HomeMy WebLinkAboutX2017-0429 - SoilsX2017-044
401 Newport Ce tier Dr
NMG
Geotechnical, Zinc.
July 17, 2017
Project No. 17017-02
Grading Permit No. X2017-0429
To: Stantec Consulting, Inc.
38 Technology Drive, Suite 100
Irvine, California 92618
Attention: Mr. Mitch Thiessen
Subject: Geotechnical Report of Observation and Testing during Construction of ADA and
Parking Lot Improvements at Fashion Island, East of Macy's Store, City of
Newport Beach, California
Reference: NMG Geotechnical, Inc., 2017, Geotechnical Review of Precise Grading Plan for
Proposed ADA Hardscape Improvements, Fashion Island, 799 Newport Center
Drive, City of Newport Beach, California, Project No. 17017-01, dated April 28,
2017.
INTRODUCTION
In accordance with your request and authorization, NMG Geotechnical, Inc. (NMG) has
provided geotechnical observation and testing services during construction of ADA and parking
lot improvements at the subject site. The geotechnical services were provided from June 2 to
June 29, 2017. The geotechnical observation and testing performed by NMG during construction
was based on the requirements in the approved project report, specifications, and the project
plans. Observation and testing for the subject site included:
• Subgrade for curb and gutter, sidewalk, concrete pavers and ADA ramp;
• Aggregate base for concrete pavers; and
• Asphalt concrete.
This report summarizes our services for the completed improvements and construction, presents
the results of our observation and testing, and provides our conclusions.
ATTACHMENTS
Figure 1 — Field Density Test Location Map — Rear of Text
Table 1— Summary of Laboratory Test Results — Rear of Text
Table 2 — Summary of Field Density Test Results — Rear of Text
17991 Fitch • Irvine, California 92614 • PHONE (949) 442-2442 • FAX (949) 476-8322 • wivw.nmggeotechnical.com
17017-02
July 17, 2017
OBSERVATION AND TESTING METHODS
Geotechnical observation and testing was conducted periodically throughout the duration of the
project by representatives of NMG. Compacted subgrade, aggregate base and asphalt concrete
were tested for relative compaction using ASTM Test Method D6938 (nuclear gauge). The
maximum density and optimum moisture content of onsite soils were determined by ASTM Test
Method D1557. Plant maximum densities were used for aggregate base and asphalt concrete.
Laboratory test results are presented in Table 1. Field density test results are presented in Table 2,
with the approximate test locations depicted on the Field Density Test Location Map (Figure 1).
The precise grading plans, prepared by Stantec, were used as the base map to present the
improvements observed and tested by NMG representatives.
Subgrade for Curb and Gutter, Sidewalk, Concrete Pavers and ADA Ramp
Generally, minor cuts and fills on the order of 1 foot or less were made to achieve subgrade.
Subgrade materials were moisture -conditioned as needed, and compacted using a hand -operated
mechanical compactor (Wacker). Subgrade materials were observed and tested to verify that a
minimum relative compaction of 90 percent, with adequate moisture content, was achieved.
Aggregate Base for Concrete Pavers
Approximately 4 to 6 inches of aggregate base (AB) materials were placed for the concrete paver
section. AB materials were moisture -conditioned to near -optimum moisture content and
compacted using a vibratory roller and Wacker. Compacted AB was observed and tested to
verify that a minimum relative compaction of 95 percent, with adequate moisture content, was
achieved.
Asphalt Concrete
Full-time deputy asphalt inspection was provided during asphalt concrete (AC) placement. Prior
to placement of AC, debris was removed and cold joints were tack -coated. In areas adjacent to
the curb, AC was placed in full -depth. For the parking lot areas, existing pavement was cold -
planed approximately 1.5 to 2 inches and capped with new AC. AC was compacted using a
vibratory roller and vibratory plate. The measured AC temperature ranged from approximately
285 to 298 degrees Fahrenheit. Compacted asphalt concrete was observed and tested to verify
that a minimum relative compaction of 95 percent was achieved.
CONCLUSION
To the extent we can infer from our observation and testing, we conclude that the subject work is
geotechnically suitable for its intended use. The work was performed in substantial compliance
with the project requirements and those of the city of Newport Beach.
