Loading...
HomeMy WebLinkAbout03_Silvers Bulkhead Improvements Coastal Development Permit_PA2018-14503/13/2018 CITY OF NEWPORT BEACH ZONING ADMINISTRATOR STAFF REPORT September 27, 2018 Agenda Item No. 3 SUBJECT: Silvers Bulkhead Improvements (PA2018-145) Coastal Development Permit No. CD2018-063 SITE LOCATION: 1601 East Bay Avenue APPLICANT: Swift Slip Dock and Pier Builders, Inc. (Jacquelyn Chung) OWNER: Craig Silvers PLANNER: Liz Westmoreland, Assistant Planner 949-644-3234, lwestmoreland@newportbeachca.gov LAND USE AND ZONING General Plan: RS-D (Single-Unit Residential Detached) Zoning District: R-1 (Single-Unit Residential) Coastal Land Use Category: RSD-B (Single Unit Residential Detached) - (6.0-9.9 DU/AC) Coastal Zoning District: R-1 (Single-Unit Residential) PROJECT SUMMARY The applicant proposes to replace an existing wooden bulkhead with a new pre-cast concrete bulkhead. The new bulkhead would be constructed to a top of wall elevation of 9.82 feet NAVD88 (10.0 feet MLLW), located inland of the existing wooden bulkhead and no new seaward encroachment would occur. The project also includes the construction of a pool, protection fencing, walls, hardscape, landscaping, and drainage features that are accessory to the existing residence. RECOMMENDATION 1)Conduct a public hearing; 2)Find this project exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15303 under Class 3 (New Construction or Conversion of Small Structures) because it has no potential to have a significant effect on the environment; and 3)Adopt Draft Zoning Administrator Resolution No. _ approving Coastal Development Permit No. CD2018-063 (Attachment No. ZA 1). 1 Silvers Bulkhead Improvements CDP (PA2018-145) Zoning Administrator, September 27, 2018 Page 2 Tmplt: 04/03/18 DISCUSSION Land Use and Development Standards  The subject property is located in the R-1 Coastal Zoning District, which provides for single-unit residential development and accessory structures, and is consistent with the City’s Coastal Land Use Plan, General Plan, and Zoning Code. A coastal development permit is required for the replacement bulkhead and the property is not eligible for a waiver for de minimis development because the property is located in the Coastal Commission Appeal Area adjacent to the Newport Bay.  The proposed accessory structures, such as the pool, fencing, and landscaping are not located adjacent to a bluff or within sensitive habitat. Therefore, these accessory structures are exempt from the requirements of a coastal development permit pursuant to Implementation Plan Section 21.52.035 C.1. This coastal development permit addresses the proposed replacement bulkhead.  The current lot configuration consists of two underlying legal lots as a portion of “Block P” (“Lots 1 and 2”) of the bay front section of the Balboa Tract, and one legal lot where the existing single-family residence was constructed. The single lot that contains the single-family residence was issued a Lot Line Adjustment (LA2004-003) to create one building site from what was previously two underlying legal lots (Lots 1 and 2 of the East Side Addition to the Balboa Tract). The project has been conditioned to require the approval and recordation of a lot merger to combine all of the aforementioned underlying legal lots prior to building permit issuance for the new improvements. The required lot merger will be exempt from a coastal development permit as it would not change the intensity or density of the building site. The front setback is measured from the abandoned right of way line (which will not change), so there would be no change in the maximum floor area allowed onsite.  The property contains an existing wooden bulkhead with a top of wall height of approximately 7.41 feet NAVD88, which does not meet the current standard for minimum top of wall height of 9.82 feet NAVD88 (10.0 MLLW).  The proposed development complies with applicable residential development standards including, but not limited to location and height. a. The top of the proposed bulkhead wall would be constructed to 9.82 feet NAVD88 (10.0 MLLW) in compliance with the Harbor Design Criteria minimum top of wall height requirement for new bulkheads. b. The proposed concrete bulkhead would be located inland of the existing wooden bulkhead. Thus, there would be no seaward encroachment of the new bulkhead. 2 Silvers Bulkhead Improvements CDP (PA2018-145) Zoning Administrator, September 27, 2018 Page 3 Tmplt: 04/03/18 c. The proposed accessory structures comply with the Zoning Code and Implementation Plan maximum height standards within front setback areas. The proposed pool, protection fencing, hardscape, and landscaping are accessory to the existing single-family residence. Hazards  A Bulkhead Conditions Report for the existing bulkhead was prepared by William Simpson & Associates, Inc. dated May 5, 2018. The report concludes that the seawall is required to protect the existing principal structure on the lot. In order to do so, the existing seawall shall be replaced in accordance with proposed plans. Once the replacement is completed, no additional repair or replacement of the seawall is anticipated for the next 75 years.  