HomeMy WebLinkAbout2.0_Harbor Pointe Senior Living_PA2015-210_Applicant PowerPointCity of Newport Beach
Planning Commission Study Session
September 13, 2018
Harbor Pointe
A Senior Living Community
Planning Commission - September 13, 2018
Item No. 2e Additional Materials Presented At Meeting
Harbor Pointe Senior Living (PA2015-210)
Project History
First Planning Commission Study Session held
February 23, 2017
Community objects to height and size of building
City requires preparation of an EIR
Applicant redesigns the building
Reduction in stories from 5 to 3
Reduction in units from 128 to 101
Reduction in size from 109,633 sf to 84,517 sf
DEIR circulated for public review/comment
Applicant requests meeting with Baycrest HOA
Second Planning Commission Study Session is
scheduled for September 13, 2018
DEIR finds no substantial impacts
Planning Commission - September 13, 2018
Item No. 2e Additional Materials Presented At Meeting
Harbor Pointe Senior Living (PA2015-210)
Market and Demographics
Population by age in Orange County and in market area:
45-64 Age Cohort
Orange County Primary Market
2015 810,127 31,657
2020 828,917 32,016
Annual
Increase .46%.23%
75+ Age Cohort
Orange County Primary Market
2015 178,819 7,431
2020 207,485 8,455
Annual
Increase 3.02%.62%
No new full service assisted living /memory care
communities built for almost 20 years in Newport Beach
Community Year Built # of Beds
Vintage Newport
Beach
1962 340
Newport Beach
Plaza
1990 101
Crown Cove 1999 61
Newport Beach
Memory Care
2016 42
Planning Commission - September 13, 2018
Item No. 2e Additional Materials Presented At Meeting
Harbor Pointe Senior Living (PA2015-210)
Project Site –101 Bayview Place Planning Commission - September 13, 2018
Item No. 2e Additional Materials Presented At Meeting
Harbor Pointe Senior Living (PA2015-210)
Project Description
101 unit senior living community
81 –AL
20 MC
3-story –33 foot high (39’-6” w/screening)
53 subterranean parking spaces (33% Surplus)
90-foot building to building separation from
closest Baycrest homes
Primary access from Bayview Place
Entitlements
Amend General Plan and Bayview Planned Community to
only allow for an assisted living –senior community
Site Development Permit & Use Permit
DEIR with full public review
No significant impacts found, including traffic
Planning Commission - September 13, 2018
Item No. 2e Additional Materials Presented At Meeting
Harbor Pointe Senior Living (PA2015-210)
Harbor Pointe Residents
HEALTHY, ACTIVE
AGING
Planning Commission - September 13, 2018
Item No. 2e Additional Materials Presented At Meeting
Harbor Pointe Senior Living (PA2015-210)
Insert View Sims here
Project Site/Landscape Plan Planning Commission - September 13, 2018
Item No. 2e Additional Materials Presented At Meeting
Harbor Pointe Senior Living (PA2015-210)
Courtyard & Entry Landscape Plan
Internal Courtyard
Main Entry Court
Planning Commission - September 13, 2018
Item No. 2e Additional Materials Presented At Meeting
Harbor Pointe Senior Living (PA2015-210)
Units & Amenities by Floor Level
Floor Level Unit Type Other Uses
Basement No units 53 parking spaces, theater, ticket booth,
theater concession, community store,
storage, fitness room, spa, salon, staff
breakroom, restroom facilities,
maintenance, mechanical room,
commercial laundry, and electric room
First Floor 13 Memory Care –One-Bedroom
7 Memory Care –Two-Bedroom
5 Assisted Living –Studios
Main lobby, living rooms, dining rooms,
private dining, kitchen, server, courtyards,
library, copy room, grille, medication
rooms, care offices, quiet room, support
facility, offices, mail room, and restroom
facilities
Second Floor 19 Assisted Living –Studio
14Assisted Living –One-Bedroom
6 Assisted Living –Two-Bedroom
Computer lab, activity room, support
facility, housekeeping, storage, standard
residential laundry, and office
Third Floor 18 Assisted Living –Studio
13 Assisted Living –One-Bedroom
6 Assisted Living –Two-Bedroom
Computer lab, support facilities,
housekeeping, storage, standard residential
laundry, assisted living roof garden, and
restroom facilities
Planning Commission - September 13, 2018
Item No. 2e Additional Materials Presented At Meeting
Harbor Pointe Senior Living (PA2015-210)
Project Rendering -Bristol Planning Commission - September 13, 2018
Item No. 2e Additional Materials Presented At Meeting
Harbor Pointe Senior Living (PA2015-210)
Project Rendering -Bayview Planning Commission - September 13, 2018
Item No. 2e Additional Materials Presented At Meeting
Harbor Pointe Senior Living (PA2015-210)
Previous vs. Proposed Project
Feature Previous (2015)2017 Proposed Result
