Loading...
HomeMy WebLinkAboutZA2018-002 - COASTAL DEVELOPMENT PERMIT TO DEMOLISH AN EXISTING SINGLE-FAMILY RESIDENCE & CONSTRUCT A NEW TWO-STORY, SINGLE FAMILY RESIDENCE AND ATTACHED THREE-CAR GARAGE - 941 VIA LIDO SOUD RESOLUTION NO. ZA2018-002 A RESOLUTION OF THE ZONING ADMINISTRATOR OF THE CITY OF NEWPORT BEACH APPROVING COASTAL DEVELOPMENT PERMIT NO. CD2017-068 TO DEMOLISH AN EXISTING SINGLE-FAMILY RESIDENCE AND CONSTRUCT A NEW TWO-STORY, SINGLE-FAMILY RESIDENCE AND ATTACHED THREE-CAR GARAGE AT 941 VIA LIDO SOUD (PA2017-166) THE ZONING ADMINISTRATOR OF THE CITY OF NEWPORT BEACH HEREBY FINDS AS FOLLOWS: SECTION 1. STATEMENT OF FACTS. 1. An application was filed by Andrew Gabriel with respect to property located at 941 Via Lido Soud, requesting approval of a coastal development permit. 2. The property is legally described as Lot 323 of Tract 907. 3. The applicant proposed the demolition of an existing two-story, 4,787-square-foot, single-family residence and the construction of a new two -story 6,580-square-foot, single-family residence with an attached three -car garage. The project includes landscape, hardscape and subsurface drainage facilities. The site is protected by an existing private bulkhead that has been inspected, is in generally good condition, and will be reinforced in conjunction with the proposed constru ction. The design complies with all applicable development standards and no deviations are requested. 4. The subject property is designated RS-D (Single-Unit Residential Detached) by the General Plan Land Use Element and is located within the R-1 (Single-Unit Residential) Zoning District. 5. The subject property is located within the coastal zone. The Coastal Land Use Plan category is RSD-C (Single-Unit Residential Detached - (10.0 - 19.9 DU/AC) and the property is located within the R-1 (Single-Unit Residential) Coastal Zone District. 6. A public hearing was held on January 11, 2018, in the Corona del Mar Conference Room (Bay E-1st Floor) at 100 Civic Center Drive, Newport Beach. A notice of time, place and purpose of the hearing was given in accordance with the Newport Beach Municipal Code. Evidence, both written and oral, was presen ted to, and considered by, the Zoning Administrator at this hearing. SECTION 2. CALIFORNIA ENVIRONMENTAL QUALITY ACT DETERMINATION. 1. This project is categorically exempt pursuant to Title 14 of the California Code of Regulations Section 15303, Article 19 of Chapter 3, Guidelines for Implementation of the California Environmental Quality Act (CEQA) under Class 3 (New Construction or Zoning Administrator Resolution No. ZA2018-002 Page 2 of 8 Conversion of Small Structures), because it has no potential to have a significant effect on the environment. 2. Class 3 exempts the construction and location of limited numbers of new, small facilities or structures including one single-family residence in a residential zone. The proposed project consists of the demolition of an existing 4,787-square-foot, single-family residence and the construction of a new 6,580-square-foot, single-family residence with an attached three-car garage in the R-1 Zoning District. SECTION 3. REQUIRED FINDINGS. In accordance with Section 21.52.015 (Coastal Development Permits, Findings and Decision) of the Newport Beach Municipal Code (NBMC), the following findings and facts in support of such findings are set forth: Finding: A. Conforms to all applicable sections of the certified Local Coastal Program. Facts in Support of Finding: 1. The proposed development complies with applicable residential development standards including, but not limited to, floor area limitation, setbacks, height, and parking. a. The maximum floor area limitation is 8,062 square feet and the proposed floor area is 6,580 square feet. b. The proposed development will provide the minimum required setbacks, which are four (4) feet along the front property line abutting Via Lido Soud, four (4) feet along each side property line, and ten (10) feet along the front property line abutting the waterway. c. The highest ridge of the sloping roof is approximately 24 feet from established grade, which complies with the maximum height limitation of 29 feet. d. The project includes enclosed garage parking for three vehicles, in compliance with the minimum parking requirement for single-family residences with more than 4,000 square feet of habitable floor area. 2. The neighborhood is predominantly developed with two-story, single-family residences. The proposed design, bulk, and scale of the development will be consistent with the existing neighborhood pattern of development and expected future development. 3. The finished first floor elevation of the proposed residence is 13.25 feet (NAVD88), which is higher than the minimum required 9.00-foot (NAVD88) elevation standard. 