A Coastal Hazards Report and Sea Level Rise Analysis was prepared by William Simpson and Associates, dated May 5, 2018 for the project. The report concludes that flooding, wave runup and erosion will not significantly impact the property over the anticipated life of the existing development. The finished floor elevation of the existing residence is approximately 8.86 feet NAVD88. The report states that future sea level rise is estimated to reach approximately 8.45 feet NAVD88, co nsidering a 1.25-foot sea level rise (the low range of projected sea level rise over the 75 - year design life of the structure based on estimates for sea level rise provided by the National Research Council 2012 SLR). The current City standard height for bulkheads is 10.0 feet (MLLW) (9.82 feet (NAVD88)) and the project has been conditioned to replace the seawall to this elevation standard. Once the existing seawall/bulkhead is replaced in accordance with the proposed plans, the need for a new shoreline protective device is not anticipated over the economic life of the development to protect it from flooding, wave runup, or erosion. If found inadequate for the actual sea level rise over the next 75 years, the bulkhead assembly allows for it to be increased in height without further seaward encroachment. Thus, based on the aforementioned assumptions, the site would be reasonably safe from future sea level rise.  Pursuant to NBMC Section 21.30.030(C)(3)(i)(iv), the property owner will be required to enter into an agreement with the City waiving any potential right to protection to address situations in the future in which the development is threatened with damage or destruction by coastal hazards (e.g., waves, erosion, and sea level rise). The property owner will also be required to acknowledge any hazards present at the site and unconditionally waive any claim to damage or liability against the decision authority, consistent with NBMC Section 21.30.015(D)(3)(c). Both requirements are included as conditions of approval that will need to be satisfied prior to the issuance of building permits for construction. 3 Silvers Bulkhead Improvements CDP (PA2018-145) Zoning Administrator, September 27, 2018 Page 4 Tmplt: 04/03/18  The property is located in an area known for the potential of seismic activity and liquefaction. All projects are required to comply with the California Building Code (CBC) and Building Division standards and policies. Geotechnical investigations specifically addressing liquefaction, if required by the Building Department, will be reviewed and approved prior to the issuance of building permits. Permit issuance is also contingent on the inclusion of design mitigation identified in the investigations. Construction plans are reviewed for compliance with approved investigations and CBC prior to building permit issuance. Water Quality  The property is located along the Newport Bay. A Construction Erosion Control Plan was provided to implement temporary Best Management Practices (BMPs) during construction to minimize erosion and sedimentation and to minimize pollution of runoff and coastal waters derived by construction chemicals and materials. The project design also addresses water quality through the inclusion of a post construction drainage system that includes drainage and percolation features designed to retain dry weather and minor rain event run-off on-site. Any water not retained on-site is directed to the City’s storm drain system. Public Access and Views  The project site is located between the nearest public road and the sea or shoreline. Implementation Plan Section 21.30A.040 requires that the provision of public access bear a reasonable relationship between the requirement and the project’s impact, and be proportional to the impact. In this case, the project replaces a wooden bulkhead with a new pre-cast concrete bulkhead that complies with the minimum 9.82 feet NAVD88 top of wall standard. The project also includes improvements such as a pool, walls, and hardscaping that are accessory to the existing single-family residence. Therefore, the project does not involve a change in land use, density or intensity that will result in increased demand on public access and recreation opportunities. Furthermore, the project is designed and sited (appropriate height, setbacks, etc.) so as not to block or impede existing public access opportunities.  Vertical access to the bay and beach is available adjacent to the site along H street. Lateral access is available on the large public beach to the south. All improvements are located within private property, and the project does not include any features that would physically obstruct access to the water or beach along these public routes.  