HomeMy WebLinkAboutZA2018-042 - COASTAL DEVELOPMENT PERMIT TO ADD A THIRD-STORY ROOF DECK AND AN ENCLOSED STAIRWELL TO AN EXISTING SINGLE-FAMILY DWELLING - 1236 WEST OCEAN FRONT02-22-2018
RESOLUTION NO. ZA2018-042
A RESOLUTION OF THE ZONING ADMINISTRATOR OF THE
CITY OF NEWPORT BEACH APPROVING COASTAL
DEVELOPMENT PERMIT NO. CD2018-001 TO ADD A THIRD-
STORY ROOF DECK AND AN ENCLOSED STAIRWELL TO AN
EXISTING SINGLE-FAMILY DWELLING LOCATED AT 1236
WEST OCEAN FRONT (PA2017-263)
THE ZONING ADMINISTRATOR OF THE CITY OF NEWPORT BEACH HEREBY FINDS AS
FOLLOWS:
SECTION 1. STATEMENT OF FACTS.
1. An application was filed by Gregory L. McCormick, PE, with respect to property located at
1236 West Ocean Front, requesting approval of a Coastal Development Permit.
2. The lot at 1236 West Ocean Front is legally described as Lot 10, Block 12, Tract 00234.
3. The applicant proposes a coastal development permit to allow the construction of a third-
story roof deck and enclosed stairwell to the existing two-story, single-family dwelling. The
enclosed stairwell with a pitched roof will provide access to the roof deck. The height of the
existing dwelling will be increased by approximately eight feet to the ridge of the new
pitched roof over the stairwell and by approximately two feet to the guardrail of the roof
deck. The proposed development complies with all applicable development standards
including height, setbacks, and floor area limits. No deviations are requested. A remodel
of the existing single-family dwelling was approved and is currently under construction.
The remodel was determined to be exempt from the requirement of a coastal development
permit. The addition of the third-story roof deck and stairwell enclosure increases the height
by more than 10 percent of the existing height of the dwelling and causes the requirement
for a coastal development permit. The stairwell enclosure increases the gross square
footage of the dwelling by seven square feet.
4. The subject property is designated RS-D (Single-Unit Residential Detached) by the
General Plan Land Use Element and is located within the R-1 (Single-Unit Residential)
Zoning District.
5. The subject property located within the coastal zone. The Coastal Land Use Plan category
is Single Unit Residential Detached (RSD-C) and it is located within the Single-Unit
Residential (R-1) Coastal Zone District.
6. A public hearing was held on April 12, 2018, in the Corona del Mar Conference Room
(Bay E-1st Floor) at 100 Civic Center Drive, Newport Beach. A notice of time, place and
purpose of the hearing was given in accordance with the Newport Beach Municipal
Code. Evidence, both written and oral, was presented to, and considered by, the Zoning
Administrator at this hearing.
Zoning Administrator Resolution No. ZA2018-042
Page 2 of 7
12-21-2017
SECTION 2. CALIFORNIA ENVIRONMENTAL QUALITY ACT DETERMINATION.
1. This project is categorically exempt pursuant to Title 14 of the California Code of
Regulations Section 15303, Article 19 of Chapter 3, Guidelines for Implementation of the
California Environmental Quality Act (CEQA) under Class 3, because it has no potential to
have a significant effect on the environment.
2. Class 3 exempts the demolition of up to three single-family residences and additions of
up to 10,000 square feet to existing structures. The proposed project consists of the
addition of a third-story roof deck to one single-family residence in the Single-Unit
Residential (R-1) zoning district.
SECTION 3. REQUIRED FINDINGS.
In accordance with Section 21.52.015 (Coastal Development Permits, Findings and Decision)
of the Newport Beach Municipal Code, t he following findings and facts in support of such
findings are set forth:
Finding:
A. Conforms to all applicable sections of the certified Local Coastal Program.
Facts in Support of Finding:
The proposed development complies with applicable residential development standards
including, but not limited to, floor area limitation, setbacks, height, and parking.
a. The maximum floor area limitation is 5,388 square feet and the existing floor area
is being increased by seven square feet for a portion of the enclosed stairwell to
3,214 square feet.
b. The proposed development provides the minimum required setbacks, which are
eight feet along the front property line abutting the public boardwalk along West
Ocean Front, three feet along each side property line and five feet along the rear
property line abutting the alley.
c. The new guardrail is less than 24 feet from established grade 12.19 feet North
American Vertical Datum of 1988 (NAVD88) and the new sloped roof which is the
highest ridge is no more than 29 feet from established grade, which comply with
the maximum height requirements.
d. The existing single-family dwelling includes garage parking for a total of three
vehicles, which is not changing.
2. The neighborhood is predominantly developed with two - and three-story, single-family
residences. The proposed design, bulk, and scale of the development is consistent with
the existing neighborhood pattern of development and expected future development.
