Loading...
HomeMy WebLinkAbout13 - PSA with Iteris for Traffic Signal ModernizationCITY OF QagWPORT I�I� \��uj � /(j � IIm1Ir��1I IY' V! _r_!� 1L/l1lJ P r �� WI r.�E./A. ��WJ 111�� City council Staff Report Agenda Item No. 13 November 27, 2012 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: Public Works Department David A. Webb, Public Works Director 949 - 644 -3311, dawebb @newportbeachca.gov PREPARED BY: Brad Sommers, Senior Civil Engineer APPROVED: TITLE: Approval of Professional Services Agreement with Iteris, Inc., for Traffic Signal Modernization Project — San Joaquin Hills Road (Phase 6A) and Newport Coast Drive (Phase 6B) ABSTRACT: Engineering services are required for preparation of plans and specifications for the San Joaquin Hills Road and Newport Coast Drive (Phases 6A and 6B) of the Traffic Signal Modernization Project. RECOMMENDATION: Approve a single source Professional Services Agreement with Iteris, Inc. ( Iteris), of Santa Ana, for design of San Joaquin Hills Road (Phase 6A) and Newport Coast Drive (Phase 6B) of the Traffic Signal Modernization Project at a not to exceed price of $387,305.00 and authorize the Mayor and City Clerk to execute the Agreement. FUNDING REQUIREMENTS: The current adopted budget includes sufficient funding for engineering services within the Measure M Competitive Fund account, 7284- C3002018. DISCUSSION: The City -wide Traffic Signal Modernization Project is being designed and constructed as a multi -year project to install a new and upgraded City -wide traffic signal management system that utilizes state of the art technology improvements. The goal of this multi - phased project is to reduce congestion and improve the efficiency and flexibility of our traffic signal system. 1 of 31 Approval of Professional Services Agreement with Iteris, Inc., for Traffic Signal Modernization Project — San Joaquin Hills Road (Phase 6A) and Newport Coast Drive (Phase 66) November 27, 2012 Page 2 Prior to the first phase of the Traffic Signal Modernization Project, staff invited seven firms to provide proposals for design of the project. Staff received three proposals, which were reviewed to evaluate each firm's qualifications, past experience on similar projects, and availability before selecting Iteris as the most qualified. As the citywide modernization project is a phased project, staff has planned to utilize one design consultant for the duration of the project to maintain consistency of the design and to capture cost saving by avoiding a new learning curve on each phase. In order to maintain design consistency and reduce costs, staff requests the City Council recognize Iteris as a single source vendor for this agreement and waive Council Policy F -14's administrative requirements to seek formal proposals. Staff did select the current design consultant through a formal proposal process prior to the start of the first phase. During design and construction of the previous six Traffic Signal Modernization Projects, Iteris has developed extensive knowledge of the City's traffic signal system and effectively reduced staff review time through better prepared plans and more comprehensive design. Staff recommends approval of an agreement with Iteris for the design of the San Joaquin Hills Road and Newport Coast Drive Phases of the modernization project which will improve our system reliability and efficiency, as well as, staff's ability to manage the system. Phases 6A and 6B of the Traffic Signal Modernization Project will be partially funded through Measure M2 and part of the 2011 OCTA Traffic Signal Synchronization Project grant. Through the grant application process, the City was awarded the maximum eligible funding for the two project corridors. The grant will fund $220,000 (approximately 37 percent) of total project cost for the San Joaquin Hills Road and $260,000 (44 percent) of total project cost to the Newport Coast Drive projects. The awarded funds will be applied to design, construction, and traffic signal timing implementation and maintenance of the approved project corridors. Recent changes to the eligibility requirements for OCTA TSSP projects require a multi - jurisdictional approach to traffic signal synchronization to improve traffic flow along entire corridors through bordering jurisdictions. To meet these requirements, Newport Coast Drive (Phase 6B) of the modernization project includes two City of Irvine traffic signals and one Caltrans traffic signal to synchronize the entire corridor from Bonita Canyon Drive to Coast Highway. Equipment upgrades for these three intersections are minimal and completely funded by the grant. The required matching costs from the City of Irvine and Caltrans will be accounted for with their staff time for project review, approval, and inspection as "In- Kind" services. A cooperative agreement with the agencies for the Newport Coast Drive corridor will be developed through the project process. The San Joaquin Hills Road Corridor, from Jamboree Road to Newport Coast Drive, is within the City of Newport Beach and will not require a cooperative agreement with another agency. 2 of 31 Approval of Professional Services Agreement with Iteris, Inc., for Traffic Signal Modernization Project — San Joaquin Hills Road (Phase 6A) and Newport Coast Drive (Phase 66) November 27, 2012 Page 3 The services included in the Iteris agreement are described below and detailed in the attached Professional Services Agreement: 1. Preparation of Phase 6A and 6B Plans, Specifications, and Estimates (PS &E). The Project consists of upgrades to the traffic signal control and communication equipment at 23 existing signalized intersections along: • San Joaquin Hills Road: Jamboree Road to Newport Coast Drive • Newport Coast Drive: Bonita Canyon Drive to Coast Highway Closed Circuit Television Cameras (CCTV) will be installed at the following four intersections: • San Joaquin Hills Road /Marguerite Avenue; • San Joaquin Hills Road /Newport Coast Drive; • Newport Coast Drive /Ridge Park Road; and • Newport Coast Drive /Coast Highway. Fiber Optic interconnect cable will be installed along the following corridor segments to close gaps in the exiting traffic signal communication network: • San Joaquin Hills Road: San Joaquin Hills Road to Newport Coast Drive • Newport Coast Drive: San Joaquin Hills Road to Pelican Hills Road North 2. Develop and deploy optimized traffic signal timing plans for traffic signals and corridors along San Joaquin Hills Road and Newport Coast Drive. As with the previous phases of the Traffic Signal Modernization Project, Iteris will review existing conditions and traffic signal timing to create new timing and coordination plans. The timing review will also ensure the City is in compliance with State and Federal traffic signal timing guidelines. Iteris will implement the optimized traffic signal coordination plans into the City's traffic signal system and "fine- tune" the traffic signal system through field observations. 3. Preparation of PS &E for rehabilitation of the San Joaquin Hills Road /Crown Drive and the Newport Coast Drive /Coast Highway traffic signals. 4. Ongoing traffic signal timing and detection maintenance. 3 of 31 Approval of Professional Services Agreement with Iteris, Inc., for Traffic Signal Modernization Project — San Joaquin Hills Road (Phase 6A) and Newport Coast Drive (Phase 613) November 27, 2012 Page 4 As required by the OCTA grant, Iteris will continue to observe the traffic signal timing and vehicle detection for a period of two years after the completion of the project. Iteris will work with Staff to correct any observed issues. 5. Project Management and Coordination. Iteris will aid Staff with coordination between agencies and to manage grant deadlines and submittals to OCTA. ENVIRONMENTAL REVIEW: Staff recommends the City Council find this project exempt from the California Environmental Quality Act ( "CEQA ") pursuant to Section 15301, (for repair, maintenance and minor alteration of existing public facilities) of the CEQA Guidelines, California Code of Regulations, Title 14, Chapter 3, because it has no potential to have a significant effect on the environment. NOTICING: The agenda item has been noticed according to the Brown Act (72 hours in advance of the meeting at which the City Council considers the item). Submitted by: David A. Webb Director of Public Works Attachments: A. Traffic Signal Modernization Exhibit B. Professional Services Agreement and Scope of Services 4 of 31 LEGEND PHASES I - 5 G ] COMPLETED (9) SIGNALS) PHASE 6A PLANNED COA:STUCTION VV 12-13 (651CN.LL5)` PHASE 6B FUTURE PLANNED CONST FY 1. -14O SIGNALS)• PHASE RA FUTURE PLANNED CONST FY 1I -13 IS SIC \ALS)" PHASE RR FUTURE (10 SIGNALS) PHASES I -5 3 ] CCTV CAMERAS COMPLETED (?] CAMERAS) PHASE 6A CCTV CA51ERASS 0 CAINIERASI PHASE 6R FUTURE CM' CAMERAS (4 CAMERAS) PHASE %A PLANNED CONK F- I243 OCTA FUNDED -CITY OF IRV NNE LED D G ?IERAl PHASE XB FUTURE CCTV CAMERAS (6 CAMERAS) COALM UNICA'I'ION NUR p13 FUNDED E Al2 FUNDED - CI'EY OF IRVINE LED PROJECT REVISED APRIL 19, 2011 DESIGN PROFESSIONAL SERVICES AGREEMENT WITH ITERIS, INC. FOR TRAFFIC SIGNAL MODERNIZATION PHASES 6A AND 6B THIS AGREEMENT FOR PROFESSIONAL SERVICES ( "Agreement') is made and entered into as of this day of October, 2012 ( "Effective Date ") by and between the CITY OF NEWPORT BEACH, a California Municipal Corporation ( "City'), and ITERIS, INC., a Delaware corporation ( "Consultant" or "iteris" ), whose address is 1700 Carnegie Ave, Suite 100, Santa Ana, California 92705 and is made with reference to the following: RECITALS A. City is a municipal corporation duly organized and validly existing under the laws of the State of California with the power to carry on its business as it is now being conducted under the statutes of the State of California and the Charter of City. B. City desires to engage Consultant to prepare design packages and assist with traffic signal timing development and deployment for the Traffic Signal Modernization Phases 6A and 6B ( "Project "). C. Consultant possesses the skill, experience, ability, background, certification and knowledge to provide the professional services described in this Agreement. D. The principal member of Consultant for purposes of Project shall be Paul Frislie E. City has solicited and received a proposal from Consultant, has reviewed the previous experience and evaluated the expertise of Consultant, and desires to retain Consultant to render professional services under the terms and conditions set forth in this Agreement. NOW, THEREFORE, it is mutually agreed by and between the undersigned parties as follows: TERM The term of this Agreement shall commence on the Effective Date, and shall terminate on June 30, 2016 unless terminated earlier as set forth herein. 