Loading...
HomeMy WebLinkAboutZA2019-014 - APPROVING COASTAL DEVELOPMENT PERMIT NO. CD2018-091 TO DEMOLISH AN EXISTING SINGLE-FAMILY RESIDENCE AND CONSTRUCT A NEW TWO-STORY, SINGLE-FAMILY RESIDENCE AND ATTACHED TWO-CAR GARAGE AT 2168 EAST OCEAN FRONTRESOLUTION NO. ZA2019-014 A RESOLUTION OF THE ZONING ADMINISTRATOR OF THE CITY OF NEWPORT BEACH APPROVING COASTAL DEVELOPMENT PERMIT NO. CD2018-091 TO DEMOLISH AN EXISTING SINGLE-FAMILY RESIDENCE AND CONSTRUCT A NEW TWO-STORY, SINGLE-FAMILY RESIDENCE AND ATTACHED TWO -CAR GARAGE AT 2168 EAST OCEAN FRONT (PA2018-219) THE ZONING ADMINISTRATOR OF THE CITY OF NEWPORT BEACH HEREBY FINDS AS FOLLOWS: SECTION 1. STATEMENT OF FACTS. 1. An application was filed by Graham Architecture ("Applicant'), on behalf of Helle Skov McLain ("Owner"), with respect to property located at 2168 East Ocean Front, requesting approval of a coastal development permit. 2. The property is legally described as Lot 18, Block E, of Tract 518 in Newport Beach. 3. The applicant proposed a coastal development permit for the demolition of an existing single-family dwelling and the construction of a new, 3,735 -square -foot, two-story single- family dwelling with a 447 -square -foot, two -car garage. The development also includes hardscape, drainage, accessory structures, and landscaping. The proposed development complies with all applicable development standards including height, setbacks and floor area limits. No deviations are requested. 4. The subject property is designated RS -D (Single -Unit Residential Detached) by the General Plan Land Use Element and is located within the R-1 (Single -Unit Residential) Zoning District. 5. The subject property is located within the coastal zone. The Coastal Land Use Plan category is RSD -C (Single -Unit Residential Detached — 10.0-19.9 DU/AC) and the property is located within the R-1 (Single -Unit Residential) Coastal Zone District. 6. A public hearing was held on February 14, 2019, in the Corona del Mar Conference Room (Bay E -1st Floor) at 100 Civic Center Drive, Newport Beach. A notice of time, place and purpose of the hearing was given in accordance with the Newport Beach Municipal Code. Evidence, both written and oral, was presented to and considered by the Zoning Administrator at this hearing. SECTION 2. CALIFORNIA ENVIRONMENTAL QUALITY ACT DETERMINATION. 1. This project is categorically exempt pursuant to Title 14 of the California Code of Regulations Section 15303, Article 19 of Chapter 3, Guidelines for Implementation of the California Environmental Quality Act (CEQA) under Class 3 (New Construction or Zoning Administrator Resolution No. ZA2019-014 Paqe 2 of 9 Conversion of Small Structures), because it has no potential to have a significant effect on the environment. 2. Class 3 exempts the construction and location of limited numbers of new, small facilities or structures including one residential duplex in a residential zone. The proposed project consists of the demolition of a single-family residence and the construction of a new two- story, 3,735 -square -foot, single-family residence with an attached 447 -square -foot two - car garage in the R-1 Zoning District. SECTION 3. REQUIRED FINDINGS. In accordance with Section 21.52.015 (Coastal Development Permits, Findings and Decision) of the Newport Beach Municipal Code (NBMC), the following findings and facts in support of such findings are set forth: Finding: A. Conforms to all applicable sections of the certified Local Coastal Program. Facts in Support of Finding: The proposed development complies with applicable residential development standards including, but not limited to, floor area limitation, setbacks, height, and parking. a. The maximum floor area limitation is 6,108 square feet and the proposed gross floor area is 4,182 square feet. b. The proposed development will provide the minimum required setbacks, which are ten feet along the front property line abutting the beach, four feet along each side property line, and zero feet along the rear property line abutting the alley. The highest flat roof is no more than 24 feet, measured from the established grade level of 14.14 feet North American Vertical Datum of 1988 (NAVD88) and the highest roof ridge is no more than 29 feet, measured from the established grade, which complies with the maximum height limitation. d. The project includes enclosed garage parking for two vehicles, which complies with the minimum parking requirement for single-family residences with less than 4,000 square feet of livable floor area. 2. The neighborhood is predominantly developed with two- and three-story single-family residences. The proposed design, bulk, and scale of the development will be consistent with the existing neighborhood pattern of development and expected future development. 3. Pursuant to NBMC Section 21.30.030(C)(3)(i)(iv), the property owner will be required to enter into an agreement with the City waiving any potential right to protection to address Zoning Administrator Resolution No. ZA2019-014 Paqe 3 of 9 situations in the future in which the development is threatened with damage or destruction by coastal hazards (e.g., waves, erosion, and sea level rise). The property owner will also be required to acknowledge any hazards present at the site and unconditionally waive any claim to damage or liability against the decision authority, consistent with NBMC Section 21.30.015(D)(3)(c). Both requirements are included as conditions of approval that will need to be satisfied prior to the issuance of building permits for construction. 