Zoning Administrator Resolution No. ZA2018-042
Page 3 of 7
12-21-2017
3. The existing development is located on private property along the public boardwalk
adjacent the West Ocean Front beach. The beach in front of the boardwalk is
approximately 500 feet wide before the Mean High Water Line of the Pacific Ocean,
which diminishes water-related hazards. The addition of the third-story deck and the
enclosed stairwell to access the deck is not subject to coastal hazards since it is on the
third-story above the existing two-story single-family structure. The finish floor elevation
of the existing dwelling is 13.38 feet (NAVD88), which complies with the minimum 9.00
feet (NAVD88) elevation standard
4. Pursuant to NBMC Section 21.30.030(C)(3)(i)(iv), the property owner will be required to
enter into an agreement with the City waiving any potential right to protection to address
situations in the future in which the development is threatened with damage or destruction
by coastal hazards (e.g., waves, erosion, and sea level rise). The property owner will also
be required to acknowledge any hazards present at the site and unconditionally waive any
claim to damage or liability against the decision authority, consistent with NBMC Section
21.30.015(D)(3)(c). Both requirements are included as conditions of approval that will need
to be satisfied prior to the issuance of building permits for construction.
5. The property is located in an area known for the potential of seismic activity and
liquefaction. All projects are required to comply with the California Building Code (CBC)
and Building Division standards and policies. Geotechnical investigations specifically
addressing liquefaction are required to be reviewed and approved prior to the issuance of
building permits. Permit issuance is also contingent on the inclusion of design mitigation
identified in the investigations. Construction plans are reviewed for compliance with
approved investigations and CBC prior to building permit issuance.
6. The project design addresses water quality with a construction erosion control plan and a
post construction drainage system that includes drainage and percolation features
designed to retain dry weather and minor rain event runoff on-site. Any water not retained
on-site is directed to the City’s storm drain system.
7. Landscaping is not proposed as a part of this project.
8. The property is not located near designated Public Viewpoints or Coastal View Roads and
will not impact public coastal views.
Finding:
B. Conforms with the public access and public recreation policies of Chapter 3 of the
Coastal Act if the project is located between the nearest public road and the sea or
shoreline of any body of water located within the coastal zone .
Zoning Administrator Resolution No. ZA2018-042
Page 4 of 7
12-21-2017
Fact in Support of Finding:
1. The project site is located between the nearest public road and the sea or shoreline; the
project will not affect the public’s ability to gain access to, use, and/or view the coast and
nearby recreational facilities.
2. The project site is located on the Balboa Peninsula between the nearest public road and
the sea. Implementation Plan Section 21.30A.040 (Determination of Public
Access/Recreation Impacts) requires that the provision of public access bear a reasonable
relationship between the requirement and the project’s impact and be proportional to the
impact. In this case, the project is the addition of a third-story roof deck to an existing single-
family residence located on a private lot adjacent to the public boardwalk and beach.
Therefore, the project does not involve a change in land use, density or intensity that will
result in increased demand on public access and recreation opportunities. Furthermore,
the project is designed and sited so as not to block or impede existing public access
opportunities.
3. The public beach also includes the 12-foot-wide public sidewalk providing lateral access
and views of the Pacific Ocean in front of the project site. Vertical access to the boardwalk
is provided from each street end for each block. In this case the street ends at 12th Street
and 13th Street. The addition of the roof deck does not impact access to the public
boardwalk or beach.
SECTION 4. DECISION.
NOW, THEREFORE, BE IT RESOLVED:
1. The Zoning Administrator of the City of Newport Beach hereby approves Coastal
Development Permit No. CD2018-001, subject to the conditions set forth in Exhibit “A,”
which is attached hereto and incorporated by reference.
2. This action shall become final and effective 14 days following the date this Resolution
was adopted unless within such time an appeal or call for review is filed with the
Community Development Director in accordance with the provisions of Title 21 Local
Coastal Implementation Plan, of the Newport Beach Municipal Code. Fin al action taken
by the City may be appealed to the Coastal Commission in compliance with Section
21.64.035 of the City’s certified LCP and Title 14 California Code of Regulations,
Sections 13111 through 13120, and Section 30603 of the Coastal Act.
PASSED, APPROVED, AND ADOPTED THIS 12TH DAY OF APRIL, 2018.
_____________________________________
Patrick J. Alford, Zoning Administrator
Zoning Administrator Resolution No. ZA2018-042
Page 5 of 7
12-21-2017
EXHIBIT “A”
CONDITIONS OF APPROVAL
1. The development shall be in substantial conformance with the approved site plan, floor
plans and building elevations stamped and dated with the date of this approval (except as
modified by applicable conditions of approval).
2. Prior to the issuance of a building permit, an agreement in a form approved by the City
Attorney between the property owner and the City shall be executed and recorded
waiving rights to the construction of future shoreline protection devices to address the
threat of damage or destruction from waves, erosion, storm conditions, landslides,
seismic activity, bluff retreat, sea level rise, or other natural hazards that may affect the
property, or development of the property, today or in the future. The agreement shall be
binding against the property owners and successors and assigns.