2. SERVICES TO BE PERFORMED City and Consultant acknowledge that the above Recitals are true and correct and are hereby incorporated by reference into this Agreement. Consultant shall diligently perform all the services described in the Scope of Services attached hereto as Exhibit A and incorporated herein by reference ( "Services" or "Work "). The City may elect to delete certain services within the Scope of Services at its sole discretion. 6 of 31 3. TIME OF PERFORMANCE 3.1 Time is of the essence in the performance of Services under this Agreement and Consultant shall perform the Services in accordance with the schedule included in Exhibit A. In the absence of a specific schedule, the Services shall be performed to completion in a diligent and timely manner. The failure by Consultant to strictly adhere to the schedule set forth in Exhibit A, if any, or perform the Services in a diligent and timely manner may result in termination of this Agreement by City. 3.1.1 Notwithstanding the foregoing, Consultant shall not be responsible for delays due to causes beyond Consultant's reasonable control. However, in the case of any such delay in the Services to be provided for the Project, each party hereby agrees to provide notice within two (2) days of the occurrence causing the delay to the other party so that all delays can be addressed. 3.2 Consultant shall submit all requests forextensions of time for performance in writing to the Project Administrator (as defined in Section 6 below) not later than ten (10) calendar days after the start of the condition that purportedly causes a delay. The Project Administrator shall review all such requests and may grant reasonable time extensions for unforeseeable delays that are beyond Consultant's control. 3.3 For all time periods not specifically set forth herein, Consultant shall respond in the most expedient and appropriate manner under the circumstances, by fax, hand - delivery or mail. 4. COMPENSATION TO CONSULTANT 4.1 City shall pay Consultant for the Services on a time and expense not -to- exceed basis in accordance with the provisions of this Section and the Schedule of Billing Rates or Progress Payments Schedule attached hereto as Exhibit B and incorporated herein by reference. Consultant's compensation for all Work performed in _accordance with this Agreement, including all reimbursable items and subconsultant fees, shall not exceed Three Hundred Eighty -Seven Thousand, Three Hundred Five Dollars and 00/100 ($387,305.00) without prior written authorization from City. No billing rate changes shall be made during the tern of this Agreement without. the prior written approval of City. 4.2 Consultant shall submit monthly invoices to City describing the Work performed the preceding month. Consultant's bills shall include the name of the person who performed the Work, •a brief description of the Services performed and /or the specific task in the Scope of 'Services to which it relates, the date the Services were performed, the number of hours spent on all Work billed on an hourly basis, and a description of any reimbursable expenditures. City shall pay Consultant no later than thirty (30) days after approval of the monthly invoice by City staff. 4.3 City shall reimburse Consultant only for those costs or expenses specifically identified in Exhibit B to this Agreement, or specifically approved in writing in advance by City. ITERIS, INC. Page 2 °ts 4.4 Consultant shall not receive any compensation for Extra Work performed Without the prior written authorization of City. As used herein, "Extra Work" means any Work that is determined by City to be necessary for the proper completion of the Project, but which is not included within the Scope of Services and which the parties did not reasonably anticipate would be necessary at the execution of this Agreement. Compensation for any authorized Extra Work shall be paid in accordance with the Schedule of Billing Rates as set forth in Exhibit B. 5. PROJECT MANAGER 5.1 Consultant shall designate a Project Manager, who shall coordinate all phases of the Project. This Project Manager shall be available to City at all reasonable times during the Agreement term. Consultant has designated Paul Frislie to be its Project Manager. Consultant shall not remove or reassign the Project Manager or any personnel listed in Exhibit A or assign any new or replacement personnel to the Project without the prior written consent of City. City's approval shall not be unreasonably withheld with respect to the removal or assignment of non -key personnel. 5.2 Consultant, at the sole discretion of City, shall remove from the Project any of its personnel assigned to the performance of Services upon written request of City. Consultant warrants that it will continuously furnish the necessary personnel to complete the Project on a timely basis as contemplated by this Agreement. 5.3 If Consultant is performing inspection services, for City, the Project Manager and any other assigned staff shall be equipped with a cellular phone to communicate with City staff. The Project Manager's cellular phone number shall be provided to the City. 6. ADMINISTRATION This Agreement will be administered by 'the Public Works Department. Brad Sommers, Senior Civil Engineer or his1her designee, shall be the Project Administrator and shall have the authority to act for City under this Agreement. The Project Administrator or his /her designee shall represent City in all matters pertaining to the Services to be rendered pursuant to this Agreement. 7. CITY'S RESPONSIBILITIES 7.1 To assist Consultant in the execution of its responsibilities under this Agreement, City agrees to, where applicable: 7.1.1 Provide access to, and upon request of Consultant, one (1) copy of all existing relevant information on file at City. City will provide all such existing relevant information in a timely manner so as not to cause delays in Consultants Work schedule. 7.1.2 Provide blueprinting and other services through City's reproduction company for bid documents. Consultant will be required to coordinate the required bid documents with City's reproduction company. All other reproduction will be the responsibility of Consultant. ITERIS, INC. Page 3 8 of 31 7.1.3 Provide usable life of facilities criteria and information with regards to new facilities or facilities to be rehabilitated. 8. STANDARD OF CARE 8.1 All of the Services shall be performed by Consultant or under Consultant's supervision. Consultant represents that it possesses the professional and technical personnel required to perform the Services required by this Agreement, and that it will perform all Services in a manner commensurate with the highest professional standards. For purposes of this Agreement, the phrase "highest professional standards" shall mean those standards of practice recognized by one (1) or more first - class firms performing similar work under similar circumstances. 8,2 All Services shall be performed by qualified and experienced personnel who are not employed by City. By delivery of completed Work, Consultant certifies that the Work conforms to the requirements of this Agreement; all applicable federal, state and local laws; and the highest professional standard. 8.3 Consultant represents and warrants to City that it has, shall obtain, and shall keep in full force and effect during the term hereof, at its sole cost and expense, all licenses, permits, qualifications, insurance and approvals of whatsoever nature that is legally required of Consultant to practice its profession. Consultant shall maintain a City of Newport Beach business license during the term of this Agreement. 8.4 Consultant shall not be responsible for delay, nor shall Consultant be responsible for damages or be in default or deemed to be in defalllt by reason of strikes, lockouts, accidents, acts of God, or the failure of City to furnish timely information or to approve or disapprove Consultant's Work promptly, or delay or faulty performance by City, contractors, or governmental agencies. 9. HOLD HARMLESS 9.1 To the fullest extent permitted by law, Consultant shall indemnify, defend and hold harmless City, its City Council, boards and commissions, officers, agents, volunteers and employees (collectively, the "Indemnified Parties) from and against any and all claims (including, without limitation, claims for bodily injury, death or damage to property), dernands, obligations, damages, actions, causes of action, suits, losses, judgments, fines, penalties, liabilities, costs and expenses (including, without limitation, attorney's fees, disbursements and court costs) of every kind and nature whatsoever (individually, a Claim; collectively, "Claims "), which may arise under this Agreement or in any manner relate (directly or indirectly) to the negligence, recklessness, or willful misconduct of the Consultant or its principals, officers, agents, employees, vendors, suppliers, subconsultants, subcontractors, anyone employed directly or indirectly by any of them or for whose acts they may be liable or any or all of them. 9.2 Notwithstanding the foregoing, nothing herein shall be construed to require Consultant to indemnify the Indemnified Parties from any Claim arising from the sole negligence, active negligence or willful misconduct of the Indemnified Parties. Nothing in this indemnity shall be construed as authorizing any award of-attorney's fees in any action on or to enforce the terms of this Agreement. This indemnity shall apply to ITERIS, INC. Page 4 9 of 31 all claims and liability regardless of whether any insurance policies are applicable. The policy limits do not act as a limitation upon the amount of indemnification to be provided by the Consultant. 