HomeMy WebLinkAboutX2017-1171 - Soils (2)COAST GEOTECHNICAL, INC. 1200 West Commonwealth Avenue, Fullerton, CA 92833 Ph:714-870-1211 Fax:714-870-1222 e-mail:coastgeotec@sbcglobal.net May 7, 2019 Mr. Kevin Moriarty 2782 Bayshore Drive Newport Beach, CA 92663 References: W.O. 551818-03 VO PV Ral Shore Dr Subject: Final Soils Report for 2772 Bayshore Drive, Newport Beach, California 1. Preliminary Soils Report, Proposed Pool House at 2772 Bayshore Drive, Newport Beach, California, by EGA Consultants, LLC, dated August 30, 2016. 2. Acceptance of Geotechnical Responsibility for Proposed Pool House at 2772 Bayshore Drive, Newport Beach, California, by COAST GEOTECHNICAL, INC., W.O. 551818-01, dated March 21, 2018. 3. Rough Grade Compaction Report for Proposed Pool House at 2772 Bayshore Drive, Newport Beach, California; by COAST GEOTECHNICAL, INC., W.O. 551818-02, dated March 23, 2018. Dear Mr. Moriarty: In accordance with the request of your contractor, this final soils report has been prepared to address geotechnical observations and testing performed since completion of rough grading. This report addresses requested observations and testing. Copies of our daily reports are maintained in our files. SWIMMING POOL BOTTOM EXCAVATION The pool excavation was observed on March 26, 2018. Probing and testing of the pool excavation indicated acceptable geotechnical conditions for support of the proposed pool. FOUNDATION EXCAVATIONS Foundation excavations for the pool house were observed on April 10, 2018 and May 14, 2018. The foundation excavations were found to be acceptable at the time of our final observations. SLAB SUBGRADE AND TRENCH BACKFILL The pool house slab subgrade and interior trench backfill were observed on May 18, 2018. Probing and testing of the interior residential slab and trench backfill areas indicated acceptable geotechnical conditions for support of the proposed slabs. COAST GEOTECHNICAL, INC. Mr. Moriarty 2 W.0.551818-03 Final Soils Report May 7 2019 HARDSCAPE Hardscape subgrades of the patios, pavers, front entry; and driveway areas were observed on April 6, 2018, March 18, 2019, March 22, 2019, April 1, 2019, April 24, 2019 and April 25, 2019. Probing and testing of hardscape area subgrades indicated acceptable geotechnical conditions for support of the proposed hardscape. OPINION It is opinion of COAST GEOTECHNICAL, INC. that the summarized geotechnical conditions approved by this office are in compliance with approved geotechnical reports and Newport Beach building codes. The final grades appear to conform to approved plans. We appreciate this opportunity to be of service to you. Respectfully Submitted: COAST GEOTECHNICAL, INC. Ming-Tarng Chen RCE 54011 No. 54/011 Exp. 12/31/19 CIV COAST GEOTECHNICAL, INC. 1200 W. Commonwealth Ave., Fullerton, CA 92833 Ph: (714) 870-1211 Fax: (714) 870-1222 E-mail: coastgeotec@sbcglobal.net March 23, 2018 W.O. 551818-02 Mr. Kevin Moriarty 2782 Bayshore Drive Newport Beach, CA 92663 Subject: Rough Grade Compaction Report for Proposed Pool House at 2772 Bayshore Drive, Newport Beach, California References: 1. Preliminary Soils Report, Proposed Pool House at 2772 Bayshore Drive, Newport Beach, California, by EGA Consultants, LLC, dated August 30, 2016. 2. Acceptance of Geotechnical Responsibility for Proposed Pool House at 2772 Bayshore Drive, Newport Beach, California, by COAST GEOTECHNICAL, INC., W.O. 551818-01, dated March 21, 2018. Dear Mr. Moriarty: Forwarded herewith is the rough grade compaction report for the subject site. Our observations and testing were performed periodically, as requested. The grading operation for the residential pool house consisted of over -excavation and recompaction to provide uniformly compacted fill soils for support of the residence, pool and hardscape. The grading operation was