Loading...
HomeMy WebLinkAboutZA2018-108 - COASTAL DEVELOPMENT PERMIT TO DEMOLISH AN EXISTING SINGLE-FAMILY RESIDENCE AND CONSTRUCT A NEW TWO-STORY, SINGLE-FAMILY RESIDENCE AND ATTACHED THREE-CAR GARAGE - 808 VIA LIDO NORDRESOLUTION NO. ZA2018-108 A RESOLUTION OF THE ZONING ADMINISTRATOR OF THE CITY OF NEWPORT BEACH APPROVING COASTAL DEVELOPMENT PERMIT NO. CD2018-076 TO DEMOLISH AN EXISTING SINGLE-FAMILY RESIDENCE AND CONSTRUCT A NEW TWO-STORY, SINGLE-FAMILY RESIDENCE AND ATTACHED THREE-CAR GARAGE AT 808 VIA LIDO NORD (PA2018-171) THE ZONING ADMINISTRATOR OF THE CITY OF NEWPORT BEACH HEREBY FINDS AS FOLLOWS: SECTION 1. STATEMENT OF FACTS. 1. An application was filed by Brandon Architects, Inc. (“Applicant”), on behalf of Bernie Hubmerman (“Owners”), with respect to property located at 808 Via Lido Nord, requesting approval of a coastal development permit. 2. The property is legally described as Lot 347 and the Southeasterly Half of Lot 348 of Tract 907. 3. The applicant proposed the demolition of an existing single-family residence and construction of a two-story, 5,646-square-foot, single-family residence with an attached 691-square-foot, three-car garage. The project includes landscape, hardscape and subsurface drainage facilities. The site is protected by an existing private bulkhead that will be reinforced in conjunction with the proposed construction. The design complies with all applicable development standards and no deviations are requested. 4. The subject property is designated RS-D (Single-Unit Residential Detached) by the General Plan Land Use Element and is located within the R-1 (Single-Unit Residential) Zoning District. 5. The subject property is located within the coastal zone. The Coastal Land Use Plan category is RSD-C (Single-Unit Residential Detached - 10.0 - 19.9 DU/AC) and the property is located within the R-1 (Single-Unit Residential) Coastal Zone District. 6. A public hearing was held on September 27, 2018, in the Corona del Mar Conference Room (Bay E-1st Floor) at 100 Civic Center Drive, Newport Beach. A notice of time, place and purpose of the hearing was given in accordance with the Newport Beach Municipal Code. Evidence, both written and oral, was presented to and considered by the Zoning Administrator at this hearing. SECTION 2. CALIFORNIA ENVIRONMENTAL QUALITY ACT DETERMINATION. 1. This project is categorically exempt pursuant to Title 14 of the California Code of Regulations Section 15303, Article 19 of Chapter 3, Guidelines for Implementation of the California Environmental Quality Act (CEQA) under Class 3 (New Construction or Zoning Administrator Resolution No. ZA2018-108 Page 2 of 9 Conversion of Small Structures), because it has no potential to have a significant effect on the environment. 2. Class 3 exempts the construction and location of limited numbers of new, small facilities or structures including one single-family residence in a residential zone. The proposed project consists of the demolition of an existing single-family residence and construction of a new two-story, 5,646-square-foot, single-family residence with an attached 691- square-foot, three-car garage in the R-1 Zoning District. SECTION 3. REQUIRED FINDINGS. In accordance with Section 21.52.015 (Coastal Development Permits, Findings and Decision) of the Newport Beach Municipal Code (NBMC), the following findings and facts in support of such findings are set forth: Finding: A. Conforms to all applicable sections of the certified Local Coastal Program. Facts in Support of Finding: 1. The proposed development complies with applicable residential development standards including, but not limited to, floor area limitation, setbacks, height, and parking. a. The maximum floor area limitation is 7,904 square feet and the proposed gross floor area is 6,338 square feet. b. The proposed development will provide the minimum required setbacks, which are four (4) feet along the front property line abutting Via Lido Nord, four (4) feet along each side property line, and ten (10) feet along the front property line abutting the waterway. c. The highest guardrail and the highest roof ridge are no more than 24 feet, measured from the established grade level of 11.67 feet (North American Vertical Datum of 1988), which complies with the maximum height limitation. d. The project includes enclosed garage parking for three vehicles, which complies with the minimum parking requirement for single-family residences with more than 4,000 square feet of habitable floor area. 2. The neighborhood is predominantly developed with two-story, single-family residences. The proposed design, bulk, and scale of the development will be consistent with the existing neighborhood pattern of development and expected future development. 3. The existing development includes a private seawall/bulkhead along the waterway. A Bulkhead Condition Report prepared by PMA Consulting, Inc., dated July 11, 2018, concludes that the cast-in-place wall is in good condition. In order to protect the Zoning Administrator Resolution No. ZA2018-108 Page 3 of 9 proposed new development, the report recommends that the wall be reinforced and repaired, and provides specific recommendations on how this should be accomplished. Once the wall has been reinforced and repaired, it is not anticipated that the wall will need further repair or replacement in the next 75 years. 