Loading...
HomeMy WebLinkAboutX2018-3034 - MiscXZOI$-303N 1307 i3; so n Ave CITY OF NEWPORT BEACH COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION 100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658-8915 www.newaortbeachca.Qov 1 (949) 644-3200 Structural Observation Report Project Address: The Bluffs - Landlord Work Report Date: CNB Inspector Name: CNB Permit#: 1302 Bison Avenue April 3, 2019 Building Owner Name: Owner's Mailing Address (if different from site); Owner's Telephone #: CNB Plan Check #: Full Name of Structural Observer (SO): SO E-mail Address: SO Telephone #: SO License / Reg. #: Samuel D. Grimm (Grimm +Chen Structural Engineering Inc. samg@gc-se.com (949)250-3150 BE #4730 PLEASE INDICATE STRUCTURAL ELEMENTS AND CONNECTIONS OBSERVED (check applicable boxes) FOUNDATIONS SHEAR WALLS FRAMES DIAPHRAGMS INDICATE LOCATION(S) DATE (Floor/Roof) OBSERVED OBSERVED ® Conventional ❑ Concrete M Steel ❑ Concrete Patio structure foundations per Sheet Footings & Slab S2.1 and Details 1&2/31.2 Patio structure HSS6x4 beam and January 29, 2019 ❑ Mat Foundation, ❑ Masonry ❑ Concrete ❑ Steel Deck Prestressed Concrete HSS4x4 column framing + connections April 2, 2019 per S2.1 and detail Sheet 51.2 ❑ Caissons, Piles, ❑ Wood or Manuf. ❑ Masonry ❑ Wood Grade Beams Shear Panels Handrail post per Detail 3/31.2 ❑ Other: ❑ Other: ❑ Other: ❑ Other: ❑ ITEMS CHECKED ABOVE ARE APPROVED AND WITHOUT DEFICIENCIES. ❑ OBSERVED DEFICIENCIES AND COMMENTS: Based on our structural observations, to the best of our knowledge the work was performed in general conformance with the design intent of the structural drawings and contract documents. ❑ REPORT CONTINUED ON ATTACHED PAGES. ® FINAL STRUCTURAL OBSERVATION REPORT: The structure generally complies with the approved construction documents, and all observed deficiencies were corrected. I declare that the following statements are true to the best of my knowledge: 1. I am the licensed design professional retained by the owner to be in responsible charge of the structural observation; 2. I, or another licensed design professional whom I have designated above and is under my responsible charge, have performed the required site visits at each significant construction stage to verify that the structure is in general conformance with the approved construction documents; 3. 1 understand that all deficiencies which I have documented must be corrected, prior to final acceptance of the structural systems by the City of Newport Beach, Building Division. April 3, 2019 SIGNATURE OF STRUCTURAL OBSERVER OF RECORD DATE to., /30 Exp. 72,13120 STAMP OF STRUCTURAL OBSERVER STRUCTURAL OBSERVATION DOES NOT WAIVE ANY REQUIREMENTS FOR BUILDING INSPECTION BY AUTHORIZED EMPLOYEES OF THE CITY OF NEWPORT BEACH. FormsNgtmati a ObsemmionRepoa&-Instructions CITY OF NEWPORT BEACH COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION 100 Civic Center Drive ( P.O. Box 1768 1 Newport Beach, CA 92658-8915 i wWw.newportbeachca.gov 1 (949) 644-3200 Structural Observation Report Project Address: The Bluffs - Landlord Work Report Date: CNB Inspector Name: CNB Permit#: 1302 Bison Avenue April 3, 2019 FOUNDATIONS SHEAR WALLS Building Owner Name: Owner's Mailing Address (if different from site); Owner's Telephone #: CNB Plan Check #: f Structural Samuel mm tural Observer (SO): - SO E-mail Address: SO Telephone #: SO License / Reg. #: D. Grimm+ Chen Structural Engineering, Inc.)samg@gc-se.com (949)250-3150 SE#4730 PLEASE INDICATE STRUCTURAL ELEMENTS AND CONNECTIONS OBSERVED (check applicable boxes) I declare that the following statements are true to the best of my knowledge: 1. I am the licensed design professional retained by the owner to be in responsible charge of the structural observation; 2. 1, or another licensed design professional whom I have designated above and is under my responsible charge, have performed the required site visits at each significant construction stage to verify that the structure is in general conformance with the approved construction documents; 3. 1 understand that all deficiencies which I have documented must be corrected, prior to final acceptance of the structural systems by the City of Newport Beach, Building Division. April 3, 2019 SIGNATURE OF STRUCTURAL OBSERVER OF RECORD DATE No. &130 Exp. 1.1'3120 STAMP OF STRUCTURAL OBSERVER STRUCTURAL OBSERVATION DOES NOT WAIVE ANY REQUIREMENTS FOR BUILDING INSPECTION BY AUTHORIZED EMPLOYEES OF THE CITY OF NEWPORT BEACH. FormslStmcnrzelObser ,itionRepatt&lnstructions DIAPHRAGMS INDICATE LOCATION(S) DATE FOUNDATIONS SHEAR WALLS FRAMES (Floor/Roof) OBSERVED OBSERVED ■ Conventional ❑ Concrete ® Steel ❑ Concrete Patio structure foundations per Sheet Footings & Slab S2.1 and Details 1&2/SL2 Patio structure HSS6x4 beam and January 29, 2019 ❑ Mat Foundation, ❑ Masonry ❑ Concrete ❑ Steel Deck Prestressed Concrete