conducted between March 15 and March 20, 2018. The project included upgrading the existing bulkhead with a new deadman and tight backs installed by Shellmakers. PLACEMENT OF FILL Compacted fill material was placed to provide adequate support for proposed structures. Over -excavation of the pool area, building pad and rear patio area extended into competent material. The depth of over -excavation was about four to seven feet below original grade. A buried structure was encountered in the proposed pool area and slot -cut excavations were necessary along the western property line in order to remove the concrete and rubble below the proposed structures. Some of the existing concrete rubble remains and extends below the adjacent property to the west. The exposed surface was scarified, moisture conditioned and compacted to a minimum of 90% relative compaction. All fill soils were blended with Portland cement to provide improved stability during foundation and pool excavations. Final grade is near original grade. COAST GEOTECHNICAL, INC. Mr. Moriarty 2 W.O. 551818-02 Rough Grade Compaction Report March 23. 2018 The rear patio area remains about two feet low and may be backfilled using spoils generated from foundation excavations. Backfill soils shall be moisture conditioned and compacted to a minimum of 90% relative compaction. Subsequent fills were placed in six to eight inch loose lifts and compacted to a minimum of 90% by track rolling. This process was followed to final grade. Limits of grading are shown on the attached Plate 1. Equipment used for the compaction of the fill soils consisted of a Kubota SVL90 rubber track loader. Soils were moisture conditioned by a fire hose. Earthwork was by Tight Quarters, Inc. TESTING Maximum density optimum moisture relationship determinations were performed for each soil type encountered during grading operations. Test results were as follows: Laboratory Standard: (ASTM:D-1557) 4 -inch diameter mold; 1/30 ft3 volume; 5 layers at 25 blows per layer; 10 lb. hammer dropped 18 inches SorlCtP ifuurn Moisture, : 3 �: Max ry Density; lbs Iype_lassaf4cauon o I Light Gray Clean Sand 10.0 112.0 Gray / Brown Silty Sand w/ II 10.0 115.0 Cement III Brown Silty Sand w/ Cement 9.5 120.0 Compaction tests were performed a minimum of every two feet and/or 500 cubic yards of compacted fill soils placed. These tests were performed in accordance with an ASTM test method. The test results are summarized in Table 1. The approximate test locations are shown on Plate 1. Areas not tested were probed to show adequate compaction. FOUNDATIONS ON GRADE The proposed structures may be supported by continuous spread footings only, placed a minimum depth of 24 inches below lowest adjacent grade. The foundation may utilize an allowable bearing value of 1,750 pounds per square foot. This value is for dead plus live load and may be increased 1/3 for total including seismic and wind loads where allowed by code. The foundations should be reinforced with at least four #5 bars, two top and two bottom and follow structural engineers requirements. COAST GEOTECHNICAL, INC. Mr. Moriarty 3 W.O. 551818-02 Roueh Grade Compaction Report March 23, 2018 The foundation excavations shall be observed by a representative of COAST GEOTECHNICAL, INC. prior to placement of steel or concrete to verify competent soil conditions. If unacceptable soil conditions are exposed mitigation will be recommended. LATERAL DESIGN Lateral restraint at the base of footings and on slabs may be assumed to be the product of the dead load and a coefficient of friction of .30. Passive pressure on the face of footings may also be used to resist lateral forces. A passive pressure of zero at the surface of finished grade, increasing at the rate of 250 pounds per square foot of depth to a maximum value of 2,500 