Site Size 1.50 acres 1.5 acres =
Building Square Footage 109,633 84,517 <
Units/Beds 128 Units / 144 Beds 101 Units / 120 Beds <
Building Stories 5-story 3-story <
Building Height
(with equipment screen)
67 feet, 8 inches 39 feet, 6 inches <
Building Placement 15 feet from Bristol
64 feet from Bayview –Main Entry
90 feet from Neighborhood Homes
Same =
Access Main Driveway –Bayview
Emergency Driveway -Bristol
Same =
Parking 48 spaces required
60 provided = 25% surplus
40 spaces required
53 provided = 33% surplus >
Revisions Made to Address Community Concerns
Planning Commission - September 13, 2018
Item No. 2e Additional Materials Presented At Meeting
Harbor Pointe Senior Living (PA2015-210)
Comparison Elevations
Comparison View from Bristol Street
Comparison View from Bayview Place
Planning Commission - September 13, 2018
Item No. 2e Additional Materials Presented At Meeting
Harbor Pointe Senior Living (PA2015-210)
Comparison Elevations
Comparison View from Santa Ana Heights Community
Comparison View from Baycrest Community
Planning Commission - September 13, 2018
Item No. 2e Additional Materials Presented At Meeting
Harbor Pointe Senior Living (PA2015-210)
Concern Response
Safety & Security 24/7 secure and monitored memory care units
Fully enclosed memory care recreational amenities
Extensive security systems for entire building
Confidential key pad entry to memory care areas
Locked and alarmed fire access doors
All exterior windows include window stops
Unintentional & unaccompanied exits by residents are rare
Noise Assisted living is a quiet use
All parking is subterranean
Fire department use of sirens limited to intersections/roads
Amenities are located within internal courtyards
Impact to Back Bay
Reserve
Stringent Water Quality requirements
Strict State requirements for medical waste
No increase in traffic means no increase in CO2
Rezoning Only minor amendment to Bayview PC text
Requires Use Permit approval to regulate operations
City’s General Plan provides a process for updates
Financial No significant impacts per EIR
No impact to surrounding uses therefore no impact to land values
Community Concerns -Responses
Correspondence Sent for Study Session September 13, 2018
Planning Commission - September 13, 2018
Item No. 2e Additional Materials Presented At Meeting
Harbor Pointe Senior Living (PA2015-210)
Office Use Alternative –Allowed
City’s DEIR: “This (office) alternative would result in greater
impacts associated with Air Quality, Cultural Resources,
Greenhouse Gas Emissions, Transportation/Traffic,
Tribal Cultural Resources.”
Zoning currently allows numerous uses that have greater
impacts i.e. restaurants, bars, theatre/nightclubs, health
clubs, animal clinics/hospitals, professional offices,
nurseries, and commercial recreation.
Planning Commission - September 13, 2018
Item No. 2e Additional Materials Presented At Meeting
Harbor Pointe Senior Living (PA2015-210)
Private View Analysis
Current view from Baycrest
View with Harbor Pointe Building
View with perimeter landscaping added
Planning Commission - September 13, 2018
Item No. 2e Additional Materials Presented At Meeting
Harbor Pointe Senior Living (PA2015-210)
Private View Analysis
Current view from Zenith Ave
View with Harbor Pointe Building
View with perimeter landscaping added
Planning Commission - September 13, 2018
Item No. 2e Additional Materials Presented At Meeting
Harbor Pointe Senior Living (PA2015-210)
Harbor Pointe Project Benefits
Redesigned project increased compatibility:
Five-story reduced to three
Reduced building height complies with Bayview PC
Building setback more than double from neighbors
Reduced shade/shadow to insignificant levels
Reduction in the number of units:
Reduced numbers of employees –less parking and trips
Reduced required parking amount –still parking surplus
Reduced traffic –less than restaurant or office alternative
Reduced overall trips –reduced off-peak trips
No significant impacts on surrounding community
Focused amendment to zoning –limits use to assisted living
Use Permit required –controls operations
Voluntary Development Agreement proposed to provide
additional community benefit
Addresses Housing Element Policy H5.1 –Ensures senior
housing needs are met
Planning Commission - September 13, 2018
Item No. 2e Additional Materials Presented At Meeting
Harbor Pointe Senior Living (PA2015-210)
Harbor Pointe Senior Living
Providing an Assisted Living/Memory Care option to
address aging resident needs within the Back Bay area
Planning Commission - September 13, 2018
Item No. 2e Additional Materials Presented At Meeting
Harbor Pointe Senior Living (PA2015-210)