4. The finished floor elevation of the first floor of the proposed structure is 14.0 feet (NAVD88), which complies with the minimum 9.0 -foot (NAVD88) elevation standard for new structures. A project -specific Coastal Hazards Report and Sea Level Rise Analysis was prepared by GeoSoils, Inc., dated June 26, 2018. The report concludes that the highest high tide elevation (currently 7.5 feet NAVD88) will not exceed the proposed finished floor elevation of 14.0 feet NAVD88 using the low-rise aversion projected sea level rise (2.9 -foot increase) over the 75 -year design life of the structure based on estimates for sea level rise provided by the State of California Sea -Level Rise Guidance 2018. 5. Pursuant to NBMC Section 21.35.050 (Water Quality and Hydrology Plan), because of the project site's proximity to coastal waters, a Water Quality and Hydrology Plan (WQHP) was prepared by Toal Engineering, Inc. dated December 13, 2018. The WQHP includes a polluted runoff and hydrologic site characterization, a sizing standard for Best Management Practices (BMPs), use of a low -impact development design approach to retain the storm runoff volume on site, and documentation of the expected effectiveness of the proposed BMPs. Construction plans will be reviewed for compliance with the approved WQHP prior to building permit issuance. 6. The property is located in an area known for the potential of seismic activity and liquefaction. All projects are required to comply with the California Building Code (CBC) and Building Division standards and policies. Geotechnical investigations specifically addressing liquefaction are required to be reviewed and approved prior to the issuance of building permits. Permit issuance is also contingent on the inclusion of design mitigation identified in the investigations. Construction plans are reviewed for compliance with approved investigations and the CBC prior to building permit issuance. 7. A post -construction drainage system will be installed that includes drainage and percolation features designed to retain dry weather and minor rain runoff on-site to ensure the project does not impact water quality. Any water not retained on-site is directed to the City's storm drain system. 8. The project design addresses water quality with a construction erosion control plan that outlines temporary BMPs to be implemented during construction to minimize erosion and sedimentation, and to minimize pollution of runoff derived by construction chemicals and materials. No water quality impacts to coastal waters are anticipated based upon the location and elevation of the property. . 9. New landscaping will be verified for compliance with NBMC Section 21.30.075. A condition of approval is included that requires drought -tolerant, and prohibits invasive species. Prior Zoning Administrator Resolution No. ZA2019-014 Paqe 4 of 9 to issuance of the building permits, the final landscape plans will be reviewed to verify invasive species are not planted. 10. The property is not located near coastal view roads and is located near West Jetty View Park, a public viewpoint. Views from this viewpoint are generally toward the Newport Harbor entrance and ocean; therefore, the project will not negatively impact public coastal views. Finding: B. Conforms with the public access and public recreation policies of Chapter 3 of the Coastal Act if the project is located between the nearest public road and the sea or shoreline of any body of water located within the coastal zone. Facts in Support of Finding: The project site is located between the nearest public road and the sea or shoreline; however, the project will not affect the public's ability to gain access to, use, and/or view the coast and nearby recreational facilities. The existing residential development neither provides nor inhibits public coastal access. Implementation Plan Section 21.30A.040 (Determination of Public Access/Recreation Impacts) requires that the provision of public access bear a reasonable relationship between the requirement and the project's impact and be proportional to the impact. In this case, the project replaces an existing single-family residence with a new single-family residence. Therefore, the project does not involve a change in land use, density or intensity that will result in increased demand on public access and recreation opportunities. 2. The project is designed and sited so as not to block or impede existing public access opportunities and development will occur within the confines of private property. Existing coastal access conditions will not be affected. Coastal access is currently provided and will continue to be provided by street ends throughout the Balboa Peninsula with access to the beach and water and at West Jetty View Park, approximately 50 feet east of the subject property. 