The project site is not located adjacent to a coastal view road or Coastal Viewpoint as identified in the Coastal Land Use Plan. The nearest coastal viewpoint is located at the south end of the peninsula and is not visible from the site. The site is located adjacent to the H Street access point, which is accessible to the public and provides some limited opportunities to view the bay. As currently developed, the existing 4 Silvers Bulkhead Improvements CDP (PA2018-145) Zoning Administrator, September 27, 2018 Page 5 Tmplt: 04/03/18 property and other residences along H Street are located within the view shed of the street end. However, the proposed bulkhead (and accessory structures) comply with all applicable Local Coastal Program (LCP) development standards and maintain a front setback area consistent with the existing neighborhood pattern of development. Additionally, the project does not contain any unique features that could degrade the visual quality of the coastal zone.  All proposed accessory structures comply with the maximum height restrictions for front setbacks. All structures would be limited to 42” within the front setback (and abandoned right of way area), with the exception of pool protection fencing required for safety, which can reach up to five feet maximum from existing grade as long as at least 40 percent of the fence or wall is open (Implementation Plan Section 21.40.040 C, 3). These requirements would ensure that views are not obstructed. ENVIRONMENTAL REVIEW This project is exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15303 - Class 3 (New Construction or Conversion of Small Structures) of the CEQA Guidelines, California Code of Regulations, Title 14, Chapter 3, because it has no potential to have a significant effect on the environment. Class 3 exempts the construction and location of limited numbers of new, small facilities or structures including accessory structures. The proposed project consists of the removal of an existing bulkhead and construction of a new bulkhead and accessory structures associated with an existing single-family residence. PUBLIC NOTICE Notice of this public hearing was published in the Daily Pilot, mailed to all owners and residential occupants of property within 300 feet of the boundaries of the site (excluding intervening rights-of-way and waterways), including the applicant, and posted on the subject property at least 10 days before the scheduled hearing, consistent with the provisions of the Municipal Code. Additionally, the item appeared on the agenda for this meeting, which was posted at City Hall and on the City website. APPEAL PERIOD: This action shall become final and effective 14 days following the date the Resolution is adopted unless within such time an appeal or call for review is filed with the Community Development Director in accordance with the provisions of Title 21 (Local Coastal Implementation Plan) of the Newport Beach Municipal Code. Final action taken by the City may be appealed to the Coastal Commission in compliance with Section 21.64.035 of the City’s certified LCP and Title 14 California Code of Regulations, Sections 13111 through 5 Silvers Bulkhead Improvements CDP (PA2018-145) Zoning Administrator, September 27, 2018 Page 6 Tmplt: 04/03/18 13120, and Section 30603 of the Coastal Act. For additional information on filing an appeal, contact the Planning Division at 949-644-3200. Prepared by: _____________________________ Liz Westmoreland, Assistant Planner JM/law Attachments: ZA 1 Draft Resolution ZA 2 Vicinity Map ZA 3 Project Plans 6 03/13/2018 Attachment No. ZA 1 Draft Resolution 7 05-15-2018 RESOLUTION NO. ZA2018-### A RESOLUTION OF THE ZONING ADMINISTRATOR OF THE CITY OF NEWPORT BEACH APPROVING COASTAL DEVELOPMENT PERMIT NO. CD2018-063 TO REPLACE AN EXISTING BULKHEAD WITH A NEW CONCRETE BULKHEAD LOCATED AT 1601 EAST BAY AVENUE (PA2018-145) THE ZONING ADMINISTRATOR OF THE CITY OF NEWPORT BEACH HEREBY FINDS AS FOLLOWS: SECTION 1. STATEMENT OF FACTS. 1. An application was filed by Jacquelyn Chung for Swift Slip Dock and Pier Builders, Inc., with respect to property located at 1601 East Bay Avenue, requesting approval of a coastal development permit. 2. The lot at 1601 East Bay Avenue is legally described as Lots 1 and 2, Block 25, Eastside Addition to Balboa Tract and Lots 1 and 2 of a portion of Block “P” of the bay front section of the Balboa Tract (APNs 048-231-40, 41). 3. The applicant proposes to replace an existing wooden bulkhead with a new pre-cast concrete bulkhead. The new bulkhead would be constructed to a top of wall elevation of 9.82 feet NAVD88 (10.0 feet MLLW), located inland of the existing wooden bulkhead and no new seaward encroachment would occur. The project also includes the construction of a pool, protection fencing, walls, hardscape, landscaping, and drainage features that are accessory to the existing residence. 4. The subject property is designated RS-D (Single-Unit Residential Detached) by the General Plan Land Use Element and is located within the R-1 (Single-Unit Residential) Zoning District. 5. The subject properties are located within the coastal zone. The Coastal Land Use Plan category is RSD-B (Single Unit Residential Detached) - (6.0-9.9 DU/AC) and it is located within the R-1 (Single-Unit Residential) Coastal Zone District. 6. A public hearing was held on September 27, 2018, in the Corona del Mar Conference Room (Bay E-1st Floor) at 100 Civic Center Drive, Newport Beach. A notice of time, place and purpose of the hearing was given in accordance with the Newport Beach Municipal Code. Evidence, both written and oral, was presented to, and considered by, the Zoning Administrator at this hearing. SECTION 2. CALIFORNIA ENVIRONMENTAL QUALITY ACT DETERMINATION. 