HomeMy WebLinkAboutZA2019-036 - APPROVING COASTAL DEVELOPMENT PERMIT NO. CD2018-110 TO DEMOLISH AN EXISTING SINGLE-FAMILY RESIDENCE AND CONSTRUCT A NEW TWO-STORY SINGLE-FAMILY RESIDENCE AND ATTACHED 3-CAR GARAGE LOCATED AT 101 SHORECLIFF ROAD05-15-2018
RESOLUTION NO. ZA2019-036
A RESOLUTION OF THE ZONING ADMINISTRATOR OF THE
CITY OF NEWPORT BEACH APPROVING COASTAL
DEVELOPMENT PERMIT NO. CD2018-110 TO DEMOLISH AN
EXISTING SINGLE-FAMILY RESIDENCE AND CONSTRUCT A
NEW TWO-STORY SINGLE-FAMILY RESIDENCE AND
ATTACHED 3-CAR GARAGE LOCATED AT 101 SHORECLIFF
ROAD (PA2018-284)
THE ZONING ADMINISTRATOR OF THE CITY OF NEWPORT BEACH HEREBY FINDS AS
FOLLOWS:
SECTION 1. STATEMENT OF FACTS.
1. An application was filed by Maisons The Art Of Design, with respect to property located
at 101 Shorecliff Road, requesting approval of a coastal development permit.
2. The lot at 101 Shorecliff Road is legally described as Lot 121, Tract 1116.
3. The applicant proposes a coastal development permit to demolish an existing single-family
residence and construct a new 3-story, 12,882-square-foot, single-family residence,
including an attached 762-square-foot three-car garage. The project includes hardscape,
drainage, landscaping improvements, and accessory structures. The proposed residence
complies with all applicable development standards including the height, setbacks, and lot
coverage limits. No deviations are requested.
4. The subject property is designated RS-D (Single-Unit Residential Detached) by the
General Plan Land Use Element and is located within the R-1-6000 (Single-Unit
Residential) Bluff (B) Overlay Zoning District.
5. The subject property is located within the coastal zone. The Coastal Land Use Plan
category is RSD-A (Single-Unit Residential Detached – 0.0-5.9 DU/AC) and it is located
within the R-1-6000 (Single-Unit Residential) Bluff (B) Overlay Coastal Zone District.
6. A public hearing was held on May 30, 2019, in the Corona del Mar Conference Room (Bay
E-1st Floor) at 100 Civic Center Drive, Newport Beach. A notice of time, place and
purpose of the hearing was given in accordance with the Newport Beach Municipal
Code. Evidence, both written and oral, was presented to, and considered by, the Zoning
Administrator at this hearing.
SECTION 2. CALIFORNIA ENVIRONMENTAL QUALITY ACT DETERMINATION.
1. This project is categorically exempt pursuant to Title 14 of the California Code of
Regulations Section 15303, Article 19 of Chapter 3, Guidelines for Implementation of the
California Environmental Quality Act (CEQA) under Class 3 (New Constructure or
Conversion of Small Structures) because it has no potential to have a significant effect
on the environment.
Zoning Administrator Resolution No. ZA2019-036
Page 2 of 9
05-15-2018
2. Class 3 exempts the demolition of up to three single-family residences and additions of
up to 10,000 square feet to existing structures. The proposed project consists of the
demolition of one single-family residence and the construction of a new 12,882-square-
foot single-family residence and attached 762-square-foot 3-car garage.
3. The exceptions to this categorical exemption under Section 15300.2 are not applicable.
The project location does not impact an environmental resource of hazardous or critical
concern, does not result in cumulative impacts, does not have a significant effect on the
environment due to unusual circumstances, does not damage scen ic resources within
a state scenic highway, is not a hazardous waste site, and is not identified as a historical
resource.
SECTION 3. REQUIRED FINDINGS.