10. INDEPENDENT CONTRACTOR It is understood that City retains Consultant on an independent contractor basis and Consultant is not an agent or employee of City. The manner and means of conducting the Work are under the control of Consultant, except to the extent they are limited by statute, rule or regulation and the expressed terms of this Agreement. No civil service status or other right of employment shall accrue to Contractor or its employees. Nothing in this Agreement shall be deemed to constitute approval for Consultant or any of Consultant's employees or agents, to be the agents or employees of City. Consultant shall have the responsibility for and control over the means of performing the Work, provided that Consultant is in compliance with the terms of this Agreement. Anything in this Agreement that may appear to give City the right to direct Consultant as to the details of the performance of the Work or to exercise a measure of control over Consultant shall mean only that Consultant shall follow the desires of City with respect to the results of the Services. 11. COOPERATION Consultant agrees to work closely and cooperate fully with City's designated Project Administrator and any other agencies that may have jurisdiction or interest in the Work to be performed. City agrees to cooperate with the Consultant on the Project. 12. CITY POLICY Consultant shall discuss and review all matters relating to policy and Project direction with City's Project Administrator in advance of all critical decision points in order to ensure the Project proceeds in a manner consistent with City goals and policies. 13. PROGRESS Consultant is responsible for keeping the Project Administrator and /or his /her duly authorized designee informed on a regular basis regarding the status and progress of the Project, activities performed and planned, and any meetings that have been scheduled or are desired. 14. INSURANCE Without limiting Consultant's indemnification of City, and prior to commencement of Work, Consultant shall obtain., provide and maintain at its own expense during the term of this Agreement or for other periods as specified in this Agreement, policies of insurance of the type, amounts, terms and conditions described in the Insurance Requirements attached hereto as Exhibit C and incorporated herein by reference. ITERIS, INC. Page 510 of 31 15. PROHIBITION AGAINST ASSIGNMENTS AND TRANSFERS Except as specifically authorized under this Agreement, the Services to be provided under this Agreement shall not be assigned, transferred contracted or subcontracted out without the prior written approval of City. Any of the following shall be construed as an assignment: The sale, assignment, transfer or other disposition of any of the issued and outstanding capital stock of Consultant, or of the interest of any general partner or joint venturer or syndicate member or cotenant if Consultant is a partnership or joint- venture or syndicate or cotenancy, which shall result in changing the control of Consultant. Control means fifty percent (50 %) or more of the voting power, or twenty -five percent (25 %) or more of the assets of the corporation, partnership or joint - venture. 16. SUBCONTRACTING The subcontractors authorized by City, if any, to perform Work on this Project are identified in Exhibit A. Consultant shall be fully responsible to City for all acts and omissions of any subcontractor. Nothing in this Agreement shall create any contractual relationship between City and any subcontractor nor shall it,create any obligation on the part of City to pay or to see to the payment of any monies due to any such subcontractor other than as otherwise required by law. The City is an intended beneficiary of any Work performed by the subcontractor for purposes of establishing a duty of care between the subcontractor and the City. Except as specifically authorized herein, the Services to be provided under this Agreement shall not be otherwise assigned, transferred, contracted or subcontracted out without the prior written approval of City. 17. OWNERSHIP OF DOCUMENTS 17.1 Each and every report, draft, map, record, plan, document and other writing produced (hereinafter "Documents "), prepared or caused to be prepared by Consultant, its officers, employees, agents and subcontractors, in the course of implementing this Agreement, shall become the exclusive property of City, and City shall have the sole right to use such materials in its discretion without further compensation to Consultant or any other party. Consultant shall, at Consultant's expense, provide such Documents to City upon prior written request. 17.2 Documents, including drawings and specifications, prepared by Consultant pursuant to this Agreement are not intended or represented to be suitable for reuse by City or others on any other project. Any use of completed Documents for other projects and any use of incomplete Documents without specific written authorization from Consultant will be at City's sole Consultant. Further, any and all liability arising out of deliverables under this Agreement by City or persons o against Consultant and City assumes full responsibility has given Consultant prior notice and has received from such changes. risk and without liability to :hanges made to Consultant's her than Consultant is waived for such changes unless City Consultant written consent for ITERIS, INC. Page 611 of 31 17.3 All improvement and /or construction plans shall be prepared with indelible waterproof ink or electrostaticly plotted on standard twenty -four inch (24 ") by thirty -six inch (36 ") Mylar with a minimum thickness of three (3) mils. Consultant shall provide to City 'As- Quilt' drawings and a copy of digital Computer Aided Design and Drafting ( "CADD ") and Tagged Image File Format (.tifo files of all final sheets within ninety (90) days after finalization of the Project. For more detailed requirements, a copy of the City of Newport Beach Standard Design Requirements is available from the City's Public Works Department. 18. COMPUTER DELIVERABLES CADD data delivered to City shall in the professional stamp of the engineer or architect in charge of or responsible for the Work. City agrees that Consultant shall not be liable for claims, liabilities or losses arising out of, or connected with (a) the modification or misuse by City, or anyone authorized by City, of CADD data; (b) the decline of accuracy or readability of CADD data due to inappropriate storage conditions or duration; or (c) any use by City, or anyone authorized by City, of CADD data for additions to this Project, for the completion of this Project by others, or for any other Project, excepting only such use as is authorized, in writing, by Consultant. By acceptance of CADD data, City agrees to indemnify Consultant for damages and liability resulting from the modification or misuse of such CADD data. All original drawings, shall be submitted to City in the version of AIItoCAD used by the City in .dwg file format, on a CD; and should comply with the City's digital submission requirements for improvement plans available from the City's Public Works Department. The City will provide Consultant with City title sheets as AutoCAD file(s) in .dwg file format. All written documents shall be transmitted to City in formats compatible with Microsoft Office and /or viewable with Adobe Acrobat. 19. CONFIDENTIALITY All Documents, including drafts, preliminary drawings or plans, notes and communications that result from the Services in this Agreement, shall be kept confidential unless City expressly authorizes in writing the release of information. 20. OPINION OF COST Any opinion of the construction cost prepared by Consultant represents the Consultant's judgment as a design professional and is supplied for the general guidance of City. Since Consultant has no control over the cost of labor and material, or over competitive bidding or market conditions, Consultant does not guarantee the accuracy of such opinions as compared to consultant or contractor bids;or actual cost to City. 21. INTELLECTUAL PROPERTY INDEMNITY The Consultant "shall defend and indemnify City, -its agents„ officers, representatives and employees against any and all liability, including costs, for infringement or alleged infringement of any United States' letters patent, trademark, or copyright, including costs, contained in Consultant's Documents provided under this Agreement. ITERIS, INC. Page 712 of 31 22. RECORDS Consultant shall keep records and invoices in connection with the Services to be performed under this Agreement. Consultant shall maintain complete and accurate records with respect to the costs incurred under this Agreement and any Services, expenditures and disbursements charged to City, for a minimum period of three (3) years, or for any longer period required by law, from the date of final payment to Consultant under this Agreement. All such records and invoices shall be clearly identifiable. Consultant shall allow a representative of City to examine, audit and make transcripts or copies of such records and invoices during regular business hours. Consultant shall allow inspection of all Work, data, Documents, proceedings and activities related to the Agreement for a period of three (3) years from the date of final payment to Consultant under this Agreement. 