1. This project is categorically exempt pursuant to Title 14 of the California Code of Regulations Sections 15303, Article 19 of Chapter 3, Guidelines for Implementation of the California Environmental Quality Act (CEQA) under Class 3 (New Construction of Conversion of Small Structures), because it has no potential to have a significant effect on the environment. 8 Zoning Administrator Resolution No. #### Page 2 of 9 05-15-2018 2. Class 3 exempts the construction and location of limited numbers of new, small facilities or structures including accessory structures. The proposed project consists of the removal of an existing bulkhead and construction of a new bulkhead and accessory structures associated with an existing single-family residence. 3. The exceptions to this categorical exemption under Section 15300.2 are no t applicable. The project location does not impact an environmental resource of hazardous or critical concern, does not result in cumulative impacts, does not have a significant effect on the environment due to unusual circumstances, does not damage scenic resources within a state scenic highway, is not a hazardous waste site, and is not identified as a historical resource. SECTION 3. REQUIRED FINDINGS. In accordance with Section 21.52.015 (Coastal Development Permits, Findings and Decision) of the Newport Beach Municipal Code, the following findings and facts in support of such findings are set forth: Finding: A. Conforms to all applicable sections of the certified Local Coastal Program. Facts in Support of Finding: 1. The proposed development complies with applicable residential development standards including, but not limited to setbacks and height. a. The top of the proposed bulkhead wall would be constructed to 9.82 feet NAVD88 (10.0 MLLW ) in compliance with the Harbor Design Criteria minimum top of wall height requirement for new bulkheads. b. The proposed accessory structures comply with the Zoning Code and Implementation Plan maximum height standards within front setback areas. 2. The proposed concrete bulkhead would be located inland of the existing wooden bulkhead. Thus, there would be no seaward encroachment of the new bulkhead. 3. A Bulkhead Conditions Report for the existing bulkhead was prepared by William Simpson & Associates, Inc. dated May 5, 2018. The report concludes that the seawall is required to protect the existing principal structure on the lot. In order to do so, the existing seawall shall be replaced in accordance with proposed plans. Once the replacement is completed, no additional repair or replacement of the seawall is anticipated for the next 75 years. 9 Zoning Administrator Resolution No. #### Page 3 of 9 05-15-2018 4. A Coastal Hazards Report and Sea Level Rise Analysis was prepared by William Simpson & Associates, dated May 5, 2018 for the project. The report concludes that flooding, wave runup and erosion will not significantly impact the property over the anticipated life of the existing development. The finished floor elevation of the existing residence is approximately 8.86 feet NAVD88. The report states that future sea level rise is estimated to reach approximately 8.45 feet NAVD88, considering a 1.25-foot sea level rise (the low range of projected sea level rise over the 75 -year design life of the structure based on estimates for sea level rise provided by the National Research Council 2012 SLR). The current City standard height for bulkheads is 10.0 feet (MLLW ) (9.82 feet (NAVD88)) and the project has been conditioned to replace the seawall to this elevation standard. Once the existing seawall/bulkhead is replaced in accordance with the proposed plans, the need for a new shoreline protective device is not anticipated over the economic life of the development to protect it from flooding, wave runup, or erosion. If found inadequate for the actual sea level rise over the next 75 years, the bulkhead assembly allows for it to be increased in height without further seaward encroachment. Thus, based on the aforementioned assumptions, the site would be reasonably safe from future sea level rise. 5. Pursuant to NBMC Section 21.30.030(C)(3)(i)(iv), the property owner will be required to enter into an agreement with the City waiving any potential right to protection to address situations in the future in which the development is threatened with damage or destruction by coastal hazards (e.g., waves, erosion, and sea level rise). The property owner will also be required to acknowledge any hazards present at the site and unconditionally waive any claim to damage or liability against the decision authority, consistent with NBMC Section 21.30.015(D)(3)(c). Both requirements are included as conditions of approval that will need to be satisfied prior to the issuance of building permits for construction. 6. The property is located in an area known for the potential of seismic activity and liquefaction. All projects are required to comply with the California Building Code (CBC) and Building Division standards and policies. Geotechnical investigations specifically addressing liquefaction, if required by the Building Department, will be reviewed and approved prior to the issuance of building permits. Permit issuance is also contingent on the inclusion of design mitigation identified in the investigations. Construction plans are reviewed for compliance with approved investigations and CBC prior to building permit issuance. 