Loading...
HomeMy WebLinkAboutZA2019-017 - APPROVING COASTAL DEVELOPMENT PERMIT NO. CD2018-108 FOR A NEW SINGLE-FAMILY RESIDENCE LOCATED AT 511 and 511 ½ 36TH STREETRESOLUTION NO. ZA2019-017 A RESOLUTION OF THE ZONING ADMINISTRATOR OF THE CITY OF NEWPORT BEACH APPROVING COASTAL DEVELOPMENT PERMIT NO. CD2018-108 FOR A NEW SINGLE- FAMILY RESIDENCE LOCATED AT 511 and 511 1/2 36TH STREET (PA2018-253) THE ZONING ADMINISTRATOR OF THE CITY OF NEWPORT BEACH HEREBY FINDS AS FOLLOWS: SECTION 1. STATEMENT OF FACTS. 1. An application was filed by Brandon Architects, Inc., with respect to property located at 511 and 511 '/2 36th Street, and legally described as Lot 6 and the southwesterly 15 feet of Lot 7 of Block 536, requesting approval of a Coastal Development Permit. 2. The applicant proposes the demolition of an existing duplex and the construction of a new 3,639 -square -foot single-family residence with a 690 -square -foot attached garage. The project includes reinforcing and raising the height of the existing bulkhead. No work will be conducted bayward of the existing property. The proposed development also includes additional appurtenances such as walls, fences, patios, hardscape, drainage devices, and landscaping. 3. The subject property is located within the Two -Unit Residential (R-2) Zoning District and the General Plan Land Use Element category is Two -Unit Residential Detached (RT). 4. The subject property is located within the coastal zone. The Coastal Land Use Plan category is Two -Unit Residential (RT -D) and the Coastal Zoning District is Two -Unit Residential (R-2). 5. A public hearing was held on February 14, 2019, in the Corona del Mar Conference Room (Bay E-1 st Floor) at 100 Civic Center Drive, Newport Beach. A notice of time, place, and purpose of the hearing was given in accordance with the Newport Beach Municipal Code. Evidence, both written and oral, was presented to, and considered by, the Zoning Administrator at this hearing. SECTION 2. CALIFORNIA ENVIRONMENTAL QUALITY ACT DETERMINATION. 1. This project is categorically exempt pursuant to Title 14 of the California Code of Regulations (Section 15315, Article 19 of Chapter 3, Guidelines for Implementation of the California Environmental Quality Act (CEQA) under Class 3 (New Construction or Conversion of Small Structures), because it has no potential to have a significant effect on the environment. 2. Class 3 exempts the construction of limited numbers of new, small structures, including one single-family residence. The proposed project is a new single-family residence located in the R-2 Coastal Zoning District. Zoning Administrator Resolution No. ZA2019-017 Page2of8 SECTION 3. REQUIRED FINDINGS. In accordance with Section 21.52.015 (Findings and Decision) of the Newport Beach Municipal Code, the following findings and facts in support of such findings are set forth: Findinq: A. Conforms to all applicable sections of the certified Local Coastal Program. Facts in Su000rt of Finding: 1. The proposed development complies with applicable residential development standards including, but not limited to, floor area limitation, setbacks, height, and parking. a. The maximum floor area limitation is 4,808 square feet and the proposed floor area is 4,329 square feet. b. The proposed development complies with the required setbacks, which are 5 feet along the property line abutting 36th Street, 30 feet abutting the Rialto, and 4 feet along each side property line. C. The highest guardrail/parapet is 24 feet from established grade and the highest ridge is 29 feet from established grade. The proposed development complies with all height requirements. d. The proposed development provides a three -car garage, meeting the minimum garage requirement for a single-family residence exceeding 4,000 square feet of habitable floor area. e. The proposed development exceeds the minimum 9.0 feet (NAVD88) top of slab elevation requirement for interior living areas of new structures. 2. The neighborhood is predominantly developed with two- and three-story single-family residences and duplexes. The proposed design, bulk, and scale of the development is consistent with the existing neighborhood pattern of development and expected future development. 3. The project site is protected by an existing cast -in-place concrete bulkhead. The applicant is proposing to cast new concrete coping and construct a new concrete stem wall with the top of the bulkhead elevation at 10.05 feet (NAVD88). A Bulkhead Conditions Report was prepared by PMA Consulting, Inc. on November 12, 2018, and concluded that the existing concrete bulkhead was in good condition. The existing bulkhead is proposed to be reinforced to support a concrete deck. Specifically, the applicant is proposing to cast a new concrete deadman and install new tiebacks. The Bulkhead Conditions Report concluded that the reinforced bulkhead will protect the proposed development. 