In accordance with Section 21.52.015 (Coastal Development Permits, Findings and Decision)
of the Newport Beach Municipal Code, the following findings and facts in support of such
findings are set forth:
Finding:
A. Conforms to all applicable sections of the certified Local Coastal Program.
Facts in Support of Finding:
1. The proposed development complies with applicable residential development standards
including, but not limited to, floor area limitation, setbacks, height, and parking.
a. The maximum lot coverage is 18,314 square feet and the proposed lot coverage is
6,402 square feet.
b. The proposed development provides the minimum required setbacks, which are 25
feet along the front property line abutting Shorecliff Road, 6 feet along each side
property line and 6 feet along the rear property line.
c. The proposed development provides the minimum required setbacks established
by the Bluff Overlay District, including a 25-foot bluff edge setback for primary
structures (Development Area A), a 10-foot bluff edge setback for accessory
structures (Development Area B) and no development seaward of Development
Area B.
d. The highest ridge is no more than 29 feet from established grade, which complies
with the maximum height requirements.
e. The project includes garage parking for a total of three vehicles, complying with the
minimum three-car garage parking requirement for single-family residences with
more than 4,000 square feet of habitable floor area.
Zoning Administrator Resolution No. ZA2019-036
Page 3 of 9
05-15-2018
2. The neighborhood is predominantly developed with two- and three-story, single-family
residences. The proposed design, bulk, and scale of the development is consistent with
the existing neighborhood pattern of development.
3. The development is located on a bluff fronting a sandy beach and the Pacific Ocean.
The project site is not protected by a bulkhead. A Geotechnical and Geologic
Investigation report was prepared by Coast Geotechnical, Inc. on October 18, 2018
examined coastal hazards including slope stability, wave action, long-term bluff retreat
and flooding and erosion and concluded that the development will be reasonably safe
from coastal hazards over the course of its design life and that no additional sea wall,
revetment, jetty, groin, retaining wall or other shoreline protective device will be
needed to protect the development The finished floor elevation of the first floor of the
proposed structure is 54.5 feet based on the North American Vertical Datum of 1988
(NAVD88), which complies with the minimum 9.0-foot (NAVD88) elevation standard for
new structures.
4. Pursuant to NBMC Section 21.30.030(C)(3)(i)(iv), the property owner will be required to
enter into an agreement with the City waiving any potential right to protection to address
situations in the future in which the development is threatened with damage or destruction
by coastal hazards (e.g., waves, erosion, and sea level rise). The property owner will also
be required to acknowledge any hazards present at the site and unconditionally waive any
claim to damage or liability against the decision authority, consistent with NBMC Section
21.30.015(D)(3)(c). Both requirements are included as conditions of approval that will need
to be satisfied prior to final building inspection, and prior to the issuance of building permits,
respectively.
5. The property is located in an area known for the potential of seismic activity and
liquefaction. All projects are required to comply with the California Building Code (CBC)
and Building Division standards and policies. Geotechnical investigations specifically
addressing liquefaction are required to be reviewed and approved prior to the issuance of
building permits. Permit issuance is also contingent on the inclusion of design mitigation
identified in the investigations. Construction plans are reviewed for compliance with
approved investigations and CBC prior to building permit issuance.
6. The project design addresses water quality with a construction erosion control plan and a
post-construction drainage system that includes drainage and percolation features
designed to retain dry weather run-off and minor rain event run-off on-site. Any water not
retained on-site is directed to the City’s storm drain system.
7. Pursuant to Municipal Code Section 21.35.050, due to the proximity of the development to
the shoreline, a Water Quality and Hydrology Plan (WQHP) is required. A preliminary
WQHP has been prepared for the project by Toal Engineering, Inc. The WQHP includes a
polluted runoff and hydrologic site characterization, a sizing standard for Best Management
Practices (BMPs), use of an LID approach to retain the design storm runoff volume on site,
and documentation of the expected effectiveness of the proposed BMPs.
