Loading...
HomeMy WebLinkAboutN2017-06170City /wCenter Drive, ofNeWpOrt Beach Beach, CA92660 IIII�IIIIIIIIIIIIIIIIIIIIIII�III�IIIIIIIIIIIIIIIIIIIIIIII I*✓ ^ Permit Counter Phone (949)644-3311 Online Inspection Request - www.newportbeachca.gov / Online r: `'` Services Job Address: 890 AVOCADO AVE NB Description : EA TO EXISTING PLANTER WALL AND NEW PROPOSED PAVE TRANSITIONS. Parcel # : 4422-720-5 - Legal Desc : P.M. 270-15 PAR 1 POR PAR Owner: IRVINE CO Phone : A Address : 550 NEWPORT CENTER DR NEWPORT BEACH, CA 92660 Applicant: HOLLAND ROB Phone: 949-923-6160 Address : 38 TECHNOLOGY #100 IRVINE CA 92618 Special Cond.: PRE -CONSTRUCTION MEETING REQUIRED Permit Processing Fee : $0.00 Sewer Connection : $0.00 Agreement Fee: $817.00 4TT Box Cover: $0.00 Traffic control Plan Check : $0.00 Total Water Meters: $0.00 Inspection Fee : $330.00 Water Meter Connection : $0.00 Refundable Deposit: $0.00 Total Water Meter Box: $0.00 Street Tree Fee : $0.00 Adjustment: $0.00 Processed By: Utilities Approval : Traffic Approval : General Services Approval Permit No: N2017-0617 Project No: 2375-2017 Inspection Requests Phone (949)644-3255 Thomas:Guide: 919E1 Contractor: COMMERCIAL BUILDERS INC Phone: 619-564-7555 Address : 525 B STREET SAN DIEGO CA 92101 Contractor State Lic: 669342 License Expire: 10 31, 2018 Business License : BT30050318 Business Expire: 03 31, 2018 Workers' Compensation Insurance - - Carrier : STATE COMP Policy No: 9036265 W. C. Expire: 12 08, 2018 Total Fee $1,147.00 Paid : $1,147.00 Balance : $0.00 Receipt No: Date : _/ / Other Department : Date Date : / / Permit Denied : Date Date : / / Issued Permit: _.—. Date Date : / / I ALL UNDERGROUND WORK SHALL BE PERFORMED BY A LICENSED CONTRACTOR I Contact "Underground Service Alert" At Least 48-Hours in Advance of Any Excavation at 800-422-4133 2 5. 10 11. 12 13. 14. TERMS AND CONDITIONS OF ENCROACHMENT PERMIT Encroachment Permits rnay be taken out by the owner of benefited property or a licensed contractor. A licensed contractor must provide a 'Letter of Authorization' to allow another party to pull a permit. An approved copy of the permit and construction plan snail be kept at the job site at all times Work, which has been done prior to issuance of a permit, is subject to rejection/fine. City reserves the right to void permit if work does not commence within 30 days after dale of issuance The Permittee agrees to defend, indemnify and hold the City.. its authorized agent, officers, representatives and employees harmless from any responsibility, liability, suit or action of any description arising out of any accident, loss or damage to persons or property occurring as a result of work undertaken under this permit. All work shall be done in accordance with the approved plans, Standard Special Provisions and Standard Drawings of the City of Newport Beach, and in compliance with all applicable State laws and City ordinances. Permittee guarantees all work performed under this permit to be free of hidden and latent defects. Any failures shall be corrected within two weeks after notification to the satisfaction of the Public Works Director. A valid State licensed contractor must perform all construction within the public right-of-way, unless waived by the Public Works Director. A valid State Contractor License Class A can perform any work in the public right-of-way. For construction or connection to water lines a valid State Contractor License Class C-34 is required. For construction or connection to sewer lines a valid State Contractor License Class C-42 is required. All trenching and/or resurfacing shall conform to City Standard 105-L for parkway/roadway and City Standard 140-L, in the alley, where a minimum half -alley width resurfacing shall be provided, unless otherwise directed by the Public Works Dept. Contractors shall obtain permits to perform excavation or trench work from the California Division of Industrial Safety prior to commencing underground construction as required by State law. Walls and faces of all excavations over 5 feet in depth