HomeMy WebLinkAboutZA2017-099 - COASTAL DEVELOPMENT PERMIT TO DEMOLISH AN EXISTING RESIDENCE AND CONSTRUCT A NEW SINGLE-FAMILY RESIDENCE - 88 LINDA ISLE08-15-2017
RESOLUTION NO. ZA2017-099
A RESOLUTION OF THE ZONING ADMINISTRATOR OF THE
CITY OF NEWPORT BEACH APPROVING COASTAL
DEVELOPMENT PERMIT NO. CD2017-035 TO DEMOLISH AN
EXISTING SINGLE-FAMILY RESIDENCE AND CONSTRUCT A
NEW TWO-STORY SINGLE-FAMILY RESIDENCE AND
ATTACHED THREE-CAR GARAGE LOCATED AT 88 LINDA ISLE
(PA2017-085)
THE ZONING ADMINISTRATOR OF THE CITY OF NEWPORT BEACH HEREBY FINDS AS
FOLLOWS:
SECTION 1. STATEMENT OF FACTS.
1. An application was filed by Randy Davis, with respect to property located at 88 Linda Isle,
and legally described as Lot 88 of Tract No. 4003, requesting approval of a coastal
development permit.
2. The applicant proposes the demolition of an existing single-family residence and
attached garage, and the construction of a new 7,445-square-foot two-story, single-
family residence with an attached 774-square-foot garage. The development also
includes hardscape, drainage, and landscaping all located within the confines of the
private property. The proposed residence complies with all applicable development
standards including height, setbacks, floor area limits, and no deviations are requested.
The existing bulkhead will not be altered as part of this project.
3. The subject property is designated Single-Unit Residential Detached (RS-D) by the
General Plan Land Use Element and is located within the Single-Unit Residential (R-1)
Zoning District.
4. The subject property is located within the coastal zone. The Coastal Land Use Plan
category is Single-Unit Residential Detached - (6.0 - 9.9 DU/AC) (RSD-B) and it is located
within the Single-Unit Residential (R-1) Coastal Zone District.
5. A public hearing was held on December 14, 2017, in the Corona del Mar Conference
Room (Bay E-1st Floor) at 100 Civic Center Drive, Newport Beach. A notice of time, place
and purpose of the hearing was given in accordance with the Newport Beach Municipal
Code. Evidence, both written and oral, was presented to, and considered by, the Zoning
Administrator at this hearing.
SECTION 2. CALIFORNIA ENVIRONMENTAL QUALITY ACT DETERMINATION.
1. This project is categorically exempt pursuant to Title 14 of the California Code of
Regulations Section 15303, Article 19 of Chapter 3, Guidelines for Implementation of the
California Environmental Quality Act (CEQA) under Class 3 (New Construction or
Conversion of Small Structures), because it has no potential to have a significant effect
on the environment.
Zoning Administrator Resolution No. ZA2017-099
Page 2 of 7
08-15-2017
2. Class 3 exempts the construction of up to three single-family residences and additions
of up to 10,000 square feet to existing structures. The proposed project consists of the
demolition of one single-family residence and the construction of a new 7,445-square-
foot single-family residence and attached 774-square-foot, three-car garage.
SECTION 3. REQUIRED FINDINGS.
In accordance with Section 21.52.015 (Coastal Development Permits, Findings and Decision)
of the Newport Beach Municipal Code, the following findings and facts in support of such
findings are set forth:
Finding:
A. Conforms to all applicable sections of the certified Local Coastal Program.
Facts in Support of Finding:
1. The proposed development complies with applicable residential development standards
including, but not limited to, floor area limitation, setbacks, height, and parking.
a. The maximum floor area limitation is 11,424 square feet and the proposed floor
area is 8,219 square feet.
b. The proposed development provides the minimum required setbacks, which are 10
feet along the front property line abutting the Newport Bay, 4 feet along each side
property line and 25 feet along the property line abutting the Linda Isle private drive.