4. The existing development includes a private seawall/bulkhead along the waterway. A Bulkhead Condition Report prepared by William Simpson & Associates, Inc., dated Zoning Administrator Resolution No. ZA2018-002 Page 3 of 8 September 29, 2017, concludes that the cast-in-place wall is in generally good condition. In order to protect the proposed new development, the report recommends that the wall be reinforced and repaired, and provides specific recommendations on how this should be accomplished. Once the wall has been reinforced and repaired, it is not anticipated that the wall will need further repair or replacement in the next 75 to 100 years. 5. Pursuant to NBMC Section 21.30.030(C)(3)(i)(iv), the property owner will be required to enter into an agreement with the City waiving any potential right to protection to address situations in the future in which the development is threatened with damage or destruction by coastal hazards (e.g., waves, erosion, and sea level rise). The property owner will also be required to acknowledge any hazards present at the site and unconditionally waive any claim to damage or liability against the decision authority, consistent with NBMC Section 21.30.015(D)(3)(c). Both requirements are included as conditions of approval that will need to be satisfied prior to the issuance of building permits for construction. 6. A project-specific Coastal Hazards Analysis Report was prepared by William Simpson & Associates, Inc., dated September 29, 2017. The report concludes that flooding, wave run up and erosion will not significantly impact this property over the life of the proposed development, once the existing seawall is reinforced and repaired as recommended. 7. The property is located in an area known for the potential of seismic activity and liquefaction. A project-specific Geotechnical Investigation prepared by Geofirm on August 22, 2017, provides recommendations relative to grading, drainage and foundation design. All projects are required to comply with the California Building Code (CBC) and Building Division standards and policies. Geotechnical investigations specifically addressing liquefaction are required to be reviewed and approved prior to the issuance of building permits. Permit issuance is also contingent on the inclusion of design mitigation identified in the investigations. Construction plans are reviewed for compliance with approved investigations and CBC prior to building permit issuance. 8. A Construction Pollution Prevention Plan (CPPP) prepared by Toal Engineering, dated July 26, 2017, provides recommendations for temporary Best Management Practices (BMPs) during construction to minimize erosion and sedimentation, and to minimize pollution of runoff derived by construction chemicals and materials. Construction plans and activities will be required to adhere to the CPPP. 9. Pursuant to Municipal Code Section 21.35.050 (Water Quality and Hydrology Plan), because of the project site’s proximity to coastal waters, a Water Quality and Hydrology Plan (WQHP) was prepared by Toal Engineering, dated July 27, 2017. The WQHP has been reviewed and approved by the City’s Engineer Geologist. The WQHP includes a polluted runoff and hydrologic site characterization, a sizing standard for BMPs, use of a low-impact development (LID) approach to retain the design storm runoff volume on site, and documentation of the expected effectiveness of the proposed BMPs. Construction plans will be reviewed for compliance with the approved WQHP prior to building permit issuance. Zoning Administrator Resolution No. ZA2018-002 Page 4 of 8 10. The project design addresses water quality with a construction erosion control plan and a post construction drainage system that includes drainage and percolation features designed to retain dry weather and minor rain event run-off on-site. Any water not retained on-site is directed to the City’s storm drain system. 11. New landscaping will be verified for compliance with NBMC Section 21.30.075. A condition of approval is included that requires drought-tolerant, and prohibits invasive, species (Condition of Approval No. 16). Prior to issuance of the building permits, the final landscape plans will be reviewed to verify invasive species are not planted. 12. The property is not located near designated public viewpoints or coastal view roads and will not impact public coastal views. Finding: B. Conforms with the public access and public recreation policies of Chapter 3 of the Coastal Act if the project is located between the nearest public road and the sea or shoreline of any body of water located within the coastal zone. Fact in Support of Finding: 1. The project site is located between the nearest public road and the sea or shoreline; however, the project will not affect the public’s ability to gain access to, use, and/or view the coast and nearby recreational facilities. 