HomeMy WebLinkAboutZA2018-051 - COASTAL DEVELOPMENT PERMIT TO CONSTRUCT A NEW SINGLE-FAMILY RESIDENCE AND ATTACHED 2-CAR GARAGE - 1721 EAST BALBOA12-21-2017
RESOLUTION NO. ZA2018-051
A RESOLUTION OF THE ZONING ADMINISTRATOR OF THE
CITY OF NEWPORT BEACH APPROVING COASTAL
DEVELOPMENT PERMIT NO. CD2018-009 TO CONSTRUCT A
NEW SINGLE-FAMILY RESIDENCE AND ATTACHED 2-CAR
GARAGE LOCATED AT 1721 EAST BALBOA BOULEVARD
(PA2018-023)
THE ZONING ADMINISTRATOR OF THE CITY OF NEWPORT BEACH HEREBY FINDS AS
FOLLOWS:
SECTION 1. STATEMENT OF FACTS.
1. An application was filed by William Guidero (“Applicant”), on behalf of Steve and Antoinette
(“Owner”) Bast, with respect to property located at 1721 East Balboa Boulevard, requesting
approval of a coastal development permit.
2. The lot at 1721 East Balboa Boulevard is legally described as Lot 23 of Tract No. 518, in
City of Newport Beach, County of Orange, State of California, as per map recorded in
Book 17, Pages 33-36 of Miscellaneous Maps, Records of Orange County, California.
Tract 948.
3. The Applicant requests a coastal development permit to allow the construction of a new
3,634 square foot, 3-story single family home and attached 2-car garage. The project also
includes landscaping, hardscape and drainage. The proposed residence complies with all
applicable development standards including height, setbacks, and floor area limits. No
deviations are requested. The property and the adjacent legal lot at 1717 East Balboa
Boulevard were previously developed with a single family home built across both lots that
has been demolished as permitted by the approval pf CDP No. CD2017-072.
4. The subject property is designated RS-D (Single-Unit Residential Detached) by the
General Plan Land Use Element and is located within the R-1 (Single-Unit Residential)
Zoning District.
5. The subject property is located within the coastal zone. The Coastal Land Use Plan
category is RSD-C (Single-Unit Residential Detached) – (10.0-19.9 DU/AC) and it is
located within the R-1 (Single-Unit Residential) Coastal Zone District.
6. A public hearing was held on April 26, 2018, in the Corona del Mar Conference Room
(Bay E-1st Floor) at 100 Civic Center Drive, Newport Beach. A notice of time, place and
purpose of the hearing was given in accordance with the Newport Beach Municipal
Code. Evidence, both written and oral, was presented to, and considered by, the Zoning
Administrator at this hearing.
Zoning Administrator Resolution No. ZA2018-051
Page 2 of 7
12-21-2017
SECTION 2. CALIFORNIA ENVIRONMENTAL QUALITY ACT DETERMINATION.
1. This project is categorically exempt pursuant to Title 14 of the California Code of
Regulations Section 15303, Article 19 of Chapter 3, Guidelines for Implementation of the
California Environmental Quality Act (CEQA) under Class 3 (New Construction or
Conversion of Small Structures), because it has no potential to have a significant effect
on the environment.
2. Class 3 exempts the demolition of up to three single-family residences and additions of
up to 10,000 square feet to existing structures. The proposed project consists of the
demolition of one single-family residence and the construction of a new 3,068-square-
foot single-family residence and attached 566-square-foot 2-car garage.
SECTION 3. REQUIRED FINDINGS.
In accordance with Section 21.52.015 (Coastal Development Permits, Findings and Decision)
of the Newport Beach Municipal Code, the following findings and facts in support of such
findings are set forth:
Finding:
A. Conforms to all applicable sections of the certified Local Coastal Program.
Facts in Support of Finding:
1. The proposed development complies with applicable residential development standards
including, but not limited to, floor area limitation, setbacks, height, and parking.
a. The total proposed floor area, including the residence and enclosed parking, is
3,634 square feet, which complies with the maximum allowable floor area limit of
3,835 square feet.
b. The proposed development provides the minimum required setbacks, which are 9
feet along the front property line abutting East Balboa Boulevard, 3 feet along eac h
side property line and 0 feet along the rear property line abutting the alley.
c. The highest guardrail is less than 24 feet from established grade (9.107 feet North
American Vertical Datum of 1988) and the highest ridge is 29 feet from established
grade, which complies with the maximum height limitation.
d. The project includes garage parking for a total of t wo vehicles, complying with the
minimum two-car garage parking requirement for single-family residences with less
than 4,000 square feet of habitable f loor area.