01-03-17 Zoning Administrator Resolution No. ZA2019-017 Paqe 3 of 8 4. The finish floor elevation of the proposed dwelling is 9.00 feet NAVD 88, which complies with the minimum 9.0 feet NAVD88 elevation standard. A new concrete stem wall is proposed to be constructed around the perimeter of the dwelling that would protect against flooding up to an elevation of 10.05 feet (NAVD88). Flood shields (sandbags and other methods) can be deployed across the openings to prevent flooding to the structure. A Coastal Hazard Report prepared by PMA Consulting, Inc. on November 12, 2018, concludes that the highest high tide elevation (currently 7.20 feet NAVD88) will not exceed the proposed exterior curb of 10.05 feet NAVD88 using the low-risk aversion projected sea level rise (2.85 -foot increase) over the 75 -year design life of the structure based on estimates for sea level rise provided by the State of California Sea -Level Rise Guidance 2018. 5. Pursuant to Municipal Code Section 21.35.050, due to the proximity of the development to the shoreline and the development containing more than 2,500 square feet of impervious surface area, a Water Quality Management Plan (WQMP) is required. A WQMP prepared by Forkert Engineering & Surveying, Inc., dated December 20, 2018, has been submitted and will be reviewed by the City's Engineer Geologist. The WQMP includes a polluted runoff and hydrologic site characterization, a sizing standard for BMPs, use of an LID approach to retain the design storm runoff volume on site, and documentation of the expected effectiveness of the proposed BMPs. 4. The property is located in an area known for the potential of seismic activity and liquefaction. All projects are required to comply with the California Building Code (CBC) and Building Division standards and policies. Geotechnical investigations specifically addressing liquefaction are required to be reviewed and approved prior to the issuance of building permits. Permit issuance is also contingent on the inclusion of design mitigation identified in the investigations. Construction plans are reviewed for compliance with approved investigations and CBC prior to building permit issuance. 5. The project site is not located adjacent to a coastal view road, public viewpoint, public park or beach, or public accessway, as identified in the Coastal Land Use Plan. Furthermore, an investigation of the project site and surrounding area did not identify any other public view opportunities. The project site may be located within the viewshed of distant public viewing areas. The project will replace an existing duplex with a new single-family home that complies with all applicable Local Coastal Program (LCP) development standards and maintains a building envelope consistent with the existing neighborhood pattern of development. Therefore, the project does not have the potential to degrade the visual quality of the Coastal Zone or result in significant adverse impacts to public views. Finding: B. Conforms with the public access and public recreation policies of Chapter 3 of the Coastal Act if the project is located between the nearest public road and the sea or shoreline of any body of water located within the coastal zone. 01-03-17 Zoning Administrator Resolution No. ZA2019-017 Page4of8 Fact in Support of Finding: 1. The project site is located in West Newport between the nearest public road and the sea. Implementation Plan Section 21.30A.040 requires that the provision of public access bear a reasonable relationship between the requirement and the project's impact and be proportional to the impact. In this case, the project replaces an existing duplex with a new single-family residence. Therefore, the project does not involve a change in land use, density or intensity that will result in increased demand on public access and recreation opportunities. Furthermore, the project is designed and sited so as not to block or impede existing public access opportunities. 2. Vertical access to the canal is available near the site on Finley Avenue and Short Street. Lateral access to the canal is available near the site on 36th Street. SECTION 4. DECISION. NOW, THEREFORE, BE IT RESOLVED: 1. The Zoning Administrator of the City of Newport Beach hereby approves Coastal Development Permit No. CD2018-108, subject to the conditions set forth in Exhibit "A," which is attached hereto and incorporated by reference. 2. This action shall become final and effective 14 days following the date this Resolution was adopted unless within such time an appeal or call for review is filed with the Community Development Director in accordance with the provisions of Title 21 Local Coastal Implementation Plan, of the Newport Beach Municipal Code. Final action taken by the City may be appealed to the Coastal Commission in compliance with Section 21.64.035 of the City's certified LCP and Title 14 California Code of Regulations, Sections 13111 through 13120, and Section 30603 of the Coastal Act. PASSED, APPROVED, AND ADOPTED THIS 14TH DAY OF FEBRUARY, 2019. Patrick J. Alford, Zoning Administrator 01-03-17 Zoning Administrator Resolution No. ZA2019-017 Paqe 5 of 8 EXHIBIT "A" CONDITIONS OF APPROVAL 1. The development shall be in substantial conformance with the approved site plan, floor plans, and building elevations stamped and dated with the date of this approval (except as modified by applicable conditions of approval). 