Portions of the existing residence that currently encroach up to 4 inches into the
westerly side setback are proposed to be demolished and the structure modified
for setback conformance.
c. The highest ridge is no more than 29 feet from established grade, which complies
with the maximum height requirements.
d. The project includes garage parking for a total of three vehicles, complying with the
minimum three-car garage parking requirement for single-family residences with
more than 4,000 square feet of habitable floor area.
2. The private neighborhood is predominantly developed with two -story single-family
residences. The proposed design, bulk, and scale of the development is consistent with
the existing neighborhood pattern of development and expected future development.
3. The development fronts the Newport Bay and is a private bayfront parcel. The project
site is protected by an existing bulkhead with the top of the bulkhead at elevation 9.20
feet (NAVD88). A Coastal Hazard and Sea Level Rise Analysis was prepared by
GeoSoils, Inc., dated November 24, 2017, for the project. The existing bulkhead is in good
condition and is not in need of any maintenance or repair at this time. The bay water
Zoning Administrator Resolution No. ZA2017-099
Page 3 of 7
08-15-2017
elevation (currently maximum 7.2 feet NAVD88) will exceed the top of the bulkhead
elevation when sea level rise is greater than 1.8 feet, which would occur approximately
75 years from now based on the minimum estimates for sea level rise provided by the
National Research Council 2012 SLR estimates. Therefore, the project will be protected
for the 75-year life of the proposed improvements.
4. Pursuant to NBMC Section 21.30.030(C)(3)(i)(iv), the property owner will be required to
enter into an agreement with the City waiving any potential right to protection to address
situations in the future in which the development is threatened with damage or destruction
by coastal hazards (e.g., waves, erosion, and sea level rise). The property owner will also
be required to acknowledge any hazards present at the site and unconditionally waive any
claim to damage or liability against the decision authority, consistent with NBMC Section
21.30.015(D)(3)(c). Both requirements are included as conditions of approval that will need
to be satisfied prior to the issuance of building permits for construction.
5. The property is located in an area known for the potential of seismic activity and
liquefaction. All projects are required to comply with the California Building Code (CBC)
and Building Division standards and policies. Geotechnical investigations specifically
addressing liquefaction are required to be reviewed and approved prior to the issuance of
building permits. Permit issuance is also contingent on the inclusion of design mitigation
identified in the investigations. Construction plans are reviewed for compliance with
approved investigations and CBC prior to building permit issuance.
6. The project design addresses water quality with a construction erosion control plan and a
post construction drainage system that includes drainage and percolation features
designed to retain dry weather and minor rain event run-off on-site. Any water not retained
on-site is directed to the City’s storm drain system.
7. Pursuant to Municipal Code Section 21.35.050, due to the proximity of the development
to the shoreline and the development containing more than 75 percent of impervious
surface area, a Water Quality and Hydrology Plan (WQHP) is required. A Water Quality
Management Plan (WQMP) has been reviewed and approved by the City’s Engineer
Geologist. The WQMP includes a polluted runoff and hydrologic site characterization, a
sizing standard for best management practices (BMPs), use of a low-impact
development (LID) approach to retain the design storm runoff volume on site, and
documentation of the expected effectiveness of the proposed BMPs
8. Proposed landscaping complies with Implementation Plan Section 21.30.075. A
condition of approval is included that requires drought -tolerant, and prohibits invasive,
species. Prior to issuance of building permits, the final landscape plans will be reviewed
to verify invasive species are not planted
Finding:
B. Conforms with the public access and public recreation policies of Chapter 3 of the
Coastal Act if the project is located between the nearest public road and the sea or
shoreline of any body of water located within the coastal zone .
Zoning Administrator Resolution No. ZA2017-099
Page 4 of 7
08-15-2017
Fact in Support of Finding:
1. Linda Isle is a private, 107-lot single-family community created in 1933, and developed in
the 1960s. A gated bridge connects the island to the mainland at Bayside Drive. As the
project site is not located between the nearest public road and the sea or shoreline, the
project will not affect the public’s ability to gain access to, use, and/or view the coast and
nearby recreational facilities.