7. The property is located along the Newport Bay. A Construction Erosion Control Plan was provided to implement temporary Best Management Practices (BMPs) during construction to minimize erosion and sedimentation and to minimize pollution of runoff and coastal waters derived by construction chemicals and materials. The project design also addresses water quality through the inclusion of a post construction drainage system that includes drainage and percolation features designed to retain dry weather and minor rain event run-off on-site. Any water not retained on-site is directed to the City’s storm drain system. 10 Zoning Administrator Resolution No. #### Page 4 of 9 05-15-2018 8. Proposed landscaping complies with Implementation Plan Section 21.30.075. A condition of approval is included that requires drought-tolerant species. Prior to issuance of building permits, the final landscape plans will be reviewed to verify in vasive species are not planted. Finding: B. Conforms with the public access and public recreation policies of Chapter 3 of the Coastal Act if the project is located between the nearest public road and the sea or shoreline of any body of water located within the coastal zone. Fact in Support of Finding: 1. The project site is located between the nearest public road and the sea or shoreline. Implementation Plan Section 21.30A.040 requires that the provision of public access bear a reasonable relationship between the requirement and the project’s impact, and be proportional to the impact. In this case, the project replaces a wooden bulkhead with a new pre-cast concrete bulkhead that complies with the minimum 9.82 feet NAVD88 top of wall standard. The project also includes improvements such as a pool, walls, and hardscaping that are accessory to the existing single-family residence. Therefore, the project does not involve a change in land use, density or intensity that will result in increased demand on public access and recreation opportunities. Furthermore, the project is designed and sited (appropriate height, setbacks, etc.) so as not to block or impede existing public access opportunities. 2. Vertical access to the bay and beach is available adjacent to the site along H street. Lateral access is available on the large public beach to the south. All improvements are located within private property, and the project does not include any features that would physically obstruct access to the water or beach along these public routes. 3. The project site is not located adjacent to a coastal view road or Coastal Viewpoint as identified in the Coastal Land Use Plan. The nearest coastal viewpoint is located at the south end of the peninsula and is not visible from the site. The site is located adjacent to the H Street access point, which is accessible to the public and provides some limited opportunities to view the bay. As currently developed, the existing property and other residences along H Street are located within the view shed of the street end. However, the proposed bulkhead (and accessory structures) comply with all applicable Local Coastal Program (LCP) development standards and maintain a front setback area consistent with the existing neighborhood pattern of development. Additionally, the project does not contain any unique features that could degrade the visual quality of the coastal zone. 4. All proposed accessory structures comply with the maximum height restrictions for front setbacks. All structures would be limited to 42” within the front setback (and abandoned right of way area), with the exception of pool protection fencing required for safety, which can reach up to five feet maximum from existing grade as long as at least 40 percent of the fence or wall is open (Implementation Plan Section 21.40.040 C, 3). These requirements would ensure that views are not obstructed. 11 Zoning Administrator Resolution No. #### Page 5 of 9 05-15-2018 SECTION 4. DECISION. NOW, THEREFORE, BE IT RESOLVED: 1. The Zoning Administrator of the City of Newport Beach hereby approves Coastal Development Permit No. CD2018-063, subject to the conditions set forth in Exhibit “A,” which is attached hereto and incorporated by reference. 2. This action shall become final and effective 14 days following the date this Resolution was adopted unless within such time an appeal or call for review is filed with the Community Development Director in accordance with the provisions of Title 21 Local Coastal Implementation Plan, of the Newport Beach Municipal Code. Final action taken by the City may be appealed to the Coastal Commission in compliance with Section 21.64.035 of the City’s certified LCP and Title 14 California Code of Regulations, Sections 13111 through 13120, and Section 30603 of the Coastal Act. PASSED, APPROVED, AND ADOPTED THIS 27TH DAY OF SEPTEMBER, 2018. _____________________________________ Patrick J. Alford, Zoning Administrator 12 Zoning Administrator Resolution No. #### Page 6 of 9 05-15-2018 EXHIBIT “A” CONDITIONS OF APPROVAL 1. The development shall be in substantial conformance with the approved site plan, bulkhead plans, and elevations stamped and dated with the date of this approval (except as modified by applicable conditions of approval). 