2. The neighborhood is predominantly developed with two - and three-story, single-family
residences. The proposed design, bulk, and scale of the development is consistent with
the existing neighborhood pattern of development and expected future development.
Zoning Administrator Resolution No. ZA2018-051
Page 3 of 7
12-21-2017
3. The development is separated from the shoreline by East Balboa Boulevard and several
rows of residences. The subject property is located approximately 300 feet from the bay
and is not protected by a bulkhead.
4. The finished floor elevation of the proposed dwelling is 9.85 feet (NAVD88), which
complies with the minimum 9 feet (NAVD88) elevation standard.
5. The property is located in an area known for the potential of seismic activity and
liquefaction. All projects are required to comply with the California Building Code (CBC)
and Building Division standards and policies. Geotechnical investigations specifically
addressing liquefaction are required to be reviewed and approved prior to the issuance of
building permits. Permit issuance is also contingent on the inclusion of design mitigation
identified in the investigations. Construction plans are reviewed for compliance with
approved investigations and the CBC prior to building permit issuance.
6. The property is not located within 100 feet of coastal waters. The project design
addresses water quality with a construction erosion control plan and a post construction
drainage system that includes drainage and percolation features designed to retain dry
weather and minor rain event run-off on-site. Any water not retained on-site is directed to
the City’s storm drain system.
7. Proposed landscaping complies with Implementation Plan Section 21.30.075. A
condition of approval is included that requires drought tolerant and prohibits invasive
species. Prior to issuance of building permits, the final landscape plans will be reviewed
to verify invasive species are not planted.
8. The property is not located near Public Viewpoints or Coastal View Roads, as designated
in the Coastal Land Use Plan, and will not impact public coastal views. Due to the distance
of the proposed development from the Public Viewpoints and the project’s compliance
with height and setbacks, views of the ocean, beach and harbor from other public spaces
will not be impacted by the proposed development. There is no Coastal View Road
(segment) on the Balboa Peninsula.
Finding:
B. Conforms with the public access and public recreation policies of Chapter 3 of the
Coastal Act if the project is located between the nearest public road and the sea or
shoreline of any body of water located within the coastal zone.
Fact in Support of Finding:
1. The project site is located between the nearest public road and the sea or shoreline;
however, the project will not affect public recreation, access, or views and will not affect
the public’s ability to gain access to, use, and/or view the coast and nearby recreational
facilities. The residential lot does not currently provide nor inhibit public coastal access.
Zoning Administrator Resolution No. ZA2018-051
Page 4 of 7
12-21-2017
2. Vertical access points to the beach and harbor are located at street-ends throughout
Balboa Peninsula. Vertical access to the beach is available south of the site along I Street.
Lateral Access is available via the large public beach along East Ocean Front. Vertical
access to the harbor is available to north from J Street.
3. The proposed project is located entirely on private property and there will be no
reduction in on-street parking spaces.
SECTION 4. DECISION.
NOW, THEREFORE, BE IT RESOLVED:
1. The Zoning Administrator of the City of Newport Beach hereby approves Coastal
Development Permit No. CD2018-009, subject to the conditions set forth in Exhibit “A,”
which is attached hereto and incorporated by reference.
2. This action shall become final and effective 14 days following the date this Resolution
was adopted unless within such time an appeal or call for review is filed with the
Community Development Director in accordance with the provisions of Title 21 Local
Coastal Implementation Plan, of the Newport Beach Municipal Code. Final action taken
by the City may be appealed to the Coastal Commission in compliance with Section
21.64.035 of the City’s certified LCP and Title 14 California Code of Regulations,
Sections 13111 through 13120, and Section 30603 of the Coastal Act.
PASSED, APPROVED, AND ADOPTED THIS 26TH DAY OF APRIL, 2018.
_______________________________
Patrick J. Alford, Zoning Administrator
Zoning Administrator Resolution No. ZA2018-051
Page 5 of 7
12-21-2017
EXHIBIT “A”
CONDITIONS OF APPROVAL
1. The development shall be in substantial conformance with the approved site plan, floor
plans and building elevations stamped and dated with the date of this approval (except as
modified by applicable conditions of approval).
2. No demolition or construction materials, equipment debris, or waste, shall be placed or
stored in a location that would enter sensitive habitat, receiving waters, or a storm drain
or result in impacts to environmentally sensitive habitat areas, streams, the beach,
wetlands or their buffers.
3. Best Management Practices (BMPs) and Good Housekeeping Practices (GHPs) shall
be implemented prior to and throughout the duration of construction activity AS
designated on the Erosion Control Plan.
