c: I v�M Phone: 4 q'� APPLICANT: Y)Z),e ( Email Address:JCeice. C Mailing Address: ,Zy �� s �K;kc� Cit /Sta /Zi : `es� OWNER: Phone: Email Address: Mailing Address: City/State/Zip: � AMPTQ1,InFIF U,RIM't'E mg "IC-0WINE, CONTRACTOR: � G6E ' office Phone: Company (if different): lJobsite Phone: (Q J 7.3 q4 Other Phone: Email Address:JCe1.t Mailing Address: 27-1 k 5 CitylState/Zip: cz C"r. 92G2 State License Number & Class: g 0 Ex ires City Business License Number: Expires: WORKERS COMPENSATION NSURANCE - Certificate of Insurance (Section 3800 Labor Code) Company: Policy No: Expires: E EFUNDABLE QE ? FEePund l'a'abis T.o ..> .: ..... ......: _ ..._ ... i ... atI Refupd To :. 'i. . :.. .. :.._ .. t .....::.. } Special Conditions of Pe it: A©DITIQNAL APPROVAL REQIIIREd FRWM 7H1= EQLLOVIiIt(PaQEP/fRTIGIE,., T$ 1' v Utilities: General Services: Traffic: Fire: 0 Other: Engineering Technician: Pub' LE //11 Date: i ( Permit No. " 0-04Z f./users/pb%WsharedlenemachlmesleWep%Wftheetx `'—'' ) -j��--2.0►� S� Public Works Department 949-644-3311 N2017- Permit Processing Fee: Inspection Fee: Public Works Only $241.00 Public Works Field Inspection $165.00 Other Department $275.00 Utilities Field Inspection $121.00 General Services Inspection $165.00 Agreement Fee: Water Quality/Artificial Turf Inspection $108.00 Preparation of Report/Agreement Document Recordation Fee $817.00 $192.00 Refundable Deposit: TBD Monitoring Wells $502.00 Improvements TBD StreetfAlley/Walk Closure: $65.00= Newspaper Rack inspection $108.00 0 Traffic Control Plan Check 8-1/2" x 11" $65.00E---J Sewer Connection Fee $250.00 24" x 36" $143.001 I 4TT Box & Cover $64.0 Additional — _ _ THE FOLLOWING ITEMS�REQUIRE APPROVAL FROM THE � Revenue Division )Approval: REVENUE DIVISION PRIOR TO PAYMENT OF FEES I Qty. ari• , 1 Water Motor: Installation Charge $52t3.00 � 1 3/4" Meter $50,25 Water Meter Boxes: 1" Meter $121,50 For Parkway & Sidewalk Area (Box + Cover =Cost 1 1 1/2" Meter $285.00 1" Meter. 13.00 + 37.00 $50,00 I 1 112" Turbine Meter $700.00 2: Meter: 27.00+ 61.25 $88 25 2" Meter $425,00 2" Turbine Meter $845,00 For Traffic & Alley Areas (Sox + Cover W Cost) 3" Meter $3,310.00 I"Meter: 13 00 + 38.00 $51.00 ) 4" Meter $4,730.00 2" Meter: 27.00 + 162.00 $189.0D I 8" MAtar 07190 nn Certificate of Compliance Fee (+100% of hrly over 3 hrs) $288.00 5200-5029 Development Services Fee (Plan check hourly) $155.00 5200-5015 Final Tract Map Checking Fee $2,488.00 5200-5026 Final Parcel Map Checking Fee - Moderate $2,488.00 5200-5027 Lot Line Adjustment Fee $1,079.00 5200-5028 Park Dedication Fee Zone _ TBD 405-470_ Street Easement/VacationFee (+100%ofhrlyover 4hrs) $1,022.00 5200-5031 Street Tree Fee ($700 Planting Fee) TBDI 030-2284 Engineering Tech: Total Amount Due: For Finance use only L� t PermiST Receipt o. flusers/pbw/sheredlen=ach/masters/ep front and back masters) Rev. 1/5/2017 epfeesheetxls-revised 10121/2018 TERMS AND CONDITIONS OF ENCROACHMENT PERMIT 1. Encroachment Permits may be taken out by the owner of benefited property or a licensed contractor. A licensed contractor must provide a "Letter of Authorization" to allow another party to pull a permit. An approved copy of the permit and construction plan shall be kept at the job site at all times. Work, which has been done prior to issuance of a permit, is subject to rejection/fine. City reserves the right to void permit if work does not commence within 30 days after date of issuance. 2. The Permittee agrees to defend, indemnify and hold the City, its authorized agent, officers, representatives and employees harmless from any responsibility, liability, suit or action of any description arising out of any accident, loss or damage to persons Or property occurring as a result of work undertaken under this permit. 