shall be protected by a shoring system, sloping of the ground, or other equivalent means. Trenches less than 5 feet in depth shall be guarded when hazardous ground movement may be expected. The Public Works Department Inspectors must inspect all work in the Public right-of-way. Forms and subgrade must be inspected and approved before concrete is ordered/poured. Sewer, pipelines, and subgrade construction must be inspected and approved before backfilling, or applicant may be required to excavate site. Separate Utilities Department or General Services Department inspections may be required depending on scope of work performed. All trench restoration must be inspected by the Public Works Department. No utility installation(s) shall be allowed over or within 5 feet of any City utilities, unless approved by the Public Works Department. Locate and pothole existing City -owned utilities (ie water, sewer, or street lighting conduits) to verify locations. Maintain a one -foot clearance over or under existing City -owned utilities. Sewer cleanouts require VCP or PVC SDR35 be used with a 4TT box over the riser. Properly lighted barricades must be provided and maintained around all trenches, excavations and obstructions. All signs, flags, lights and other warning and safety devices shall conform to the requirements of the current "Manual of Warning Signs, Sights and Other Devices for the Use in Performance of Work Upon Highways issued by the California Department of Transportation If needed barricades can be obtained from the City at a charge of $10.00 per barricade per day, with a minimum charge of $35.00. It is the responsibility of the applicant to place barricades to protect the general public. Access to fire hydrants must be maintained at all times. Work within or near beach sensitive areas will not be allowed during. City holidays, spring break. Memorial Day weekend, summer between June 15 and September 15, and during the holiday season from December 19 to January 1, unless approved by the Public Works Department. Any work that extends into traffic or parking lanes and impedes the normal flow of traffic requires the applicant to acquire a Temporary Street Closure Permit from the Public Works Department. Access for fire, police and emergency vehicles must be maintained at all times. Traffic Control must be per Work Area Traffic Control Handbook (WATCH). No nighttime traffic lane closures, unless prior approval has been granted. Any lane(s) closure on a major street will only be allowed between 9:00 a.m. and 3:00 p.m. (Monday thru Friday), unless approved by the Public Works Department Any work affecting the Slate Highway's traffic or within the State Highway right-of-way will require a Caltrans Permit. All vehicles shall be lawfully parked. This permit does not authorize the closure of sidewalks, streets, or alleys for construction access, storage of materials, or parking of construction vehicles unless detailed on an attached Temporary Street Closure. Applicant must notify USA at 1-800-227-2600 2 days before starting any underground construction. Applicant must notify all affected residents 24 hours in advance of restricted access and any inconveniences. Refuse or unused materials shall be removed within 24 hours after completion of the work. If not removed, the City may remove and bill the applicant Coordinate alley closures with City's refuse pick-up days by calling 949-644-3066 for the collection schedule so service is not interrupted. To place a dumpster or materials in the public right-of-way, a Temporary Street Closure Permit must be obtained from the Public Works Department. WORKER'S COMPENSATION INSURANCE (Section 3800 Labor Code) . I certify that I have a Certificate of consent to self -insure, Certificate of Worker's Compensations Insurance, or a Certified Cop ,th Date: L " Signature: 001, CERTIFICATE OF EXEMPTION (Section 3800 Labor Code) I certify that in the performance of the work under this permit, I shall not employ any person so as to become subject to California Worker's Compensation Laws. If, after signing this certificate I become subject to the Worker's Compensation provisions of the State Labor Code, I must comply with the provisions of Section 3700 or this permit shall be deemed revoked. Date: Signature: CONTRACTOR LICENSE EXEMPTION As the Owner of the benefiting property, I certify I am personally performing all work in the Public Right -of -Way. Date: Signature: HOLD HARMLESS STATEMENT I understand that I am locating minor encroachments within the City Right-of- Way/Easement. As property owner it is my responsibility to maintain the encroachments. I will be responsible for replacing the improvements if the City removes them for maintenance of utilities or other public need. I shall indemnify and hold the City harmless for any liability associated with the minor encroachments. Date: Signature: 24-hour notice for Encroachment Permit Inspection is required by calling Public Works at 949-644-3311 L� 15. Any above ground utility facilities will require documented approval from the adjacent affected property owner(s). 16 Homeowner, contractors, and subcontracotrs may each be liable for violations of Water Quality Laws. Best Management Practices will be enforced. It is against the law to discharge construction debris into the gutter and storm drain. Felony violations of Water Quality Laws are punishable by fines up to $25,000 and/or up to three years in Stale prison plus the full cost to clean up an illegal discharge or spill. 17. If a refundable deposit was paid, applicant must submit a Soils Compaction Certificate or Evidence of a Slurried Backfill and request a final inspection from the Public Works Department. Monies may be held for six months after final inspection before a refund will be processed. 18. No trees in the public right-of-way shall be planted, removed, trimmed, or relocated without approval from the General Services Department. 19. All work in the public right-of-way must meet the approval of the Public Works Department or corrections will be required (i.e. removals, exposing connections, etc.). Additional inspection fees may be required. 20. Permit is for standard materials in the public right-of-way only, unless previously approved by Public Works and an Encroachment Agreement has been processed. 21. Permit is valid for "description" of work noted on front only. Additional work performed may require issuance of a separate permit and/or additional fees. No work related to this encroachment permit $hall be performed until the Public Works Department has Issued this permit. Applicant hereby acknowledges he/she has read and under nds the terms and conditions of this permit and he/she agrees to abide by them. Permit is void if work Is not commenced within 30 days after issuance. a Permit fees are nonrefundable. Date Signature: __ OI K$k1E� �R ER�6�G�II�YE`�.�iIT PERMIT h COMPLETE THE BELOW INFORMATION PROJECT ADDRESS: 53cio AQCXj�np DETAILED DESCRIPTION OF PROPOSED WORK: IZ S I I�C+M�-WI,S• E 2145 - APPLICANT: Phone: Email Address: Mailing Address: City/State/Zip: OWNER: Phone: Email Address: Mailing Address: City/State/Zip: ALL CONTRACTOR INFORMATION IS REQUIRED -PLEASE COMPLETE CONTRACTOR: it - 4.L ZU;LAas Z,V C Office Phone: Company (if different): Jobsite Phone: 7AI Other Phone: Email Address: , S Odom. Mailin Address: ,.� , 8 -frifeil .i�4; c o Ci /State/Zip; .s,v �0 -Wo / State LiceS� �-'mber & Class: (� 9d Expires: 0 - - 8 ss icense Number: C2r-Mi-oln; Expires: WORKERS COMPE#SATION INSURANCE - Certificate of Insurance (Section 3800 Labor Code) Compan • A Otis, diae i✓ PolicyNo: D - Expires:/r1' �8' Municipal Oerations: 949-644-3055 Utilities: 949-644-3011 Urban Forestry: 949-644-3083 FOR OFFICE USE ONLY Special Conditions of Permit: ADDITIONAL APPROVAL REQUIRED FROM THE FOLLOWING DEPARTMENTS Utilities: Traffic: 0 Fire: Municipal Operations Other: Engineering Technician: Permit Specialist Date: Permit No. fJuseryptwlsharoc;encroachlmasters/epworksheet ds h� Public Works Department 949-644-3311 100 Civic Center Drive, Newport Beach, CA 92660 