HomeMy WebLinkAboutZA2018-061 - COASTAL DEVELOPMENT PERMIT TO DEMOLISH AN EXISTING RESIDENTIAL DUPLEX AND CONSTRUCT A NEW THREE-STORY, SINGLE FAMILY RESIDENCE WITH AN ATTACHED TWO-CAR GARAGE - 127 JADE AVENUERESOLUTION NO. ZA2018-061
A RESOLUTION OF THE ZONING ADMINISTRATOR OF THE
CITY OF NEWPORT BEACH, CALIFORNIA APPROVING
COASTAL DEVELOPMENT PERMIT NO. CD2018-022 TO
DEMOLISH AN EXISTING RESIDENTIAL DUPLEX AND
CONSTRUCT A NEW THREE-STORY, SINGLE-FAMILY
RESIDENCE WITH AN ATTACHED TWO-CAR GARAGE AT 127
JADE AVENUE (PA2018-057)
THE ZONING ADMINISTRATOR OF THE CITY OF NEWPORT BEACH HEREBY FINDS AS
FOLLOWS:
SECTION 1. STATEMENT OF FACTS.
1. An application was filed by Brandon Architects, Inc. (“Applicant”), on behalf of Bob Bakshi
(“Owner”), with respect to property located at 127 Jade Avenue, requesting approval of a
coastal development permit (“CDP”).
2. The property is legally described as Lot 16, in Block 3 of Tract 103, in the City of Newport
Beach, County of Orange, State of California.
3. The Applicant proposes to demolish an existing residential duplex, and construct a new
three-story, 2,329-square-foot, single-family residence and attached 397-square-foot, two-
car garage. The project will include hardscape, landscape, and subsurface drainage
facilities all located within the confines of private property. The design complies with all
applicable development standards and no deviations are requested.
4. The subject property is designated RT (Two-Unit Residential) by the General Plan Land
Use Element and is located within the R-BI (Balboa Island) Zoning District.
5. The subject property is located within the coastal zone. The Coastal Land Use Plan
category is RT-E (Two-Unit Residential - 30.0 – 39.9 DU/AC) and the property is located
within the R-BI (Balboa Island) Coastal Zone District.
6. A public hearing was held on May 10, 2018, in the Corona del Mar Conference Room (Bay
E-1st Floor) at 100 Civic Center Drive, Newport Beach. A notice of time, place, and
purpose of the hearing was given in accordance with the Newport Beach Municipal
Code. Evidence, both written and oral, was prese nted to, and considered by, the Zoning
Administrator at this hearing.
SECTION 2. CALIFORNIA ENVIRONMENTAL QUALITY ACT DETERMINATION.
1. This project is categorically exempt pursuant to Title 14 of the California Code of
Regulations Section 15303, Article 19 of Chapter 3, Guidelines for Implementation of the
California Environmental Quality Act (“CEQA”) under Class 3 (New Construction or
Conversion of Small Structures), because it has no potential to have a significant effect on
the environment.
Zoning Administrator Resolution No. ZA2018-061
Page 2 of 7
2. Class 3 exempts the construction and location of limited numbers of new, small facilities
or structures including one single-family residence in a residential zone. The proposed
project consists of the demolition of an existing residential duplex, and the construction
of a new 2,329-square-foot single-family residence and 397-square-foot, two-car garage
in the R-BI Zoning District.
SECTION 3. REQUIRED FINDINGS.
In accordance with Newport Beach Municipal Code (“NBMC”) Section 21.52.015 (Coastal
Development Permits, Findings and Decision), the following findings and facts in support of
such findings are set forth:
Finding:
A. Conforms to all applicable sections of the certified Local Coastal Program.
Facts in Support of Finding:
1. The proposed development complies with applicable residential development standards
including, but not limited to, floor area limitation, setbacks, height, and parking.
A. The total proposed floor area, including the residence and enclosed parking, is
2,726 square feet, which complies with the maximum allowable floor area limit of
2,726 square feet.
B. The proposed development will provide the minimum required setbacks, which are
ten (10) feet along the front property line abutting Jade Street, three (3) feet along
each side property line, and five (5) feet along the rear property line abutting the
alley.
C. The highest guardrail is no more than 24 feet and the highest roof ridge is no more
than 29 feet, measured from the established grade level of 9 feet based on the
North American Vertical Datum of 1988 (“NAVD88”), which complies with the
maximum height limitation.
D. The project includes enclosed garage parking for two vehicles, in compliance with
the minimum parking requirement for single-family residences with less than 4,000
square feet of habitable floor area.
2. The neighborhood is predominantly developed with two- and three-story single- and two-
family residences. The proposed design, bulk, and scale of the development is
consistent with the existing neighborhood pattern of development and expected future
development because the development meets all development standards for the
construction of a single-family residence.