3. All work shall be done in accordance with the approved plans, Standard Special Provisions and Standard Drawings of the City of Newport Beach, and in compliance with all applicable State laws and City ordinances. 4. Permittee guarantees all work performed under this permit to be free of hidden and latent defects. Any failures shall be corrected within two weeks after notification to the satisfaction of the Public Works Director, 5. A valid State licensed contractor must perform all construction within the public right-of-way, unless waived by the Public Works Director.. A valid State Contractor License Class A can perform any work in the public right-of-way. For construction or connection to water lines a valid State Contractor License Class C-34 is required. For construction or connection to sewer lines a valid State Contractor License Class C-42 is required. 6. All trenching and/or resurfacing shall conform to City Standard 105-L for parkway/roadway and City Standard 140-L, in the alley, where a minimum half -alley width resurfacing shall be provided, unless otherwise directed by the Public Works Dept. Contractors shall obtain permits to perform excavation or trench work from the California Division of Industrial Safety prior to commencing underground construction as required by State law. Walls and faces of all excavations over 5 feet in depth shall be protected by a shoring system, sloping of the ground, or other equivalent means. Trenches less than 5 feet in depth shall be guarded when hazardous ground movement may be expected. 7. The Public Works Department Inspectors must inspect all work in the Public right-of-way. Forms and subgmde must be inspected and approved before concrete is ordered/poured. Sewer, pipelines, and subgrade construction must be inspected and approved before backfilling, or applicant may be required to excavate site. Separate Utilities Department or General Services Department inspections may be required depending on scope of work performed. 8. All trench restoration must be inspected by the Public Works Department. No utility installations) shall be allowed over or within 5 feet of any City utilities, unless approved by the Public Works Department. Locate and pothole existing City -owned utilities (ie: water, sewer, or street lighting conduits) to verify locations. Maintain a one -foot clearance over or under existing City -owned utilities. Sewer cleanouts require VCR or PVC SDR35 be used with a 4TT box over the riser. 9. Properly lighted barricades must be provided and maintained around all trenches, excavations and obstructions. All signs, flags, lights and other warning and safety devices shall conform to the requirements of the current "Manual of Warning Signs, Sights and Other Devices for the Use in Performance of Work Upon Highways", issued by the California Department of Transportation. If needed, barricades can be obtained from the City at a charge of $10.00 per barricade per day, with a minimum charge of $35.00, It is the responsibility of the applicant to place barricades to protect the general public. Access to fire hydrants must be maintained at all times. 10. Work within or near beach sensitive areas will not be allowed during, City holidays, spring break, Memorial Day weekend, summer between June 15 and September 15, and during the holiday season from December 19 to January 1, unless approved by the Public Works Department. 