23. WITHHOLDINGS City may withhold payment to Consultant of any disputed sums until satisfaction of the dispute with respect to such payment. Such withholding shall not be deemed to constitute a failure to pay according to the terms of this Agreement. Consultant shall not discontinue Work as a result of such withholding. Consultant shall have an immediate right to appeal to the City Manager or his /her designee with 'respect to such disputed sums. Consultant shall be entitled to receive interest on any withheld sums at the rate of return that City earned on its investments during the time period, from the date of withholding of any amounts found to have been improperly withheld. 24. ERRORS AND OMISSIONS In the event of errors or omissions that are due to the negligence or professional inexperience of Consultant which result in expense to City greater than what would have resulted if there were not errors or omissions, in the Work accomplished by Consultant, the additional design, construction and /or restoration expense shall be borne by Consultant. Nothing in this Section is intended to limit City's rights under the law or any other sections of this Agreement. 25. CITY'S RIGHT TO EMPLOY OTHER CONSULTANTS City reserves the right to employ other Consultants in connection with the Project. 26. CONFLICTS OF INTEREST 26.1 The Consultant or its employees may be subject to the provisions of the California Political Reform Act of 1974 .(the "Act'), which (1) requires such persons to disclose any financial interest that may foreseeably be materially affected by the Work performed under this Agreement, and (2) prohibits such persons from making, or participating in making, decisions that will foreseeably financially affect such interest. 26,2 If subject to the Act, Consultant shall conform to all requirements of the Act. Failure to do so constitutes a material breach and is grounds for immediate termination of this Agreement by City. Consultant shall indemnify and hold harmless ITERIS, INC. Page 813 of 31 City for any and all claims for damages resulting from COnSUlta t'S violation of this Section. 27. NOTICES 27.1 All notices, demands, requests or approvals, including any change in mailing address, to be given under the terms of this Agreement shall be given in writing, and conclusively shall be deemed served when delivered personally, or on the third business day after the deposit thereof in the United States mail, postage prepaid, first - class mail, addressed as hereinafter provided. All notices, demands, requests or approvals from Consultant to City shall be addressed to City at: Attn: Brad Sommers, Senior Civil Engineer Public Works City of Newport Beach 3300 Newport Boulevard PO Box 1768 Newport Beach, CA 92658 Phone: (949) 644 -3326 Fax: (949)644 -3318 27.2 All notices, demands, requests or approvals from City to Consultant shall be addressed to Consultant at' Attn: Paul Frislie ITERIS, INC. 17.00 Carnegie Ave, Suite 100 Santa Ana, CA 92705 Phone: (949) 270 -9661 Fax: (949) 270 -9401 28. CLAIMS Unless a shorter time is specified - elsewhere in this Agreement, before making its final _ request for payment under this Agreement, Consultant shall submit to City, in writing, all claims for compensation under or arising out of this Agreement. Consultant's acceptance of the final payment shall 'constitute a waiver of all claims for compensation under or- arising out of this Agreement except those previously made in writing and identified by Consultant in writing as unsettled at the time of its final request for payment. The Consultant and the City expressly agree that in addition to any claims filing requirements set forth in the Agreement, the Consultant shall be required to file any claim the Consultant may have against the City in strict conformance with the Tort Claims Act (Government Code sections 900 et seq.). 29. TERMINATION 29.1 In the event that either party fails or refuses to perform any of the provisions of this Agreement at the time and in the manner required, that party shall be deemed in default in the performance of this Agreement. If such default is not cured within a period of two (2) calendar days, or if more than two (2) calendar days are ITERIS, INC. Page 914 of 31 reasonably required to cure the default and the defaulting party fails to give adequate assurance of clue performance within two (2) calendar days after receipt of written notice of default, specifying the nature of such default and the steps necessary to cure such default, and thereafter diligently take steps to cure the default, the non - defaulting party may terminate the Agreement forthwith by giving to the defaulting party written notice thereof. 29.2 Notwithstanding the above provisions, City shall have the right, at its sole and absolute discretion and without cause, of terminating this Agreement at any time by giving no less than seven (7) calendar days prior written notice to Consultant. In the event of termination under this Section, City shall pay Consultant for Services satisfactorily performed and costs incurred up to the effective date of termination for which Consultant has not been previously paid. On the effective date of termination, Consultant shall deliver to City all reports, Documents and other information developed or accumulated in the performance of this Agreement, whether in draft or final form. 30. STANDARD PROVISIONS 30.1 Compliance with all Laws. Consultant shall at its own cost and expense comply with all statutes, ordinances, regulations and requirements of all governmental entities, including federal, state; county or municipal, whether now in force or hereinafter enacted. In addition, all Work pi`epared by Consultant shall conform to applicable City, county, state and federal laws, rules, regulations and permit requirements and be subject to approval of the Project Administrator and City. 30.2 Waiver. A waiver by either party of any breach; of any term, covenant or condition contained herein shall not be deemed to be a waiver of any subsequent breach of the same or any other term, covenant or condition contained herein, whether of the same or a different character. 30.3 Integrated Contract. This Agreement represents the full and complete understanding of every kind or nature whatsoever between the parties hereto, and all preliminary negotiations and agreements of whatsoever Kind or nature are merged herein. No verbal agreement or implied covenant shall be held to vary the provisions herein. 30.4 Conflicts or Inconsistencies. In the event there are any conflicts or inconsistencies between this Agreement and the Scope of Services or any other attachments attached hereto, the terms of this Agreement shall govern. 30.5 Interpretation. The terms of this Agreement shall be construed in accordance with the meaning of the language used and shall not be construed for or against either party by reason of the authorship of the Agreement or any other rule of construction which might otherwise apply. 30.6 Amendments. This Agreement may be modified or amended only by a written document executed by both Consultant and City and approved as to form by the City Attorney. ITERIS, INC. Page 1015 of 31 30.7 Severability. If any term or portion of this Agreement is held to be invalid, illegal, or otherwise unenforceable by a Court of competent jurisdiction, the remaining provisions of this Agreement shall continue in full force and effect. 30.8 Controllinq Law and Venue. The laws of the State of California shall govern this Agreement and all matters relating to it and any action brought relating to this Agreement shall be adjudicated in a court of competent jurisdiction in the County of Orange, State of California. 30.9 Equal Opportunity Employment. Consultant represents that it is an equal opportunity employer and it shall not discriminate against any subcontractor, employee or applicant for employment because of race, religion, color, national origin, handicap, ancestry, sex, age or any other impermissible basis under law. 30.10 No Attorney's Fees. In the event of any dispute or legal action arising under this Agreement; the prevailing party shall not be entitled to attorney's fees. 30.11 Counterparts. This Agreement may be executed in two (2) or more counterparts, each of which shall be deemed an original and all of which together shall constitute one (1) and the same instrument. [SIGNATURES ON NEXT PAGE] ITERIS, INC. Page 1196 of 31 IN WITNESS WHEREOF, the patties have caused this Agreement to be executed on the dates written below. APPROVED AS TO FORM: CITY ATTORNEY'S OFFICE CITY OF NEWPORT BEACH, A California municipal corporation Date: / ' r ' Aardin' C. Harp Z Nancy Gardner City Attorney Ilfl Mayol' ATTEST: CONSULTANT: ITERIS, INC., a Delaware Date: corporation Date: By: By: Leilani I. Brown Dan Gilliam City Clerk Vice President Date: By: James S. Miele Chief Financial Officer [END OF SIGNATURES] Attachments: Exhibit A — Scope of Services Exhibit B — Schedule of Billing Rates Exhibit C — Insurance Requirements f: lappslsharedl lemlilateslprofessional serviceslpsa engineer architect.doN ITERIS, INC. Page 1217 of 31 EXHIBIT A SCOPE OF SERVICES ITERIS, INC. Page A -1 8 of 31 M' Newport Beach Signal] Modernization ion Phase 6A Project er. r an JoagnIn Hills Road Corridor Ft ail %nR1111• A. PROJECT APPROACH Iteris has prepared a detailed scope of work to ensure that the Traffic Signal Modernization Phase 6A project is completed on time, within budget and to the complete satisfaction of the City. Iteris proposes to complete