pounds per square foot, may be used for compacted fill at this site. If passive pressure and friction are combined when evaluating the lateral resistance, then the value of the passive pressure should be limited to 2/3 of the values given above. POOL RECOMMDATIONS The pool shall be supported by compacted fill in all areas. The pool should be designed as a freestanding structure. Pool walls should be designed to support the water, having a density of 62.4 pounds per cubic foot without bearing from the adjacent soil. The walls should be able to support the adjacent backfill soil when the pool is empty. The active earth pressure may be calculated as an equivalent fluid pressure of 100 pcf, plus the lateral pressure due to any superimposed surcharge when the pool is empty. The pool excavation shall be observed and approved by COAST GEOTECHNICAL, Inc., prior to steel placement. All pool utility lines shall be backfilled with soils compacted to a minimum of 90% relative compaction. Where pool lines are sensitive to the use of compaction equipment the trenches shall be backfilled with one sack slurry. COAST GEOTECHNICAL, Inc. shall verify the backfill of all trenches. EXPANSIVE SOILS Results of expansion tests indicate that the near surface soil at the completion of grading has a very low expansion potential. FLOOR SLABS The concrete slab on grade area shall be at least 5 inches thick supported on engineered fill compacted to a minimum of 90% relative compaction. Slabs should be reinforced with #4 bars at 12 inches on center each way. Subgrade soil should be kept moist prior to casting the slab. However, if the soils at grade become disturbed during construction, they should be brought to approximately optimum moisture content and rolled to a firm, unyielding condition prior to placing concrete. COAST GEOTECHNICAL, INC. Mr. Moriarty 4 W.O. 551818-02 Rough Grade Compaction Report March 23, 2018 Section 4.505.2.1 of the California Green Code requires the use of a capillary break between the slab subgrade and vapor barrier. The capillary break material shall comply with the requirements of the local jurisdiction and shall be a minimum of four inches in thickness. The City of Newport Beach requires the use of four inches of gravel (1/2 -inch or larger clean aggregate). The capillary break shall be covered with a heavy filter fabric (Mirafi 140N) prior to placement of the recommended vapor barrier to minimize puncturing of the vapor barrier. Additionally, a vibratory plate should be used over the gravels prior to placement of the recommended filter fabric to smooth out any sharp protuberances and consolidate the gravels. Slab areas should be underlain by a vapor retarder consisting of an engineered plastic film (as described by ASTM:E-1745). In areas where a moisture sensitive floor covering will be used and/or where moisture infiltration is not desirable, a vapor barrier with a permeance of less than 0.01perms (consistent with ACI 302.2R-06) such as 15 mil. Stego Wrap Vapor Barrier, or equivalent, should be considered, and a qualified water proofing specialist should be consulted. The vapor barrier should be underlain by the above described capillary break materials and filter cloth. The capillary break materials should be compacted to a uniform condition prior to placement of the recommended filter cloth and vapor barrier. The vapor barrier should be properly lapped and sealed. Since the vapor barrier will prevent moisture from draining from fresh concrete, a better concrete finish can usually be obtained if at least two inches of sand is spread over the vapor barrier prior to placement of concrete. DRAINAGE Positive drainage should be planned for the site. Drainage should be directed away from structures via non -erodible conduits to suitable disposal areas. The