4. Pursuant to NBMC Section 21.30.030(C)(3)(i)(iv), the property owner will be required to enter into an agreement with the City waiving any potential right to protection to address situations in the future in which the development is threatened with damage or destruction by coastal hazards (e.g., waves, erosion, and sea level rise). The property owner will also be required to acknowledge any hazards present at the site and unconditionally waive any claim to damage or liability against the decision authority, consistent with NBMC Section 21.30.015(D)(3)(c). Both requirements are included as conditions of approval that will need to be satisfied prior to the issuance of building permits for construction. 5. A project-specific Coastal Hazards Analysis Report was prepared by PMA Consulting, Inc., dated July 11, 2018. The report concludes that flooding, wave run up and erosion will not significantly impact this property over the life of the proposed development, provided the existing seawall is reinforced and repaired as recommended. 6. Pursuant to NBMC Section 21.35.050 (Water Quality and Hydrology Plan), because of the project site’s proximity to coastal waters, a Water Quality and Hydrology Plan (WQHP) was prepared by Forkert Engineering & Surveying, Inc., dated July 24, 2018. The WQHP includes a polluted runoff and hydrologic site characterization, a sizing standard for Best Management Practices (BMPs), use of a low-impact development approach to retain the design storm runoff volume on site, and documentation of the expected effectiveness of the proposed BMPs. Construction plans will be reviewed for compliance with the approved WQHP prior to building permit issuance. 7. The property is located in an area known for the potential of seismic activity and liquefaction. All projects are required to comply with the California Building Code (CBC) and Building Division standards and policies. Geotechnical investigations specifically addressing liquefaction are required to be reviewed and approved prior to the issuance of building permits. Permit issuance is also contingent on the inclusion of design mitigation identified in the investigations. Construction plans are reviewed for compliance with approved investigations and CBC prior to building permit issuance. 8. The project design addresses water quality with a construction erosion control plan and a post construction drainage system that includes drainage and percolation features designed to retain dry weather and minor rain event run-off on-site. Any water not retained on-site is directed to the City’s storm drain system. 9. New landscaping will be verified for compliance with NBMC Section 21.30.075. A condition of approval is included that requires drought-tolerant, and prohibits invasive, species (Condition of Approval No. 14). Prior to issuance of the building permits, the final landscape plans will be reviewed to verify invasive species are not planted. Zoning Administrator Resolution No. ZA2018-108 Page 4 of 9 10. The property is not located near designated public viewpoints or coastal view roads and will not impact public coastal views. Finding: B. Conforms with the public access and public recreation policies of Chapter 3 of the Coastal Act if the project is located between the nearest public road and the sea or shoreline of any body of water located within the coastal zone. Facts in Support of Finding: 1. The project site is located between the nearest public road and the sea or shoreline; however, the project will not affect the public’s ability to gain access to, use, and/or view the coast and nearby recreational facilities. The existing residential development neither provides nor inhibits public coastal access. Implementation Plan Section 21.30A.040 (Determination of Public Access/Recreation Impacts) requires that the provision of public access bear a reasonable relationship between the requirement and the project’s impact and be proportional to the impact. In this case, the project replaces an existing single-family residence with a new single-family residence. Therefore, the project does not involve a change in land use, density or intensity that will result in increased demand on public access and recreation opportunities. Furthermore, the project is designed and sited so as not to block or impede existing public access opportunities. 2. The residential lot does not currently provide nor does it inhibit public coastal access. The proposed scope of work involves the removal and replacement of an existing single-family residence with a new single-family residence. Development will occur within the confines of private property, and existing coastal access conditions will not be affected. Coastal access is currently provided and will continue to be provided by adjacent small public beach areas with access to the water. 