VO]i] 2
NMG
17017-02
July 17, 2017
LIMITATIONS
NMG's conclusions regarding the adequacy of the earthwork and construction reported herein
are inferred from periodic site observations, limited tests, data collected in the field, and
information provided by the project participants. We provided our services to the typical
standards of care of local geotechnical consultants, and as required by the city of Newport Beach.
Our acceptance of the reported work is not a guarantee of the work; meeting the project
specifications and code requirements is the responsibility of the contractor(s) performing the
work.
If you have any questions regarding this report, please contact our office. We appreciate the
opportunity to provide our services.
Respectfully submitted,
NMG GEOTECHNICAL, INC.
d Z No. 3071 'A i
Reza Saberi, GE 3071 * 't
Associate Engineer sp�0 CHN�GP�P
�TFOF CAL\FOS
DNG/RS/grd
Distribution: (1) Addressee (E -Mail)
(3) Ms. Mayra Rozales, Cuesta Construction (and E -Mail)
170717 3
NMG
LEGEND
LOCATIONS AREAPPROXIMATE
O SG -10 Subgrade Test
OAS -3 Aggregate Base Test
• AC•13 Asphalt Concrete Test
FIELD DENSITY TEST LOCATION MAP
MACY'S - FASHION ISLAND
CITY OF NEWPORT BEACH, CALIFORNIA
Project Number: 17017-02
Project Name: Stantec / F.I. Macy's -ADA
Date: 7/17/17 Figure 1
Base Map: Stantec
NMG
Geotechnical, Ir
TABLE 1
SUMMARY OF LABORATORY TEST RESULTS
Soil
Type
No.
-
Description
FMetthod
Maximum
Density
(pcf)
Optimum
Moisture
Content
(%)
USCS
s
G/S/P
1
Reddish brown silty SAND
125.5
8.5
AB -1
Crushed Miscellaneous Base (Plant Max)
123.0
10.0
AC -1
Asphalt Concrete (Plant Max)
149.0
AC -2
Asphalt Concrete (Plant Max)
147.0
Test Method:
[A] ASTM D1 557for Soil and Aggregate Base (Dry Density)
[B] ASTM D1560 or CTM 308forAsphaltic Concrete (Hveem)
[C] ASTM D1559 and ASTM D2726 for Asphaltic Concrete (Marshall)
[DI CTM 216/231 (Wet Densi
Notes:
1 — Classification of Soils for Engineering Purposes
(Unified Soil Classification System —UCSC)
2 —Percentage Gravel / Sand / Fines
(Based on Grain Size Anal sis)
Maximum
Density Test
Results
(FRM019 Rev.4)
Project No: 17017-02
Project Name: Stantec/F.I.Macy's -ADA
NMG
TABLE 2 17017-02
SUMMARY OF FIELD DENSITY TEST RESULTS July 17, 2017
Stantec•1 F. /. Macy's -ADA
z°
m
m
::
0
m
O
2 0
W
Approximate
Location
°
f u
a
a H
�`
a ._
d o
�` 0
d
Z
2
U
> >
E y
0 2
E
> ._
E e
m 3
c
> u
= n
E
U
Remarks8
Comments
-
SG -1
CUGU
6/1/17
SG
E/O
MACYS
N
10.7
113.8
1
8.5
125.5
91
SG -2
CUGU
6/1/17
SG
E/O
MACYS
N
11.8
112.9
1
8.5
125.51
90
_
SG -3
RAMP
6/1/17
SG
E/O
MACYS
N
10.2
115.0
1
8.5
125.5
92
SG -4
SDWK
6/1/17
SG
E/O
MACYS
N
11.3
113.5
1
8.5
125.5
F 90
SG -5
CUGU
6/16/17
SG
E/O
MACYS
N
12.2
114.3
1
8.5
125.5
91
SG -6
CUGU
6116/17
SG
E/0
j MACYS
N
10.6
116.1
1
8.5
125.5
93
_
SG -7
CUGU
6/16/17
SG
E/O
MACYS
N
10.7
114.1
1
8.5
125.5
91
SG -8
CUGU
6/16/17
SG
E/O
MACYS
N
9.7
112.5
1
8.5
125.5
90
SG -9
SDWK
6/16/17
SG
E/O
MACYS
N
11.6
114.8
1
8.5
125.5
91
SG -10
SDWK
_
6116/17
SG
E/O
MACYS
N
10.5
112.8
1
8.5
125.5
90
N
AB -1
SDWK
6/6/17
AB
E/O
MACYS
N
.11.8
117.6
AB -1
10.0
123.0
96
AB -2
SDWK
6/6/17
A8
E/O
MACYS
N
12.4
116.9
AB -1
10.0
123.0
95
j
AB -3
SDWK
6/21/17
AB
E/O
MACYS
N
11.7
119.5
AB -1
10.0
123.0
97