11. Any work that extends into traffic or parking lanes and impedes the normal flow of traffic requires the applicant to acquire a Temporary Street Closure Permit from the Public Works Department. Access for fire, police and emergency vehicles must be maintained at all times. Traffic Control must be per Work Area Traffic Control Handbook (WATCH). No nighttime traffic lane closures, unless prior approval has been granted. Any lane(s) closure on a major street will only be allowed between 9:00 a.m. and 3:00 p.m. (Monday thru Friday), unless approved by the Public Works Department. Any work affecting the State Highway's traffic or within the State Highway right-of-way will require a Caltrans Permit. All vehicles shall be lawfully parked. 12. This permit does not authorize the closure of sidewalks, streets, or alleys for construction access, storage of materials, or parking of construction vehicles unless detailed on an attached Temporary Street Closure, 13. Applicant must notify USA at 1-800-227-2600 2 days before starting any underground construction. Applicant must notify all affected residents 24 hours in advance of restricted access and any inconveniences. 14. Refuse or unused materials shall be removed within 24 hours after completion of the work. If not removed, the City may remove and bill the applicant. Coordinate alley closures with City's refuse pick-up days by calling 949-644-3066 for the collection schedule so service is not interrupted. To place a dumpster or materials in the public right-of-way, a Temporary Street Closure Permit must be obtained from the Public Works Department. WORKER'S COMPENSATION INSURANCE (Section 3800 Labor Code) -- certify that I have a Certificate of consent f-insure ificate of WorkaT's Compensation Insurance, or a Certified Co 4 ereo . CERTIFICATE OF EXEMPTIO ion 3800 Labor Code) I certify that in the performance of the work under this permit, 1 shall not employ any person so as to become subject to California Worker's Compensation Laws. If, after signing this certificate I become subject to the Worker's Compensation provisions of the State Labor Code, I must comply with the provisions of Section 3700 or this permit shall be deemed revoked. Date: Signature: CONTRACTOR LICENSE EXEMPTION As the Owner of the benefiting property, I certify I am personally performing all work in the Public Right -of -Way. Date: Signature: HOLD HARMLESS STATEMENT understand that I am locating minor encroachments within the City Right-of- Way/Easement. As property owner it is my responsibility to maintain the encroachments. I will be responsible for replacing the improvements if the City removes them for maintenance of utilities or other public need. I shall indemnify and hold the City harmless for any liability associated with the minor encroachments. Date: Signature: 24-hour notice for Encroachment ermit Inspection is required by calling Public Works at 949-644-3311. 15. Any above ground utility facilities i ire documented approval from the "adjacent affected property owner(s). 16. Homeowner, contractors, and subcontracoirs may each be liable for violations of Water Quality Laws. Best Management Practices will be enforced. It is against the law to discharge construction debris into the gutter and storm drain. Felony violations of Water Quality Laws are punishable by fines up to $25,000 and/or up to three years in State prison plus the full cost to clean up an illegal discharge or spill. 17. If a refundable deposit was paid, applicant must submit a Soils Compaction Certificate or Evidence of a Slurried Backfill and request a final inspection from the Public Works Department. Monies may be held for six months after final inspection before a refund will be processed. 18. No trees in the public right-of-way shall be planted, removed, trimmed, or relocated without approval from the General Services Department. 19. All work in the public right-of-way must meet the approval of the Public Works Department or corrections will be required (i.e. removals, exposing connections, etc.). Additional inspection fees may be required. 