HomeMy WebLinkAboutZA2019-009 - APPROVING COASTAL DEVELOPMENT PERMIT NO. CD2018-087 TO CONSTRUCT A NEW SINGLE-FAMILY RESIDENCE AND ATTACHED 2-CAR GARAGE LOCATED AT 3902 CHANNEL PLACERESOLUTION NO. ZA2019-009
A RESOLUTION OF THE ZONING ADMINISTRATOR OF THE
CITY OF NEWPORT BEACH APPROVING COASTAL
DEVELOPMENT PERMIT NO. CD2018-087 TO CONSTRUCT A
NEW SINGLE-FAMILY RESIDENCE AND ATTACHED 2 -CAR
GARAGE LOCATED AT 3902 CHANNEL PLACE (PA2018-210)
THE ZONING ADMINISTRATOR OF THE CITY OF NEWPORT BEACH HEREBY FINDS AS
FOLLOWS:
SECTION 1. STATEMENT OF FACTS.
1. An application was filed by Brandon Architects, with respect to property located at 3902
Channel Place, requesting approval of a coastal development permit.
2. The lot at 3902 Channel Place is legally described as Lot 2, Block 539, of Canal Section.
3. The applicant proposes a coastal development permit to allow the construction of a new
three-story, 3,019 -square -foot, single-family residence including an attached two -car
garage. The project includes reinforcing and raising the height of the existing bulkhead. No
work will be conducted bayward of the existing property. The proposed development
includes landscape, hardscape, and subsurface drainage facilities..
4. The subject property is designated RT (Two -Unit Residential) by the General Plan Land
Use Element and is located within the R-2 (Two -Family Residential) Zoning District.
5. The subject property is located within the coastal zone. The Coastal Land Use Plan
category is Two -Unit Residential (RT -D) 20.0-29.9 DU/AC and it is located within the Two -
unit Residential (R-2) Coastal Zone District.
6. A public hearing was held on January 31, 2019, in the Corona del Mar Conference Room
(Bay E -1st Floor) at 100 Civic Center Drive, Newport Beach. A notice of time, place and
purpose of the hearing was given in accordance with the Newport Beach Municipal
Code. Evidence, both written and oral, was presented to, and considered by, the Zoning
Administrator at this hearing.
SECTION 2. CALIFORNIA ENVIRONMENTAL QUALITY ACT DETERMINATION.
1. This project is categorically exempt pursuant to Title 14 of the California Code of
Regulations Section 15303, Article 19 of Chapter 3, Guidelines for Implementation of the
California Environmental Quality Act (CEQA) under Class 3 (New Construction or
Conversion of Small Structures).
2. Class 3 exempts the demolition of up to three single-family residences and additions of
up to 10,000 square feet to existing structures. The proposed project consists of the
demolition of one single-family residence and the construction of a new 3,019 -square -
foot single-family residence and attached 2 -car garage.
05-15-2018
Zoning Administrator Resolution No. ZA2019-009
Paqe 2 of 9
3. The exceptions to this categorical exemption under Section 15300.2 are not applicable.
The project location does not impact an environmental resource of hazardous or critical
concern, does not result in cumulative impacts, does not have a significant effect on the
environment due to unusual circumstances, does not damage scenic resources within
a state scenic highway, is not a hazardous waste site, and is not identified as a historical
resource.
SECTION 3. REQUIRED FINDINGS.
In accordance with Section 21.52.015 (Coastal Development Permits, Findings and Decision)
of the Newport Beach Municipal Code, the following findings and facts in support of such
findings are set forth:
Finding:
A. Conforms to all applicable sections of the certified Local Coastal Program.
Facts in Support of Finding:
The proposed development complies with applicable residential development standards
including, but not limited to, floor area limitation, setbacks, height, and parking.
a. The maximum floor area limitation is 3,198 square feet and the proposed floor area
is 3,019 square feet.
b. The proposed development provides the minimum required setbacks, which are 3
feet along the front property line abutting Channel Place, 3 feet along each side
property line and 20 feet along the second frontage abutting Newport Bay.
The highest guardrail is less than 24 feet from established grade (9.00 feet
NAVD88) and the highest ridge is no more than 29 feet from established grade,
which comply with the maximum height requirements.
The project includes garage parking for a total of two vehicles, complying with the
minimum two -car garage parking requirement for single-family residences with less
than 4,000 square feet of habitable floor area.
2. The neighborhood is predominantly developed with two- and three-story, single-family
residences. The proposed design, bulk, and scale of the development is consistent with
the existing neighborhood pattern of development and expected future development.