N
AC -1
PRKG
619/17
SLOT
E/O
MACYS
N
--
143.7
AC -1
--
149.0
96
AC -2
PRKG
6/9/17
SLOT
E/O
MACYS
N
--
142.4
AC -1
--
149.0
96
AC -3
PRKG
6/9/17
SLOT
E/O
MACYS
N
--
142.8
.AC -1
--
149.0
96
AC -4
PRKG
6/29/17
SLOT
_
E/O
MACYS
N
--
142.1
1AC-2
--
147.0
97
AC -5
PRKG
6129117
SLOT
E/O
MACYS
N
--
141.4
AC -2
--
147.0
96
_
AC -6
PRKG
6/29/17
SLOT
E/0
MACYS
N
--
142.6
IAC -2
-
147.0
97
AC -7
PRKG
6/29/17
CAP
E/O
MACYS
N
--
143.7
AC -2
--
147.0
98
AC -8
PRKG
6/29/17
CAP
E/O
MACYS
N
--
141.9
AC -2
--
147.0
97
AC -9
PRKG6/29/17
CAP
E/0
MACYS
N
--
143.0
AC -2
--
147.0
97
AC -10
PRKG
6/29117
CAP
E/O
MACYS
N
--
142.9
AC -2
--
147.0
97
AC -11
PRKG
6/29117
CAP
E/O
MACYS
N
--
140.8
AC -2
--
147.0 j
96
AC -12
PRKG
6/29117
CAP
E/O
MACYS
N
--
140.1
AC -2
--
147.0
95
AC -13
PRKG
6/29/17
CAP
E/O
MACYS
N
--
142.3
1AC-2
--
147.0
97
I
170717
INMG
Geotechnical, Inc.
July 17, 2018
Project No. 17017-04
To: Stantec
38 Technology Drive, Suite 100
Irvine, California 92618
Attention: Mr. Mitch Thiessen
Subject: Geotechnical Report of Observation and Testing during Construction of Parking
Lot and ADA Improvements, Fashion Island, 401 Newport Center Drive, City of
Newport Beach, California
Reference: NMG Geotechnical, Inc., 2017, Geotechnical Review of Precise Grading Plan for
Proposed ADA Hardscape Improvements, Fashion Island, 799 Newport Center
Drive, City of Newport Beach, California, Project No. 17017-01, dated April 28,
2017.
INTRODUCTION
In accordance with your request and authorization, NMG Geotechnical, Inc. (NMG) has
provided geotechnical observation and testing services during construction of parking lot and
ADA improvements at the subject site. Observation and testing services included subgrade for
sidewalk and curb -and -gutter, and asphalt concrete. The geotechnical observation and testing
performed by NMG during construction was based on the approved project report, project
specification and the project plans. This report presents the results of our observation and testing,
and provides our conclusions.
Please note that this report summarizes our services for the completed improvements and
construction within the areas shown on Figure 1 (Sheet C10 of the overall Fashion Island ADA
improvement precise grading plan, prepared by Stantec). A report for the remaining
improvements within Fashion Island will be issued upon completion of construction.
ATTACHMENTS
Figure 1 — Field Density Test Location Map — Rear of Text
Table 1— Summary of Laboratory Test Result — Rear of Text
Table 2 — Summary of Field Density Test Results — Rear of Text
17994 Fitch o Irvine, California 92614 • PHONE (949) 442-2442 o FAX (949) 476-8322 • www.nmggeotechnical.com
17017-04
July 17, 2018
OBSERVATION AND TESTING METHODS
Geotechnical observation and testing was conducted periodically throughout the duration of the
project by representatives of NMG. Compacted subgrade and asphalt concrete were tested for
relative compaction using ASTM Test Method D6938 (nuclear gauge). Maximum density and
optimum moisture content of onsite soil was determined by ASTM Test Method D1557. A plant
maximum density was used for asphalt concrete. Laboratory test results are presented in Table 1.
