HomeMy WebLinkAboutZA2018-029 - COASTAL DEVELOPMENT PERMIT TO DEMOLISH AN EXISTING SINGLE-FAMILY RESIDENCE AND CONSTRUCT A NEW SINGLE-FAMILY RESIDENCE AND ATTACHED 2-CAR GARAGE - 1556 OCEAN BOULEVARD
RESOLUTION NO. ZA2018-029
A RESOLUTION OF THE ZONING ADMINISTRATOR OF THE CITY
OF NEWPORT BEACH APPROVING COASTAL DEVELOPMENT
PERMIT NO. CD2017-086 TO DEMOLISH AN EXISTING SINGLE-
FAMILY RESIDENCE AND CONSTRUCT A NEW SINGLE-FAMILY
RESIDENCE AND ATTACHED 2-CAR GARAGE LOCATED AT 1556
OCEAN BOULEVARD (PA2017-200)
THE ZONING ADMINISTRATOR OF THE CITY OF NEWPORT BEACH HEREBY FINDS AS
FOLLOWS:
SECTION 1. STATEMENT OF FACTS.
1. An application was filed by Ana Sachse on behalf of Mark Haupert, with respect to property
located at 1556 Ocean Boulevard, requesting approval of a coastal development permit.
2. The property is legally described as Lot 15 of Block I of Tract 518 in the City of Newport Beach
of the County of Orange, California.
3. The applicant proposes a coastal development permit (CDP) for the demolition of an existing
single-family dwelling and the construction of a new, 3,302-square-foot, three-story single-
family residence including an attached 537-square-foot 2-car garage. The project includes
hardscape, drainage, and landscaping improvements. The project complies with all
applicable development standards and no deviations are requested.
4. The subject property is located within the R-1 (Single-Unit Residential) Zoning District and the
General Plan Land Use Element category is RS-D (Single-Unit Residential Detached).
5. The subject property is located within the coastal zone. The Coastal Land Use Plan category
is RSD-C (Single-Unit Residential Detached – 10.0-19.9 DU/AC) and the Coastal Zoning
District is R-1 (Single Unit Residential).
6. A public hearing was held on March 15, 2018, in the Corona del Mar Conference Room (Bay
E-1st Floor) at 100 Civic Center Drive, Newport Beach. A notice of time, place and purpose
of the meeting was given in accordance with the Newport Beach Municipal Code.
Evidence, both written and oral, was presented to, and considered by, the Zoning
Administrator at this meeting.
SECTION 2. CALIFORNIA ENVIRONMENTAL QUALITY ACT DETERMINATION.
1. This project is categorically exempt pursuant to Title 14 of the California Code of Regulations
Section 15303, Article 19 of Chapter 3, Guidelines for Implementation of the California
Environmental Quality Act (CEQA) under Class 3 (New Construction or Conversion of Small
Structures).
2. Class 3 exempts the demolition of up to three single-family residences and additions of up
to 10,000 square feet to existing structures. The proposed project consists of the demolition
Zoning Administrator Resolution No. ZA2018-029
Page 2 of 7
06-02-2017
of one single-family residence and the construction of a new 3,302-square-foot single-
family residence, including an attached 537-square-foot, 2-car garage.
SECTION 3. REQUIRED FINDINGS.
In accordance with Section 21.52.015 (Coastal Development Permits, Findings and Decision) of
the Newport Beach Municipal Code, the following findings and facts in support of such findings
are set forth:
Finding:
A. Conforms to all applicable sections of the certified Local Coastal Program.
Facts in Support of Finding:
1. The proposed development complies with applicable residential development standards
including, but not limited to, floor area limitation, setbacks, height, and parking.
a. The maximum floor area limitation is 3,916 square feet and the proposed floor area is
3,302 square feet.
b. The proposed development provides the minimum required setbacks, which are 9 feet
along the front property line, 3 feet along each side property line and 0 feet along the
rear property line abutting the alley.
c. The highest guardrail is no more than 24 feet as measured from established grade
and the highest ridge is no more than 29 feet as measured from established grade,
which complies with the maximum height requirements.
d. The project includes garage parking for two vehicles, complying with the minimum
two-car garage parking requirement.
2. The neighborhood is predominantly developed with two - and three-story single-family
residences. The proposed design, bulk, and scale of the development is consistent with
the existing neighborhood pattern of development and expected future development.
3. The proposed development is not located on the shoreline. The p roposed finished floor is
11.25 feet (NAVD 88), which is higher than the 9.00 feet (NAVD 88) minimum elevation
standard. As such, impacts from future sea level rise are not anticipated.