Tom Thompson From: Ostrom, Brandon <brandon.ostrom@stantec.com> Sent: Wednesday, February 28, 2018 12:45 PM To: Tom Thompson Cc: Kareem Ali (kali@irvinecompany.com); Aaron Fry (aafry@irvinecompany.com); Joshua Westling (josh@westlingcm.com); Holland, Rob; Carton, Kelsey Subject: FW: CDM Avocado LS Encroachment Agreement & Permit Attachments: cnb_cdm_avocado_Is_encr_app.pdf r of Hea:',,-up Novi that the Encroachment Agreerent is back at CNB for final signature and recordation There is the ,-utter of the Encroachment "Permit" that can now be pulled for work in the public right-of-way. You can use the attached application, pay the fees (5330) and one will be issued. P'( as(- let I:s knoww �f you need any clarification Regards. Project Manager Direct: (949) 923-6160 Mobile: (949) 294-9074 Fax: (949) 923-6121 Stantec Consulting Services Inc. 38 Technology Drive Suite 100 Irvine CA 92618-5312 US x The content of this email is the confidential property of Stantec and should not be copied, modified, retransmitted. or used for any purpose except with Stanlec's written authorization. If you are not the intended recipientplease delete all copies and notify us immediately. From: Holland, Rob Sent: Wednesday, February 28, 2018 12:39 PM To: Ostrom, Brandon <brandon.ostrom@stantec.com> Cc: Elwell, Dave <dave.elwell@stantec.com>; Carton, Kelsey <Kelsey.Carton@stantec.com> Subject: CDM Avocado LS Encroachment Agreement & Permit Brandon, The above signed Encroachment Agreement was picked up & submitted to David Keely this morning at the City of Newport Beach. The document will be recorded by the city both the Irvine Company & Stantec will receive a copy of the recorded document. There is also the Encroachment Permit itself. It will be ready to issue at the counter. The contractor will simply need to complete the attached application & pay a $330.00 fee. The contractor will only need to fill out the area of the application which is marked, all other information is already on file with the city. Please let me know if there are any questions. Thanks, Permitting Coordinator Direct: (949) 923-6260 Mobile. (714) 329-5608 Stantec Consulting Services Inc. 38 Technology Drive Suite 100 Irvine CA 92618-5312 US The content of this email is the confidential property of Stantec and should not be copied. modified, retransmitted. or used for any purpose except with Stantec s written authorization. If you are not the intended recipient, please delete all copies and notify us immediately. WORKSHEET FOR ENCROACHMENT PERMIT CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT COMPLETE THE BELOW INFORMATION PROJECT ADDRESS: c C^ f DETAILED DESCRIPTION OF PROPOSED WORK: t'i= ,­ .7—/CIitl , (PLEPf5f s EE X M4 01 J APPLICANT: ^C (' Phone: c `)) 2— 2-(� ' Email Address: Mailing Address: S 7ECNivcZ-c�� Y 4/cc� City/Ste/Zip:_ 11cL, h� L OWNER: �%� /%1� CC. �C 7l� lC i�i�.� �`''—�Y"7 t � Phone: ,i 74 Email Address: ZVII,-i Mailing Address: City/State/Zip: 9,7 ALL CONTRACTOR INFORMATION IS REQUIRED -PLEASE COMPLETE CONTRACTOR: —re 1��. '- ' �� �//w c. !.� Office Phone: Company (if different): Jobsite Phone: Other Phone: Email Address: Mailing Address: City/State/Zip: State License Number Class: Expires: City Business License Number: Expires: WORKERS COMPENSATION INSURANCE - Certificate of Insurance (Section 3800 Labor Code) Company: Policy No: Expires: REFUNDABLE DEPOSIT INFORMATION (if Appficable ): Refund Payable To: Mail Refund To: FOR OFFICE USE ONLY Special Conditions of Permit: -FA i, ADDITIONAL APPROVAL REQUIRED FROM THE FOLLOWING DEPARTMENTS Utilities: General Services: Traffic: Fire: Other: Engineering Technician: Pub, orks Specialist: Date: Permit No. tYtlsers/pt'fisharediencroach/masters/eptcorksheet xis Public Works Department 949-644-3311 I PROPERTY UNE WALKWAY I IMPROVEMENT I I I I CITY SIDEWALK I I I aanproTv I PROPO PROPERTY WALKWAY LINE IMPROVEMENT CITY SIDEWALK I CONCRETE WALKWAY DETAIL 2 i PROPOSE WALKWAY CITY IMPROVEk SIDEWALK PI` R LINE 1 CONCRETE WALKWAY DETAIL 3 LINE CITY SIDEWALK PROPOSED PROPERTY WALKWAY ( I I UNE , 0 IMPROVEMENT 4. PROPOSED CONCRETE WALKWAY WALKWAY DETAIL 1 I IMPROVEMENT =1 " �A PAVER WALKWAY \ DETAIL 4 r SCALE: 1"-10' 0 r PREPARED BY: DATE: CORONA DEL MAR PLAZA 12/07/2017 a ® Stantec ENCROACHMENT PERMIT 2 RIVE, SURE 103 E� z N = R8 1NE CA 922618TECHNOLOGY 9e9.923 60M startec.com EXHIBIT 2IV 7 N PAVER WALKWAY DETAIL 4 L. SEE SHEET 2 J'` CONCRETE WALKi ' - DETAIL 3 - SEE SHEET 2 ` • - - �` Innunnrrr unn".