Field density test results are presented in Table 2, with the approximate test locations depicted on
the Field Density Test Location Map (Figure 1). The precise grading plan, prepared by Stantec,
was used as the base map to present the approximate locations of improvements observed and
tested by NMG representatives.
Subgrade for Sidewalk and Curb -and -Gutter
Generally, minor cuts and fills on the order of 1 foot or less were made to achieve subgrade.
Subgrade materials were moisture -conditioned as needed, and compacted using a hand directed
mechanical compactor (Wacker) and vibratory plate. Subgrade materials were observed and
tested to verify that a minimum relative compaction of 90 percent, with adequate moisture
content, was achieved.
Subsequent to compaction, the subgrade soils for sidewalk improvements were moisture -
conditioned, as recommended for expansive soils (NMG, 2017).
Asphalt Concrete
Full-time deputy asphalt inspection was provided during asphalt concrete (AC) placement. Prior
to placement of AC, debris was removed and contact surfaces were tack -coated. For the parking
lot areas, existing pavement was cold -planed approximately 2 to 3 inches and capped with new
AC. Asphalt concrete was placed in full -depth for slot patch adjacent to curbs. AC was
compacted using a vibratory roller, a Wacker, and a vibratory plate. Compacted asphalt concrete
was observed and tested to verify that a minimum relative compaction of 95 percent was
achieved. The measured AC temperature ranged from approximately 278 to 289 degrees
Fahrenheit.
CONCLUSION
To the extent we can infer from our observation and testing, we conclude that the subject work is
geotechnically suitable for its intended use. The work was performed in substantial compliance
with the project requirements and those of the City of Newport Beach.
LIMITATIONS
NMG's conclusions regarding the adequacy of the earthwork and construction reported herein
are inferred from periodic site observations, limited tests, data collected in the field, and
information provided by the project participants. We provided our services to the typical
standards of care of local geotechnical consultants, and as required by the City of Newport Beach.
Our acceptance of the reported work is not a guarantee of the work; meeting the project
180717 2
NMG
17017-04
July 17, 2018
specifications and code requirements is the responsibility of the contractor(s) performing the
work.
If you have any questions regarding this report, please contact our office. We appreciate the
opportunity to provide our services.
Respectfully submitted,
NMG GEOTECHNICAL, INC.
(f f ( No. 3071
Reza Saberi, GE 3071 * cP"
Principal Engineer s ��TECNN`c�A`P
qTF OF CAl-SFO
DNG/RS/je
Distribution: (1) Addressee (E -Mail)
(3) Ms. Mayra Rozales, Cuesta Construction (and E -Mail)
180717 3
NMG
t � gapl-
• C•SG3
I
i TRIM FOac
VIINr
$G 2
Aal
" •AC.6 / "dq. t
I
i
I ,
LEGEND
LOCATIONSAREAPPROXIMATE
® SG -6 Subgrade Test
® AC -7 Asphalt Concrete Test
Base Map: Stantec
FIELD DENSITY TEST LOCATION MAP Project Number: 17017-04
FASHION ISLAND ADA IMPROVEMENTS project Name: Stantec / FI ADA C10 I V / V iG
401 NEWPORT CENTER DRIVE Geotechnical, Inc.
CITY OF NEWPORT BEACH, CALIFORNIA Date: 7/17/18 Figure 1
TABLE 1
SUMMARY OF LABORATORY TEST RESULTS
Soil
Type
No.
Description
Test
Method
Maximum
Density
*0C%L.
Optimum
Moisture
Content
USCSt
GIS/F1
1
Reddish brown clayey SAND
A
125.0
9.5
AC -1
Asphalt Concrete (Plant Max)
--
148.0
Test Method:
[A] ASTM DI557 for Soil and Aggregate Base (Dry Density)
[B] ASTM D1560 or CTM 308 for Asphaltic Concrete (Hveem)
[Cl ASTM D1559 and ASTM D2726 forAsphaltic Concrete (Marshall)
[D] CTM 216/231 et Density)
Notes:
1 — Classification of Soils for Engineering Purposes
(Unified Soil Classification System — UCSC)
2 — Percentage Gravel / Sand / Fines
Based on Grain Size Anal sis
Maximum
Density Test
Results
(FRM019 Rev.4)
Project No: 17017-04
Project Name: Stantec / Fashion Island ADA
NMG
TABLE 2 17017-04
SUMMARY OF FIELD DENSITY TEST RESULTS July 17, 2018
Stantec /Fashion Island ADA
zF.