2. Revisions to the approved plans may require an amendment to this Coastal Development Permit or the processing of a new Coastal Development Permit. 3. Coastal Development Permit No. CD2018-108 shall expire unless exercised within 24 months from the date of approval as specified in Section 21.54.060 (Time Limits and Extensions) of the Newport Beach Municipal Code, unless an extension is otherwise granted. 4. Prior to the issuance of a building permit, an agreement in a form approved by the City Attorney between the property owner and the City shall be executed and recorded waiving rights to the construction of future shoreline protection devices including the repair and maintenance, enhancement, reinforcement, or any other activity affecting the bulkhead, that results in any encroachment seaward of the authorized footprint of the bulkhead or other shoreline protective device. The agreement shall be binding against the property owners and successors and assigns. 5. Prior to the issuance of a building permit, the property owner shall submit a notarized signed letter acknowledging all hazards present at the site, assuming the risk of injury or damage from such hazards, unconditionally waiving any claims of damage against the City from such hazards, and to indemnify and hold harmless City, its City Council, its boards and commissions, officials, officers, employees, and agents from and against any and all claims, demands, obligations, damages, actions, causes of action, suits, losses, judgments, fines, penalties, liabilities, costs and expenses (including without limitation, attorney's fees, disbursements and court costs) of every kind and nature whatsoeverwhich may arise from or in any manner relate (directly or indirectly) to City's approval of development. 6. No demolition or construction materials, equipment debris, or waste, shall be placed or stored in a location that would enter sensitive habitat, receiving waters, or a storm drain or result in impacts to environmentally sensitive habitat areas, streams, the beach, wetlands or their buffers. 7. This approval does not authorize any new or existing improvements (including landscaping) on State tidelands, public beaches, or the public right-of-way. 8. This Coastal Development Permit does not authorize any development seaward of the private property. Should the bulkhead require more extensive repair or replacement with construction equipment bayward of the private property, an additional Coastal Development Permit shall be obtained for the bulkhead from the Coastal Commission. 01-03-17 Zoning Administrator Resolution No. ZA2019-017 Paqe 6 of 8 9. The discharge of any hazardous materials into storm sewer systems or receiving waters shall be prohibited. Machinery and equipment shall be maintained and washed in confined areas specifically designed to control runoff. A designated fueling and vehicle maintenance area with appropriate berms and protection to prevent spillage shall be provided as far away from storm drain systems or receiving waters as possible. 10. Debris from demolition shall be removed from work areas each day and removed from the project site within 24 hours of the completion of the project. Stock -piles and construction materials shall be covered, enclosed on all sites, not stored in contact with the soil, and located as far away as possible from drain inlets and any waterway. 11. Trash and debris shall be disposed in proper trash and recycling receptacles at the end of each construction day. Solid waste, including excess concrete, shall be disposed in adequate disposal facilities at a legal disposal site or recycled at a recycling facility. 12. Prior to issuance of building permits, the final WQHP/WQMP shall be reviewed and approved by the Building Division. Implementation shall be in compliance with the WQHPIWQMP and any changes could require separate review and approval by the Building Division. 13. Prior to the issuance of building permits, the applicant shall submit a final drainage and grading plan. The plan shall be subject to the review and approval by the Building Division. 14. Prior to the issuance of building permits, the applicant shall submit a final landscape and irrigation plan. These plans shall incorporate drought tolerant plantings, non-invasive plant species and water efficient irrigation design. The plans shall be approved by the Planning Division. 15. All landscape materials and irrigation systems shall be maintained in accordance with the approved landscape plan. All landscaped areas shall be maintained in a healthy and growing condition and shall receive regular pruning, fertilizing, mowing, and trimming. All landscaped areas shall be kept free of weeds and debris. All irrigation systems shall be kept operable, including adjustments, replacements, repairs, and cleaning as part of regular maintenance. 