3. The project site is not located adjacent to a coastal view road, public viewpoint, public park or beach, or public accessway, as identified in the Coastal Land Use Plan. Furthermore, an investigation of the project site and surrounding area did not identify any other public view opportunities. The project site may be located within the viewshed of distant public viewing areas. However, the project will replace an existing single-family home with a new single-family home that complies with all applicable Local Coastal Program (LCP) development standards and maintains a building envelope consistent with the existing and anticipated neighborhood pattern of development. Therefore, the project does not have the potential to degrade the visual quality of the Coastal Zone or result in significant adverse impacts to public views. SECTION 4. DECISION. NOW, THEREFORE, BE IT RESOLVED: Zoning Administrator Resolution No. ZA2018-108 Page 5 of 9 1. The Zoning Administrator of the City of Newport Beach hereby approves Coastal Development Permit No. CD2018-076, subject to the conditions set forth in Exhibit “A,” which is attached hereto and incorporated by reference. 2. This action shall become final and effective 14 days following the date this Resolution was adopted unless within such time an appeal or call for review is filed with the Community Development Director in accordance with the provisions of Title 21 Local Coastal Implementation Plan, of the Newport Beach Municipal Code. Final action taken by the City may be appealed to the Coastal Commission in compliance with Section 21.64.035 of the City’s certified LCP and Title 14 California Code of Regulations, Sections 13111 through 13120, and Section 30603 of the Coastal Act. PASSED, APPROVED, AND ADOPTED THIS 27TH DAY OF SEPTEMBER, 2018. _____________________________________ Patrick J. Alford, Zoning Administrator Zoning Administrator Resolution No. ZA2018-108 Page 6 of 9 EXHIBIT “A” CONDITIONS OF APPROVAL 1. The development shall be in substantial conformance with the approved site plan, floor plans and building elevations stamped and dated with the date of this approval (except as modified by applicable conditions of approval). 2. Revisions to the approved plans may require an amendment to this Coastal Development Permit or the processing of a new coastal development permit. 3. Coastal Development Permit No. CD2018-076 shall expire unless exercised within 24 months from the date of approval as specified in Section 21.54.060 (Time Limits and Extensions) of the Newport Beach Municipal Code, unless an extension is otherwise granted 4. Prior to the issuance of a building permit, an agreement in a form approved by the City Attorney between the property owner and the City shall be executed and recorded waiving rights to the construction of future shoreline protection devices including the repair and maintenance, enhancement, reinforcement, or any other activity affecting the bulkhead, that results in any encroachment seaward of the authorized footprint of the bulkhead or other shoreline protective device. The agreement shall be binding against the property owners and successors and assigns. 5. Prior to the issuance of a building permit, the property owner shall submit a notarized signed letter acknowledging all hazards present at the site, assuming the risk of injury or damage from such hazards, unconditionally waiving any claims of damage against the City from such hazards, and to indemnify and hold harmless City, its City Council, its boards and commissions, officials, officers, employees, and agents from and against any and all claims, demands, obligations, damages, actions, causes of action, suits, losses, judgments, fines, penalties, liabilities, costs and expenses (including without limitation, attorney’s fees, disbursements and court costs) of every kind and nature whatsoever which may arise from or in any manner relate (directly or indirectly) to City’s approval of development. 6. The existing private seawall/bulkhead shall be reinforced and repaired, in keeping with the recommendations provided in the Bulkhead Condition Report prepared by PMA Consulting, Inc., dated July 11, 2018. 7. The project is subject to all applicable City ordinances, policies, and standards, unless specifically waived or modified by the conditions of approval. 8. The applicant shall comply with all federal, state, and local laws. Material violation of any of those laws in connection with the use may be cause for revocation of this coastal development permit. Zoning Administrator Resolution No. ZA2018-108 Page 7 of 9 9. This Coastal Development Permit may be modified or revoked by the Zoning Administrator if determined that the proposed uses or conditions under which it is being operated or maintained is detrimental to the public health, welfare or materially injurious to property or improvements in the vicinity or if the property is operated or maintained so as to constitute a public nuisance. 10. Best Management Practices and Good Housekeeping Practices shall be implemented prior to and throughout the duration of construction activity as designated in the Construction Pollution Prevention Plan . 11. Prior to issuance of the building permits, a copy of the Resolution, including conditions of approval Exhibit “A” shall be incorporated into the Building Division and field sets of plans. 12. Prior to issuance of building permits, the applicant shall submit to the Planning Division an additional copy of the approved architectural plans for inclusion in the coastal development permit file. The plans shall be identical to those approved by all City departments for building permit issuance. The approved copy shall include architectural sheets only and shall be reduced in size to 11 inches by 17 inches. The plans shall accurately depict the elements approved by this coastal development permit. 