F 10
F
�«
> w
.
Approximate Location
I o
g
(%)
'
TO
V
(Pcf).
"
C2
(%)
.p
E °
qm
O
(pct)
Y mE
G
V
(/)
Remarks &
Commentsw
SG -1
I CUGU 1 617/18
SG
I SW OF TRUE FOOD
N
10.6
1 114.7 1
9.5
1 125.0
1 92
SG -2
CUGU 6/7/18
SG
SW OF TRUE FOOD
N
11.3
117.2 1
9.5
125.0
94
SG -3
CUGU 6/7/18
SG
W OF TRUE FOOD
N
9.8
116.6 1
9.5
125.0
93
SG4
SDWK 6/12118
SG
S OF TRUE FOOD
N
14.2
112.6 1
9.5
125.0
90
SG -5
SDWK 6/12118
SG
SW OF TRUE FOOD
N
12.3
114.9 1
9.5
125.0
92
SG -6
SDWK 6/12118
SG
W OF TRUE FOOD
N
10.6
116.4 1
9.5
125.0
93
AGA
PRKG 6/20/18
AC
W OF TRUE FOOD
N
-
142.6 AC -1
148.0
96
AC -2 I
I PRKG 6/20/18
AC
SW OF TRUE FOOD
N
-
141.7 AC -1
148.0
96
AC -3
PRKG 6120/18
AC
SW OF TRUE FOOD
N
--
142.9 AG -1
148.0
97
AC-4PRKG
6/20118
AC
SW OF TRUE FOOD
N
--
143.6 AC -1
148.0
97
AC -5
PRKG 6/20118
AC
SW OF TRUE FOOD
N
--
144.0 AC -1148.0
97
AC -6
PRKG 6/20/18
AC
SW OF TRUE FOOD
N
-
142.7 AC -1
148.0
98
AG7
PRKG 6/20/18
AC
S OF TRUE FOOD
N
--
141.5 AC -1
148.0
96
180717
NMG
Geotechnical, Inc.
June 14, 2019
Project No. 17017-01
Permit No.: X2017-0429
To: Stantec
38 Technology Drive, Suite 100
Irvine, California 92618
Attention: Mr. Mitch Thiessen
Subject: Supplemental Geotechnical Report of Observation and Testing during Construction
of Parking Lot and ADA Improvements at Fashion Island, Phase 1, 401 Newport
Center Drive, City of Newport Beach, California
INTRODUCTION
In accordance with your request and authorization, NMG Geotechnical, Inc. (NMG) has provided
geotechnical observation and testing services during construction of parking lot and ADA
improvements (Phase 1) at Fashion Island in the city of Newport Beach, California. The
geotechnical services included in this report were provided from January 28 to February 19, 2019.
The geotechnical observation and testing performed by NMG during construction was based on
the approved project report, project specifications, and project plans. Observation and testing for
the subject site included:
• Subgrade for sidewalk;
• Aggregate base for parking lot; and
• Asphalt concrete.
This report summarizes our services for the completed improvements and construction, presents
the results of our observation and testing, and provides our conclusions. Please note that we had
issued other reports for the Phase 1 ADA improvements, which are referenced in this report.
ATTACHMENTS
References — Rear of Text
Table 1 — Summary of Laboratory Test Results — Rear of Text
Table 2 — Summary of Field Density Test Results — Rear of Text
Figures 1 and 2 — Field Density Test Location Maps — Rear of Text
17991 Fitch o Irvine, California 9261.4 • PHONE (949) 442-2442 • FAX (949) 476-8322 • www.nmggeotechnical.com
17017-01
June 14, 2019
OBSERVATION AND TESTING METHODS
Geotechnical observation and testing were conducted periodically throughout the duration of the
project by representatives of NMG. Compacted subgrade, aggregate base and asphalt concrete
were tested for relative compaction using ASTM Test Method D6938 (nuclear gauge). Maximum
density and optimum moisture content of onsite soils were determined by ASTM Test Method
D1557. Plant maximum densities and optimum moisture content of aggregate base and asphalt
concrete were used. Laboratory test results are presented in Table 1. Field density test results are
presented in Table 2, with the approximate test locations depicted on the Field Density Test
Location Maps (Figures 1 and 2). The precise grading plan, prepared by Stantec, was used as the
base map to present the improvements observed and tested by NMG representatives.