4. The discharge of any hazardous materials into storm sewer systems or receiving waters
shall be prohibited. Machinery and equipment shall be maintained and washed in
confined areas specifically designed to control runoff. A designated fueling and vehicle
maintenance area with appropriate berms and protection to prevent spillage shall be
provided as far away from storm drain systems or receiving waters as possible.
5. Debris from demolition shall be removed from work areas each day and removed from
the project site within 24 hours of the completion of the project. Stockpiles and
construction materials shall be covered, enclosed on all sites, not stored in contact with
the soil, and located as far away as possible from drain inlets and any waterway.
6. Trash and debris shall be disposed in proper trash and recycling receptacles at the end
of each construction day. Solid waste, including excess concrete, shall be disposed in
adequate disposal facilities at a legal disposal site or recycled at a recycling facility.
7. Revisions to the approved plans may require an amendment to this Coastal
Development Permit or the processing of a new coastal development permit.
8. The project is subject to all applicable City ordinances, policies, and standards, unless
specifically waived or modified by the conditions of approval.
9. The Applicant shall comply with all federal, state, and local laws. Material violation of
any of those laws in connection with the use may be cause for revocation of this Coastal
Development Permit.
10. This Coastal Development Permit may be modified or revoked by the Zoning
Administrator if determined that the proposed uses or conditions under which it is being
operated or maintained is detrimental to the public health, welfare or materially injurious
to property or improvements in the vicinity or if the property is operated or maintained
so as to constitute a public nuisance.
Zoning Administrator Resolution No. ZA2018-051
Page 6 of 7
12-21-2017
11. Prior to issuance of a building permit, a copy of the Resolution, including conditions of
approval Exhibit “A” shall be incorporated into the Building Division and field sets of
plans.
12. Prior to issuance of a building permit, the applicant shall submit to the Planning Division
an additional copy of the approved architectural plans for inclusion in the Coastal
Development file. The plans shall be identical to those approved by all City departm ents
for building permit issuance. The approved copy shall include architectural sheets only
and shall be reduced in size to 11 inches by 17 inches. The plans shall accurately depict
the elements approved by this Coastal Development Permit.
13. Prior to the issuance of building permits, the applicant shall submit a final landscape and
irrigation plan. These plans shall incorporate drought tolerant plantings, non -invasive
plant species and water efficient irrigation design. The plans shall be approved by the
Planning Division.
14. All landscape materials and irrigation systems shall be maintained in accordance with
the approved landscape plan. All landscaped areas shall be maintained in a healthy and
growing condition and shall receive regular pruning, fertilizing, mowing, and trimming.
All landscaped areas shall be kept free of weeds and debris. All irrigation systems shall
be kept operable, including adjustments, replacements, repairs, and cleaning as part of
regular maintenance.
15. Prior to the issuance of a building permit, the Applicant shall pay any unpaid
administrative costs associated with the processing of this application to the Planning
Division.
16. Should the property be sold or otherwise come under different ownership, any future
owners or assignees shall be notified of the conditions of this approval by the current
property owner or agent.
17. Coastal Development Permit No. CD2018-009 shall expire unless exercised within 24
months from the date of approval as specified in Section 21.54.060 (Time Limits and
Extensions) of the Newport Beach Municipal Code, unless an extension is otherwise
granted.
18. To the fullest extent permitted by law, applicant shall indemnify, defend and hold harmless
City, its City Council, its boards and commissions, officials, officers, employees, and agents
from and against any and all claims, demands, obligations, damages, actions, causes of
action, suits, losses, judgments, fines, penalties, liabilities, costs and expenses (including
without limitation, attorney’s fees, disbursements and court costs) of every kind and nature
whatsoever which may arise from or in any manner relate (directly or indirectly) to City’s
approval of Bast Residence CDP including, but not limited to, Coastal Development Permit
No. CD2018-009 (PA2018-023). This indemnification shall include, but not be limited to,
damages awarded against the City, if any, costs of suit, attorneys' fees, and other
expenses incurred in connection with such claim, action, causes of action, suit or
Zoning Administrator Resolution No. ZA2018-051
Page 7 of 7
12-21-2017
proceeding whether incurred by applicant, City, and/or the parties initiating or bringing such
proceeding. The applicant shall indemnify the City for all of City's costs, attorneys' fees,
and damages, which City incurs in enforcing the indemnification provisions set forth in this
condition. The applicant shall pay to the City upon demand any amount owed to the City
pursuant to the indemnification requirements prescribed in this condition.