the design of the project (Task 1) within a three - month time period; a schedule that should allow the City to capture the low construction costs. The schedule for signal timing Is devised to implement signal timing plans after construction is completed. The project approach is based on the project understanding, project issues and goals, Iteris' depth of understanding of both ITS and Systems Engineering; and past experience working with the City of Newport Beach on the Traffic Signal Communication Master Plan and Phase I PS &E, the Traffic. Signal Modernization Phase 2 and Phase 3, the Traffic Signal Modernization Phase 4 and 7, and the Traffic Signal Modernization Phase 5 projects. Iteris' approach is divided into the tasks listed below. • Task 0: Project Management • Task 1: Traffic Signal System Modernization Design (PS &E) • Task 2: Traffic Signal Timing Development and Deployment • Task3: Construction Support • Task 4: Before and After Travel Time Studies • Task 5: On -Going Maintenance and Operation This scope of work is based on the services Iteris provided to the City on previous design and timing synchronization projects as previously noted, as well as the details of the Master Plan specific for Phase 6A and input from City staff. Additionally, being an OCTA Measure M2- funded- project, there are additional Project Management, before and after studies, and on- going maintenance tasks that are required for this project Iteris will work with City staff to prepare a detailed schedule as necessary to meet any project requirements and Is proposing a 3 -month schedule to complete design. Note that the preparation of the signal timing plans can occur at any time. Iteris recommends that the initial data collection for the signal timing effort be completed in parallel with the design field work. However, the traffic counts should be collected while school is in session (January — June or September — November), which may require an adjustment in the schedule for Task 2. Implementation and fine- tuning will be completed after construction of the traffic signal system modernizations. I; � II ifltCl I,l!��Pi�srh�l Ipl. IJ- ht1u,L+faislG� ^Jrjlut.�;jialb]I Iteris strongly believes that excellent project management is essential in the successful completion of any project. successful completion does not only mean finishing the project, but also completing the project to the client's satisfaction within budget and on schedule. As part of Iteris_' project management strategy, Mr. Paul Frislie will serve as the Project Manager (PM) for this project. He will be the principal contact with the ..City and other entities per the City's direction. As part of the Project Management task, Mr. Frislie will be available to attend regular meetings with City staff and prepare and present status reports. He will also be available to City staff should specific questions arise throughout the duration of the project and for special coordination meetings to discuss the project with other stakeholders /nelghboring- agencies. Mr. Frislie will be supported by Mr. Scott Carlson who will serve as the Senior Advisor on this project. IlL 11.e110 K Page 11 19 of 31 NewpoIrtk Beach 509nall GUilodell ImlzaNio n Ahfase 6A Plrc)ect he r r San Joarlidn Hills (load Corridor I��r.rruNVd• Iteris' PM approach has been developed through many years of experience, and has proven effective in measuring progress, anticipating problems, reacting qulcldy to changes in the requirements and maintaining schedule integrity. This approach is designed with checks and balances that have resulted in an Impressive track record of successful projects. Some Items that contribute to this approach are discussed briefly below. COMMUNICATION Active and open communication between the City and Iteris is vital. Communication is essential to the successful outcome of any project. Iteris' primary objective is to keep the City abreast of the developments that Impact the project. QUALITY ASSURANCE /QUALITY CONTROL (QA /QC) Iteris' ability to implement high - quality deliverables is result of the adherence to a quality assurance program that ensures accuracy, product usability and an overall commitment to pindUct excellence and user satisfaction. The Iteris PM ensures the team's commitment to these objectives by identifying goals at the outset of the project and monitoring the product Implementation and delivery process. Iteris strives to improve the processes and tools used to provide high- quality products and services.. INTERNAL QA /QC Iteris' quality assurance also includes internal management reviews. Iteris upper -level management Is committed to maintaining a proper environment for the successful execution of the project, providing projects with adequate resources, and monitoring the effectiveness of the project PM and the project team. Internal management conducts monthly project review meetings, reviewing the current project status against the current project schedule to ensure that projects are kept on schedule and on budget. OCTA M2 PROJECT MANAGEMFNTTASKS Iteris will provide project management service to the City in fulfilling OCTA's Comprehensive Transportation Funding Programs (CTFP) requirements, which include preparation and submission of final report and payment application to OCTA. The report . will be prepared In full compliance with the CTFP funding guidelines. We will also coordinate with OCTA staff throughout the review process until the project is approved by OCTA. Ililll2ail„ u.hY l;lellrr"i7ls'Ir 1W This task will focus on the continued citywide upgrade of the City's VMS 330 traffic signal system to the Centrocs'"' traffic signal system, the deployment of CCTV cameras at select intersections and upgrades (rewire, signal . modifications) at select signalized intersections, all of which will be supported by Ethernet -based coimnunications employing a combination of new fiber optic cable and existing twisted pair cable. The Project will include a total of 12 City of Newport Beach signalized intersections. The listing of project signalized intersections below includes the type of existing traffic signal controller. (1.) (2) (3) (4) (S) (6) (7) (8) Page 12 San Joaquin Hills Road & Jamboree. Road San Joaquin Hills Road &Santa Cruz Drive / Big Canyon Drive San Joaquin Hills Road & Santa Rosa Drive / Big Canyon Drive San Joaquin Hills Road & MacArthur Boulevard San Joaquin Hills Road & San Miguel Drive San Joaquin Hills Road & Crown Drive San Joaquin Hills Road & Marguerite Avenue San Joaquin Hills Road & Spy Glass Hill Road Existing ASC /3 Existing ASC /3 Existing ASC /3 Existing ASC /3 Existing ASC /3 Existing 820A Existing 820A Existing 820A X111 "ICY 20 of 31 r �1 psYr"��; Newport Beach SOgnag WilodemilzatHon Phase 6A Pro�ece r r -gr San Joaquhi Mills Rnad Cnrridm' u (4) San Joaquin Hills Road & Newport Ridge Drive West Existing 820A (10) San Joaquin Mills Road & Newport Ridge Drive East/ Ridge Park Road Existing 820A (11) San Joaquin Hills Road & Newport Coast Drive Existing 820A (12) Ridge Park Road Eire Station /Center Drive Existing 820A The Project signalized Intersections, as shown in Figure 1, represent a portion of Phase G of the Master Plan. The output of Task 1. will be a detailed Plans, Specifications and Estimate (PS &E) package for the system elements summarized below. Page 13 Figure 1: Project Area Map 21 of 31 ._Fanolw ., r � ' yi °vim I� I "u�� Nen_Tp ��b °oysr)�n» / • I � :::TTT Lacdon Map Lwene O 1nd:5Sp9 prJl:'. 0 L(J Iqn ?G11 '14b IOi) 1 21 of 31 f { W Pp�� Newport Beach Vgnag Modevnb.aUon Phase 6A Project u Y r Sap Joaquin Hills Road Col Odor I1 ��firONp 1. Traffic signal Cabinet: Replace existing traffic signal cabinet at San Joaquin Hills Road at Marguerite Avenue and San Joaquin Hills Road at San Miguel Drive. 2. Traffic Signal Controllers: Replace existing traffic signal controllers at six (6) existing Project signalized intersections with new City - furnished Econolite ASC /3 shelf -mount traffic signal controllers in NEMA cabinet's. 3. CCTV Surveillance Cameras: Prepare design to implement new CCTV cameras at two (2) signalized intersections with cameras mounted on existing traffic signal poles and matching:IP encoders installed in the traffic signal controller cabinets at locations as noted below. (1) San Joaquin Hills Road at Marguerite Avenue (2) San Joaquin Hills Road at Newport Coast Drive 4. Communications: The Project signalized intersections east of San Miguel Drive, are currently supported with twisted pair cable. The City's existing communications will be modernized to support Ethernet communications to all traffic signal controllers along the corridor and the CCTV cameras, The upgrades will utilize the existing infrastructure to the maximum extent possible, and will Include new fiber optic cable. The details of the communications upgrades are summarized below. (1) San Joaquin Hills Road': Communication upgrades will consist of new fiber optic cable installed in existing condult along San Joaquin Hills Road from San Miguel Drive to Newport Coast Drive. (2) Possible fiber termination for the Newport Coast Community Center (3) Ridge Park Road: Utilize existing twisted pair cable between Newport Coast Drive and Center Drive. 