2. Prior to the issuance of a building permit, an agreement in a form approved by the City Attorney between the property owner and the City shall be executed and recorded waiving rights to the construction of future shoreline protection devices including the repair and maintenance, enhancement, reinforcement, or any other activity affecting the bulkhead, that results in any encroachment seaward of the authorized footprint of the bulkhead or other shoreline protective device. The agreement shall be binding against the property owners and successors and assigns. 3. Prior to the issuance of a building permit, the property owner shall submit a notarized signed letter acknowledging all hazards present at the site, assuming the risk of injury or damage from such hazards, unconditionally waiving any claims of damage against the City from such hazards, and to indemnify and hold harmless City, its City Council, its boards and commissions, officials, officers, employees, and agents from and against any and all claims, demands, obligations, damages, actions, causes of action, suits, losses, judgments, fines, penalties, liabilities, costs and expenses (including without limitation, attorney’s fees, disbursements and court costs) of every kind and nature whatsoever which may arise from or in any manner relate (directly or indirectly) to City’s approval of development. 4. Prior to the issuance of building permits, a lot merger shall be approved and recorded to merge the existing underlying legal lots (APN 048-231-40 and 048-231-41). 5. No demolition or construction materials, equipment debris, or waste, shall be placed or stored in a location that would enter sensitive habitat, receiving waters, or a storm drain or result in impacts to environmentally sensitive habitat areas, streams, the beach, wetlands or their buffers. 6. This approval does not authorize any new or existing improvements (including landscaping) on State tidelands, public beaches, or the public right -of-way. 7. This Coastal Development Permit does not authorize any development seaward of the private property. 8. Grading, brush removal, building demolition, tree trimming, and similar construction activities shall occur between August 16 and January 31. If such activities must occur inside the peak nesting season (from February 1 to August 15), compliance with the following is required to prevent the taking of Native Birds pursuant to the Migratory Bird Treaty Act (MBTA): 13 Zoning Administrator Resolution No. #### Page 7 of 9 05-15-2018 A. The construction area shall be inspected for active nests. If birds are observed flying from a nest or sitting on a nest, it can be assumed that the nest is active. Construction activity within 300 feet of an active nest shall be delayed until the nest is no longer active. Continue to observe the nest until the chicks have left the nest and activity is no longer observed. When the nest is no longer active, construction activity can continue in the nest area. B. The applicant is responsible for compliance with the MBTA. It is a violation of state and federal law to kill or harm a native bird. To ensure compliance, consider hiring a biologist to assist with the survey for nesting birds, and to determine when it is safe to commence construction activities. If an active nest is found, one or two short follow-up surveys will be necessary to check on the nest and determine when the nest is no longer active. 9. Best Management Practices (BMP’s) and Good Housekeeping Practices (GHP’s) shall be implemented prior to and throughout the duration of construction activity as designated in the Construction Erosion Control Plan. 10. The discharge of any hazardous materials into storm sewer systems or receiving waters shall be prohibited. Machinery and equipment shall be maintained and washed in confined areas specifically designed to control runoff. A designated fueling and vehicle maintenance area with appropriate berms and protection to prevent spillage shall be provided as far away from storm drain systems or receiving waters as possible. 11. Debris from demolition shall be removed from work areas each day and removed from the project site within 24 hours of the completion of the project. Stock piles and construction materials shall be covered, enclosed on all sites, not stored in contact with the soil, and located as far away as possible from drain inlets and any waterway. 12. Trash and debris shall be disposed in proper trash and recycling receptacles at the end of each construction day. Solid waste, including excess concrete, shall be disposed in adequate disposal facilities at a legal disposal site or recycled at a recycling facility. 13. Revisions to the approved plans may require a n amendment to this Coastal Development Permit or the processing of a new coastal development permit. 