►i - DETAIL 2 SEE SHEET 2 - CONCRETE WALKWAY -4- DETAIL 1 SEE SHEET 2 us. 2.61' PROPOSED PAVER WALKWAY j EXISTING PLANTER WALL E CITY I F SIDEWALK � I PROPERTY LINE . 7.T �x PLANTER WALL DETAIL SCALE 1"=20' r - , PLANTER WALL DETAIL- . SEE RIGHT 900 t AVOCADO PACIFIC COAST HIGHWAY SCALE. 1'=60' 3 PREPARED BY: DATE: CORONA DEL MAR PLAZA 12/07/2017 ® Stant@C ENCROACHMENT PERMIT qq 38 ECHNOLCGY DRIVE, SURE !CO IRVINE CA 92618 EXHIBIT SHEET z m OF 2 N 949.923 o003 sfartec.com U. Q a Lj Z c 0 I AVOCADO AVENUE AVOCADO _a GRAPHIC SCALE 5 0 5 10 20 ( IN FEET ) 1 inch - 10 ft. PREPARED BY: PREPARED FOR: CORONA DEL MAR DATE:2/10/2017 SHEET 2 Stantec IRVINE COMPANY PLANTER WALL ENCROACHMENT 0 38 TECHNOLOGY DRIVE. SUITE 100 SIGHT LINE EXHIBIT Z N IRVINE, CA 92618 949.923.6000 vantcc.com SInCC 1864 NEWPORT BEACH, CALIFORNIA � 2 CoO O' cv R W 110.76 TW 110.76 TW 108.36 FS 108.38 FS ................. ........................... _ 110.79 TW 108.28 FS — —� o o R W - 110.74 TW 108.81 FS D ETAI L SCALE: I • = 1 0' PACIFIC COAST HWY CENTER MEDIAN 525.0' TRAFFIC LANE CL — _ . — — _ LINE OF SIGHT o _ — o — — — — ` �— — — — — ....... EXIST WALL Q 5 EXIST WALL Q 900 a AVOCADO] UO ' ', PAINTED _ Q CENTERLINE GRAPHIC SCALE 40 40 t20 PREPARED BY: PREPARED FOR: CORONA DEL MAR DATE: 12/07/2017 o 0 20 80 `�� ve Stantec jRVINE COMPANY PLANTER WALL ENCROACHMENT Z SHEET 1 a) re 38 TECHNOLOGY DRIVE. SUITE 100 SIGHT LINE EXHIBIT N IRVINE. CA 92618 949.923.6000 vontec.com S incc l S64 NEWPORT BEACH, CALIFORNIA 2 Coo 04 Request to Retain Existing Improvements within the Public Right -of -Way in the Newport Center Area October 25, 2016 Page 3 NOTICING: The agenda item has been noticed according to the Brown Act (72 hours in advance of the meeting at which the City Council considers the item). ATTACHMENTS: Attachment A - Location Map Attachment B — Site Photos Attachment C — Plans Attachment D — City Council Policy L-6 _-3 PAVER WALKWAY DETAIL 4 SEE SHEEF2 CONCRETE WRLKRY DETAIL 3 -SEE SHEET 2 CONCRETE WI DETAIL 2 SEE SHEET 2 ku- PROPERTY CLINE IL 1 SEE SHEET 2 C. jz > EXISTING PLANTER WALL (approx. 10 LF IN PUBLIC R/W CITY SI 2.61' EX. -MAX WALL • -�HEIGHT 2. SCALE 1"=20' PLANTER WALL D SEE RIGHT 900 AVOCADO PACIFIC COAST HIGHWAY SCALE: 1 *=60' PREPARED BY: DATE: CORONA DEL MAR PLAZA 12/07/2017 CD stantec ENCROACHMENT PERMIT SHEET dz C4 38 TECHNOLOGY DRIVE, SUITE I -C v IRVINE, CA 92618 EXHIBIT co Q OF 2 0 949.923,6000 stantec.cormi PROPERTY LINE 0.8' IMPROVEMENT I I I I CITY SIDEWALK I I I PpnprpTv LINE 0.9' _ I PROPOSED WALKWAY I I IMPROVEMENT EE CONCRETE WALKWAY DETAIL 1 CONCRETE WALKWAY DETAIL 2 I I PROPOSED WALKWAY CITY IMPROVEMENT SIDEWALK PI` R LINE CONCRETE WALKWAY DETAIL 3 CITY SIDEWALK . PROPERTY i LINE i 4' PROPOSED WALKWAY :. IMPROVEMENT o PAVER WALKWAY �\ DETAIL 4 0 SCALE: 1'=10' PREPARED BY: DATE: v CORONA DEL MAR PLAZA 12107/2017In ® Stantec ENCROACHMENT PERMIT 2 y 39 tECHNOLOGY DRIVE. SUITE I x = IRVINE, CA 92618 EXHIBIT SHEET z a r 949.923.KOO stontec.com � 2 m � N TO: FROM: CITY OF NEWPORT BEACH City Council Staff Report January 9, 2018 Agenda Item No. HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL David A. Webb, Public Works Director - 949-644-3311, dawebb@newportbeachca.gov PREPARED BY: David Keely, Senior Civil Engineer, dkeely@newportbeachca.gov PHONE: 949-644-3349 TITLE: Encroachment Agreement for Existing Improvements within the Public Right -of -Way adjacent to 900 Avocado Avenue. ABSTRACT: The applicant requests to retain an existing planter wall within public right-of-way located at the corner of East Coast Highway and Avocado Avenue adjacent to 900 Avocado Avenue. The City and