20. Permit is for standard materials in the public right-of-way only, unless previously approved by Public Works and an Encroachment Agreement has been processed. 21. Permit is valid for "description' of work noted on front only. Additional work performed may require issuance of a separate permit and/or additional fees. 4 {. 8M6/2017 City of Newport Beach Page 15 of 16 6:34:19AM INSP160 - Daily Inspection Request Report OWNER: BARTZ HOWARD APPLICANT: SHORELINE DEVELOPERS )Pscrinfion - INSTALL SEWER CLEAN OUT PER STD 406-L. Item: 10030 CLEAN -OUT Requested Time: 8/16/2017 12:00:OOAM Requestor: Entered By: WEBUSER Comments: ANY - Assigned to : zzzzzzzzzzz' Inspector: ,�� V Phone : 443-667-9229 Phone : 949-697-3993 WEBUSER 9496973993 Date: ( 1 Z 7 Time: r Comments: 1,—' 04.1-� /--- 7- 5' G0 ,�� ,5_ L - Logged F:\Users\PBW \Shared\ENCROACH\MASTERS\FORMS\InsoectorS heet. doc r 8131/2017 City of Newport Beach Page 20 of 21 6:34:58AM INSP150 - Daily Inspection Request Report Requested Inspection Date : 08/31/2017 Inspection Type: ENCROACH Inspection Area: PW Site Address : 1909 BAY AVE E A( Information: Activity : N2017-0424 SubType: NEW Status : APPROVED OWNER: BARTZ HOWARD APPLICANT: SHORELINE DEVELOPERS Description : INSTALL SEWER CLEAN OUT PER STD 406-L. Requested inspections) Item: 10250 FINAL - PW Requested Time: 8/31/2017 12:00:OOAM Requestor: Entered By: WEBUSER Comments: ANY - Assigned to : zzzzzzzz=* Inspector: Comments: J v Date: F? S 1 4 1-7 V�4 F:\Users\PBW\Shared\ENCROACH\MASTERS\FORMS\InspectorSheet.doc f/L, Phone: 443-667-9229 Phone: 949-697-3993 WEBUSER 9496973993 Time: I T �� AM(�ii) u Planning Notes O o I FRONT YARD SETBACK 00 OD (NON -CONFORMING) II p O 3'-0" 3,-0" (E) RESIDENCE HARDSCAPE WALKWAY 1,766 SF FOOTPRINT 2-STORY + GARAGE BELOW (E) 6'H WOOD FENCING (E) 6'H WOOD FENCING 19.10, 15.95' HARDSCAPE WALKWAY & STAIRS a • (E) SCREENED TRASH AREA ALL WORK RELATED TO WASTE WATER IN THE �I (E) SEWER LATERAL PUBLIC RIGHT OF WAY SHALL BE PERFORMED BYLO A C-42 LICENSED SANITATION SEWER CONTRACTOR — OR A LICENSED GENERAL ENGINEERING O (E) R = 30.00, INSTALL NEW CLEAN -OUT PER CITY CONTRACTOR. u WM STANDARD STD-406-L; TRAFFIC GRADE -- ------------� BOX REQ'D AN APPROVED ENCROACHMENT PERMIT IS REQUIRED FOR ALL WORK ACTIVITIES WITHIN THE PUBLIC RIGHT-OF-WAY. EAST BAY AVENUE EXISTING HARDSCAPE & LANDSCAPE TO REMAIN; NO CHANGE. Plot Plan Scale: V = 10'-0" 1 1. POOLS, SPAS, WALLS, FENCES, PATIO COV STRUCTURES REQUIRE REVIEW BY CITY OF 2. COASTAL COMMISSION EXEMPT <10% ADDI' 3. VARIANCE NO. VA1025 AUTORIZES 4,033 4,004 PROPOSED. 4. RESIDENCE IN NON -CONFORMING TO 4-F1 OPEN SPACE. <10% ADDITIONAL PERMITTI Architect's Notes to Contractor / O' 1. THESE PLANS REPRESENT A FINAL BUILD BUILDING CONDITIONS MAY NOT BE REPR[ CONTRACTOR SHALL BECOME FAMILIAR WF PROPERTY AND STRUCTURES PRIOR TO B 2. ALL NEW CONSTRUCTION SHALL COMPLY ZONING CODES EVEN IF NOT EXPLICITLY IS THE RESPONSIBILITY OF THE CONTRAC- CODES RELATED TO CONSTRUCTION OF T1 3. CONTRACTOR SHALL REVIEW ALL SHEETS UNDERSTANDING OF THE PROJECT. NOT SET IS GRAPHICAL. CONTRACTOR SHALL FORMS, AND CALCULATIONS WITHIN THE F ACCORDINGLY. 4. CONTRACTOR SHALL VERIFY ALL INFORMAI ACCURACY AND SHALL ALERT THE ARCHIT DISCREPANCIES, ERRORS, OR OMISSIONS. ARCHITECT'S INSTRUCTION PRIOR TO COM CONFUSION, DISCREPANCY, ERROR, OR 01 5. THE CONTRACTOR SHALL CONFIRM ALL SF PRIOR TO PURCHASE OF ALL MANUFACTUI FIXTURES AND EQUIPMENT SUCH AS BUT EXTERIOR FINISH, ROOF FINISH MATERIAL, CARPENTRY, PLUMBING FIXTURES, HVAC E ARCHITECT SHALL NOT BE RESPONSIBLE IF CONTRACTOR AND OWNER DID NOT CO ITEMS PRIOR TO PURCHASE. IF THERE I`. SPECIFICATION AND THE OWNER'S WISHES