3. The project site is not located adjacent to a coastal view road. However, it is located approximately 50 feet west of West Jetty View Park, a public viewpoint as identified in the Coastal Land Use Plan. The project site is also located adjacent to a public beach. The views from West Jetty View Park are primarily toward the Newport Harbor entrance and the ocean and are not toward the project site. The project site may be located within the viewshed of distant public viewing areas. However, the project will replace an existing single-family residence with a new single-family residence that complies with all applicable Local Coastal Program (LCP) development standards and maintains a building envelope consistent with the existing and anticipated neighborhood pattern of development. Therefore, the project does not have the potential to degrade the visual quality of the Coastal Zone or result in significant adverse impacts to public views. Zoning Administrator Resolution No. ZA2019-014 Paqe 5 of 9 SECTION 4. DECISION. NOW, THEREFORE, BE IT RESOLVED: 1. The Zoning Administrator of the City of Newport Beach hereby approves Coastal Development Permit No. CD2018-091, subject to the conditions set forth in Exhibit "A," which is attached hereto and incorporated by reference. 2. This action shall become final and effective 14 days following the date this Resolution was adopted unless within such time an appeal or call for review is filed with the Community Development Director in accordance with the provisions of Title 21 Local Coastal Implementation Plan, of the Newport Beach Municipal Code. Final action taken by the City may be appealed to the Coastal Commission in compliance with Section 21.64.035 of the City's certified LCP and Title 14 California Code of Regulations, Sections 13111 through 13120, and Section 30603 of the Coastal Act. PASSED, APPROVED, AND ADOPTED THIS 14TH DAY OF FEBRUARY, 2019. Patrick J. Alford, Zoning Administrator Zoning Administrator Resolution No. ZA2019-014 Paqe 6 of 9 EXHIBIT "A" CONDITIONS OF APPROVAL 1. The development shall be in substantial conformance with the approved site plan, floor plans and building elevations, stamped and dated with the date of this approval (except as modified by applicable conditions of approval). 2. Revisions to the approved plans may require an amendment to this Coastal Development Permit or the processing of a new coastal development permit. 3. Coastal Development Permit No. CD2018-091 shall expire unless exercised within 24 months from the date of approval as specified in Section 21.54.060 (Time Limits and Extensions) of the Newport Beach Municipal Code, unless an extension is otherwise granted 4. Prior to the issuance of a building permit, an agreement in a form approved by the City Attorney between the property owner and the City shall be executed and recorded waiving rights to the construction of future shoreline protection devices including the repair and maintenance, enhancement, reinforcement, or any other activity affecting the bulkhead, that results in any encroachment seaward of the authorized footprint of the bulkhead or other shoreline protective device. The agreement shall be binding against the property owners and successors and assigns. 5. Prior to the issuance of a building permit, the property owner shall submit a notarized signed letter acknowledging all hazards present at the site, assuming the risk of injury or damage from such hazards, unconditionally waiving any claims of damage against the City from such hazards, and to indemnify and hold harmless City, its City Council, its boards and commissions, officials, officers, employees, and agents from and against any and all claims, demands, obligations, damages, actions, causes of action, suits, losses, judgments, fines, penalties, liabilities, costs and expenses (including without limitation, attorney's fees, disbursements and court costs) of every kind and nature whatsoeverwhich may arise from or in any manner relate (directly or indirectly) to City's approval of development. 6. The project is subject to all applicable City ordinances, policies, and standards, unless specifically waived or modified by the conditions of approval. 7. The applicant shall comply with all federal, state, and local laws. Material violation of any of those laws in connection with the use may be cause for revocation of this coastal development permit. 8. This Coastal Development Permit may be modified or revoked by the Zoning Administrator if determined that the proposed uses or conditions under which it is being operated or maintained is detrimental to the public health, welfare or materially injurious to property or improvements in the vicinity or if the property is operated or maintained so as to constitute a public nuisance. Zoning Administrator Resolution No. ZA2019-014 Paqe 7 of 9 9. This approval does not authorize any new or existing improvements (including landscaping) on State tidelands, public beaches, or the public right-of-way. 10. This Coastal Development Permit does not authorize any development seaward of the private property. 11. Best Management Practices and Good Housekeeping Practices shall be implemented prior to and throughout the duration of construction activity as designated in the Construction Pollution Prevention Plan. 12. Prior to issuance of the building permits, a copy of the Resolution, including conditions of approval Exhibit "A" shall be incorporated into the Building Division and field sets of plans. 13. Prior to issuance of building permits, the applicant shall submit to the Planning Division an additional copy of the approved architectural plans for inclusion in the coastal development permit file. The plans shall be identical to those approved by all City departments for building permit issuance. The approved copy shall include architectural sheets only and shall be reduced in size to 11 inches by 17 inches. The plans shall accurately depict the elements approved by this coastal development permit. 