5. Full Intersection Rehab: Upgrade existing signalized Intersection with 'new traffic signal poles, signal heads, pedestrian heads, traffic signal controller cabinet and new conductors (rewire), at one signalized intersections listed below. (1) San Joaquin Hills Road & Crown Drive Task 1.1: Preliminary Design and 30% Plans The first step in developing the PS &E package for the Traffic Signal System Modernization Phase 6A project is to prepare a Preliminary Design Technical Memorandum that both qualifies and quantifies the project elements. Under this task Iteris will detail the design of the signal system modernizations, CCTV camera design, and communication infrastructure to support the overall Project: Iteris has designed, deployed and integrated several systems similar to this for the City of Newport Beach and will be able to complete this effort as efficiently and effectively as possible. Based on the proposed scope of work and Iteris' understanding of the project, the Preliminary Design Technical Memorandum efforts will focus on the Project elements as detailed previously in Task '1. Upon completion of the field surveys, Iteris will prepare a Technical Memorandum for review by the City. The Technical Memorandum will serve as a basis for the Detailed Design completed In Task 1.2. City comments on Page 14 22 of 31 h1Newp dire Beach 509naH Wii1®ai er mOzatiomi Phase 6A Pvojectk :an Joaquin Hills Road Corridor the Technical Memorandum will be Incorporated Into the detailed design. Below Is a summary of the efforts that will sup portthe development of the Preliminary Design: Traffic Signal Modernization The design of the traffic signal controller upgrades will involve the preparation of design packages for the installation of new ASC /3 traffic signal controllers In existing traffic signal controller cabinets at select locations, as detailed in Task 1. 'file design of the traffic signal cabinet and controller replacements will include an extensive field review of the existing inventory and detail necessary cabinet equipment upgrades, intersection wiring, communications interface, as well as conduit and pull boxes. Civil engineering Improvements will be limited to the cabinets where it is determined that the existing cabinets need to be replaced. This work will be detailed on a combination of the 40 -scale communication design plans as well as 20 -scale Intersection plans in the case of signal rewiring and rehabs. The details of the :traffic signal controller modernization, including Ethernet communication requirements, recommended upgrades and integration with the new traffic signal system, and other possible Intersection upgrades, will be Incorporated Into the design CCTV Cameras The design of the CCTV cameras will involve the preparation of.PS &E'package for the installation of new CCTV cameras at the signalized intersections as detailed in Task 1. The design will include details on all necessary cabinet equipment upgrades, intersection wiring and communications Interface. Civil engineering improvements will be limited to the Installation of CCTV cameras on existing poles. The CCTV design will Include the plans, specifications and cost estimates for the implementation of CCTV cameras, and associated hardware to Interface the cameras with the fiber optic communication system. The design of the CCTV camera system will be hased on CCTV cameras, IP encoders and central camera control software by WILL Traffic Signal Communication Upgrades Iteris will prepare the PS &E for the COMMUnication system. The design of the communication system will focus on Implementing an Ethernet -based communications system to Support the Project traffic signal controller's and CCTV cameras, while serving as a foundation for the expansion of the communication system to other corridors and signalized intersections over time. The design of the Communication system will include fiber optic cable in a combination of primarily existing and select segments of new conduit. At the discretion, of the City, other communication mediums can be considered. The design of the communication system will include the use of existing conduit and pull boxes to the maximum extent possible and the installation of new conduit and pull boxes, as required, due to lack existing infrastructure or the lack of spare capacity in the existing infrastructure. Design Reviews and Approvals The Preliminary Design Memorandum will document the existing conditions, and detail the recommended design elements encompassed in the traffic signal controller upgrades, traffic signal cabinet upgrades, CCTV ITEMS- Page 15 23 of 31 h 1lempa®irg Beach SlIgnM hViladeu -now. tl oh Phase SA Prrojeal i Sanloaquin Hills (toad Corridor iy�9<IIURR��� cameras, and the communication upgrades, along with a. Preliminary Cost Estimate for construction. The Preliminary Design Memorandum will also include the 30% design that includes base plans and preliminary design elements that will be used to support the Preliminary Cost Estimate for construction. The Preliminary Design Memorandum will be submitted to the City in draft form. As a cost savings measure, lteris will conduct a review of City comments and incorporate them into the Detailed Design. The Preliminary Design Memorandum will not be updated and submitted as a final document. Required Permits, Affected Agencies and Coordination Issues The installation of the field elements will be done primarily in existing condult, minimizing the amount of construction, and will be completed within City right -of -way. It is not anticipated that any permits will be required. DelNerables: o Preliminary Design Memorandum 30 % Plans and Estimates Task 1.2: Detailed Design Once the details of the project elements have been Identified and agreed upon by the City in the form of City comments on the Preliminary Design Memorandum (Task 1.1), lteris will begin the detailed design phase that will produce the 90 %, 100% and final submittals. The plans and specifications will include the traffic signal controller upgrades, traffic signal cabinet upgrades, CCN cameras, wiring and other intersection upgrades, associated communication equipment, fiber optic and twisted pair communications and Infrastructure. The plans and specifications will be prepared to satisfy the requirements of the project. The final PS &E will Include all necessary improvements to be performed by a contractor for a complete and operational. system. The final PS &E will be prepared based on final comments from City staff. Plans will be prepared on AUtoCAD in English units for City right -of -way. It is anticipated that detailed PS &E packages will be prepared for the following items: R CCTV site plans at 20- scale. Communication Infrastructure, including conduit, pull boxes, etc., at 40- scale. Communication infastructure details for the installation of conduit, pull boxes and splice vaults, if applicable. • Traffic signal controller, cabinets and communication hardware upgrades at 40rscale as part of the communication plans. • Detailed coniimunication block diagrams forfield equipment and hardware, nodes, coin IIIunlcation hubs and fiber_ assignments. Based on initial estimates, it is envisioned that the PS &E package will be comprised of 20 plan sheets. Typical construction detail sheets will be prepared to support construction of items shown on the field element design plans. These sheets will cover details such as mounting configuration and hardware, and the installation of field element equipment. These sheets will also cover details such as trench configurations, pull box /splice ITE IS• Page 16 24 of 31 �%4(/�,1\ • `r Newport Beach ia�llrna� bull ®¢Veo-Mzafliion Phase 6A Pir¢oje cQ u hl San Joncirdn Flilk Road Curridur l�vir 4on: . vault details, risers, sweeps and bend requirements, structure crossings, splice procedures, arrangement of multllile field cabinets, cabinet equipment layout and power distribution assembly, and others needed to clearly illustrate the work required. Iteris assumes that the City will provide the following information to support the preparation of the detailed design. 1. Utility contact information 2. 20 -scale plans (electronically, scanned .tif files or hard copies) for the signalized intersections within the limits of the communication segments previous identified in this task. 3. Aerials and /or GIS files that include the communication segments previous identified in this task. Standard Specifications The City's Traffic Signal Specification Supplemental, updated by Iteris as part of the Phase 5 project will be used to support the Phase 6A project. Design Reviews and Approvals It Is assumed that the PS &E for the traffic signal controller upgrades, CCTV cameras, and Communications design elements will be submitted as one package and that each submittal will be subject to review by the City_ Comments from each review cycle received within the established time frames will be reviewed, discussed and incorporated into the next scheduled PS &E submittal.. Signature blocks for City will be added to the plans as appropriate. Iteris will meet with the City at each review to discuss the design and address comments. Comments received by the utilities and third party entities will be incorporated into subsequent submittals. Applicable Standards Design plans will be prepared in accordance with applicable pl. icablc. Caltrans or Newport Beach stancards, including Caltrans 2010 standards, Pubic Works Construction (2003) and City standards. Symbols and legends will be compiled based on discussions with the City and presented for approval before commencing with detailed design. NTCIP standards and open architecture standards will be identified and followed when possible. Estimates Construction cost estimates be submitted with the plan submittal at each submittal. For the final submittal, a detailed breakdown by project component will be Included in the Bid Summary. Oefiverobles: 90% PS &E 0 100 %PS &E a Final (Mylar) PS &E o final PS &E on CD or DVD Page 17 MZ 7, 71 R& ) V, , WIMM 25 of 31 i��QUrriR. I,� hiNeriu�m ®R`a I�easOn �GqoualV 6Ug®�12 rrimiielttB tDlm Phase SA Pi ®gectk San Joiiquin Hills Rind Corridor ib ' ilfl1[I)i r)'1 IIII {nJ�li;i.liJrl'�i)'l1O�1111- flu. "�1y.