8. Proposed landscaping complies with Implementation Plan Section 21.30.075. A
condition of approval is included that requires drought-tolerant species. Prior to issuance
Zoning Administrator Resolution No. ZA2019-036
Page 4 of 9
05-15-2018
of building permits, the final landscape plans will be reviewed to verify invasive speci es
are not planted
9. The project site is located approximately 1,300 feet southeast of Inspiration Point, which
is a designated public viewpoint in the Coastal Land Use Plan and offers public views of
the Pacific Ocean and shoreline. Site evaluation revealed that the proposed design is
consistent with the existing neighborhood pattern of development and will not affect the
existing views afforded from Inspiration Point. The project will replace an existing single-
family residence with a new single-family residence that complies with all applicable
development standards, including the Bluff Overlay standards that requires an increased
10-foot setback from the bluff edge for accessory structures and 25-foot setback from bluff
edge for primary structures. Inspiration Point is improved with public benches and
landscaping that orients and frames views toward the ocean and not toward the subject
site. Therefore, the project does not have the potential to degrade the visual quality of the
Coastal Zone or result in significant adverse impacts to public views.
10. The rear of the proposed residence, which is visible from Little Corona Beach, contains
substantial architectural treatment and visual interest, consistent with the design guidelines
of the Zoning Code. The new structure would comply with required setbacks of the R-1-
6000 Coastal Zoning District and the Bluff Overlay Zone. The design includes modulation
of volume throughout the structure and low walls that prevent the appearance of the site
being walled off from the beach. The development complies with a primary structure
stringline, required by the Shorecliffs Community, which further protects views up the Buck
Gully Canyon from Little Corona Beach. Therefore, the project does not have the potential
to degrade the visual quality of the Coastal Zone or result in significant adverse impacts to
existing public views.
11. The rear and side of the proposed residence are visible from Glen Drive, which provides
pedestrian access to Little Corona Beach. The elevations of the development contain
substantial architectural treatment and visual interest, consistent with the design guidelines
of the Zoning Code. The new structure would comply with the required setbacks of the R-
1-6000 Coastal Zoning District and the Bluff Overlay Zone. Additionally, the development
complies with a primary structure stringline, required by the Shorecliffs Community, which
ensures that the development is consistent with the neighboring developments and
protects public views of the shoreline and bluff as viewed from Glen Drive.
Finding:
B. Conforms with the public access and public recreation policies of Chapter 3 of the
Coastal Act if the project is located between the nearest public road and the sea or
shoreline of any body of water located within the coastal zone .
Fact in Support of Finding:
1. The project site is located between the nearest public road and the sea or shoreline.
Implementation Plan Section 21.30A.040 requires that the provision of public access bear
a reasonable relationship between the requirement and the project’s impact, and be
proportional to the impact. In this case, the project replaces an existing single-family
Zoning Administrator Resolution No. ZA2019-036
Page 5 of 9
05-15-2018
residence located on a standard R-1-6000 lot with a new single-family residence.
Therefore, the project does not involve a change in land use, density or intensity that will
result in increased demand on public access and recreation opportunities. Furthermore,
the project is designed and sited (appropriate height, setbacks, etc.) so as not to block or
impede existing public access opportunities.
2. Vertical access to the beach and ocean is available via Glen Drive, across Buck Gully
from the subject property. Lateral access is available along the beach to the south of the
property. Vertical access to the beach is also available to members of the Shorecliff
community through a private pedestrian gate and footpath which crosses the subject
property. The project does not include any features that would obstruct access along
these existing routes.
SECTION 4. DECISION.
NOW, THEREFORE, BE IT RESOLVED:
1. The Zoning Administrator of the City of Newport Beach hereby approves Coastal
Development Permit No. CD2018-110, subject to the conditions set forth in Exhibit “A,”
which is attached hereto and incorporated by reference.
2. This action shall become final and effective 14 days following the date this Resolution
was adopted unless within such time an appeal or call for review is filed with the
Community Development Director in accordance with the provisions of Title 21 Local
Coastal Implementation Plan, of the Newport Beach Municipal Code. Final action taken
by the City may be appealed to the Coastal Commission in compliance with Section
21.64.035 of the City’s certified LCP and Title 14 California Code of Regulations,
Sections 13111 through 13120, and Section 30603 of the Coastal Act.
PASSED, APPROVED, AND ADOPTED THIS 30TH DAY OF MAY, 2019.
_____________________________________
Patrick J. Alford, Zoning Administrator
Zoning Administrator Resolution No. ZA2019-036
Page 6 of 9
05-15-2018
EXHIBIT “A”
CONDITIONS OF APPROVAL
1. The development shall be in substantial conformance with the approved site plan, floor
plans and building elevations stamped and dated with the date of this approval (except as
modified by applicable conditions of approval).