14. The project is subject to all applicable City ordinances, policies, and standards, unless specifically waived or modified by the conditions of approval. 15. The applicant shall comply with all federal, state, and local laws. Material violation of any of those laws in connection with the use may be cause for revocation of this Coastal Development Permit. 16. This Coastal Development Permit may be modified or revoked by the Zoning Administrator if determined that the proposed uses or conditions under which it is being operated or maintained is detrimental to the public health, welfare or materially injurious to property or improvements in the vicinity or if the property is operated or maintained so as to constitute a public nuisance. 14 Zoning Administrator Resolution No. #### Page 8 of 9 05-15-2018 17. Prior to the issuance of building permits, the applicant shall submit a final construction erosion control plan. The plan shall be subject to the review and approval by the Building Division. 18. Prior to the issuance of building permits, the applicant shall submit a final drainage and grading plan. The plan shall be subject to the review and approval by the Building Division. 19. Prior to issuance of a building permit, a copy of the Resolution, including conditions of approval Exhibit “A” shall be incorporated into the Building Division and field sets of plans. 20. Prior to issuance of a building permit, the applicant shall submit to the Planning Division an additional copy of the approved architectural plans for inclusion in the Coastal Development file. The plans shall be identical to those approved by all City departments for building permit issuance. The approved copy shall include architectural sheets only and shall be reduced in size to 11 inches by 17 inches. The plans shall accurately depict the elements approved by this Coastal Development Permit. 21. Prior to the issuance of building permits, the applicant shall submit a final landscape and irrigation plan. These plans shall incorporate drought tolerant plantings, non-invasive plant species and water efficient irrigation design. The plans shall be approved by the Planning Division. 22. All landscape materials and irrigation systems shall be maintained in accordance with the approved landscape plan. All landscaped areas shall be maintained in a healthy and growing condition and shall receive regular pruning, fertilizing, mowing, and trimming. All landscaped areas shall be kept free of weeds and debris. All irrigation systems shall be kept operable, including adjustments, replacements, repairs, and cleaning as part of regular maintenance. 23. Prior to the issuance of building permit, the applicant shall pay any unpaid administrative costs associated with the processing of this application to the Planning Division. 24. Should the property be sold or otherwise come under different ownership, any future owners or assignees shall be notified of the conditions of this approval by the current property owner or agent. 25. This Coastal Development Permit No. CD2018-063 shall expire unless exercised within 24 months from the date of approval as specified in Section 21.54.060 (Time Limits and Extensions) of the Newport Beach Municipal Code, unless an extension is otherwise granted. 26. To the fullest extent permitted by law, applicant shall indemnify, defend and hold harmless City, its City Council, its boards and commissions, officials, officers, employees, and agents from and against any and all claims, demands, obligations, damages, actions, causes of action, suits, losses, judgments, fines, penalties, liabilities, costs and expenses (including 15 Zoning Administrator Resolution No. #### Page 9 of 9 05-15-2018 without limitation, attorney’s fees, disbursements and court costs) of every kind and nature whatsoever which may arise from or in any manner relate (directly or indirectly) to City’s approval of Silvers Bulkhead Improvements including, but not limited to, Coastal Development Permit No. CD2018-063 (PA2018-145). This indemnification shall include, but not be limited to, damages awarded against the City, if any, costs of suit, attorneys' fees, and other expenses incurred in connection with such claim, action, causes of action, suit or proceeding whether incurred by applicant, City, and/or the parties initiating or bringing such proceeding. The applicant shall indemnify the City for all of City's costs, attorneys' fees, and damages, which City incurs in enforcing the indemnification provisions set forth in this condition. The applicant shall pay to the City upon demand any amount owed to the City pursuant to the indemnification requirements prescribed in this condition. 16 03/13/2018 Attachment No. ZA 2 Vicinity Map 17 03/13/2018 VICINITY MAP Coastal Development Permit No. CD2018-063 PA2018-145 1601 East Bay Avenue Subject Property 18 03/13/2018 Attachment No. ZA 3 Project Plans 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 J P R S U V K Q E SW-3REPLACING THE (E) SEAWALL LOCATED AT:1601 EAST BAY AVE.NEWPORT BEACH, CA 92661Mr. Craig Silvers1601 East Bay Ave.Newport Beach, CA 9266137 Q VTU (E) BLDG SW-4REPLACING THE (E) SEAWALL LOCATED AT:1601 EAST BAY AVE.NEWPORT BEACH, CA 92661Mr. Craig Silvers1601 East Bay Ave.Newport Beach, CA 9266138