HomeMy WebLinkAboutZA2018-074 - COASTAL DEVELOPMENT PERMIT TO DEMOLISH AN EXISTING SINGLE-FAMILY RESIDENCE AND CONSTRUCT A NEW SINGLE-FAMILY RESIDENCE - 10 LINDA ISLERESOLUTION NO. ZA2018-074
A RESOLUTION OF THE ZONING ADMINISTRATOR OF THE
CITY OF NEWPORT BEACH APPROVING COASTAL
DEVELOPMENT PERMIT NO. CD2018-030 TO DEMOLISH AN
EXISTING SINGLE-FAMILY RESIDENCE AND CONSTRUCT A
NEW SINGLE-FAMILY RESIDENCE LOCATED AT 10 LINDA ISLE
(PA2018-070)
THE ZONING ADMINISTRATOR OF THE CITY OF NEWPORT BEACH HEREBY FINDS AS
FOLLOWS:
SECTION 1. STATEMENT OF FACTS.
1. An application was filed by Caitlin Smith of Brandon Architects, with respect to property
located at 10 Linda Isle, and legally described as Lot 10 of Tract 4003, requesting approval
of a Coastal Development Permit.
2. The applicant proposes the demolition of an existing single-family residence and the
construction of a new 4,360-square-foot single-family residence with a 600-square-foot
attached three-car garage. The proposed development also includes additional
appurtenances such as walls, fences, patios, hardscape, drainage devices, and
landscaping.
3. The subject property is located within the Single-Unit Residential (R-1) Zoning District and
the General Plan Land Use Element category is Single-Unit Residential Detached (RS-
D).
4. The subject property is located within the coastal zone. The Coastal Land Use Plan
category is Single Unit Residential Detached - (6.0 - 9.9 DU/AC) (RSD-B) and the Coastal
Zoning District is Single-Unit Residential (R-1).
5. A public hearing was held on June 14, 2018, in the Corona del Mar Conference Room
(Bay E-1st Floor) at 100 Civic Center Drive, Newport Beach. A notice of time, place, and
purpose of the hearing was given in accordance with the Newport Beach Municipal
Code. Evidence, both written and oral, was presented to, and considered by, the Zoning
Administrator at this hearing.
SECTION 2. CALIFORNIA ENVIRONMENTAL QUALITY ACT DETERMINATION.
1. This project is categorically exempt pursuant to Title 14 of the California Code of
Regulations (Section 15303 Article 19 of Chapter 3, Guidelines for Implementation of the
California Environmental Quality Act (CEQA) under Class 3 (New Construction or
Conversion of Small Structures), because it has no potential to have a significant effect
on the environment.
Zoning Administrator Resolution No. ZA2018-074
Page 2 of 8
01-03-17
2. Class 3 exempts the construction of limited numbers of new, small structures, including
one single-family residence. The proposed project is a new single-family residence
located in the R-1 Coastal Zoning District.
SECTION 3. REQUIRED FINDINGS.
In accordance with Section 21.52.015 (Findings and Decision) of the Newport Beach Municipal
Code, the following findings and facts in support of such findings are set forth:
Finding:
A. Conforms to all applicable sections of the certified Local Coastal Program.
Facts in Support of Finding:
1. The proposed development complies with applicable residential development standards
including, but not limited to, floor area limitation, setbacks, height, and parking.
a. The maximum floor area limitation is 6,607 square feet and the proposed floor
area is 4,960 square feet.
b. The proposed development complies with the required setbacks, which are 25
feet along the property line abutting Linda Isle, 4 feet along each side property
line, and 10 feet along the property line abutting the water.
c. The highest guardrail/parapet is 24 feet from established grade and the highest
ridge is 26 feet from established grade. The proposed development complies with
all height requirements.
d. The proposed development provides a three-car garage, meeting the minimum
garage requirement for a single-family residence exceeding 4,000 square feet in
habitable floor area.
e. The proposed development meets the minimum 9.0 (NAVD88) top of slab
elevation requirement for interior living areas of new structures.