Subgrade for Sidewalk
Generally, minor cuts on the order of 1 foot or less were made to achieve subgrade. Subgrade
materials were observed, probed and tested to verify that a minimum relative compaction of 90
percent, with adequate moisture content, was achieved.
Aggregate Base for Parking Lot
Aggregate base (AB) material was placed for the structural pavement section within the parking
stalls south of Roy's Hawaiian Fusion. Aggregate base materials were moisture -conditioned to
near -optimum moisture content and compacted using a hand -operated mechanical compactor
(Wacker) and vibratory plate. Compacted AB was observed and tested to verify that a minimum
relative compaction of 95 percent, with adequate moisture content, was achieved.
Asphalt Concrete
Full-time deputy asphalt inspection was provided during asphalt concrete (AC) placement. Prior
to placement of AC, debris was removed and cold joints were tack -coated. In areas adjacent to the
curb, AC was placed in full -depth. For the parking stalls south of Roy's Hawaiian Fusion, new AC
was placed over compacted AB. The adjacent AC pavement areas were cold -planed approximately
1.5 to 2 inches and capped with new AC. Asphalt concrete was compacted using a vibratory roller,
Wacker and vibratory plate. Compacted AC was observed to verify that a minimum relative
compaction of 95 percent was achieved. The measured AC temperature ranged from
approximately 293 to 320 degrees Fahrenheit.
190614 2
NMG
17017-01
June 14, 2019
CONCLUSION
To the extent we can infer from our observation and testing, we conclude that the subject work is
geotechnically suitable for its intended use. The work was performed in substantial compliance
with the project requirements and those of the City of Newport Beach.
LIMITATIONS
NMG's conclusions regarding the adequacy of the earthwork and construction reported herein are
inferred from periodic site observations, limited tests, data collected in the field, and information
provided by the project participants. We provided our services to the typical standards of care of
local geotechnical consultants, and as required by the City of Newport Beach. Our acceptance of
the reported work is not a guarantee of the work; meeting the project specifications and code
requirements is the responsibility of the contractor(s) performing the work.
If you have any questions regarding this report, please contact our office. We appreciate the
opportunity to provide our services.
Respectfully submitted, OpµOFESS101V
Pei �Ep R
NMGG GGEEOTECHNICAL, INC.
No. 3071 A
Reza Saberi, GE 3071 * c Qy
Principal Engineer s �CTECHN�C
OF CA0-
DNG/RS/je
Distribution: (1) Addressee (E -Mail)
(3) Mr. Cody Braly, Cuesta Construction Company (includes copies for submittal to
City of Newport Beach)
190614 J
NMG
17017-01
June 14, 2019
REFERENCES
NMG Geotechnical, Inc., 2017a, Geotechnical Review of Precise Grading Plan for Proposed ADA
Hardscape Improvements, Fashion Island, 799 Newport Center Drive, City of Newport
Beach, California, Project No. 17017-01, dated April 28, 2017.
NMG Geotechnical, Inc., 2017b, Geotechnical Report of Observation and Testing during
Construction of ADA and Parking Lot Improvements at Fashion Island, East of Macy's
Store, City of Newport Beach, California, Project No. 17017-02, dated July 17, 2017.
NMG Geotechnical, Inc., 2017c, Geotechnical Report of Observation and Testing during
Construction of Parking Lot and ADA Improvements, Fashion Island, 401 Newport
Center Drive, City of Newport Beach, California, Project No. 17017-04, dated July 17,
2017.
NMG Geotechnical, Inc., 2017d, Geotechnical Report of Observation and Testing during
Construction of ADA and Parking Lot Improvements at Fashion Island, Phase 1, 401
Newport Center Drive, City of Newport Beach, California, Project No. 17017-03, dated
October 24, 2017.
190614
NMG
TABLE 1
SUMMARY OF LABORATORY TEST RESULTS
Soil
Type
No.