�i'_(I o,Ir Ir aY74i I�IlV °) �' I IV9J��/11�i 1cIAf Iteris will prepare the weckdaysignal timing plans as detailed in the subtasks presented in Task 2 for all Project signalized intersections listed below. (1) San Joaquin Hills Road & Jamboree Road (2) San Joaquin Hills Road & Santa Cruz Drive / Big Canyon Drive (3) San Joaquin Hills Road & Santa Rosa Drive / Big Canyon Drive (4) San Joaquin Hills Road & MacArthur Boulevard (5) San Joaquin Hills Road & San Miguel Drive (6) San Joaquin Bills Road & Crown Drive (7) San Joaquin lulls Road & Marguerite Avenue (B) San Joaquin 'Hills Road & Spy Glass Hill Road (9) San Joaquin Hills Road & Newport Ridge Drive West (10) San Joaquin Hills Road & Newport Ridge Drive East / Ridge Park Road (11) San Joaquin Mills Road & Newport Coast Drive One element of this task will be to determine the grouping of the Phase 6A signalized Intersections . for coordination, including where coordination between signalized Intersections does not make sense due to spacing, traffic patterns, etc. Based on discussions with City staff and Iteris' previous projects for crossing corridors (Jamboree Road and MacArthur Boulevard); there may be a need to update coordination plans along MacArthur Boulevard to maintain a similar cycle length throughout the stretch of San Joaquin Hills Road. Task 2:1: Field Review This sub -task involves conducting field reviews of the intersections to ensure a thorough understanding of current traffic operations conditions. The field review will support the signal timing analysis. Initial information will be obtained from Iteris' files based on previous work completed for the City of Newport Beach and additional verification will be completed through field reviews. The data that will be collected includes: physical intersection geometry, lane assignments, posted speed limits, crosswalk lengths, turn bay lengths, turn restrictions, intersection signing, vehicle pedestrian displays, pedestrian push buttons, and the condition of the existing controller cabinet and stub up conduit. Deliverable: e Field Review Technical Memorandum Task 2.2: Data Collection The focus of this task is to collect the necessary information to thoroughly understand existing traffic conditions and facilitate the analysis of optimized signal timing plans. 7 -Day Average Daily Traffic (ADT) Counts Iteris will conduct 7 -clay ADT counts at up to six (6) I<ey locations along the Project corridor's. This data will be utilized to better understand the peaking characteristics of Project corridors. The results of the 7 -day ADT counts will also be used to determine the 2 -hour peak periods In which the turning movement counts will be conducted during the AM, midday and PM peaks. In addition, ADT counts will be utilized to identify the need for additional coordination patters. 1111 li.'sR1Cny Page 18 26 of 31 rH f fL Newp oirt Beach SlignaV 6U odefrnlza on Phase 6A Piro ject f u r' San joaquin hlilis Iliad corritinr Turning Movement Counts. Upon the completion of the ADT count collection and activities, AM, midday and PM peal( .period turning movement counts will be conducted at all Project signalized intersections. Turning movement counts will be conducted at 2 -hour AM, midday, and PM peak periods. No weekend turning moving counts will he conducted. Deliverable: o Traffic Counts Technical Memorandum Tasl(23: SisnalTiminaDntimization As part of this subtask, lteris will evaluate the existing timing operation, update the existing Synchro model (developed by lteris as part of the 2003 Traffic Flow Optimization project and updated as part of the Phase 1, Phase 2 & 3, Phase 4 & 7, and Phase 5 projects), and perform signal timing analysis to determine the most ideal signal timing plans for various volume patterns. This analysis will be conducted for weekday AM, midday and PM peak periods for the Phase 6A Project Intersections. This will Include the development of the optimal cycle length, coordination timing, phasing at der, split timing, vehicle (yellow and all red) timings, pedestrian (walk and don't walk) timings, and time -of -day start and stop Intervals for each timing plan. identified. lteris will also review potential Impacts on the cycle lengths due to the updates to the bicycle timing requhements included in the latest California Manual on Uniform Control Devices (CA MUTCD). Actuated Settings Analysis As part of this sub- task, . lteris will review actuated settings for each Phase 6A study Intersection to not only ensure that the existing data from the 820/820A traffic signal controllers are transferred .properly to the new ASC /3 controllers, but also to identify opportunities to enhance safety and to minimize delay during n6n- coordnated periods. The analysis shall include, but not be limited to, review of minimum green settings; yellow change and red clearance interval times (to ensure that they meet the newly accepted 2012 CA MUTCD); pedestrian timing; bicycle timing; gap, extension and reduction settings;: and phase sequence. Recommendations will be forwarded to the City of Newport Beach staff for approval. Coordinated Settings Analysis lteris staff developed an extensive Synchro network of the City of Newport Beach as part of past projects completed by lteris. That network will be used as a base network for this project to save the City funds and assist in conducting this project as efficiently as possible. The new project Intersections will be revised accordingly based on the field review, new controllers and any revisions in timing setting values listed (as described in the previous sections). The following sub -tasks will develop optimum signal timing -plans for the time periods identified to benefit from the provision of coordinated signal operation. It is proposed that once the initial signal cycle lengths and subsystems have been completed, meetings be held with City staff to discuss the effects on existing crossing arterials. Upon approval of these initial settings, more detailed analysis (i.e. split timings, offsets, etc) will be conducted. Cycle Length Analysis: The initial step in the analysis process will be to determine the minimum cycle length, the critical intersection cycle length, the signal groupings /subsystems and the cycle lengths for the signal groupings /subsystems. These elements are summarized below. Page 19 27 of 31 = 1M'W 4 hl9erl polrt Leach Vq nW 6Ulf odetrlmIxaflomi (Phase 6A (Project Sa11 Joaqu1111-1 !1IsRnadCorridor ��prrunx��- 1. Minimum Cycle Length: Depending on the level of pedestrian activity, the need to accommodate pedestrian timings at each intersection will be a key element In determiiiing the cycle length and thru movement splits. As part of the minimum cycle length analysis, the pedestrian volumes will be studied and minlmum cycle lengths will be developed. Some of the assumptions that will be used in developing the mininnun cycle lengths include: • Minimum thru split with pedestrian timing= Walk + Flashing Don't Walk + Yellow +All Red • Knimurii left turn split (if protected left turn movement) = Minimum green time + Yellow +All Red It should be noted that the vehicular (yellow and all red time) clearance times will be based on the minimum values dictated by the latest California MUfCD. 2. Critical hitersection Cycle Length: At intersections with the highest volume /capacity ratio and a high number of pedestrian and bicycle activity (critical intersection) a detailed cycle length analysis: will be conducted. The theory behind this analysis is that the critical intersections drive the operation of the roadway segment or Sub- system of intersections and it Is Trey to first study them. In conducting the cycle length analysis at these critical intersections, the following factors will be taken into consideration: cycle length required to serve pedestrian and vehicular demand; intersection turning movement volumes; Individual intersection delay and level of service; and approach delay per movement for each Intersection In order to provide an efficient flow of traffic, it is important to provide a cycle length that world provide sufficient green time to be able to serve all movements. However, high cycle lengths typically cause increased delay for side street approaches and /or protected -only left turn movements. The optimum cycle length will be the merging of all the above factors Into one value. 3. Signal Grouninos /Subsystems: A sub- system evaluation will be conducted following the critical intersection cycle length analysis. Reasons for groyping intersections together will be: travel time between Intersections (this captures the proximity of intersections to each other); storage capacity between intersections; similar traffic characteristics between Intersections; coordinated crossing arterials; cycle lengths of critical inteisections; cycle lengths of major crossing corridors; intersections with similar cycle lengths; traffic platoons; and, traffic volumes. A coordination subsystem or sub -area comprises a group of signals within a traffic signal system that have similar characteristics and are located adjacent to each other. The major objective in selecting a group of signals and designing a coordination subsystem Is to allow for the effective coordination of as many traffic signals as possible within subsystems. With the successful implementation of proper geographical subsystems and timing plans, dispersed vehicles can be joined together to form vehicle platoons Which will aid in smoother traffic flow while maintaining rather unifoiin speeds. Once the decision to form subsystems has been completed, the next step is to decide which type of subsystem to form. 4. Signal Grouping /Subsystem 'Cycle Length: System wide coordination would be accomplished by using a similar cycle length throughout the system or grouping of intersections. Upon the development of the optimal cycle lengths for critical intersections, the minimum cycle lengths based on pedestrian activity, and corridor or sub- system of con'iclors, the optimum cycle length for each study period will be developed. This