Loading...
HomeMy WebLinkAbout2.0_A3_Harbor Day School Reconstruction_PA2018-183_PC-3_Prior Project Site Entitlements Attachment No. PC 3 Prior Project Site Entitlements 45 V� QP �P HARBOR DAY SCHOOL ENTITLEMENT HISTORY SEPTEMBER 2, 1971 Use Permit No. UP1546 approved to allow the construction and operation of a private school. CEQA Review:None Listed SEPTEMBER 21, 1972 Use Permit No.UP1546 amended to allowtemporary use of a relocatable building for locker room purposes and maintenance and storage operation. Also to delay required landscaping along San Joaquin Hills Road in a Southern California Edison easement. CEQA Review:None Listed MAY 19, 1983 Use Permit No. UP1546 amended to construct additional administrative office space and to include the retention of two previously approved prefabricated buildings on a permanent basis. CEQA Review:Class 1 JANUARY 4, 1990 Use Permit No. UP1546 amended to construct three (3) new classrooms, expansion of two(2)existing classrooms, construction of a new storage room,expansion of an existing storage room,and construction of various mechanical rooms. CEQA Review:Class 1 MARCH 21, 1996 Use Permit No. UP1546 amended to construct a new 8,108-square-foot building comprised of two (2) art labs, pottery storage, wood shop and machine area,a science lab,music room,and restroom facilities. CEQA Review:Class 1 MARCH 18, 1999 Use Permit No. UP1546 amended to construct a 12,750-square-foot gym,including storage facility,weight and locker rooms, as well as supporting offices.Also to allow the gym to exceed the 32-foot height limit. CEQA Review:Class 14 APRIL 12, 1999 General Plan Amendment No.99-1(E)to increase the development limit from 0.15 to 0.30 FAR(from 42,823 square feet to 85,646 square feet). CEQA Review:Class 14 2006 General Plan Update increased development limit from 0.30 to 0.35 FAR(from 85,646 square feet to 99,708 square feet). CEQA Review:General Plan Update Programmatic EIR APRIL 3, 2014 Use Permit No. UP2013-024 to allow an increase in enrollment by 72 students from 408 to 480, to make improvements to the school's existing parking lot and to improve a portion of the Big Canyon Reservoir site as an off-site parking lot for traffic queuing and special event parking. No increase in square footage. CEQA Review:Class 11 and Class 14 7 V� QP �P �g