3. The development fronts the Newport Bay. The project site is protected by a bulkhead.
The finished floor elevation of the proposed dwelling is 9.00 feet NAVD 88, which
complies with the minimum 9.00 feet NAVD88 elevation standard. A waterproofing 6 -
inch curb is proposed to be constructed around the perimeter of the dwelling that would
protect against flooding up to an elevation of 10.05 feet NAVD88. Flood shields (sand
bags and other methods) can be deployed across the openings to prevent flooding to
the structure.
05-15-2018
Zoning Administrator Resolution No. ZA2019-009
Paqe 3 of 9
4. A Coastal Hazards Report and Sea Level Rise Analysis was prepared by PMA
Consulting, dated December 3, 2018 for the project. The report concludes that the
proposed project is reasonably safe from the shoreline erosion due to lack of wave or
wakes that can erode sand from the beach. However, the site requires a reinforced and
raised bulkhead to protect the site and surrounding development from sea level rise,
considering a 2.85 -foot sea level rise (the low-risk aversion projected sea level rise over
the 75 -year design life of the structure based on estimates for sea level rise provided by
the State of California Sea -Level Rise Guidance 2018). The project includes raising the
bulkhead to 10.05 feet (NAVD88), which meets the State of California Sea -Level Rise
Guidance 2018.
5. Pursuant to NBMC Section 21.30.030(C)(3)(i)(iv), the property owner will be required to
enter into an agreement with the City waiving any potential right to protection to address
situations in the future in which the development is threatened with damage or destruction
by coastal hazards (e.g., waves, erosion, and sea level rise). The property owner will also
be required to acknowledge any hazards present at the site and unconditionally waive any
claim to damage or liability against the decision authority, consistent with NBMC Section
21.30.015(D)(3)(c). Both requirements are included as conditions of approval that will need
to be satisfied prior to the issuance of building permits for construction.
6. The property is located in an area known for the potential of seismic activity and
liquefaction. All projects are required to comply with the California Building Code (CBC)
and Building Division standards and policies. Geotechnical investigations specifically
addressing liquefaction are required to be reviewed and approved prior to the issuance of
building permits. Permit issuance is also contingent on the inclusion of design mitigation
identified in the investigations. Construction plans are reviewed for compliance with
approved investigations and CBC prior to building permit issuance.
7. The property is located adjacent to coastal waters. A Construction Erosion Control Plan
was provided to implement temporary Best Management Practices (BMPs) during
construction to minimize erosion and sedimentation and to minimize pollution of runoff
and coastal waters derived by construction chemicals and materials. The project design
also addresses water quality through the inclusion of a post construction drainage
system that includes drainage and percolation features designed to retain dry weather
and minor rain event run-off on-site. Any water not retained on-site is directed to the
City's storm drain system.
8. Pursuant to Municipal Code Section 21.35.050 (Water Quality and Hydrology Plan), due
to the proximity of the development to the shoreline and the development containing more
than 75 percent of impervious surface area, a preliminary Water Quality and Hydrology
Plan (WQHP) has been provided and will undergo a final review during building permit plan
check. The WQHP was prepared for the project by Forkert Engineering & Surveying, Inc.
on October 17, 2018.The WQHP includes a polluted runoff and hydrologic site
characterization, a sizing standard for BMPs, use of an LID approach to retain the design
storm runoff volume on site, and documentation of the expected effectiveness of the
05-15-2018
Zoning Administrator Resolution No. ZA2019-009
Paqe 4 of 9
proposed BMPs. Construction plans will be reviewed for compliance with the approved
WQHP prior to building permit issuance
9. Proposed landscaping complies with Implementation Plan Section 21.30.075. A
condition of approval is included that requires drought -tolerant species. Prior to issuance
of building permits, the final landscape plans will be reviewed to verify invasive species
are not planted
10. The property is not located near designated Public Viewpoints or Coastal View Roads and
will not impact public coastal views.
Finding:
B. Conforms with the public access and public recreation policies of Chapter 3 of the
Coastal Act if the project is located between the nearest public road and the sea or
shoreline of any body of water located within the coastal zone.
Facts in Support of Finding:
1. The project site is located between the nearest public road and the sea or shoreline;
however, the project will not affect the public's ability to gain access to, use, and/or view
the coast and nearby recreational facilities.
2. Vertical access to the bay is available approximately 50 feet east of the site at the terminus
of 39th Street and the Newport Bay.
3. The closest designated public viewpoint is located on the 38th Street bridge entrance to
Newport Island, approximately 500 feet from the property. The site is also visible in the
distance from the Channel Place Park. The proposed residence is not located near Coastal
View Roads, as designated in the Coastal Land Use Plan. Due to the distance of the
proposed development from the public view points and the project's compliance with
applicable Local Coastal Program (LCP) development standards, including height and
setbacks, the project will not impact coastal views.