2. Implementation Plan Section 21.30A.040 requires that the provision of public access bear
a reasonable relationship between the requirement and the project’s impact and be
proportional to the impact. The project involves the demolition of a single-family residence
and the construction of a new single-family residence. Therefore, there is no change in
land use and the proposed increases in floor area, height and bulk will not result in any
significant adverse impacts to public recreation, access or views or otherwise diminish the
public’s use of the ocean, harbor, bay, channels, estuaries, salt marshes, sloughs,
beaches, coastal parks, trails, or coastal bluffs.
3. The closest Public Viewpoint is located near Bayside Drive and Harbor Island Drive,
approximately 1,500 feet from the property. The proposed residence is located near
Coast Highway and Bayside Drive, which are both Coastal View Roads, as designated
in the Coastal Land Use Plan. Due to the distance of the proposed development from
the public viewpoint and the project’s compliance with height, setbacks, the project will
not impact coastal views.
SECTION 4. DECISION.
NOW, THEREFORE, BE IT RESOLVED:
1. The Zoning Administrator of the City of Newport Beach hereby approves Coastal
Development Permit No. CD2017-035, subject to the conditions set forth in Exhibit “A,”
which is attached hereto and incorporated by reference.
2. This action shall become final and effective 14 days following the date this Resolution
was adopted unless within such time an appeal or call for review is filed with the
Community Development Director in accordance with the provisions of Title 21 Local
Coastal Implementation Plan, of the Newport Beach Municipal Code. Final action taken
by the City may be appealed to the Coastal Commission in compliance with Section
21.64.035 of the City’s certified LCP and Title 14 California Code of Regulations,
Sections 13111 through 13120, and Section 30603 of the Coastal Act.
PASSED, APPROVED, AND ADOPTED THIS 14TH DAY OF DECEMBER, 2017.
_____________________________________
Patrick J. Alford, Zoning Administrator
Zoning Administrator Resolution No. ZA2017-099
Page 5 of 7
08-15-2017
EXHIBIT “A”
CONDITIONS OF APPROVAL
1. The development shall be in substantial conformance with the approved site plan, floor
plans and building elevations stamped and dated with the date of this approval (except as
modified by applicable conditions of approval).
2. Prior to the issuance of a building permit, an agreement in a form approved by the City
Attorney between the property owner and the City shall be executed and recorded
waiving rights to the construction of future shoreline protection devices including the
repair and maintenance, enhancement, reinforcement, or any other activity affecting the
bulkhead, that results in any encroachment seaward of the authorized footprint o f the
bulkhead or other shoreline protective device. The agreement shall be binding against
the property owners and successors and assigns.
3. Prior to the issuance of a building permit, the property owner shall submit a notarized
signed letter acknowledging all hazards present at the site, assuming the risk of injury
or damage from such hazards, unconditionally waiving any claims of damage against
the City from such hazards, and to indemnify and hold harmless City, its City Council, its
boards and commissions, officials, officers, employees, and agents from and against any
and all claims, demands, obligations, damages, actions, causes of action, suits, losses,
judgments, fines, penalties, liabilities, costs and expenses (including without limitation,
attorney’s fees, disbursements and court costs) of every kind and nature whatsoever which
may arise from or in any manner relate (directly or indirectly) to City’s approval of
development.
4. No demolition or construction materials, equipment debris, or wa ste, shall be placed or
stored in a location that would enter sensitive habitat, receiving waters, or a storm drain
or result in impacts to environmentally sensitive habitat areas, streams, wetland or their
buffers.
5. Best Management Practices (BMPs) and Good Housekeeping Practices (GHPs) shall
be implemented prior to and throughout the duration of construction activity as
designated in the erosion control plan and conceptual construction pollution prevention
plan (CPPP).
6. The discharge of any hazardous materials into storm sewer systems or receiving waters
shall be prohibited. Machinery and equipment shall be maintained and washed in
confined areas specifically designed to control runoff. A designated fueling and vehicle
maintenance area with appropriate berms and protection to prevent spillage shall be
provided as far away from storm drain systems or receiving waters as possible.
7. Debris from demolition shall be removed from work areas each day and removed from
the project site within 24 hours of the completion of the project. Stock piles and
construction materials shall be covered, enclosed on all sites, not stored in contact with
the soil, and located as far away as possible from drain inlets and any waterway.