4. The property is located in an area known for the potential of seismic activity and liquefaction.
All projects are required to comply with the California Building Code (CBC) and Building
Division standards and policies. Geotechnical investigations specifically addressing
liquefaction are required to be reviewed and approved prior to the issuance of building
permits. Permit issuance is also contingent on the inclusion of design mitigation identified in
the investigations. Construction plans are reviewed for compliance with approved
investigations and CBC prior to building permit issuance.
Zoning Administrator Resolution No. ZA2018-029
Page 3 of 7
06-02-2017
5. Proposed landscaping complies with Implementation Plan Section 21.30.075. A condition
of approval is included that requires drought-tolerant species. Prior to issuance of building
permits, the final landscape plans will be reviewed to verify invasive species are not
planted.
6. The project design addresses water quality with a construction erosion control plan and a
post construction drainage system that includes drainage and percolation features designed
to retain dry weather and minor rain event run-off on-site. Any water not retained on-site is
directed to the City’s storm drain system
Finding:
B. Conforms with the public access and public recreation policies of Chapter 3 of the Coastal
Act if the project is located between the nearest public road and the sea or shoreline of any
body of water located within the coastal zone .
Fact in Support of Finding:
1. The project site is located on the Balboa Peninsula between the nearest public road and the
sea. Implementation Plan Section 21.30A.040 requires that the provision of public access
bear a reasonable relationship between the requirement and the project’s impact and be
proportional to the impact. In this case, the project replaces an existing single-family
residence located on an inland lot with a new single-family residence. Therefore, the project
does not involve a change in land use, density or intensity that will result in increased demand
on public access and recreation opportunities. Furthermore, the project is designed and sited
so as not to block or impede existing public access opportunities.
2. The project site is not located adjacent to a coastal view road, public viewpoint, public park or
beach, or public accessway, as identified in the Coastal Land Use Plan. Furthermore, an
investigation of the project site and surrounding area did not identify any other public view
opportunities. The project site may be located within the viewshed of distant public viewing
areas. However, the project is located on an inland lot and will replace an existing single-
family home with a new single-family home that complies with all applicable LCP development
standards and maintains a building envelope consistent with the existing neighborhood
pattern of development. Therefore, the project does not have the potential to degrade the
visual quality of the Coastal Zone or result in significant adverse impacts to public views.
SECTION 4. DECISION.
NOW, THEREFORE, BE IT RESOLVED:
1. The Zoning Administrator of the City of Newport Beach hereby approves Coastal
Development Permit No. CD2017-086, subject to the conditions set forth in Exhibit “A,” which
is attached hereto and incorporated by reference.
2. This action shall become final and effective 14 days following the date this Resolution was
adopted unless within such time an appeal or call for review is filed with the Community
Development Director in accordance with the provisions of Title 21 Local Coastal
Zoning Administrator Resolution No. ZA2018-029
Page 4 of 7
06-02-2017
Implementation Plan, of the Newport Beach Municipal Code. Final action taken by the City
may be appealed to the Coastal Commission in compliance with Section 21.64.035 of the
City’s certified LCP and Title 14 California Code of Regulations, Sections 13111 through
13120, and Section 30603 of the Coastal Act.
PASSED, APPROVED, AND ADOPTED THIS 15TH DAY OF MARCH, 2018.
_____________________________________
Patrick J. Alford, Zoning Administrator
Zoning Administrator Resolution No. ZA2018-029
Page 5 of 7
06-02-2017
EXHIBIT “A”
CONDITIONS OF APPROVAL
1. The development shall be in substantial conformance with the approved site plan, floor plans
and building elevations stamped and dated with the date of this approval (except as modified
by applicable conditions of approval).
2. Revisions to the approved plans may require an amendment to this Coastal Development
Permit or the processing of a new coastal development permit.
3. Coastal Development Permit No. CD2017-086 shall expire unless exercised within 24
months from the date of approval as specified in Section 21.54.060 (Time Limits and
Extensions) of the Newport Beach Municipal Code, unless an extension is otherwise
granted.
4. The project is subject to all applicable City ordinances, policies, and standards, unless
specifically waived or modified by the conditions of approval.
5. This Coastal Development Permit may be modified or revoked by the Zoning Administrator
if determined that the proposed uses or conditions under which it is being operated or
maintained is detrimental to the public health, welfare o r materially injurious to property or
improvement in the vicinity or if the property is operated or maintained so as to constitute
a public nuisance.