2. Prior to final building permit inspection, an agreement in a form approved by the City
Attorney between the property owner and the City shall be executed and recorded
waiving rights to the construction of future shoreline protection devices to address the
threat of damage or destruction from waves, erosion, storm conditions, landslides,
seismic activity, bluff retreat, sea level rise, or other natural hazards that may affect the
property, or development of the property, today or in the future. The agreement shall be
binding against the property owners and successors and assigns.
3. Prior to the issuance of a building permit, the property owner shall submit a nota rized
signed letter acknowledging all hazards present at the site, assuming the risk of injury
or damage from such hazards, unconditionally waiving any claims of damage against
the City from such hazards, and to indemnify and hold harmless City, its City Council, its
boards and commissions, officials, officers, employees, and agents from and against any
and all claims, demands, obligations, damages, actions, causes of action, suits, losses,
judgments, fines, penalties, liabilities, costs and expenses (including without limitation,
attorney’s fees, disbursements and court costs) of every kind and nature whatsoever which
may arise from or in any manner relate (directly or indirectly) to City’s approval of
development. This letter shall be scanned into the plan set prior to building permit issuance.
4. No demolition or construction materials, equipment debris, or waste, shall be placed or
stored in a location that would enter sensitive habitat, receiving waters, or a storm drain
or result in impacts to environmentally sensitive habitat areas, streams, the beach,
wetlands or their buffers. No demolition or construction materials shall be stored on
public property.
5. This approval does not authorize any new or existing improvements (including
landscaping) on State tidelands, public beaches, or the public right -of-way.
6. This Coastal Development Permit does not authorize any development seaward of the
private property.
7. The applicant is responsible for compliance with the Migratory Bird Treaty Act (MBTA).
In compliance with the MBTA, grading, brush removal, building demolition, tree
trimming, and similar construction activities shall occur between August 16 and January
31, outside of the peak nesting period. If such activities must occur inside the peak
nesting season from February 1 to August 15, compliance with the following is required
to prevent the taking of Native Birds pursuant to the MBTA:
A. The construction area shall be inspected for active nests. If birds are observed flying
from a nest or sitting on a nest, it can be assumed that the nest is active. Construction
Zoning Administrator Resolution No. ZA2019-036
Page 7 of 9
05-15-2018
activity within 300 feet of an active nest shall be delayed until the nest is no longer
active. Continue to observe the nest until the chicks have left the nest and activity is no
longer observed. When the nest is no longer active, construction activity can continue
in the nest area.
B. It is a violation of state and federal law to kill or harm a native bird. To ensure
compliance, consider hiring a biologist to assist with the survey for nesting birds, and
to determine when it is safe to commence construction activities. If an active nest is
found, one or two short follow-up surveys will be necessary to check on the nest and
determine when the nest is no longer active.
8. Best Management Practices (BMP’s) and Good Housekeeping Practices (GHP’s) shall
be implemented prior to and throughout the duration of construction activity as
designated in the Construction Erosion Control Plan.
9. The discharge of any hazardous materials into storm sewer systems or receiving waters
shall be prohibited. Machinery and equipment shall be maintained and washed in
confined areas specifically designed to control runoff. A designated fueling and vehicle
maintenance area with appropriate berms and protection to prevent spillage shall be
provided as far away from storm drain systems or receiving waters as possible.
10. Debris from demolition shall be removed from work areas each day and removed from
the project site within 24 hours of the completion of the project. Stock piles and
construction materials shall be covered, enclosed on all sites, not stored in contact with
the soil, and located as far away as possible from drain inlets and any waterway.
11. Trash and debris shall be disposed in proper trash and recycling receptacles at the end
of each construction day. Solid waste, including excess concrete, shall be disposed in
adequate disposal facilities at a legal disposal site or recycled at a recycling facility.
12. Revisions to the approved plans may require a n amendment to this Coastal
Development Permit or the processing of a new coastal development permit.