Owner have no record of an encroachment agreement for the existing planter wall. RECOMMENDATION: a) Determine that the action is exempt from the California Environmental Quality Act (CEQA) pursuant to Sections 15060(c)(2) and 15060(c)(3) of the CEQA Guidelines because it will not result in a physical change to the environment, directly or indirectly; b) Waive City Council Policy L-6, Private Encroachments in the Public Right -of -Way, to retain an existing planter wall that encroaches in excess of 1-foot into the public right- of-way at the corner of East Coast Highway and Avocado Avenue; and c) Direct staff to enter into an Encroachment Agreement with the Owner and authorize the City Manager and City Clerk to execute the Encroachment Agreement within one (1) calendar year upon receipt of approval. FUNDING REQUIREMENTS: There is no fiscal impact related to this item. Request to Retain Existing Improvements within the Public Right -of -Way in the Newport Center Area October 25, 2016 Page 2 DISCUSSION: The Owner has submitted plans for site improvements at the Corona Del Mar Shopping Center located at 810 to 984 Avocado Avenue. As part of the plan review, staff identified the existing planter wall located within the public right-of-way. The City and Owner have no record of an encroachment agreement for the existing planter wall. The Owner is requesting a waiver of City Council Policy L-6 to retain an existing 102-foot long planter wall that encroaches up to 12.3-feet into the public right-of-way at the corner of East Coast Highway and Avocado Avenue. Based on the information provided by the applicant, the wall was constructed in 1997. The applicant is also proposing to install decorative carriage walks along the Avocado Avenue frontage that are consistent with the City Council Policy. City Council Policy L-6, "Private Encroachments in Public Rights -of -Way" explains and describes how the public rights -of -way are to be reserved for public use or open space; and that the rights of the public, present and future, are not to be diminished by the installation of private improvements within the public rights -of -way. The Policy specifies allowable and prohibited encroachments and describes the required permits or encroachment agreements. In Section A, which outlines the general encroachment prohibitions, "...structural encroachments including fences, walls, patios, raised planters, etc., which encroach in excess of 1-foot into the public right-of-way or exceeds 3 feet in height..." are prohibited. The owner is requesting City Council consideration for waiver of this policy to allow the retention of the planter wall that encroaches up to 12.3-feet into the East Coast Highway and Avocado Avenue public rights -of -way. Staff has reviewed this request and supports this policy waiver. In staffs review of the existing site conditions, the existing improvements do not hinder the use of the public right of way, including sidewalks. The retention of the various improvements will not diminish the rights of the public, present and future, at these locations. Should the City Council elect to approve the waiver and retention of the said private improvements and appurtenances, staff recommends that the City Council require the owner to enter into an encroachment agreement with the City. The encroachment agreement specifies the rights of the City including future removals and the responsibilities of the property owner. The encroachment agreement is recorded onto the property's title and provides important notice and protections for the City and for the current and future property owners. ENVIRONMENTAL REVIEW: Staff recommends the City Council find this project exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15060(c)(2) and 15060(c)(3) of the CEQA Guidelines, California Code of Regulations, Title 14, Chapter 3, because it has no potential to have a significant effect on the environment. EXHIBIT A ( I PAVER WALKWAY DETAIL 4 r (SEE -SHEETfir -= •\ J CONCRETE WASLKAr DETAIL 3 (SEE SHEET ) • --D I CONCRETE KW 4� DETAIL 2 (SEE SHEET 2) 1 li pPROPERTY tiIJNE CONCRETE YIIAI_KWAY DETAIL 1 ;41-7(SEE-SHEET t7 lift] I- s >1 a _ O x j I <: `a I _ o e — , PLANTER WALL DETAIL SEE RIGH *` I 900 AVOCADO e H o I 0 �-< EXISTING — 1 PLANTER W j (approx. 