6. Prior to the issuance of building permits, a copy of the Resolution, including conditions of
approval Exhibit “A” shall be incorporated into the Building Division and field sets of plans.
7. Prior to the issuance of a building permit, the applicant shall pay any unpaid administrative
costs associated with the processing of this application to the Planning Division.
8. Prior to the issuance of building permits, the applicant shall submit to the Planning Division
an additional copy of the approved architectural plans for inclusio n in the Coastal
Development file. The plans shall be identical to those approved b y all City departments
for building permit issuance. The approved copy shall include architectural sheets only and
shall be reduced in size to 11 inches by 17 inches. The plans shall accurately depict the
elements approved by this Coastal Development Permit.
9. All landscape materials and irrigation systems shall be maintained in accordance with the
approved landscape plan. All landscaped areas shall be maintained in a healthy and
growing condition and shall receive regular pruning fertilizing, mowing, and tr imming. All
landscaped areas shall be kept free of weeds and debris. All irrigation systems shall be
kept operable, including adjustments, replacements, repairs, and cleaning as part of
regular maintenance.
10. Prior to issuance of a building permit, the applicant shall submit a final landscape and
irrigation plan. These plans shall incorporate drought tolerant plantings, non-invasive plant
species and water efficient irrigation design. The plans shall be approved by the Planning
Division.
Zoning Administrator Resolution No. ZA2018-029
Page 6 of 7
06-02-2017
11. Construction activities shall comply with NBMC Section 10.28.040, which restricts hours of
noise-generating construction activities to between the hours of 7 a.m. and 6:30 p.m., Monday
through Friday and 8 a.m. and 6 p.m. on Saturday. Noise-generating construction activities
are not allowed on Sundays or Holidays.
12. Prior to the issuance of building permits, the applicant shall submit a final drainage and
grading plan. The plan shall be subject to the review and approval by the Building Division.
13. Should the property be sold or otherwise come under different ownership, any future
owners or assignees shall be notified of the conditions of this approval by either the current
business owner, property owner or the leasing agent.
14. Debris from demolition shall be removed from work areas each day and removed from the
project site within 24 hours of the completion of the project. Stock piles and construction
materials shall be covered, enclosed on all sites, not stored in contact with the soil, and
located as far away as possible from drain inlets and any waterway.
15. Trash and debris shall be disposed in proper trash and recycling receptacles at the end of
each construction day. Solid waste, including excess concrete, shall be disposed in
adequate disposal facilities at a legal disposal site or recycled at a recycling facility.
16. The applicant shall comply with all federal, state, and local laws. Material violation of any
of those laws in connection with the use may be cause for revocation of this Coastal
Development Permit.
17. No demolition or construction materials, equipment debris, or waste, shall be placed or
stored in a location that would enter sensitive habitat, receiving waters, or a storm drain,
or result in impacts to environmentally sensitive habitat areas, streams, wetl and or their
buffers.
18. The discharge of any hazardous materials into storm sewer systems or receiving waters
shall be prohibited. Machinery and equipment shall be maintained and washed in confined
areas specifically designed to control runoff. A designated fueling and vehicle maintenance
area with appropriate berms and protection to prevent spillage shall be provided as far
away from storm drain systems or receiving waters as possible.
19. To the fullest extent permitted by law, applicant shall indemnify, defend and hold harmless
City, its City Council, its boards and commissions, officials, officers, employees, and agents
from and against any and all claims, demands, obligations, damages, actions, causes of
action, suits, losses, judgments, fines, penalties, liabilities, costs and expenses (including
without limitation, attorney’s fees, disbursements and court costs) of every kind and nature
whatsoever which may arise from or in any manner relate (directly or indirectly) to City’s
approval of Haupert Residence including, but not limited to, Coastal Development Permit No.
CD2017-086 (PA2017-200). This indemnification shall include, but not be limited to, damages
awarded against the City, if any, costs of suit, attorneys' fees, and other expenses incurred in
connection with such claim, action, causes of action, suit or proceeding whether incurred by
applicant, City, and/or the parties initiating or bringing such proceeding. The applicant shall
indemnify the City for all of City's costs, attorneys' fees, and damages, which City incurs in
Zoning Administrator Resolution No. ZA2018-029
Page 7 of 7
06-02-2017
enforcing the indemnification provisions set forth in this condition. The applicant shall pay to
the City upon demand any amount owed to the City pursuant to the indemnification
requirements prescribed in this condition.