SECTION 4. DECISION.
NOW, THEREFORE, BE IT RESOLVED:
1. The Zoning Administrator of the City of Newport Beach hereby approves Coastal
Development Permit No. CD2018-087, subject to the conditions set forth in Exhibit "A,"
which is attached hereto and incorporated by reference.
2. This action shall become final and effective 14 days following the date this Resolution
was adopted unless within such time an appeal or call for review is filed with the
Community Development Director in accordance with the provisions of Title 21 Local
Coastal Implementation Plan, of the Newport Beach Municipal Code. Final action taken
by the City may be appealed to the Coastal Commission in compliance with Section
05-15-2018
Zoning Administrator Resolution No. ZA2019-009
Paqe 5 of 9
21.64.035 of the City's certified LCP and Title 14 California Code of Regulations,
Sections 13111 through 13120, and Section 30603 of the Coastal Act.
PASSED, APPROVED, AND ADOPTED THIS 31st DAY OF JANUARY, 2019.
Patrick J. Alford, Zoning Administrator
05-15-2018
Zoning Administrator Resolution No. ZA2019-009
Paqe 6 of 9
EXHIBIT "A"
CONDITIONS OF APPROVAL
1. The development shall be in substantial conformance with the approved site plan, floor
plans and building elevations stamped and dated with the date of this approval (except as
modified by applicable conditions of approval).
2. Prior to the issuance of a building permit, an agreement in a form approved by the City
Attorney between the property owner and the City shall be executed and recorded
waiving rights to the construction of future shoreline protection devices including the
repair and maintenance, enhancement, reinforcement, or any other activity affecting the
bulkhead, that results in any encroachment seaward of the authorized footprint of the
bulkhead or other shoreline protective device. The agreement shall be binding against
the property owners and successors and assigns.
3. Prior to the issuance of a building permit, the property owner shall submit a notarized
signed letter acknowledging all hazards present at the site, assuming the risk of injury
or damage from such hazards, unconditionally waiving any claims of damage against
the City from such hazards, and to indemnify and hold harmless City, its City Council, its
boards and commissions, officials, officers, employees, and agents from and against any
and all claims, demands, obligations, damages, actions, causes of action, suits, losses,
judgments, fines, penalties, liabilities, costs and expenses (including without limitation,
attorney's fees, disbursements and court costs) of every kind and nature whatsoever which
may arise from or in any manner relate (directly or indirectly) to City's approval of
development.
4. No demolition or construction materials, equipment debris, or waste, shall be placed or
stored in a location that would enter sensitive habitat, receiving waters, or a storm drain
or result in impacts to environmentally sensitive habitat areas, streams, the beach,
wetlands or their buffers.
5. This approval does not authorize any new or existing improvements (including
landscaping) on State tidelands, public beaches, or the public right-of-way.
6. This Coastal Development Permit does not authorize any development seaward of the
private property. Should the bulkhead require more extensive repair or replacement with
construction equipment bayward of the private property, an additional Coastal
Development Permit shall be obtained for the bulkhead from the Coastal Commission.
7. The discharge of any hazardous materials into storm sewer systems or receiving waters
shall be prohibited. Machinery and equipment shall be maintained and washed in
confined areas specifically designed to control runoff. A designated fueling and vehicle
maintenance area with appropriate berms and protection to prevent spillage shall be
provided as far away from storm drain systems or receiving waters as possible.
8. Debris from demolition shall be removed from work areas each day and removed from
the project site within 24 hours of the completion of the project. Stock piles and
05-15-2018
Zoning Administrator Resolution No. ZA2019-009
Paqe 7 of 9
construction materials shall be covered, enclosed on all sites, not stored in contact with
the soil, and located as far away as possible from drain inlets and any waterway.
9. Trash and debris shall be disposed in proper trash and recycling receptacles at the end
of each construction day. Solid waste, including excess concrete, shall be disposed in
adequate disposal facilities at a legal disposal site or recycled at a recycling facility.
10. Revisions to the approved plans may require an amendment to this Coastal
Development Permit or the processing of a new coastal development permit.
11. The project is subject to all applicable City ordinances, policies, and standards, unless
specifically waived or modified by the conditions of approval.
12. The applicant shall comply with all federal, state, and local laws. Material violation of
any of those laws in connection with the use may be cause for revocation of this Coastal
Development Permit.
13. This Coastal Development Permit may be modified or revoked by the Zoning
Administrator if determined that the proposed uses or conditions under which it is being
operated or maintained is detrimental to the public health, welfare or materially injurious
to property or improvements in the vicinity or if the property is operated or maintained
so as to constitute a public nuisance.