1 LF a IN PUBLIC /W) CITY SIDEWALK 2.6' rnvrvar-1 PAVER - WALKWAY Y �i EX.-.. WALL - HEIGHT 2.4' -- PLANTER WALL DETAIL SCALE 1 "=20' PAVING TYPES NOTE DESCRIPTION MANUFACTURE/ MATERIAL/ COLOR NO. SUPPLIER PRODUCT NO. APPIAN RIVER OPRECAST ACKERSTONE (STANDARD VIEW PAVERS CHAMFER) BLEND OCONCRETE 2 PAVING DAVIS INTEGRAL LAKESIDE COLORS COLOR BROWN (4' THICK) PACIFIC COAST HIGHWAY SCALE: 1'=60' PREPARED BY: DATE: v CORONA DEL MAR PLAZA 01/25►2018 ® Stantec ENCROACHMENT PERMIT 38TECHNOLOGYDRIVE,SUITEI�X IRVINE. CA 92618 EXHIBIT s"E� z a m0 x 9d9.923.KOO stantec.ccm 2 3 N EXHIBIT A OF - - PROPERTY PROPO PROPERTY 2 LINE WALKWAY �.. LINE IMPROVEMENT \ y 0.8' I I - l — ; 2 P OS CITY WALKWAY SIDEWALK IMPROVEMENT l I CONCRETE WALKWAY DETAIL 2 0.6' , 2 P OPOSED ' c WALKWAY IMPROVEMENT CITY SIDEWALK cITY - - c SIDEWALK PI-� OPERTY 0 I LINE CONCRETE WALKWAY o I DETAIL 3 PROPERTY LINE 0.9' _ I CITY ?®( = SIDEWALK 2 PR POSE P OPERTY WALKWAY r LINE IMPROVEMENT ` 0._' I 3 / 0 CONCRETE WALKWAY PROPOSED o DETAIL 1 I WALKWAY IMPROVEMENT o PAVER WALKWAY DETAIL 4 SCALE: 1'=10' PREPARED BY: DATE: v CORONA DEL MAR PLAZA 01/25/2018 ® Stant@C ENCROACHMENT PERMIT 2 J 36 TECHNOLOGY DRIVE, SUITE I �� IRVINE, CA 92618 EXHIBIT SHEET 2 z N IV an c r 9A9 923.6000 stantoc.com N 100 Civic Center Drive Newport Beach, California 92660 949-644-3311 i 949-644-3308 newcortbeachca.9ov q<�FOR, February 22, 2018 Shawn D. Monterastelli Vice President and Assistant General Counsel Irvine Company 550 Newport Center Drive Newport Beach, CA 92660 SUBJECT: Non -Standard Improvements in Public Right -Of -Way (EPN-2017-0617) at 900 Avocado Avenue Dear Mr. Monterastelli, Your request to retain and construct non-standard improvements in the Public Right -Of - Way at 900 Avocado Avenue requires execution of an Encroachment Agreement. Please execute the copy of the attached Non -Standard Encroachment Agreement (attached) using a notary and signing in BLUE INK, return packet to my attention for processing. If you have any questions or need additional information, I can be reached by phone (949) 644-3349. Sincerely, David Keely, Senior Civil Engineer Permit Processing Fee: Public Works Only Other Department Agreement Fee: Preparation of Report/Agreement Document Recordation Fee Monitoring Wells $241.00 $275.00 [n $817.00 $192.00 $502.00 Inspection Fee: Qty- Public Works Field Inspection $165.00 Utilities Field Inspection $121.00 General Services Inspection $165.00 Water Quality/Artificial Turf Inspection $108.00 Refundable Deposit: Improvements Street/Alley/Walk Closure: $65.000 Newspaper Rack Inspection Traffic Control Plan Check 8-1/2" x 11" $65.00 Sewer Connection Fee 24" x 36" $143.00 4TT Box S Cover Additional THE FOLLOWING ITEMS REQUIRE APPROVAL FROM THE R I REVENUE DIVISION PRIOR TO PAYMENT OF FEES A TBDeTBD $108.00 0 $250.00 $64.00 — — — ---- venue Division 1 1 Clty. Q [Water Meter: Installation Charge $528.00 13/4" Meter $50.25 11" Meter $121.50 Water Meter Boxes: 1 11 1/2" Meter $285.00 1" DFW Meter Box $96.66 1 11 1/2" Turbine Meter $700.00 2" DFW Meter Box $203.24 1 B �2" Meter $425.00 1 2" Turbine Meter $845.00 1 1 13" Meter 14" $3,310.00 1 Meter $4,730.00 1 16" Meter $7,190.00 I Certificate of Compliance Fee (+100% of hriy over 3 hrs) $288.00 5200-5029 Development Services Fee (Plan check hourly) $155.00 5200-5015 Final Tract Map Checking Fee $2,488.00 5200-5026 Final Parcel Map Checking Fee - Moderate $2,488.00 5200-5027 Lot Line Adjustment Fee $1,079.00 5200-5028 Park Dedication Fee Zone TBD 405-470_ Street EasementtVacation Fee (+100% of My over 4 hrs) $1,022.00 5200-5031 Street Tree Fee ($700 Planting Fee) TBD ... ... 