LANDSCAPE INSTALLATION CERTIFICATE OF COMPLETION
I hereby certify that:
(1) 1 am a professional appropriately licensed in the State of California to provide
professional landscape design services.
(2) The landscape project for the property located at /D 3P, W 1-07Z 54 /'�S CiJ y
(provide street
address or parcel number(s)) was installed by me or under my supervision.
(3) The landscaping for the identified property has been installed in substantial
conformance with the approved Landscape Documentation Package and complies with
the requirements of the City of Newport Beach Water Efficient Landscape Ordinance
(Municipal Code Section 14.17) and the City of Newport Beach Standards for
Implementation of the City of Newport Beach Water Efficient Landscape Ordinance for
the efficient use of water in the landscape.
(4) The following elements are attached hereto:
a. Irrigation scheduling parameters used to set the controller;
b. Landscape and irrigation maintenance schedule;' -
c. Irrigation audit report; and
d. Soil analysis report, if not submitted with Landscape Documentation Package,
and documentation verifying implementation of the soil report
recommendations.
(5) The site installation complies with the following:
a. The required irrigation system has been installed according to approved plans
and specifications and if applicable, any prior approved irrigation system
alternatives.
V_ Yes No
b. Sprinklers comply with ASABE/ICC 802-2014 Landscape Irrigation Sprinkler &
Emitter Standard.
4 Yes _ No
(6) The information I have provided in this Landscape Installation Certificate of
Completion is true and correct and is hereby submitted in compliance with the City of
Newport Beach Design Standards for Implementation of the City of Newport Beach
Water Efficient Landscape Ordinance.
33
i-7�V r p P� t7�t;5 r ti
Print Name
Signature
7 -rte-
Date
License Number
,Zyz7/ U 0
Address
QN9-,7-5i-9??%
Telephone
Landscape Design Professional's Stamp
(If Appropriate)
j7r�yE� p��,�r�as�i?Ccsh-(
E-mail Address
34
LANDSGAPE WATERING GUIDELINES
SEASONAL FREQUENCY- DAYS BETWEEN WATERINGS
SPRING
SUMMER
FALL
WINTER
WATER THIS
MAR- MAY
MAY - OCT
OCT - DEC
DEC - MAR
DEEPLY
TREES
DROUGHT
4 - 30 DAY
7 -18 DAYS
14 - 30 DAYS
24 - 45 DAY
24:'- 36'
PLANTING
HIGH WATER
7 -12 DAYS
7 -10 DAYS
7 -12 DAYS
14 - 30 DAY
24:'- 36'
USE PLANTS
SHRUBS
DROUGHT
4 - 30 DAY
7 -18 DAYS
14 - 30 DAYS
24 - 30 DAY
18" - 24'
PLANTING
HIGH WATER
7 -10 DAYS
5 - 7 DAYS
7 - 10 DAYS
10 -14 DAYS
18" - 24'
USE PLANTS
GROUND
DROUGHT
4 - 30 DAY
7 - 21 DAYS
14 - 30 DAYS
24 - 30 DAY
8" - 12'
COVERS
PLANTING
HIGH WATER
7 -10 DAYS
2 -10 DAYS
7 -10 DAYS
10 -14 DAYS
6- 12'
USE PLANT
ANNUALS
3 - 7 DAYS
2 - 5 DAYS
3 - 7 DAYS
5-10 DAYS
8" - 10"
TURF
3 - 7 DAYS
NONE
3 -10 DAYS
7 -14 DAYS
6' -10"
THESE GUIDELINES ARE FRO ESTABLISHED PLANTS n YEAR FRO SHRUBS, 3 YEARS FOR TREES).
ADDITIONAL WATER IS NEEDED FOR NEW PLANTINGS OR UNUSUALLY HOT OR DRY WEATHER. LESS
WATER 15 NEEDED DURING COOL OR RAINY WEATHER DRIP RUN TIMES ARE TYPICALLY 2 HOURS OR
MORE FOR EACH WATERING,
ALL SPRINKLERS SHOULD SERVER ONLY THE REQUIRED TURF AREAS AND NOT SPRAY ON BUILDINGS,
FENCES OR NON-LANDSCAPE AREAS. WATERING SHOULD BE DONE BEFORE SUNRISE TO REDUCE
EVAPORATION LOSSES. ALWAYS IRRIGATE THE ENTIRE DEPTH AND WIDTH OF THE ROOT ZONE
REGARDLESS OF THE TIME OF YEAR. TWICE A YEAR WATER TWICE AS LONG TO LEACH OUT SALTS AND
BUILDUP IN THE SOIL