2. The residential lot does not currently provide nor does it inhibit public coastal access. Coastal access is provided by adjacent small public beach areas with access from the water. 3. There are no designated public viewpoints or coastal view roads near the project site, per the Coastal Land Use Plan. Due to the distance of the proposed development from public view points and the project’s compliance with all applicable development standards, including height and setbacks, the project will not impact coastal views. SECTION 4. DECISION. NOW, THEREFORE, BE IT RESOLVED: 1. The Zoning Administrator of the City of Newport Beach hereby approves Coastal Development Permit No. CD2017-068, subject to the conditions set forth in Exhibit “A,” which is attached hereto and incorporated by reference. 2. This action shall become final and effective 14 days following the date this Resolution was adopted unless within such time an appeal or call for review is filed with the Community Development Director in accordance with the provisions of Title 21 Local Coastal Implementation Plan, of the Newport Beach Municipal Code. Final action taken by the City may be appealed to the Coastal Commission in compliance with Section Zoning Administrator Resolution No. ZA2018-002 Page 5 of 8 21.64.035 of the City’s certified LCP and Title 14 California Code of Regulations, Sections 13111 through 13120, and Section 30603 of the Coastal Act. PASSED, APPROVED, AND ADOPTED THIS 11TH DAY OF JANUARY, 2018. _____________________________________ Jim Campbell, Deputy Community Development Director Acting Zoning Administrator Zoning Administrator Resolution No. ZA2018-002 Page 6 of 8 EXHIBIT “A” CONDITIONS OF APPROVAL 1. The development shall be in substantial conformance with the approved site plan, floor plans and building elevations stamped and dated with the date of this approval (except as modified by applicable conditions of approval). 2. Prior to the issuance of a building permit, an agreement in a form approved by the City Attorney between the property owner and the City shall be e xecuted and recorded waiving rights to the construction of future shoreline protection devices including the repair and maintenance, enhancement, reinforcement, or any other activity affecting the bulkhead, that results in any encroachment seaward of the a uthorized footprint of the bulkhead or other shoreline protective device. The agreement shall be binding against the property owners and successors and assigns. 3. Prior to the issuance of a building permit, the property owner shall submit a notarized signed letter acknowledging all hazards present at the site, assuming the risk of injury or damage from such hazards, unconditionally waiving any claims of damage against the City from such hazards, and to indemnify and hold harmless City, its City Council, its boards and commissions, officials, officers, employees, and agents from and against any and all claims, demands, obligations, damages, actions, causes of action, suits, losses, judgments, fines, penalties, liabilities, costs and expenses (including without limitation, attorney’s fees, disbursements and court costs) of every kind and nature whatsoever which may arise from or in any manner relate (directly or indirectly) to City’s approval of development. 4. The existing private seawall/bulkhead shall be reinforced and repaired, in keeping with the recommendations provided in the Bulkhead Condition Report prepared by William Simpson & Associates, Inc., dated September 29, 2017. 5. No demolition or construction materials, equipment debris, or waste, shall be placed or stored in a location that would enter sensitive habitat, receiving waters, or a storm drain or result in impacts to environmentally sensitive habitat areas, streams, wetland or their buffers. 6. Best Management Practices (BMPs) and Good Housekeeping Practices (GHPs) shall be implemented prior to and throughout the duration of construction activity as designated in the Construction Pollution Prevention Plan (CPPP). 7. The discharge of any hazardous materials into storm sewer systems or receiving waters shall be prohibited. Machinery and equipment shall be maintained and washed in confined areas specifically designed to control runoff. A designated fueling and vehicle maintenance area with appropriate berms and protection to prevent spillage shall be provided as far away from storm drain systems or receiving waters as possible. Zoning Administrator Resolution No. ZA2018-002 Page 7 of 8 8. Debris from demolition shall be removed from work areas each day and removed from the project site within 24 hours of the com pletion of the project. Stock piles and construction materials shall be covered, enclosed on all sites, not stored in contact with the soil, and located as far away as possible from drain inlets and any waterway. 