3. No demolition or construction materials, equipment debris, or waste, shall be placed or
stored in a location that would enter sensitive habitat, receiving waters, or a storm drain
or result in impacts to environmentally sensitive habitat areas, streams, the beach,
wetlands or their buffers.
4. This approval does not authorize any new or existing improvements (including
landscaping) on State tidelands, public beaches, or the public right-of-way.
5. This Coastal Development Permit does not authorize any development seaward of the
private property.
6. The discharge of any hazardous materials into storm sewer systems or receiving waters
shall be prohibited. Machinery and equipment shall be maintained and washed in
confined areas specif ically designed to control runoff. A designated fueling and vehicle
maintenance area with appropriate berms and protection to prevent spillage shall be
provided as far away from storm drain systems or receiving waters as possible.
7. Debris from demolition shall be removed from work areas each day and removed from
the project site within 24 hours of the completion of the project. Stockpiles and
construction materials shall be covered, enclosed on all sites, not stored in contact with
the soil, and located as far away as possible from drain inlets and any waterway.
8. Trash and debris shall be disposed in proper trash and recycling receptacles at the end
of each construction day. Solid waste, including excess concrete, shall be disposed in
adequate disposal facilities at a legal disposal site or recycled at a recycling facility.
9. Revisions to the approved plans may require an amendment to this Coastal Development
Permit or the processing of a new coastal development permit.
Zoning Administrator Resolution No. ZA2018-042
Page 6 of 7
12-21-2017
10. The project is subject to all applicable City ordinances, policies, and standards, unless
specifically waived or modified by the conditions of approval.
11. The applicant shall comply with all federal, state, and local laws. Material violation of any
of those laws in connection with the use may be cause for revocation of this Coastal
Development Permit.
12. This Coastal Development Permit may be modified or revoked by the Zoning
Administrator if determined that the proposed uses or conditions under which it is being
operated or maintained is detrimental to the public health, welfare or materially injurious
to property or improvements in the vicinity or if the property is operated or maintained so
as to constitute a public nuisance.
13. Prior to issuance of a building permit, a copy of the Resolution, including conditions of
approval Exhibit “A” shall be incorporated into the Building Division and field sets of plans.
14. Prior to issuance of a building permit, the applicant shall submit to the Planning Division
an additional copy of the approved architectural plans for inclusion in the Coastal
Development file. The plans shall be identical to those approved by all City departments
for building permit issuance. The approved copy shall include architectural sheets only
and shall be reduced in size to 11 inches by 17 inches. The plans shall accurately depict
the elements approved by this Coastal Development Permit.
15. Prior to the issuance of building permits, the applicant shall submit a final landscape and
irrigation plan. These plans shall incorporate drought tolerant plantings, non-invasive
plant species and water efficient irrigation design. The plans shall be approved by the
Planning Division.
16. All landscape materials and irrigation systems shall be maintained in accordance with
the approved landscape plan. All landscaped areas shall be maintained in a healthy and
growing condition and shall receive regular pruning, fertilizing, mowing, and trimming. All
landscaped areas shall be kept free of weeds and debris. All irrigation systems shall be
kept operable, including adjustments, replacements, repairs, and cleaning as part of
regular maintenance.
17. Prior to the issuance of building permit, the applicant shall pay any unpaid administrative
costs associated with the processing of this application to the Planning Division.
18. Should the property be sold or otherwise come under different ownership, any future
owners or assignees shall be notified of the conditions of this approval by the current
property owner or agent.
19. This Coastal Development Permit No. CD2018-001 shall expire unless exercised within 24
months from the date of approval as specified in Section 21.54.060 (Time Limits and
Extensions) of the Newport Beach Municipal Code, unless an extension is otherwise
granted.
Zoning Administrator Resolution No. ZA2018-042
Page 7 of 7
12-21-2017
20. To the fullest extent permitted by law, applicant shall indemnify, defend and hold harmless
City, its City Council, its boards and commissions, officials, officers, employees, and agents
from and against any and all claims, demands, obligations, damages, actions, causes of
action, suits, losses, judgments, fines, penalties, liabilities, costs and expenses (including
without limitation, attorney’s fees, disbursements and court costs) of every kind and nature
whatsoever which may arise from or in any manner relate (directly or indirectly) to City’s
approval of Campana Residence Roof Deck including, but not limited to, Coastal Development
Permit No. CD2018-001 (PA2017-263). This indemnification shall include, but not be limited
to, damages awarded against the City, if any, costs of suit, attorneys' fees, and other
expenses incurred in connection with such claim, action, causes of action, suit or
proceeding whether incurred by applicant, City, and/or the parties initiating or bringing such
proceeding. The applicant shall indemnify the City for all of City's costs, attorneys' fees,
and damages, which City incurs in enforcing the indemnification provisions set forth in this
condition. The applicant shall pay to the City upon demand any amount owed to the City
pursuant to the indemnification requirements prescribed in this condition.