13. Prior to issuance of building permits, the applicant shall submit a final construction erosion control plan. The plan shall be subject to review and approval by the Building Division. 14. Prior to the issuance of building permits, the applicant shall submit a final landscape and irrigation plan. These plans shall incorporate drought tolerant plantings, non-invasive plant species and water efficient irrigation design. The plans shall be approved by the Planning Division. 15. All landscape materials and irrigation systems shall be maintained in accordance with the approved landscape plan. All landscaped areas shall be maintained in a healthy and growing condition and shall receive regular pruning, fertilizing, mowing, and trimming. All landscaped areas shall be kept free of weeds and debris. All irrigation systems shall be kept operable, including adjustments, replacements, repairs, and cleaning as part of regular maintenance. 16. Prior to the issuance of building permits, the applicant shall pay any unpaid administrative costs associated with the processing of this application to the Planning Division. 17. No demolition or construction materials, equipment debris, or waste, shall be placed or stored in a location that would enter sensitive habitat, receiving waters, or a storm drain or result in impacts to environmentally sensitive habitat areas, streams, wetland or their buffers. Zoning Administrator Resolution No. ZA2018-108 Page 8 of 9 18. The discharge of any hazardous materials into storm sewer systems or receiving waters shall be prohibited. Machinery and equipment shall be maintained and washed in confined areas specifically designed to control runoff. A designated fueling and vehicle maintenance area with appropriate berms and protection to prevent spillage shall be provided as far away from storm drain systems or receiving waters as possible. 19. Debris from demolition shall be removed from work areas each day and removed from the project site within 24 hours of the completion of the project. Stockpiles and construction materials shall be covered, enclosed on all sites, not stored in contact with the soil, and located as far away as possible from drain inlets and any waterway. 20. Trash and debris shall be disposed in proper trash and recycling receptacles at the end of each construction day. Solid waste, including excess concrete, shall be disposed in adequate disposal facilities at a legal disposal site or recycled at a recycling facility. 21. Should the property be sold or otherwise come under different ownership, any future owners or assignees shall be notified of the conditions of this approval by the current property owner or agent. 22. The applicant is responsible for compliance with the Migratory Bird Treaty Act (MBTA). In compliance with the MBTA, grading, brush removal, building demolition, tree trimming, and similar construction activities shall occur between August 16 and January 31, outside of the peak nesting period. If such activities must occur inside the peak nesting season from February 1 to August 15, compliance with the following is required to prevent the taking of Native Birds pursuant to MBTA: A. The construction area shall be inspected for active nests. If birds are observed flying from a nest or sitting on a nest, it can be assumed that the nest is active. Construction activity within 300 feet of an active nest shall be delayed until the nest is no longer active. Continue to observe the nest until the chicks have left the nest and activity is no longer observed. When the nest is no longer active, construction activity can continue in the nest area. B. It is a violation of state and federal law to kill or harm a native bird. To ensure compliance, consider hiring a biologist to assist with the survey for nesting birds, and to determine when it is safe to commence construction activities. If an active nest is found, one or two short follow-up surveys will be necessary to check on the nest and determine when the nest is no longer active. 23. To the fullest extent permitted by law, applicant shall indemnify, defend and hold harmless City, its City Council, its boards and commissions, officials, officers, employees, and agents from and against any and all claims, demands, obligations, damages, actions, causes of action, suits, losses, judgments, fines, penalties, liabilities, costs and expenses (including without limitation, attorney’s fees, disbursements and court costs) of every kind and nature whatsoever which may arise from or in any manner relate (directly or indirectly) to City’s approval of Hubmerman Residence including, but not limited to, Coastal Development Zoning Administrator Resolution No. ZA2018-108 Page 9 of 9 Permit No. CD2018-076 (PA2018-171). This indemnification shall include, but not be limited to, damages awarded against the City, if any, costs of suit, attorneys' fees, and other expenses incurred in connection with such claim, action, causes of action, suit or proceeding whether incurred by applicant, City, and/or the parties initiating or bringing such proceeding. The applicant shall indemnify the City for all of City's costs, attorneys' fees, and damages, which City incurs in enforcing the indemnification provisions set forth in this condition. The applicant shall pay to the City upon demand any amount owed to the City pursuant to the indemnification requirements prescribed in this condition.