Description
Test
Method
Maximum
Density
c
Optimum
Moisture
Content
%
USCS'
G/S/F
°/,
1
Reddish brown silty SAND
A
125.5
8.5
AB -1
Crushed Miscellaneous Base (Plant Max)
127.0
8.5
AC -6
Asphalt Concrete (Plant Max)
149.0
--
AC-7
Asphalt Concrete (Plant Max)
147.0
AC -8
Asphalt Concrete (Plant Max)
149.0
AC -9
Asphalt Concrete (Plant Max)
149.0
AC -11
Asphalt Concrete (Plant Max)
149.0
AC -12
Asphalt Concrete (Plant Max)
147.0
Test Method:
[A] ASTM D1557 for Soil and Aggregate Base (Dry Density)
[B] ASTM D1560 or CTM 308 forAsphaltic Concrete (Hveem)
[Cl ASTM D1559 and ASTM D2726 for Asphaltic Concrete (Marshall)
CTM 216/231 et Density)
Notes:
1 — Classification of Soils for Engineering Purposes
(Unified Soil Classification System — UCSC)
2 — Percentage Gravel / Sand / Fines
(Based on Grain Size Analysis)
Maximum
Density Test
Results
(FRM019 Rev.4)
Project No: 17017-01
Project Name: Stantec / FI ADA
NMG
TABLE 2 17017-01
SUMMARY OF FIELD DENSITY TEST RESULTS June 14, 2019
Stantec / Fashion Island ADA
d
2
H
°
F
P%
o
H
O£
2
Approximate Location
_.o
o
u$
f..�
gam..
a y
iI o
2
a
-m c
�. u
O
c
U
E.a
E ;_
a o
O g
=F
K c
m
?!z
% 10
u °'
o:•. c
U
Remarks &
Comments
SG -35
SDWK
2/11/19
SG
S OF SAN MIGUEL DR
N
11.8
115.2
1
8.5
125.5
92
SG -36
SDWK
2/11/19
SG
S OF SAN MIGUEL DR
N
11.7
115.0
1
8.5
125.5
92
SG -37
CUGU
2/11/19
SG
S OF SAN MIGUEL DR
N
12.0
115.5
1
8.5
125.5
92
AB -1
PRKG
2/19/19
AS
S OF ROYS HAWAIIAN
N
10.2
121.2
AB -1
8.5
127.0
95
AB -2
PRKG
2/19/19
AB
S OF ROYS HAWAIIAN
N
10.0
121.0
AB -1
8.5
127.0
95
AC -1 THROUGH AC -19 NOT USED FOR PHASE 1 IMPROVEMENTS
AC -201 I
PRKG
1/28/19
AC
NW OF FLEMING'S
N
--
142.4
AC -6
--
149.0
96
AC -21
PRKG
1/28/19
AC
NW OF FLEMING'S
N
--
143.1
AC -6
--
149.0
96
PRKG
1/28/19
AC
NW OF FLEMING'S
N
--
140.6
AC -7
--
147.0
96
PRKG
1/28/19
AC
NW OF FLEMING'S
N
--
142.7
AC -6
--
149.0
96
JAC-25
PRKG
1/28/19
AC
NW OF FLEMING'S
N
--
140.1
AC -7
--
147.0
95
PRKG
1/28/19
AC
NW OF FLEMING'S
N
--
143.3
AC -6
--
149.0
96
PRKG
1/28/19
AC
NW OF FLEMING'S
N
--
139.9
AC -7
--
147.0
95
AC -27
PRKG
1/29/19
AC
NW OF FLEMING'S
N
--
141.8
AC -8
--
149.0
95
AC -28
PRKG
1/29/19
AC
NW OF FLEMING'S
N
--
142.5
149.0
96
AC -29
PRKG
1/29/19
AC
NW OF FLEMING'S
N
--
141.7
149.0
95
AC -30
PRKG
1/29/19
AC
NW OF FLEMING'S
N
--
141.0
149.0
96
AC -31
PRKG
1/29/19
AC
NW OF FLEMING'S
N
--
142.8
1AC-8--
149.0
96
AC -32
PRKG
1/29/19
AC
NW OF FLEMING'S
N
--
143.0
149.0
96
AC -33
PRKG
1/29/19
AC
NW OF FLEMING'S
N
--
142.6
149.0
96
AC -34
PRKG
1/29/19
AC
NW OF FLEMING'S
N
