Use Permit No. UP1546 approved to allow the construction and operation of a private school.
CEQA Review:None Listed
SEPTEMBER 21, 1972
Use Permit No.UP1546 amended to allowtemporary use of a relocatable building for locker room purposes and maintenance and storage operation.
Also to delay required landscaping along San Joaquin Hills Road in a Southern California Edison easement.
CEQA Review:None Listed
MAY 19, 1983
Use Permit No. UP1546 amended to construct additional administrative office space and to include the retention of two previously approved
prefabricated buildings on a permanent basis.
CEQA Review:Class 1
JANUARY 4, 1990
Use Permit No. UP1546 amended to construct three (3) new classrooms, expansion of two(2)existing classrooms, construction of a new storage
room,expansion of an existing storage room,and construction of various mechanical rooms.
CEQA Review:Class 1
MARCH 21, 1996
Use Permit No. UP1546 amended to construct a new 8,108-square-foot building comprised of two (2) art labs, pottery storage, wood shop and
machine area,a science lab,music room,and restroom facilities.
CEQA Review:Class 1
MARCH 18, 1999
Use Permit No. UP1546 amended to construct a 12,750-square-foot gym,including storage facility,weight and locker rooms, as well as supporting
offices.Also to allow the gym to exceed the 32-foot height limit.
CEQA Review:Class 14
APRIL 12, 1999
General Plan Amendment No.99-1(E)to increase the development limit from 0.15 to 0.30 FAR(from 42,823 square feet to 85,646 square feet).
CEQA Review:Class 14
2006
General Plan Update increased development limit from 0.30 to 0.35 FAR(from 85,646 square feet to 99,708 square feet).
CEQA Review:General Plan Update Programmatic EIR
APRIL 3, 2014
Use Permit No. UP2013-024 to allow an increase in enrollment by 72 students from 408 to 480, to make improvements to the school's existing
parking lot and to improve a portion of the Big Canyon Reservoir site as an off-site parking lot for traffic queuing and special event parking. No
increase in square footage.