14. Prior to issuance of building permits, the applicant shall submit a final construction erosion control plan. The plan shall be subject to review and approval by the Building Division. 15. Prior to issuance of building permits, the applicant shall submit a final landscape and irrigation plan. These plans shall incorporate drought tolerant plantings, non-invasive plant species and water efficient irrigation design. The plans shall be approved by the Planning Division. 16. All landscape materials and irrigation systems shall be maintained in accordance with the approved landscape plan. All landscaped areas shall be maintained in a healthy and growing condition and shall receive regular pruning, fertilizing, mowing, and trimming. All landscaped areas shall be kept free of weeds and debris. All irrigation systems shall be kept operable, including adjustments, replacements, repairs, and cleaning as part of regular maintenance. 17. Prior to issuance of building permits, the applicant shall pay any unpaid administrative costs associated with the processing of this application to the Planning Division. 18. No demolition or construction materials, equipment debris, or waste, shall be placed or stored in a location that would enter sensitive habitat, receiving waters, or a storm drain or result in impacts to environmentally sensitive habitat areas, streams, wetland or their buffers. Zoning Administrator Resolution No. ZA2019-014 Paqe 8 of 9 19. The discharge of any hazardous materials into storm sewer systems or receiving waters shall be prohibited. Machinery and equipment shall be maintained and washed in confined areas specifically designed to control runoff. A designated fueling and vehicle maintenance area with appropriate berms and protection to prevent spillage shall be provided as far away from storm drain systems or receiving waters as possible. 20. Debris from demolition shall be removed from work areas each day and removed from the project site within 24 hours of the completion of the project. Stockpiles and construction materials shall be covered, enclosed on all sites, not stored in contact with the soil, and located as far away as possible from drain inlets and any waterway. 21. Trash and debris shall be disposed in proper trash and recycling receptacles at the end of each construction day. Solid waste, including excess concrete, shall be disposed in adequate disposal facilities at a legal disposal site or recycled at a recycling facility. 22. Should the property be sold or otherwise come under different ownership, any future owners or assignees shall be notified of the conditions of this approval by the current property owner or agent. 23. The applicant is responsible for compliance with the Migratory Bird Treaty Act (MBTA). In compliance with the MBTA, grading, brush removal, building demolition, tree trimming, and similar construction activities shall occur between August 16 and January 31, outside of the peak nesting period. If such activities must occur inside the peak nesting season from February 1 to August 15, compliance with the following is required to prevent the taking of native birds pursuant to MBTA: A. The construction area shall be inspected for active nests. If birds are observed flying from a nest or sitting on a nest, it can be assumed that the nest is active. Construction activity within 300 feet of an active nest shall be delayed until the nest is no longer active. Continue to observe the nest until the chicks have left the nest and activity is no longer observed. When the nest is no longer active, construction activity can continue in the nest area. B. It is a violation of state and federal law to kill or harm a native bird. To ensure compliance, consider hiring a biologist to assist with the survey for nesting birds, and to determine when it is safe to commence construction activities. If an active nest is found, one or two short follow-up surveys will be necessary to check on the nest and determine when the nest is no longer active. 24. To the fullest extent permitted by law, applicant shall indemnify, defend and hold harmless City, its City Council, its boards and commissions, officials, officers, employees, and agents from and against any and all claims, demands, obligations, damages, actions, causes of action, suits, losses, judgments, fines, penalties, liabilities, costs and expenses (including without limitation, attorney's fees, disbursements and court costs) of every kind and nature whatsoever which may arise from or in any manner relate (directly or indirectly) to City's approval of McLain Residence including, but not limited to, Coastal Development Permit Zoning Administrator Resolution No. ZA2019-014 Paqe 9 of 9 No. CD2018-091 (PA2018-219). This indemnification shall include, but not be limited to, damages awarded against the City, if any, costs of suit, attorneys' fees, and other expenses incurred in connection with such claim, action, causes of action, suit or proceeding whether incurred by applicant, City, and/orthe parties initiating or bringing such proceeding. The applicant shall indemnify the City for all of City's costs, attorneys' fees, and damages, which City incurs in enforcing the indemnification provisions set forth in this condition. The applicant shall pay to the City upon demand any amount owed to the City pursuant to the indemnification requirements prescribed in this condition.