2. The neighborhood is predominantly developed with two- and three-story single-family
residences. The proposed design, bulk, and scale of the development is consistent with
the existing neighborhood pattern of development and expected future development.
3. The project site is protected by an existing cast-in-place concrete bulkhead with the top
of the bulkhead elevation at 9.15 feet (NAVD88). A Bulkhead Conditions Report was
prepared by William Simpson & Associates, Inc. on May 24, 2018, and concluded that
the existing concrete bulkhead was in good condition. The existing bulkhead is proposed
to be reinforced to support the existing cantilevered deck, which includes a curb height
of 9.15 feet NAVD88. The Bulkhead Conditions Report concluded that the reinforced
bulkhead with the cantilevered deck will protect the proposed development and adjacent
development.
Zoning Administrator Resolution No. ZA2018-074
Page 3 of 8
01-03-17
4. A Coastal Hazards Analysis Report (Attachment ZA 4) was prepared by William
Simpson & Associates, Inc. on May 24, 2018. The report concludes that with the
reinforced bulkhead and existing cantilevered deck at a height of 9.15 NAVD88, the
project will not be impacted by potential coastal hazards, including sea level rise over
the next 75 years. The anticipated low range sea level rise over the 75 -year economic
life of structure is 8.45 feet (NAVD88); therefore the existing bulkhead and cantilevered
deck is sufficient to protect the project site. The need for a new shoreline-protective
device is not anticipated. Furthermore, if the bulkhead is found to not adequately protect
the development for the actual sea level rise over the next 75 years, the bulkhead
assembly allows an increase in height without further seaward encroachment.
5. Pursuant to NBMC Section 21.30.030(C)(3)(i)(iv), the property owner will be required to
enter into an agreement with the City waiving any potential right to protection to address
situations in the future in which the development is threatened with damage or destruction
by coastal hazards (e.g., waves, erosion, and sea level rise). The property owner will also
be required to acknowledge any hazards present at the site and unconditionally waive any
claim to damage or liability against the decision authority, consistent with NBMC Section
21.30.015(D)(3)(c). Both requirements are included as conditions of approval that will need
to be satisfied prior to the issuance of building permits for construction.
6. The property is located in an area known for the potential of seismic activity and
liquefaction. All projects are required to comply with the California Building Code (CBC)
and Building Division standards and policies. Geotechnical investigations specifically
addressing liquefaction are required to be reviewed and approved prior to the issuance of
building permits. Permit issuance is also contingent on the inclusion of design mitigation
identified in the investigations. Construction plans are reviewed for compliance with
approved investigations and CBC prior to building permit issuance.
7. The project design addresses water quality with a construction erosion control plan and a
post construction drainage system that includes drainage and percolation features
designed to retain dry weather run-off and minor rain event run-off on-site. Any water not
retained on-site is directed to the City’s storm drain system.
8. Pursuant to Municipal Code Section 21.35.050, due to the proximity of the development
to the shoreline and the development containing more than 2,500 square feet of
impervious surface area, a Water Quality Management Plan (WQMP) is required. A
WQMP prepared by Forkert Engineering & Surveying, Inc., dated March 21, 2018, has
been submitted and will be reviewed by the City’s Engineer Geologist. The WQMP
includes a polluted runoff and hydrologic site characterization, a sizing standard for
BMPs, use of an LID approach to retain the design storm runoff volume on site, and
documentation of the expected effectiveness of the proposed BMPs.
9. Proposed landscaping complies with Implementation Plan Section 21.30.075. A
condition of approval is included that requires drought-tolerant species. Prior to issuance
of building permits, the final landscape plans will be reviewed to verify invasive species
are not planted
Zoning Administrator Resolution No. ZA2018-074
Page 4 of 8
01-03-17
Finding:
B. Conforms with the public access and public recreation policies of Chapter 3 of the Coastal
Act if the project is located between the nearest public road and the sea or shoreline of any
body of water located within the coastal zone .