13. The project is subject to all applicable City ordinances, policies, and standards, unless
specifically waived or modified by the conditions of approval.
14. The applicant shall comply with all federal, state, and local laws. Material violation of
any of those laws in connection with the use may be cause for revocation of this Coastal
Development Permit.
15. This Coastal Development Permit may be modified or revoked by the Zoning
Administrator if determined that the proposed uses or conditions under which it is being
operated or maintained is detrimental to the public health, welfare or materially injurious
to property or improvements in the vicinity or if the property is operated or maintained
so as to constitute a public nuisance.
Zoning Administrator Resolution No. ZA2019-036
Page 8 of 9
05-15-2018
16. Prior to the issuance of building permits, the applicant shall submit a final construction
erosion control plan. The plan shall be subject to the review and approval by the Buildin g
Division.
17. Prior to the issuance of building permits, the applicant shall submit a final drainage and
grading plan. The plan shall be subject to the review and approval by the Building
Division.
18. Prior to issuance of a building permit, a copy of the Resolution, including conditions of
approval Exhibit “A” shall be incorporated into the Building Division and field sets of
plans.
19. Prior to issuance of a building permit, the applicant shall submit to the Planning Division
an additional copy of the approved architectural plans for inclusion in the Coastal
Development file. The plans shall be identical to those approved by all City departments
for building permit issuance. The approved copy shall include architectural sheets only
and shall be reduced in size to 11 inches by 17 inches. The plans shall accurately depict
the elements approved by this Coastal Development Permit.
20. Prior to issuance of building permits, the final WQHP/WQMP shall be reviewed and
approved by the Building Division. Implementation shall be in compliance with the
approved WQHP/WQMP and any changes could require separate review and approval
by the Building Division.
21. Prior to the issuance of building permits, the applicant shall submit a final landscape and
irrigation plan. These plans shall incorporate drought tolerant plantings, non-invasive
plant species and water efficient irrigation design. The plans shall be approved by the
Planning Division.
22. All landscape materials and irrigation systems shall be maintained in accordance with
the approved landscape plan. All landscaped areas shall be maintained in a healthy and
growing condition and shall receive regular pruning, fertilizing, mowing, and trimming.
All landscaped areas shall be kept free of weeds and debris. All irrigation systems shall
be kept operable, including adjustments, replacements, repairs, and cleaning as part of
regular maintenance.
23. Prior to the issuance of building permit, the applicant shall pay any unpaid administrative
costs associated with the processing of this application to the Planning Division.
24. Should the property be sold or otherwise come under different ownership, any future
owners or assignees shall be notified of the conditions of this approval by the current
property owner or agent.
25. This Coastal Development Permit No. CD2018-110 shall expire unless exercised within 24
months from the date of approval as specified in Section 21.54.060 (Time Limits and
Extensions) of the Newport Beach Municipal Code, unless an extension is otherwise
granted.
Zoning Administrator Resolution No. ZA2019-036
Page 9 of 9
05-15-2018
26. Swimming pools shall be of double wall construction with subdrains between the walls and
leak detection devices or an equivalent method.
27. To the fullest extent permitted by law, applicant shall indemnify, defend and hold harmless
City, its City Council, its boards and commissions, officials, officers, employees, and agents
from and against any and all claims, demands, obligations, damages, actions, causes of
action, suits, losses, judgments, fines, penalties, liabilities, costs and expenses (including
without limitation, attorney’s fees, disbursements and court costs) of every kind and nature
whatsoever which may arise from or in any manner relate (directly or indirectly) to City’s
approval of Stack Residence including, but not limited to, Coastal Development Permit No.
CD2018-110 (PA2018-284). This indemnification shall include, but not be limited to,
damages awarded against the City, if any, costs of suit, attorneys' fees, and other
expenses incurred in connection with such claim, action, causes of action, suit or
proceeding whether incurred by applicant, City, and/or the parties initiating or bringing such
proceeding. The applicant shall indemnify the City for all of City's costs, attorneys' fees,
and damages, which City incurs in enforcing the indemnification provisions set forth in this
condition. The applicant shall pay to the City upon demand any amount owed to the City
pursuant to the indemnification requirements prescribed in this condition.