3. The project site is located approximately 140 feet from the bay front and is separated from
the water by Jade Avenue, East Bay Front alleyway, a row of existing residential
development and the Bay Front promenade. The finished first floor elevation of the
Zoning Administrator Resolution No. ZA2018-061
Page 3 of 7
interior living area of the proposed residence is 9.00 feet based on the North American
Vertical Datum of 1988 (NAVD88) elevation standard, which complies with the minimum
required 9-foot (NAVD88) elevation standard. The finished floor elevation of the garage
(i.e., not living area) is 7.86 feet (NAVD88) with an approximately 2-percent slope
driveway connecting to the existing street.
4. The property is located in an area known for the potential of seismic activity and
liquefaction. All projects are required to comply with the California Building Code (CBC)
and Building Division standards and policies. Geotechnical investigations specifically
addressing liquefaction are required to be reviewed and approved prior to the issuance of
building permits. Permit issuance is also contingent on the inclusion of design mitigation
identified in the investigations. Construction plans are reviewed for compliance with
approved investigations and CBC prior to building permit issuance.
5. The project design addresses water quality with a construction erosion control plan that
outlines temporary Best Management Practices (BMPs) to be implemented during
construction to minimize erosion and sedimentation, and to minimize pollution of runoff
derived by construction chemicals and materials. No water quality impacts to coastal
waters are anticipated based upon the location and elevation of the property.
6. The property is not located on the shoreline nor is it located within 100 feet of coastal
waters. The project design addresses water quality with a construction erosion control plan
and a post construction drainage system that includes drainage and percolation features
designed to retain dry weather and minor rain event run-off on-site. Any water not retained
on-site is directed to the City’s storm drain system.
7. New landscaping will be verified for compliance with NBMC Section 21.30.075
(Landscaping). Condition of Approval No. 11 is included to require drought-tolerant, and
prohibits invasive, species. Prior to issuance of the building permits, the final landscape
plans will be reviewed to verify invasive species are not planted.
8. The property is not located near designated public viewpoints or coastal view roads and
will not impact public coastal views.
Finding:
B. Conforms with the public access and public recreation policies of Chapter 3 of the
Coastal Act if the project is located between the nearest public road and the sea or
shoreline of any body of water located within the coastal zone .
Fact in Support of Finding:
1. The project site is an inland lot on Balboa Island, and is located between the nearest public
road and the sea or shoreline. The existing residential development neither provides nor
inhibits public coastal access. Implementation Plan Section 21.30A.040 (Determination of
Public Access/Recreation Impacts) requires that the provision of public access bear a
reasonable relationship between the requirement and the project’s impact and be
proportional to the impact. In this case, the project replaces an existing residential duplex
Zoning Administrator Resolution No. ZA2018-061
Page 4 of 7
with a new single-family residence. Therefore, the project does not involve a change in
land use, density or intensity that will result in increased demand on public access and
recreation opportunities. Furthermore, the project is designed and sited so as not to block
or impede existing public access opportunities.
2. The residential lot does not currently provide nor does it inhibit public coastal access.
Lateral access is provided by the nearby bay front public sidewalk and public beach.
Vertical access to the bay front area is provided at various public street-ends throughout
Balboa Island, with the nearest vertical access provided along Park Avenue immediately
north of the project site.
3. The project site is not located adjacent to a coastal view road, public viewpoint, public park
or beach, or public accessway, as identified in the Coastal Land Use Plan. Furthermore,
an investigation of the project site and surrounding area did not identify any other public
view opportunities. The project site may be located within the viewshed of distant public
viewing areas. However, the project will replace an existing residential duplex with a new
single-family residence that complies with all applicable Local Coastal Program
development standards and maintains a building envelope consistent with the existing
neighborhood pattern of development. Therefore, the project does not have the potential
to degrade the visual quality of the Coastal Zone or result in significant adverse impacts to
public views.
SECTION 4. DECISION.
NOW, THEREFORE, BE IT RESOLVED:
1. The Zoning Administrator of the City of Newport Beach hereby approves Coastal
Development Permit No. CD2018-022, subject to the conditions set forth in Exhibit “A,”
which is attached hereto and incorporated by reference.
2. This action shall become final and effective 14 days following the date this Resolution
was adopted unless within such time an appeal or call for review is filed with the
Community Development Director in accordance with the provisions of Title 21 Local
Coastal Implementation Plan, of the Newport Beach Municipal Code. Final action taken
by the City may be appealed to the Coastal Commission in compliance with Section
21.64.035 of the City’s certified LCP and Title 14 California Code of Regulations,
Sections 13111 through 13120, and Section 30603 of the Coastal Act.
PASSED, APPROVED, AND ADOPTED THIS 10TH DAY OF MAY, 2018.
_____________________________________
Patrick J. Alford, Zoning Administrator
Zoning Administrator Resolution No. ZA2018-061
Page 5 of 7
EXHIBIT “A”
CONDITIONS OF APPROVAL
1. The development shall be in substantial conformance with the approved site plan, floor
plans and building elevations stamped and dated with the date of this approval (except as
modified by applicable conditions of approval).
2. Revisions to the approved plans may require an amendment to this Coastal
Development Permit or the processing of a new coastal development permit.