Fact in Support of Finding:
1. The project site is located on Linda Isle between the nearest public road and the sea.
Implementation Plan Section 21.30A.040 requires that the provision of public access bear
a reasonable relationship between the requirement and the project’s impact and be
proportional to the impact. In this case, the project replaces an existing single-family
residence with a new single-family residence. Therefore, the project does not involve a
change in land use or intensity that will result in increased demand on public access and
recreation opportunities. Furthermore, the project is designed and sited so as not to block
or impede existing public access opportunities.
2. The project site is not located adjacent to a coastal view road, public viewpoint, public park
or beach, or public accessway, as identified in the Coastal land Use Plan. Furthermore, an
investigation of the project site and surrounding area did not identify any other public view
opportunities. The project may be located within the viewshed of distant public viewing
areas. However, the project will replace an existing single-family home with a single-family
residence that complies with all applicable LCP development standards and maintains a
building envelope consistent with the existing neighborhood pattern of development.
Therefore, the project does not have the potential to degrade the visual quality of the
Coastal Zone or result in significant adverse impacts to public views.
SECTION 4. DECISION.
NOW, THEREFORE, BE IT RESOLVED:
1. The Zoning Administrator of the City of Newport Beach hereby approves Coastal
Development Permit No. CD2018-030, subject to the conditions set forth in Exhibit “A,”
which is attached hereto and incorporated by reference.
2. This action shall become final and effective 14 days following the date this Resolution
was adopted unless within such time an appeal or call for review is filed with the
Community Development Director in accordance with the provisions of Title 21 Local
Coastal Implementation Plan, of the Newport Beach Municipal Code. Final action taken
by the City may be appealed to the Coastal Commission in compliance with Section
21.64.035 of the City’s certified LCP and Title 14 California Code of Regulations,
Sections 13111 through 13120, and Section 30603 of the Coastal Act.
Zoning Administrator Resolution No. ZA2018-074
Page 5 of 8
01-03-17
PASSED, APPROVED, AND ADOPTED THIS 14TH DAY OF JUNE, 2018.
_____________________________________
Patrick J. Alford, Zoning Administrator
Zoning Administrator Resolution No. ZA2018-074
Page 6 of 8
01-03-17
EXHIBIT “A”
CONDITIONS OF APPROVAL
1. The development shall be in substantial conformance with the approved site plan, floor
plans, and building elevations stamped and dated with the date of this approval (except as
modified by applicable conditions of approval).
2. Revisions to the approved plans may require an amendment to this Coastal
Development Permit or the processing of a new Coastal Development Permit.
3. Prior to the issuance of a building permit, an agreement in a form approved by the City
Attorney between the property owner and the City shall be executed and recorded
waiving rights to the construction of future shoreline prot ection devices including the
repair and maintenance, enhancement, reinforcement, or any other activity affecting the
bulkhead, that results in any encroachment seaward of the authorized footprint of the
bulkhead or other shoreline protective device. The agreement shall be binding against
the property owners and successors and assigns.
4. Prior to the issuance of a building permit, the property owner shall submit a notarized
signed letter acknowledging all hazards present at the site, assuming the risk of inju ry
or damage from such hazards, unconditionally waiving any claims of damage against
the City from such hazards, and to indemnify and hold harmless City, its City Council, its
boards and commissions, officials, officers, employees, and agents from and against any
and all claims, demands, obligations, damages, actions, causes of action, suits, losses,
judgments, fines, penalties, liabilities, costs and expenses (including without limitation,
attorney’s fees, disbursements and court costs) of every kind and nature whatsoever which
may arise from or in any manner relate (directly or indirectly) to City’s approval of
development.
5. No demolition or construction materials, equipment debris, or waste, shall be placed or
stored in a location that would enter sensitive habitat, receiving waters, or a storm drain
or result in impacts to environmentally sensitive habitat areas, streams, the beach,
wetlands or their buffers.
