Loading...
HomeMy WebLinkAboutHARDSHIP REQUESTS 2017_BFBAY N Y N 1 307 Placentia 01/05/2017 2907-2016 TI "HOAG" 2156 SF TECHNICALLY INFEASIBLE 2017-01 350,000$ y 01/19/2017 N SJ Approved The existing elevator at 307 Placentia, which only serves two The surrounding walls are CMU and the location is situated We are requesting a variance on the cab size due to the fact that 2 6480 W. Coast Hwy 01/11/2017 2641-2016 HARDSHIP 2017-02 9,700$ y 01/11/2017 N SJ Approved front door accessable threshold, sanitary facilities, drinking WILL BE BROUGHT TO COMPLIANCE ada parking stall, detectable warning surface, widening doorway 3 2800 Pacific View Dr 03/02/2017 2727-2016 TECHNICALLY INFEASIBLE 2017-03 700,000$ y 03/10/2017 N SJ Approved Also the existing affordable housing appartments are built per federal standard sizes that are already very small and any modifications to the mobility unity bathrooms will require expanding the bathroom walls into unit kitchen or main living spaces. This option will not be acceptable to HUD regulators and will not be financially feasible to an affordable housing entity. EQUIVALENT FACILITATION The new rolling showers will have per plans a clear space to access of four feet and nine inches, this will allow more than sufficient clear space for a wheel chair to approach the shower as is depicted in sheet A3 of the attached Plans. 4 3010 Lafayetter Rd 03/09/2017 2505-2016 HARDSHIP 2017-04 79,000$ y 03/14/2017 N SJ Approved path of travel to entrance, sanitary facilites, & other WILL BE BROUGHT TO COMPLIANCE shows on exhibit 5 3700 Newport Blvd 03/14/2017 2016-4198 HARDSHIP N/A 2017-05 70,000$ y 03/29/2017 N SJ Approved TECHNICALLY INFEASIBLE The ratio of the cost to make existing elevator accessibility improvements far exceed the cost of the base project. EQUIVALENT FACILITATION Three story office building will be modified w new ADA restroom 6 1000 Avocado 03/30/2017 1903-2016 HARDSHIP Restrooms 2017-06 350,000$ y 03/30/2017 N SJ Approved TECHNICALLY INFEASIBLE At employee female restrooms - the EQUIVALENT FACILITATION Addition of automatic door openers on interior and exterior of APPROVED RATIFICATION Exisiting mobility unit bathrooms are inadequate per todays standard and CBC requirements. In order to make the existing bathrooms completely accessible exting structural elements of the building will have to be removed. This will compromise the integrity of the existing structural system requiring major structural repair. MFR ALTERATIONS TO NON- ACCESSIBLE (94) AND ACCESSIBLE BATHROOMS (6) COMM TI RESTROOM @ CENTRAL LIBRARY (959 SF) COMM TI "VACANCY COFFEE BAR" 377 SF COMM TI - 2ND FLR COMMON AREAS INCLUDING RESTROOMS, ADA COMPLIANCE, DOOR HARDWARE, CEILING SYSTEMS AND STAIR RAILING COMM TI 'THE CANNERY" 249 SF WORK DESCRIPTION DECISIONP/C #HARDSHIP #HARDSHIP - 2017PROJECT ADDRESS BYVALUATIONDATE RECEIVED DATE APPROVED Y N Y N APPROVED RATIFICATIONWORK DESCRIPTION DECISIONP/C #HARDSHIP #HARDSHIP - 2017PROJECT ADDRESS BYVALUATIONDATE RECEIVED DATE APPROVED 7 1100 Quail 04/07/2017 1609-2015 HARDSHIP restrooms 2017-07 50,000$ y 04/13/2017 N SJ WILL BE BROUGHT TO COMPLIANCE a. new storefront & landing b. accessible path & two accessible parking stalls 8 3112 Newport Blvd 03/29/2017 2278-2016 HARDSHIP 2017-08 103,000,000$ y 04/13/2017 N SJ Approved Restrooms WILL BE BROUGHT TO COMPLIANCE a. extend rear entrance to meet ADA clearances b. Re-pave rear parking with new handicap parking c. Install new electric handicap operating door d. Install new rear exterior lighting TECHNICALLY INFEASIBLE due to existing structural walls 9 301 Marine Ave 06/12/2017 1078-2017 HARDSHIP 2017-09 3,000$ x 06/22/2017 N SJ Approved path of travel to entrance WILL BE BROUGHT TO COMPLIANCE a. access to wall sink - move wall b. replace sink w/ ADA compliant c. replace existing grab rails in RR 10 1020 Irvine Ave 07/10/2017 0870-2016 HARDSHIP path of travel to entrance from public sidewalk, parking 2017-10 42,000$ 07/10/2017 N SJ Approved WILL BE BROUGHT TO COMPLIANCE a. male & female restrooms b. exit braill signages c. RX millwork counters 11 4340 Von Karman Ave 07/13/2017 1415-2017 HARDSHIP path of travel to altered area 2017-11 79,000$ y 07/18/2017 N SJ Approved WILL BE BROUGHT TO COMPLIANCE N/A TECHNICALLY INFEASIBLE original elevator shafts are too small to accommodate the larger EQUIVALENT FACILITATION other building elements including stairs are accessible compliant 12 3430 Via Lido 07/18/2017 1451-2017 HARDSHIP 2017-12 15,000$ y 07/18/2017 N SJ Approved Path of travel to entrance, restrooms WILL BE BROUGHT TO COMPLIANCE accessible entrance 13 3456 Via Oporto 08/07/2017 1756-2017 HARDSHIP 2017-13 5,000$ y 08/07/2017 N SJ Approved restrooms WILL BE BROUGHT TO COMPLIANCE west dining room exit door COMM FIRE DAMAGE RPR "HO SUM BISTRO" COMM TI 2228 SF "BEAUTY BARRAGE" COMM TI "BELLA AND BALL" 353 SF COMM TI "CVS PHARMACY" 232 SF COMM-TI "ROTUNDA M.D." 222 SF COMM - R/R NON-BEARING WALL 'ELKS LODGE" (STOP WORK) COMM TI - ADD WALL & (4) DOORS "BALBOA BOUTIQUE" 1050 SF (AS BUILT I17-1414) Y N Y N APPROVED RATIFICATIONWORK DESCRIPTION DECISIONP/C #HARDSHIP #HARDSHIP - 2017PROJECT ADDRESS BYVALUATIONDATE RECEIVED DATE APPROVED 14 1090 Bayside Drive 09/18/2017 1982-2017 HARDSHIP 2017-14 8,000$ y 09/18/2017 N SG Approved path of travel to entrance, parking, accessible signage, other WILL BE BROUGHT TO COMPLIANCE a. compliant van accessible signage (xz) b. Remove existing signage and intall c. compliant signage @ correct height d. patch el repair as needed 15 2751/2801 W Coast Hw 10/17/2017 2586-2016 HARDSHIP 2017-15 60,000$ y 10/17/2017 N DK Approved Ste. 270 a. ramp, railing WILL BE BROUGHT TO COMPLIANCE a. ADA railings added to (2) existing drawings b. ADA gates installed in path of travel 16 4343 Von Karman 11/28/2017 2409-2017 TECHNICALLY INFEASIBLE 2017-16 167,684$ y 11/28/2017 N SG Approved 2nd Floor 1. Elevator cab size cannot be enlarged due to existing elevator shaft enclosure size. 2. Min 18" clr @ strike side of door @ both restrooms R/R (5) FINGERS RELOCATE (30 PILES, INSTAL NEW FINGER ADN (4) NEW 18" ROUND PILE COMM TI "SURLAMER" 3,811 SF COMM "UNION BANK" REMOVE STOREFRONT DOORS AND REPLACE W/ SINGLE PANE OF GLAZING