030-2284 _.. ... Engineering Tech: Total Amount Due: For Finance Use Only )1.e<' Permit S ialist Receipt No. flus"ptfw/shareWancroadVrnastwWep front and pack masters/ Rev. 11/8/2017 epfeesneetAs-revised 111&17 M 4 Stantec December 7, 2017 File: 2042464500 Attention: David Keely City of Newport Beach 100 Civic Center Drive P.O. Box 1768 Newport Beach, CA 92658 Stantec Consulting Services Inc. 38 Technology Drive. Suite 100, Irvine CA 92618-5312 Reference: Corona Del Mar Shopping Center- Planter Wall - ENCROACHMENT PERMIT Dear David, As requested, in association with Plan Check #2375-2017 for site improvements at Corona Del Mar Shopping Center, we are submitting for an Encroachment Agreement / Permit for an existing planter wall located within the public right-of-way. The wall in question, constructed in 1997, encroaches over the Avocado Avenue right -of -way -line at the corner of Avocado Avenue and Pacific Coast Highway. This wall, likely constructed to hold back excessive grade at the corner, is approximately 2' tall though this section and follows the back of the sidewalk. Related plans for the construction of the wall include a precise grading plan, PC#851G97, which defers grading in the area in question to a landscape plan, PC#851 L97. The sidewalk was improved as part of the Avocado Avenue street improvements, R-5649-5 in around 1990. The City of Newport Beach does not have any records of an encroachment agreement on file for this wall, hence this permit submittal. The improvement plans we submitted for review as Plan Check #2375-2017 (currently in process) only include scope located behind this already established planter wall. No modifications to the existing wall are proposed in the encroaching segment. The scope of the currently proposed improvements includes the removal and replacement of landscape planting, as well as voluntary hardscape improvements to address accessibility compliance issues at the Center. The improvements aim to improve the existing access routes and only minimally modify lengths and alignments to achieve compliant slopes and gradients. The scope of work includes moving the landings for the existing access stairs and ramps to the Irvine Company side of the property line as requested, however the portions tying into the public walk are proposed to be set with concrete pavers. We have been informed that completing this work will require an encroachment permit, and therefore request that these proposed paver transitions connecting the privately -owned portions to the public walk be included in this encroachment request. Exhibits have been provided for your reference to demonstrate the scope of the encroachment. Please do not hesitate to contact me should you require any additional information or documentation to complete your review. Sincerely STANTEC CONSULTING SERVICES INC. Project Manager Stantec 38 Technology Drive Suite 100, Irvine CA 92618-5312 Phone: (949) 923-6160 Cell: (949) 294-9074 brandon.ostroms stantec.com 41' 6i2s/2018 City of Newport Beach Page 1 of 14 6:34:25AM INSP150 - Daily Inspection Request Report Requested Inspection Date: 06/25/2018 Inspection Type: ENCROACH Inspection Area : PW Site Address : 890 AVOCADO AVE AM/D Information: Activity : N2017-0617 SubType : NEW Status : APPROVED OWNER: IRVINE CO Phone: APPLICANT: HOLLAND ROB Phone : 949-923-6160 ROB.HOLLAND@STANTEC Description : EA TO EXISTING PLANTER WALL AND NEW PROPOSED PAVE TRANSITIONS. Requested Inspection(s) Item: 10110 CONCRETE PUBLIC WORKS Requested Time: 6/25/2018 12:00:OOAM Requestor: Entered By: NBIVR Comments: AM Assigned to : Me *.1 L ' rJ 9/13/2018 City of Newport Beach Page 1 of 12 4:30:35PM INSP150 • Daily Inspection Request Report Requested Inspection Date: 09/14/2018 Inspection Type: ENCROACH Inspection Area : PW Site Address : 890 AVOCADO AVE A/PID Information: Activity : N2017-0617 SubType : NEW Status : APPROVED OWNER: IRVINE CO Phone: APPLICANT: HOLLAND ROB Phone : 949-923-6160 ROB.HOLLAND@STANTEC Description : EA TO EXISTING PLANTER WALL AND NEW PROPOSED PAVE TRANSITIONS. Requested Inspection(s) Item: 10210 PUBLIC WORKS --- . I Requested Time: 9/14/2018 12:00:OOAM Requestor: NBIVR 9498427646 Entered By: NBIVR..-, Comments: AM _r Assigned to: 1