9. Trash and debris shall be disposed in proper trash and recycling receptacles at the end of each construction day. Solid waste, including excess concrete, shall be disposed in adequate disposal facilities at a legal disposal site or recycled at a recycling facility. 10. Revisions to the approved plans may require an amendment to this Coastal Development Permit or the processing of a new coastal development permit. 11. The project is subject to all applicable City ordinances, policies, and standards, unless specifically waived or modified by the conditions of approval. 12. The applicant shall comply with all federal, state, and local laws. Material violation of any of those laws in connection with the use may be cause for revocation of this coastal development permit. 13. This coastal development Ppermit may be modified or revoked by the Zoning Administrator if determined that the proposed uses or conditions under which it is being operated or maintained is detrimental to the public health, welfare or materially injurious to property or improvements in the vicinity or if the property is operated or maintained so as to constitute a public nuisance. 14. Prior to issuance of the building permits, a copy of the Resolution, including conditions of approval Exhibit “A” shall be incorporated into the Building Division an d field sets of plans. 15. Prior to issuance of building permits, the applicant shall submit to the Planning Division an additional copy of the approved architectural plans for inclusion in the coastal development permit file. The plans shall be identical to those approved by all City departments for building permit issuance. The approved copy shall include architectural sheets only and shall be reduced in size to 11 inches by 17 inches. The plans shall accurately depict the elements approved by this coastal development permit. 16. Prior to issuance of the building permits, the approved CPPP shall be submitted with the Building Permit plans. Implementation shall be in compliance with the approved CPPP and any changes could require separate review and approval by the Building Division. 17. Prior to the issuance of building permits, the applicant shall submit a final landscape and irrigation plan. These plans shall incorporate drought tolerant plantings, non -invasive plant species and water efficient irrigation design. The plans shall be approved by the Planning Division. Zoning Administrator Resolution No. ZA2018-002 Page 8 of 8 18. Prior to the issuance of building permits, the applicant shall pay any unpaid administrative costs associated with the processing of this application to the Planning Division. 19. Should the property be sold or otherwise come under different ownership, any future owners or assignees shall be notified of the conditions of this approval by the current property owner or agent. 20. Coastal Development Permit No. CD2017-068 shall expire unless exercised within 24 months from the date of approval as specified in Section 21.54.060 (Time Limits and Extensions) of the Newport Beach Municipal Code, unless an extension is otherwise granted. 21. To the fullest extent permitted by law, applicant shall indemnify, defend and hold harmless City, its City Council, its boards and commissions, officials, officers, employees, and agents from and against any and all claims, demands, obligations, damages, actions, causes of action, suits, losses, judgments, fines, penalties, liabilities, costs and expenses (including without limitation, attorney’s fees, disbursements and court costs) of every kind and nature whatsoever which may arise from or in any manner relate (directly or indirectly) to City’s approval of Gabriel Residence including, but not limited to, Coastal Development Permit No. CD2017-068 (PA2017-166). This indemnification shall include, but not be limited to, damages awarded against the City, if any, costs of suit, attorneys' fees, and other expenses incurred in connection with such claim, action, causes of action, suit or proceeding whether incurred by applicant, City, and/or the parties initiating or bringing such proceeding. The applicant shall indemnify the City for all of City's costs, attorneys' fees, and damages, which City incurs in enforcing the indemnification provisions set forth in this condition. The applicant shall pay to the City upon demand any amount owed to the City pursuant to the indemnification requirements prescribed in this condition.