6. Coastal Development Permit No. CD2018-030 shall expire unless exercised within 24
months from the date of approval as specified in Section 21.54.060 (Time Limits and
Extensions) of the Newport Beach Municipal Code, unless an extension is otherwise
granted.
7. The project is subject to all applicable City ordinances, policies, and standards, unless
specifically waived or modified by the conditions of approval.
8. The applicant shall comply with all federal, state, and local laws. Material violation of
any of those laws in connection with the use may be cause for revocation of this Coastal
Development Permit.
Zoning Administrator Resolution No. ZA2018-074
Page 7 of 8
01-03-17
9. This Coastal Development Permit may be modified or revoked by the Zoning
Administrator if determined that the proposed uses or conditions under which it is being
operated or maintained is detrimental to the public health, welfare or materially injurious
to property or improvements in the vicinity or if the property is operated or maintained
so as to constitute a public nuisance.
10. Prior to issuance of the building permits, a copy of the Resolution, including conditions
of approval Exhibit “A” shall be incorporated into the Building Division and field sets of
plans.
11. Prior to issuance of building permits, the applicant shall submit to the Planning Division
an additional copy of the approved architectural plans for inclusion in the Coastal
Development file. The plans shall be identical to those approved by all City departments
for building permit issuance. The approved copy shall include architectural sheets only
and shall be reduced in size to 11 inches by 17 inches. The plans shall accurately depict
the elements approved by this Coastal Development Permit.
12. Prior to issuance of a building permit, a Water Quality Management Plan (WQMP) shall
be submitted with the Building Permit plans. Implementation shall be in compliance with
the approved WQMP and any changes could require separate review and approval by
the Building Division.
13. Prior to the issuance of building permits, the applicant shall submit a final landscape and
irrigation plan. These plans shall incorporate drought tolerant plantings, non -invasive
plan species and water efficient irrigation design. The plans shall be approved by the
Planning Division.
14. Prior to the issuance of building permits, the applicant shall submit a final construction
erosion control plan. The plan shall be subject to the review and approval by the Building
Division.
15. Prior to the issuance of building permit, the applicant shall pay any unpaid administrative
costs associated with the processing of this application to the Planning Division.
16. Should the property be sold or otherwise come under different ownership, any future
owners or assignees shall be notified of the conditions of this approval by either the
current business owner, property owner, or the leasing agent.
17. This approval shall expire and become void unless exercised within 24 months from the
actual date of review authority approval, except where an extension of time is approved in
compliance with the provisions of Title 21 Planning and Zoning of the Newport Beach
Municipal Code.
18. To the fullest extent permitted by law, applicant shall indemnify, defend and hold harmless
City, its City Council, its boards and commissions, officials, officers, employees, and agents
from and against any and all claims, demands, obligations, damages, actions, causes of
action, suits, losses, judgments, fines, penalties, liabilities, costs and expenses (including
Zoning Administrator Resolution No. ZA2018-074
Page 8 of 8
01-03-17
without limitation, attorney’s fees, disbursements and court costs) of every kind and nature
whatsoever which may arise from or in any manner relate (directly or indirectly) to City’s
approval of Clemons Residence Coastal Development Permit including, but not limited to,
Coastal Development Permit No. CD2018-030 (PA2018-070). This indemnification shall
include, but not be limited to, damages awarded against the City, if any, costs of suit,
attorneys' fees, and other expenses incurred in connection with such claim, action, causes
of action, suit or proceeding whether incurred by applicant, City, and/or the parties initiating
or bringing such proceeding. The applicant shall indemnify the City for all of City's costs,
attorneys' fees, and damages which City incurs in enforcing the indemnification provisions
set forth in this condition. The applicant shall pay to the City upon demand any amount
owed to the City pursuant to the indemnification requirements prescribed in this condition.