HSS4x4 column framing + connections per 32.1 and detail Sheet S1.2 April 2, 2019 ❑ Caissons, Piles, ❑ Wood or Manuf. ❑ Masonry ❑ Wood Grade Beams Shear Panels Handrail post per Detail 361.2 ❑ Other: ❑ Other: ❑ Other: ❑ Other: ❑ ITEMS CHECKED ABOVE ARE APPROVED AND WITHOUT DEFICIENCIES. ❑ OBSERVED DEFICIENCIES AND COMMENTS: Based on our structural observations, to the best of our knowledge the work was performed in general conformance with the design intent of the structural drawings and contract documents. ❑ REPORT CONTINUED ON ATTACHED PAGES. ■ FINAL STRUCTURAL OBSERVATION REPORT: The structure generally complies with the approved construction documents, and all observed deficiencies were corrected. I declare that the following statements are true to the best of my knowledge: 1. I am the licensed design professional retained by the owner to be in responsible charge of the structural observation; 2. 1, or another licensed design professional whom I have designated above and is under my responsible charge, have performed the required site visits at each significant construction stage to verify that the structure is in general conformance with the approved construction documents; 3. 1 understand that all deficiencies which I have documented must be corrected, prior to final acceptance of the structural systems by the City of Newport Beach, Building Division. April 3, 2019 SIGNATURE OF STRUCTURAL OBSERVER OF RECORD DATE No. &130 Exp. 1.1'3120 STAMP OF STRUCTURAL OBSERVER STRUCTURAL OBSERVATION DOES NOT WAIVE ANY REQUIREMENTS FOR BUILDING INSPECTION BY AUTHORIZED EMPLOYEES OF THE CITY OF NEWPORT BEACH. FormslStmcnrzelObser ,itionRepatt&lnstructions GRIMM /CHEN X2018 3034 130) 13;son Ave DATE PROJECT NO, ENGINEER PAGE NO. i'� ��,,� „�,-..=.,,•mom Q�pfESSlpNq O F4. D. Gq� << w V/31/20 Project Permit Ntunber�& I nspection Type(s) Inspection Date(s) Report of Special Inspection rVQi a Periodic /V%.^0 -303N 1302 8;son Ave �G ] Continuous List,Tests Made: O'S U/aL Total Inspection Time Each Day: Date Hours List Items Requiring Correction, include uncorrected items previously listed t o ire nest ct my Knowledge, the work inspected was in accordance with the Building Department approved design drawings, spec' cations and applicable workmanship provisions or the U.B.C. except as noted ab OF Signed- Date ��� Print Full Name. Aj& 1 l : Registration No. ! �� FORM SI -02,90 2L Report of Special Inspection Project Name & Adqress _11` d / SO/Y Permit Number A Inspection Type(s) GON Inspection. Date(s) Z Ow�..im (_ ) Periodic [ "><) Continuous List Tests Made: SL /Yre .a Z? -I: , , Total Inspection Time Each Day: Date Hours List Items Requiring Correction, include uncorrected items previously listed Comments: l��_3{ LY>D �W71 Azm <le,y To the best of my knowledge, the work inspected was in accordance with the Building Department approved design drawings, specifications and applicable workmanship provisions of the U.B.C. except as noted aboy Signed: Date 7 Print Full Name: - Registration No. �16 FO3N! 5I-ei, 90 Al' - Report of 5pecial Inspection Permit Number �' I nspection Type(s) Inspection. Date(s) Describe Inspection Made, including List Tests Made: Total Inspection Time Each Day: List Items Acquiring Correction, include uncorrected items previously listed Comments: �I-C/A_3i 660 Periodic ( 5G j Continuous To the best or ny knowledge. the work inspected was in accordance with the Building Department approved design drawings, specifications and applicable workmanship provisions or the U.B.C. except as noted ab v Signed: �/) Date �/-7/ Print Full Name:-/��/�� J—S✓g,% f Registration No. FORM 51-02,90 �L- Prnjet:t Name x: 1'r:nni[ I•Auul7er,�,, Inspection Type(s) inspection Dates) Describe lnsoecdo _R,epar# of� iatial_TTaspeciion Made, including �a• List Tests Made: Total Inspection' IMC 13nch Day.- Periodic ( 7! ) Continuous Hours Datc '�-"- l..ist ltrpt� Requiring Correction, include uncorrected !terns previously listed To the best of mp kito%vWge,.th6.ivol* inspected was in accordance with the Building Dopartment approved design drritvings,'specillmations al applicahlc workmanship provisions of the U.B.C. except as noted above, 7/ Signed:—...__G/c�h- - '. Date Print Full �lseme: /1!7��!�`�1..._,f-/4r_f Registration No, _ `.''� .._-____ DORM SI -02,90 Project Name & Permit Number X Inspection Type(s) Inspection Date(s) Report of Special Inspection Periodic [ X l Continuous List7csts Made: -I/� Total Inspection Time Each Day; List Items Requiring Correction, include uncorrected items previously listed -1-0 the best 01 my knowledge, the work inspected was in accordance with the Building Department approved design drawings, specifcay. ns and applicable workmanship provisions of the U.B.C. except as noted above., i !� Signed: !/�/��, (�/ Date Print Full Name: ' Wa4c Registration No. 3/�S FORM SI -02,90 At,