14. Prior to the issuance of building permits, the applicant shall submit a final construction
erosion control plan. The plan shall be subject to the review and approval by the Building
Division.
15. Prior to issuance of building permits, the final WQHP/WQMP shall be reviewed and
approved by the Building Division. Implementation shall be in compliance with the
WQHPIWQMP and any changes could require separate review and approval by the
Building Division.
16. Prior to the issuance of building permits, the applicant shall submit a final drainage and
grading plan. The plan shall be subject to the review and approval by the Building
Division.
17. Prior to issuance of a building permit, a copy of the Resolution, including conditions of
approval Exhibit "A" shall be incorporated into the Building Division and field sets of
plans.
18. Prior to issuance of a building permit, the applicant shall submit to the Planning Division
an additional copy of the approved architectural plans for inclusion in the Coastal
Development file. The plans shall be identical to those approved by all City departments
for building permit issuance. The approved copy shall include architectural sheets only
and shall be reduced in size to 11 inches by 17 inches. The plans shall accurately depict
the elements approved by this Coastal Development Permit.
05-15-2018
Zoning Administrator Resolution No. ZA2019-009
Paqe 8 of 9
19. Prior to the issuance of building permits, the applicant shall submit a final landscape and
irrigation plan. These plans shall incorporate drought tolerant plantings, non-invasive
plant species and water efficient irrigation design. The plans shall be approved by the
Planning Division.
20. All landscape materials and irrigation systems shall be maintained in accordance with
the approved landscape plan. All landscaped areas shall be maintained in a healthy and
growing condition and shall receive regular pruning, fertilizing, mowing, and trimming.
All landscaped areas shall be kept free of weeds and debris. All irrigation systems shall
be kept operable, including adjustments, replacements, repairs, and cleaning as part of
regular maintenance.
21. Prior to the issuance of building permit, the applicant shall pay any unpaid administrative
costs associated with the processing of this application to the Planning Division.
22. Should the property be sold or otherwise come under different ownership, any future
owners or assignees shall be notified of the conditions of this approval by the current
property owner or agent.
23. This Coastal Development Permit No. CD2018-087 shall expire unless exercised within 24
months from the date of approval as specified in Section 21.54.060 (Time Limits and
Extensions) of the Newport Beach Municipal Code, unless an extension is otherwise
granted.
24. The applicant is responsible for compliance with the Migratory Bird Treaty Act (MBTA). In
compliance with the MBTA, grading, brush removal, building demolition, tree trimming, and
similar construction activities shall occur between August 16 and January 31, outside of the
peak nesting period. If such activities must occur inside the peak nesting season from
February 1 to August 15, compliance with the following is required to prevent the taking of
Native Birds pursuant to MBTA:
A. The construction area shall be inspected for active nests. If birds are observed flying
from a nest or sitting on a nest, it can be assumed that the nest is active. Construction
activity within 300 feet of an active nest shall be delayed until the nest is no longer
active. Continue to observe the nest until the chicks have left the nest and activity is
no longer observed. When the nest is no longer active, construction activity can
continue in the nest area.
B. It is a violation of state and federal law to kill or harm a native bird. To ensure
compliance, consider hiring a biologist to assist with the survey for nesting birds, and
to determine when it is safe to commence construction activities. If an active nest is
found, one or two short follow-up surveys will be necessary to check on the nest and
determine when the nest is no longer active.
25. To the fullest extent permitted by law, applicant shall indemnify, defend and hold harmless
City, its City Council, its boards and commissions, officials, officers, employees, and agents
from and against any and all claims, demands, obligations, damages, actions, causes of
action, suits, losses, judgments, fines, penalties, liabilities, costs and expenses (including
05-15-2018
Zoning Administrator Resolution No. ZA2019-009
Paqe 9 of 9
without limitation, attorney's fees, disbursements and court costs) of every kind and nature
whatsoever which may arise from or in any manner relate (directly or indirectly) to City's
approval of 3902 Channel Place Residence including, but not limited to, Coastal Development
Permit No. CD2018-087 (PA2018-210). This indemnification shall include, but not be
limited to, damages awarded against the City, if any, costs of suit, attorneys' fees, and
other expenses incurred in connection with such claim, action, causes of action, suit or
proceeding whether incurred by applicant, City, and/or the parties initiating or bringing such
proceeding. The applicant shall indemnify the City for all of City's costs, attorneys' fees,
and damages, which City incurs in enforcing the indemnification provisions set forth in this
condition. The applicant shall pay to the City upon demand any amount owed to the City
pursuant to the indemnification requirements prescribed in this condition.
05-15-2018