16. The applicant is responsible for compliance with the Migratory Bird Treaty Act (MBTA). In compliance with the MBTA, grading, brush removal, building demolition, tree trimming, and similar construction activities shall occur between August 16 and January 31, outside of the peak nesting period. If such activities must occur inside the peak nesting season from February 1 to August 15, compliance with the following is required to prevent the taking of Native Birds pursuant to MBTA: A. The construction area shall be inspected for active nests. If birds are observed flying from a nest or sitting on a nest, it can be assumed that the nest is active. Construction activity within 300 feet of an active nest shall be delayed until the nest is no longer active. Continue to observe the nest until the chicks have left the nest and activity is no 01-03-17 Zoning Administrator Resolution No. ZA2019-017 Paqe 7 of 8 longer observed. When the nest is no longer active, construction activity can continue in the nest area. B. It is a violation of state and federal law to kill or harm a native bird. To ensure compliance, consider hiring a biologist to assist with the survey for nesting birds, and to determine when it is safe to commence construction activities. If an active nest is found, one or two short follow-up surveys will be necessary to check on the nest and determine when the nest is no longer active. 17. The project is subject to all applicable City ordinances, policies, and standards, unless specifically waived or modified by the conditions of approval. 18. The applicant shall comply with all federal, state, and local laws. Material violation of any of those laws in connection with the use may be cause for revocation of this Coastal Development Permit. 19. This Coastal Development Permit may be modified or revoked by the Zoning Administrator if determined that the proposed uses or conditions under which it is being operated or maintained is detrimental to the public health, welfare or materially injurious to property or improvements in the vicinity or if the property is operated or maintained so as to constitute a public nuisance. 20. Prior to issuance of the building permits, a copy of the Resolution, including conditions of approval Exhibit "A" shall be incorporated into the Building Division and field sets of plans. 21. Prior to issuance of building permits, the applicant shall submit to the Planning Division an additional copy of the approved architectural plans for inclusion in the Coastal Development file. The plans shall be identical to those approved by all City departments for building permit issuance. The approved copy shall include architectural sheets only and shall be reduced in size to 11 inches by 17 inches. The plans shall accurately depict the elements approved by this Coastal Development Permit. 22. Prior to the issuance of building permits, the applicant shall submit a final construction erosion control plan. The plan shall be subject to the review and approval by the Building Division. 23. Prior to the issuance of building permit, the applicant shall pay any unpaid administrative costs associated with the processing of this application to the Planning Division. 24. Should the property be sold or otherwise come under different ownership, any future owners or assignees shall be notified of the conditions of this approval by either the current business owner, property owner, or the leasing agent. 25. This approval shall expire and become void unless exercised within 24 months from the actual date of review authority approval, except where an extension of time is approved in compliance with the provisions of Title 21 Planning and Zoning of the Newport Beach 01-03-17 Zoning Administrator Resolution No. ZA2019-017 Paqe 8 of 8 Municipal Code. 26. To the fullest extent permitted by law, applicant shall indemnify, defend and hold harmless City, its City Council, its boards and commissions, officials, officers, employees, and agents from and against any and all claims, demands, obligations, damages, actions, causes of action, suits, losses, judgments, fines, penalties, liabilities, costs and expenses (including without limitation, attorney's fees, disbursements and court costs) of every kind and nature whatsoever which may arise from or in any manner relate (directly or indirectly) to City's approval of Simpson Residence Coastal Development Permit including, but not limited to, Coastal Development Permit No. CD2018-108 (PA2018-253). This indemnification shall include, but not be limited to, damages awarded against the City, if any, costs of suit, attomeys' fees, and other expenses incurred in connection with such claim, action, causes of action, suit or proceeding whether incurred by applicant, City, and/or the parties initiating or bringing such proceeding. The applicant shall indemnify the City for all of City's costs, attorneys' fees, and damages which City incurs in enforcing the indemnification provisions set forth in this condition. The applicant shall pay to the City upon demand any amount owed to the City pursuant to the indemnification requirements prescribed in this condition. 01-03-17