--
143.3
149.0
96
AC -35
PRKG
1/29/19
AC
NW OF FLEMING'S
N
--
142.5
149.0
96
AC -36 THROUGH AC -48 NOT USED FOR PHASE 1 IMPROVEMENTS
AC -47
PRKG
2/19/19
AC
S OF ROYS
N
--
142.6
AC -11
--
149.0
96
AC -48
PRKG
2/19/19
AC
S OF ROYS
N
--
141.8
AC -11
--
149.0
95
AC -49
PRKG
2/19/19
AC
S OF ROYS
N
--
142.9
AC -11
--
149.0
96
AC -50
PRKG
2/19/19
AC
S OF ROYS
N
--
143.1
AC -11
-
149.0
96
AC -51
PRKG
2/19/19
AC
SOF ROYS
N
--
140.7
AC -12
--
147.0
96
AC -52
PRKG
2/19/19
AC
S OF ROYS
N
--
141.2
AC -12
--
147.0
96
AC -53
PRKG
2/19/19
AC
S OF ROYS
N
--
141.0
AC -12
--
147.0
96
190614
e
� cA
m
v �
�_ P6
LEGEND
ALL LOCATIONSAREAPPROXIMATE
AC -53
• ASPHALT CONCRETE TEST
AB -2
• ASPHALT CONCRETE TEST
0SG-37 SUBGRADE TEST
FIELD DENSITY TEST LOCATION MAP
FASHION ISLAND ADA IMPROVEMENTS
401 NEWPORT CENTER DRIVE
CITY OF NEWPORT BEACH, CALIFORNIA
a
1\
law._wo
OAC 34
s
ril
B1AC 27D� sAC- t33 � II II i Ii i
a. 72 m
m
�� eaxaPe Irs�,� I
N'
fW0 �
101N'E W Wrs \ �
1
nrs
Project Number: 17017-01
Project Name: Stantec / FI ADA
Date: 6/14/19
FuUMI-. S ICWL
9TeAK FIoU,E
Figure 1
Not To Scale
Base Map: Stantec
NMG
Geotechnical, Inc.
LEGEND
ALL LOCATIONSAREAPPROXIMATE
AC -53
• ASPHALT CONCRETE TEST
AB -2
• ASPHALT CONCRETE TEST
0SG-37 SUBGRADE TEST
FIELD DENSITY TEST LOCATION MAP
FASHION ISLAND ADA IMPROVEMENTS
401 NEWPORT CENTER DRIVE
CITY OF NEWPORT BEACH, CALIFORNIA
a
1\
law._wo
OAC 34
s
ril
B1AC 27D� sAC- t33 � II II i Ii i
a. 72 m
m
�� eaxaPe Irs�,� I
N'
fW0 �
101N'E W Wrs \ �
1
nrs
Project Number: 17017-01
Project Name: Stantec / FI ADA
Date: 6/14/19
FuUMI-. S ICWL
9TeAK FIoU,E
Figure 1
Not To Scale
Base Map: Stantec
NMG
Geotechnical, Inc.
-
Roy's Hawaiian Fusion
c
;
,1
OIL
a V,ywnrn
\'2.12
es9 dr.�
AC 51 JIB
Ak
st
Not To Scale I
Base Map: Stantec
FIELD DENSITY TEST LOCATION MAP Project Number: 17017-01 ���
FASHION ISLAND ADA IMPROVEMENTS project Name: Stantec/ FI ADA
401 NEWPORT CENTER DRIVE Geotechnical, Inc.
CITY OF NEWPORT BEACH, CALIFORNIA Date: 6/14/19 Figure 2
r
;
,1
i
Not To Scale I
Base Map: Stantec
FIELD DENSITY TEST LOCATION MAP Project Number: 17017-01 ���
FASHION ISLAND ADA IMPROVEMENTS project Name: Stantec/ FI ADA
401 NEWPORT CENTER DRIVE Geotechnical, Inc.
CITY OF NEWPORT BEACH, CALIFORNIA Date: 6/14/19 Figure 2
r
;
,1
Not To Scale I
Base Map: Stantec
FIELD DENSITY TEST LOCATION MAP Project Number: 17017-01 ���
FASHION ISLAND ADA IMPROVEMENTS project Name: Stantec/ FI ADA
401 NEWPORT CENTER DRIVE Geotechnical, Inc.
CITY OF NEWPORT BEACH, CALIFORNIA Date: 6/14/19 Figure 2