HomeMy WebLinkAbout3.0_Verizon Eastbluff Monopole Telecom_PA2017-256_Staff PowerPointPlanning Commission
Public Hearing
September 13, 2018
Planning Commission - September 13, 2018
Item No. 3c Additional Materials Presented At Meeting
Verizon Eastbluff Monopole Telecom (PA2017-256)
[aerial photograph]
[highlight site]
[highlight relevant nearby uses]
September 13, 2018 Community Development Department -Planning Division
Proposed
Facility
Planning Commission - September 13, 2018
Item No. 3c Additional Materials Presented At Meeting
Verizon Eastbluff Monopole Telecom (PA2017-256)
Conditional Use Permit –Class 4 Installation
47-foot tall slimline monopole (from existing grade)
▪Three feet in diameter
▪Painted to blend into surroundings
▪Three sectors of panel antennas
Supporting equipment atop replaced trash enclosure
September 13, 2018 Community Development Department -Planning Division
Planning Commission - September 13, 2018
Item No. 3c Additional Materials Presented At Meeting
Verizon Eastbluff Monopole Telecom (PA2017-256)
[Hearing Date] Community Development Department -
Planning Division
Planning Commission - September 13, 2018
Item No. 3c Additional Materials Presented At Meeting
Verizon Eastbluff Monopole Telecom (PA2017-256)
Conditional Use Permit –Class 4 Installation
47-foot tall slimline monopole (from existing grade)
▪Three feet in diameter
▪Painted to blend into surroundings
▪Three sectors of panel antennas
Supporting equipment atop replaced trash enclosure
September 13, 2018 Community Development Department -Planning Division
View from “back-of-house”
Planning Commission - September 13, 2018
Item No. 3c Additional Materials Presented At Meeting
Verizon Eastbluff Monopole Telecom (PA2017-256)
Conditional Use Permit –Class 4 Installation
47-foot tall slimline monopole (from existing grade)
▪Three feet in diameter
▪Painted to blend into surroundings
▪Three sectors of panel antennas
Supporting equipment atop replaced trash enclosure
September 13, 2018 Community Development Department -Planning Division
View from “back-of-house”View from sidewalk
Planning Commission - September 13, 2018
Item No. 3c Additional Materials Presented At Meeting
Verizon Eastbluff Monopole Telecom (PA2017-256)
Conditional Use Permit –Class 4 Installation
47-foot tall slimline monopole (from existing grade)
Three sectors of panel antennas
Supporting equipment atop replaced trash enclosure
September 13, 2018 Community Development Department -Planning Division
View from Eastbluff Drive
Planning Commission - September 13, 2018
Item No. 3c Additional Materials Presented At Meeting
Verizon Eastbluff Monopole Telecom (PA2017-256)
September 13, 2018 Community Development Department -Planning Division
View from North Bluff Private Park
Planning Commission - September 13, 2018
Item No. 3c Additional Materials Presented At Meeting
Verizon Eastbluff Monopole Telecom (PA2017-256)
Conduct a public hearing;
Find project exempt from CEQA; and
Adopt Resolution No. PC2018-027 for approval.
September 13, 2018 Community Development Department -Planning Division
Planning Commission - September 13, 2018
Item No. 3c Additional Materials Presented At Meeting
Verizon Eastbluff Monopole Telecom (PA2017-256)
Visual compatibility
Sited away from public roads and residential
Blends with commercial “back-of-house”
Compliance with design standards
Within maximum 50-foot height limit
Alternative site locations
Alternative higher preference installation
Preferred design by property owner
Alternatives pursued by applicant, but not feasible
September 13, 2018 Community Development Department -Planning Division
Planning Commission - September 13, 2018
Item No. 3c Additional Materials Presented At Meeting
Verizon Eastbluff Monopole Telecom (PA2017-256)
Conduct a public hearing;
Find project exempt from CEQA; and
Adopt Resolution No. PC2018-027 for approval.
Notable conditions of approval:
COA#5 –limits height to 47 feet from existing grade.
COA#6 –ensures facility retains original appearance and
is maintained in good condition.
COA#18 –requires Planning Division inspection prior to
final.
September 13, 2018 Community Development Department -Planning Division
Planning Commission - September 13, 2018
Item No. 3c Additional Materials Presented At Meeting
Verizon Eastbluff Monopole Telecom (PA2017-256)
For more information contact:
Benjamin M. Zdeba, AICP949-644-3253bzdeba@newportbeachca.govwww.newportbeachca.gov
Planning Commission - September 13, 2018
Item No. 3c Additional Materials Presented At Meeting
Verizon Eastbluff Monopole Telecom (PA2017-256)
[Hearing Date] Community Development Department -
Planning Division
Planning Commission - September 13, 2018
Item No. 3c Additional Materials Presented At Meeting
Verizon Eastbluff Monopole Telecom (PA2017-256)
[Hearing Date] Community Development Department -
Planning Division
Planning Commission - September 13, 2018
Item No. 3c Additional Materials Presented At Meeting
Verizon Eastbluff Monopole Telecom (PA2017-256)