Zoning Administrator Resolution No. ZA2017-099
Page 6 of 7
08-15-2017
8. Trash and debris shall be disposed in proper trash and recycling receptacles at the end
of each construction day. Solid waste, including excess concrete, shall be disposed in
adequate disposal facilities at a legal disposal site or recycled at a recycling facility.
9. Revisions to the approved plans may require an amendment to this Coastal
Development Permit or the processing of a new Coastal Development Permit.
10. The project is subject to all applicable City ordinances, policies, and standards, unless
specifically waived or modified by the conditions of approval.
11. The applicant shall comply with all federal, state, and local laws. Material violation of
any of those laws in connection with the use may be cause for revocation of this Coastal
Development Permit.
12. This Coastal Development Permit may be modified or revoked by the Zoning
Administrator if determined that the proposed uses or conditions under which it is being
operated or maintained is detrimental to the public health, welfare or materially injurious
to property or improvements in the vicinity or if the property is operated or maintained
so as to constitute a public nuisance.
13. Prior to issuance of the building permits, a copy of the Resolution, including conditions
of approval Exhibit “A” shall be incorporated into the Building Division and fiel d sets of
plans.
14. Prior to issuance of building permits, the applicant shall submit to the Planning Division
an additional copy of the approved architectural plans for inclusion in the Coastal
Development file. The plans shall be identical to those approved by all City departments
for building permit issuance. The approved copy shall include architectural sheets only
and shall be reduced in size to 11 inches by 17 inches. The plans shall accurately depict
the elements approved by this Coastal Development Permit.
15. Prior to issuance of the building permits, the approved CPPP and WQMP shall be
submitted with the Building Permit plans. Implementation shall be in complianc e with the
approved CPPP and WQMP and any changes could require separate review and
approval by the Building Division.
16. Prior to the issuance of building permits, the applicant shall submit a final landscape and
irrigation plan. These plans shall incorporate drought tolerant plantings, non -invasive
plant species and water efficient irrigation design. The plans sh all be approved by the
Planning Division.
17. All landscape materials and irrigation systems shall be maintained in accordance with
the approved landscape plan. All landscaped areas shall be maintained in a healthy and
growing condition and shall receive regular pruning, fertilizing, mowing, and trimming.
All landscaped areas shall be kept free of weeds and debris. All irrigation systems shall
Zoning Administrator Resolution No. ZA2017-099
Page 7 of 7
08-15-2017
be kept operable, including adjustments, replacements, repairs, and cleaning as part of
regular maintenance.
18. Prior to the issuance of building permit, the applicant shall pay any unpaid administrative
costs associated with the processing of this application to the Planning Division.
19. Should the property be sold or otherwise come under different ownership, any future
owners or assignees shall be notified of the conditions of this approval by the current
property owner or agent.
20. This Coastal Development Permit No. CD2017-035 shall expire unless exercised within 24
months from the date of approval as specified in Section 21.54.060 (Time Limits and
Extensions) of the Newport Beach Municipal Code, unless an extension is otherwise
granted.
21. To the fullest extent permitted by law, applicant shall indemnify, defend and hold harmless
City, its City Council, its boards and commissions, officials, officers, employees, and agents
from and against any and all claims, demands, obligations, damages, actions, causes of
action, suits, losses, judgments, fines, penalties, liabilities, costs and expenses (including
without limitation, attorney’s fees, disbursements and court costs) of every kind and nature
whatsoever which may arise from or in any manner relate (directly or indirectly) to City’s
approval of Davis Residence including, but not limited to, Coastal Development Permit No.
CD2017-035 (PA2017-085). This indemnification shall include, but not be limited to,
damages awarded against the City, if any, costs of suit, attorneys' fees, and other
expenses incurred in connection with such claim, action, causes of action, suit or
proceeding whether incurred by applicant, City, and/or the parties initiating or bringing such
proceeding. The applicant shall indemnify the City for all of City's costs, attorneys' fees,
and damages, which City incurs in enforcing the indemnification provisions set forth in this
condition. The applicant shall pay to the City upon demand any amount owed to the City
pursuant to the indemnification requirements prescribed in this condition.