3. Coastal Development Permit No. CD2018-022 shall expire unless exercised within 24
months from the date of approval as specified in NBMC Section 21.54.060 (Time Limits
and Extensions), unless an extension is otherwise granted.
4. The project is subject to all applicable City ordinances, policies, and standards, unless
specifically waived or modified by the conditions of approval.
5. The Applicant shall comply with all federal, state, and local laws. Material violation of
any of those laws in connection with the use may be cause for revocation of this Coastal
Development Permit.
6. This Coastal Development Permit may be modified or revoked by the Zoning
Administrator if determined that the proposed uses or conditions under which it is being
operated or maintained is detrimental to the public health, welfare or materially injurious
to property or improvements in the vicinity or if the property is operated or maintained
so as to constitute a public nuisance.
7. Best Management Practices (BMPs) and Good Housekeeping Practices (GHPs) shall
be implemented prior to and throughout the duration of construction activity as
designated in the Construction Pollution Prevention Plan (CPPP).
8. The proposed site design shall be revised to take vehicular access from the alley unless
vehicular access from the alley is deemed infeasible by the City’s Traffic Engineer.
9. Prior to issuance of a building permit, a copy of the Resolution, including conditions of
approval Exhibit “A” shall be incorporated into the Bu ilding Division and field sets of
plans.
10. Prior to issuance of a building permit, the Applicant shall submit to the Planning Division
an additional copy of the approved architectural plans for inclusion in the Coastal
Development Permit file. The plans shall be identical to those approved by all City
departments for building permit issuance. The approved copy shall include architectural
sheets only and shall be reduced in size to 11 inches by 17 inches. The plans shall
accurately depict the elements approved by this Coastal Development Permit.
Zoning Administrator Resolution No. ZA2018-061
Page 6 of 7
11. Prior to issuance of a building permit, the applicant shall submit a final construction
erosion control plan. The plan shall be subject to review and approval by the Building
Division.
12. Prior to the issuance of a building permit, the Applicant shall submit a final landscape
and irrigation plan. These plans shall incorporate drought tolerant plantings, non-
invasive plant species, and water efficient irrigation design. The plans shall be approved
by the Planning Division.
13. All landscape materials and irrigation systems shall be maintained in accordance with
the approved landscape plan. All landscaped areas shall be maintained in a healthy and
growing condition and shall receive regular pruning, fertilizing, mowing, and trimming.
All landscaped areas shall be kept free of weeds and debris. All irrigation systems shall
be kept operable, including adjustments, replacements, repairs, and cleaning as part of
regular maintenance.
14. Prior to the issuance of a building permit, the Applicant shall pay any unpaid
administrative costs associated with the processing of this application to the Planning
Division.
15. No demolition or construction materials, equipment debris, or waste, shall be placed or
stored in a location that would enter sensitive habitat, receiving waters, or a storm drain
or result in impacts to environmentally sensitive habitat areas, streams, wetland or their
buffers.
16. The discharge of any hazardous materials into storm sewer systems or receiving waters
shall be prohibited. Machinery and equipment shall be maintained and washed in
confined areas specifically designed to control runoff. A designated fueling and vehicle
maintenance area with appropriate berms and protection to prevent spillage shall be
provided as far away from storm drain systems or receiving waters as possible.
17. Debris from demolition shall be removed from work areas each day and removed from
the project site within 24 hours of the completion of the project. Stock piles and
construction materials shall be covered, enclosed on all sites, not stored in contact with
the soil, and located as far away as possible from drain inlets and any waterway.
18. Trash and debris shall be disposed in proper trash and recycling receptacles at the end
of each construction day. Solid waste, including excess concrete, shall be disposed in
adequate disposal facilities at a legal disposal site or recycled at a recycling facility.
19. Should the property be sold or otherwise come under different ownership, any future
owners or assignees shall be notified of the conditions of this approval by the current
property owner or agent.
20. To the fullest extent permitted by law, Applicant shall indemnify, defend and hold harmless
City, its City Council, its boards and commissions, officials, officers, employees, and agents
from and against any and all claims, demands, obligations, damages, actions, causes of
action, suits, losses, judgments, fines, penalties, liabilities, costs and expenses (including
Zoning Administrator Resolution No. ZA2018-061
Page 7 of 7
without limitation, attorney’s fees, disbursements and court costs) of every kind and nature
whatsoever which may arise from or in any manner relate (directly or indirectly) to City’s
approval of Bakshi Residence including, but not limited to, Coastal Development Permit
No. CD2018-022 (PA2018-057). This indemnification shall include, but not be limited to,
damages awarded against the City, if any, costs of suit, attorneys' fees, and other
expenses incurred in connection with such claim, action, causes of action, suit or
proceeding whether incurred by Applicant, City, and/or the parties initiating or bringing such
proceeding. The Applicant shall indemnify the City for all of City's costs, attorneys' fees,
and damages, which City incurs in enforcing the indemnification provisions set forth in this
condition. The Applicant shall pay to the City upon demand any amount owed to the City
pursuant to the indemnification requirements prescribed in this condition.