analysis could result in operating some of the intersections with a half - cycle. ITERY Page 110 28 of 31 f. ��vrvrofa,� Mevulpo t Beach Si glnl aO IN9odelrnro zaiflon Phase GA Pro ect e San JoaquinHills Rohl corridor Phase Splits, Sequence and Coordination Analysis: Using Synchro and Iteris' signal . timing expertise, the final step in the analysis process will be to calculate the Optimum signal timing splits that will provide sufficient green time to adequately serve the vehicle demand. In addition, the phase order and the offsets will be optimized to provide the most efficient coordination with the widest bandwidth and least delay. In developing the signal timing splits and phase sequences, it will also be Important to keep In mind the special needs of each individual Intersection along the corridor. The green time that will be developed will also be dependent on transit and pedestrian activities. Development of Timing Sheets Traffic signal timing plans for identified periods will be developed from the above- mentioned process. The new timing plans will be submitted to City staff far their review and approval. Tinting plans in Synchro printout formats will accompany the brief technical memorandum .presented to the City fat review. The format will be easily Integrated Into the Ceitracs" traffic management system and the appropriate signal controller (ASC /3- NEMA), to be performed as part of another task. Modifications will be matte to the memo and new timing plans based on the City's comments and time -space diagrams will be presented. SintTraffic micro- simulation tool will be used to illustrate the proposed signal timing plans. Task 2.4i Signal Timing Implementation and Fine- Tuning As part of this subtask, Iteris will Implement and fine -tune the City approved timing plans, including the new approved actuated settings and hours of operation. Controller Setting Deployment Iteris will coordinate the activities of this task with Econolite and City staff to ensure the most efficient deployment procedure is followed. It is envisioned that Econolite will configure the Phase. 6A traffic signal controllers with basic signal timing parameters for initial operations. From the TMC, Iteris will program the Project traffic signal controllers with the coordinated signal timing plans developed for Task 2. In addition to entering the Phase 6A coorcination parameters, Iteris will also provide optimi7.ed Values for the other "non - coordination" based settings. These values will be based on the city -wide standards developed by Iteris as part of the previous project activities, most recently the Phase 5 project. If the City reconfigure its current detection settings at any of the Project Intersections, Iteris will coordinate with Econolite to make sure the new settings are input Into the new controllers. Signal Tinting Fine- tuning Although modern optimization software produces excellent coordination plans, observation and fine - tuning of the plans under field conditions are crucial to achieving the best possible coordinated flows along the corridor. Once the Phase 6A proposed signal timing plans have been implemented, Iteris staff will conduct field reviews after the deployment of the timing plans. The intent of this task is to observe the efficiency of the new signal timing plains. Special attention will be given In regard to the Interaction of cross- corriclors and existing coordinated crossing arterials (jamboree Road, MacArthur Boulevard, and San Miguel Drive), and minor streets. When developing optimum signal timing plans, in addition to providing the widest green bandwidth along the coordinated corridors, it is important to observe the vehicle delays and queuing on the minor movements during the Field fine- tuning exercise. Upon completion of the field fine- tuning, Iteris will develop signal timing sheets and deliver final timing plan sheets to the City for their records and use. Page 1'11 EMMUM 29 of 31 imewpv®rrb Beach Spgonall 6V odei'onazaVouo Phase 6A Povjectt San Joaquin Hills Road Corridor Deliverables: • Technical memorandum SUMMarizing proposed cycle length, splits and offsets (including time - spare diagrams) • Electronic Synchro 6.0 data files used In analysis. • Implementation ready timing sheets in appropriate format • Field implementation of optimized traffic signal plans, including all requlred fine - tuning • Technical memorandum documenting the signal timing implementation and fine - tuning In support of this task, Iteris will serve as an extension of City staff to provide construction support. Iteris will be available to support the activities listed below. 1. Attendance at Pre - Construction Meeting 2. Assistance with Bid Process, Selection and Award 3. Communicating through City staff_, respond via phone and email to requests for information by Contractor or City staff 4. Support approval process of submittals by Contractor S. On -site construction support 6. Preparation of Mylar record drawings based on Contractor red -line As- Builts drawings Deliverables: • Status Meeting Notes • Mylar Record Drawings Iteris will perform 'before' and 'after' travel time studies using TnrTiaffic software, a GPS unit, and the floating car method. All travel time 'runs' will be accompanied by a video recording that will be submitted electronically. A minimum of four runs will be conducted In each direction to obtain a- statistically valid estimation. The travel time studies will be conducted during the time periods Identified for coordinated traffic signal timing operation. For an accurate comparison of the 'before' and 'after' travel time runs, it is anticipated that the studies will not be conducted until a week before the implementation and a week after the fine -timing of the new timing plans. Measures of effectiveness (MOE) will be compiled from Tru- Traffic field data as well as from the existing conditions Synchro models. The data will be used to evaluate the effects of the Synchronization plan improvements. The MOE's will include OCTA's established Corridor Synchronization Performance Index (CSPI) metrics such as average speed, number of stops per mile, and green light to red light ratio. A description of the CSPI criteria is presented below in Table 1. Iteris will also Include additional metrics, such as average travel time, average delay, number of total stops, fuel consumption, and vehicle pollutant and greenhouse gas emissions. Iteris will submit all travel time study data for review by City staff. Page 112 30 of 31 r%ti urr��� Neuup owe Beach SOg nall BUdoderrnilzadttio n Phase 6A Pwoject Ive San loarµdn hlllls Read Curridnr l e 1�4rrdN "` 'Fable 1: OCTA's CSPI Snoring Criteria Performance Level Description CSPI Score Very Good Operations with very few numbers of stops at signalized intersections occurring Signal Synchronization with favorable progression and travel speeds along the corridor. Vehicles get >= 80 00000 through most of signalized intersections without stopping. Corridor has very good signal synchronization. Good Operations with few numbers of stops at signalized intersections occurring. with Signal Synchronization good progression and travel speeds along the corridoi. Vehlrles get through >= 70 to 80 0000 many signalized Intersections without stopping. Corridor has 'good signal synchronization. Average Operations with average numbers of stops at signalized intersections occurring Signal Synchronization with fair progression and travel speeds along the corridor: Vehicles get through > =.60 to 70 C�UC� above average numbers of signalized intersections without stopping. Corridor has an above average level signal synchronization. Operations with many numbers of stops at signalized Intersections occurring Below Average with limited progression and slower than desired travel speeds. Many vehicles Signal Synchronization experience delay and vehicles get through fewer numbers of signalized >= 50 to 60 00 intersections without stopping than expected. Corridor has a below average level signal synchronization. Needs Improvement Operations with delays and numbers of stops unacceptable to most drivers to the Signal occurring with over - saturated conditions, poor progression, and low travel Synchronization speeds. Most vehicles experience high delay and low travel speeds, and vehicles <50 0 get through very few numbers of signalized intersections without stopping. 0 Corridor ineeds improvement tothesignalsynchronization. Source: OCTA, 2011 A travel time study memorandum specifying the 'before' and 'after' travel time studies with reference to the Measure of Effectiveness elements. Absolute and percent differences will be compared for the entire corridor and key segments by direction and time period. Deliverables: o Travel Time Study Comparison Memorandum and Project Report I `!I✓l I'c�t; Chi[- C>°t�tl;hVf�il;lia ftl r�t4tttY <I(o�,t7iliils'Aal To account for any changes in traffic patterns that may occur following they implementation and fine - tuning tasks, Iteris will provide post- Implementation support to the City on a monthly basis. This task will include: 1. Monitor the coordinated timings and assist the City in maintaining coordinated timing plans. 2. Drive the length of the project corridor during all designated timing plan hours on a monthly basis and make adjustments as necessary. 3. Perform field observations / investigations during all peak periods and adjust signal timing parameters when long queues or delays are reported by local agencies or residents. 4. observe traffic conditions during all peak periods and adjust signal timing parameters when there are changes in roadway geometry or lane configuration. S. Design and Implement special signal timing during major planned events that will severely Impact traffic signal operations (e.g. lane closure during planned constructions). Page 113 31 of 31