structure should utilize roof gutters and down spouts tied directly to yard drainage. Minimum drainage shall be one percent for hardscape areas and two percent for landscape areas. Site waters shall not be allowed to drain in an uncontrolled manner. Waters shall be collected and dispersed of in a manner in accordance with governing guidelines. Bottomless trench drain to contain runoff on-site should not be located within five feet of foundations. Run-off should be directed to approved areas. POST -GRADING SERVICES During construction of the residence, it is recommended, and at times required by the regulatory agency, the following be observed and/or tested by the geotechnical engineer: • Excavation of pool and foundations • Backfill of interior slab areas • Backfill of interior trenches • Backfill of exterior utility trenches • Hardscape subgrade COAST GEOTECHNICAL, INC. Mr. Moriarty 5 W.O. 551818-02 Rough Grade Compaction Report March 23 2018 It is the responsibility of the developer to schedule the required observations and testing. REGULATORY COMPLLANCE I hereby certify that the subject grading was observed by a representative from this office, and the work was done in full compliance with the Grading Ordinance of the City of Newport Beach and in accordance with the best accepted practices of the applicable chapter of the California Building Code. All cuts, fills or processing of original ground under the purview of this report have been completed under the observation of and with selective testing by COAST GEOTECHNICAL, INC. and found to be in compliance with the Grading Code of the City of Newport Beach. The completed work has been observed by COAST GEOTECHNICAL, INC., and is considered adequate for the development. Our findings were made and recommendations prepared in accordance with generally accepted professional engineering practices, and no further warranty is implied nor made. This report is subject to review by the controlling authorities for this project. We appreciate this opportunity to be of service to you. Respectfully submitted: COAST GEOTECHNICAL, INC. Q,ofESSIn QUO R G, Ming-Tarng Chen �� C� p N c �F2 4amel RCE 54011 ; tim z Staff Geologist w No, 54011 Z m c Exp. 12/31/19 a COAST GEOTECHNICAL, INC. Mr. Moriarty 6 W.O. 551818-02 Rough Grade Compaction Report March 23, 2018 COMPACTION TEST RESULTS TABLE 1 est NoYade:(fl}' I ocatxon 'Below'.-,;,- Prtrposccl'. ; iVIaisture Content Dry Uxut weight , So Relative Co�npactior Date 1 I Pool Area 6.57.0 11.4 105.9 II 92.1 3/15/18 2 Pool Area 4.0-4.5 12.1 106.1 II 92.2 3/15/18 Pool Area 4.0-4.5 1 9.5 106.4 II 1 92.5 3/15/18 4 Slot -Cut Pad ea 4.0-4.5 12.7 104.8 II 91.1 3/15/18 5 Slot-CCnett Pad 3.0-3.5 11.2 105.3 II 91.6 3/15/18 6 Pool Area 2.53.0 9.5 105.6 II 91.9 3/16/18 7 Pool Area 2.0-2.5 11.9 106.7 II 92.8 3/16/18 8 Hardscape Area 4.0-4.5 10.5 106.4 II 92.5 3/16/18 9 Pool Area 1.52.0 10.9 109.8 I1I 91.5 3/16/18 10 Pad Area 4.0-4.5 12.5 103.0 I 92.0 3/19/18 11 Pad Area 4.0-4.5 12.4 102.5 I 91.5 3/19/18 12 Hardscape Area 3.0-3.5 12.0 110.2 III 91.8 3/19/18 13 Pad Area 0.51.0 9.0 110.3 III 91.9 3/19/18 14 Pad Area 1.52.0 12.1 105.6 II 91.8 3/19/18 15 Hardscape Area 2.0-2.5 11.7 105.1 II 91.4 3/19/18 16 Pad Area 0.51.0 9.3 105.8 II 92.0 3/19/18 17 Hardscape Area 2.0-2.5 1 10.5 106.1 II 92.3 3/19/18 18 Pad Area 3.54.0 11.5 102.5 I 91.5 3/20/18 19 Pad Area 2.0-2.5 13.1 106.0 II 92.1 3/20/18 20 Pad Area 1.52.0 13.4 105.4 II 91.7 3/20/18 21 Pad Area F.G. 13.2 106.0 II 1 92.2 3/20/18 22 Pad Area F.G. 11.0 107.0 II 93.0 3/20/18 23 Pool Area F.G. 11.5 107.2 II 93.2 3/20/18 F.G. =Finish Grade SITE PLAN Scale 1" = 20, kpproximate "ompaction Pest Location Approximate Limits of Grading Roug Grade Compaction Report Work Order 551818-02 2772 Bayshore Drive Newport Beach, California Plate No. 1 COAST GEOTECHNICAL, INC.