CITY OF NEWPORT BEACH
City Council Minutes
Study Session
September 13, 1999 - 4:00 p.m.
ROLL CALL
Present: Adams, Glover, Thomson, Ridgeway, Debay, Noyes
Absent: Mayor O'Neil
CURRENT BUSINESS
1. CLARIFICATION OF ITEMS ON THE CONSENT CALENDAR.
No items were discussed.
2. GREEN ACRES PROJECT UPDATE.
Public Works Director Webb stated that the City has been involved in this
project for a number of years and there are one or two action items that will
be on the September 27th agenda for Council consideration.
Utilities Engineer Mike Sinacori recognized Steve Conklin, Director of
• Engineering and Associate General Manager for the Orange County Water
District (OCWD), and indicated that Mr. Conklin can answer any specific
questions on their efforts over the past three years.
The proposed expansion for the Green Acres project was planned in the late
1980's and Council executed an agreement in the early 1990's to bring the
reclaimed water into Newport Beach. Mr. Sinacori stated that the proposed
Phase I expansion into Newport Beach in 1995 was actually deemed a low -
priority project by the OCWD when they reconsidered their finances, looked
at their overall system and the cost of the project. In 1996 the Irvine Ranch
Water District (IRWD) proposed discharging reclaimed water into the Upper
Newport Bay. It was that proposal that led to the three -party intertie
agreement between the City, OCWD and IRWD, which was signed in July of
1996. Referring to the exhibits displayed, Mr. Sinacori provided an
explanation of the Intertie project. He noted that the central part of the
system came on line in 1991, and serves the cities of Fountain Valley, Santa
Ana and Costa Mesa. The expansion project to the south (Newport Beach)
and to the west (Huntington Beach) cost $16 million total. The Intertie
agreement was to take the excess water that IRWD was going to dump into
the Upper Newport Bay and utilize it for four months out of the year in the
Green Acres system. The excess water would get discharged through the
Sanitation District's facility and their outfall. It took another 1 to 1 -1/2
years to build the other facilities. The total money spent on transmission
mains was about $4 million plus $2 million from IRWD. Prior to starting
any of the work the City was obligated to have end -user agreements in place
with the major users that the system was going to provide water for. The
five end -users are the Newport -Mesa School District, Big Canyon Country
Club, Newport Beach Country Club, the Bluffs Homeowners Association,
and the City. The school district is going to utilize the water at Corona del
Volume 52 - Page 675
INDEX
Green Acres Project
Update
(89)
•
City of Newport Beach
Study Session Minutes
September 13, 1999
INDEX
Mar High School once they can afford to re -do their irrigation system. The
soccer field at Eastbluff School is now utilizing reclaimed water. The City
has also put on -line the medians in Jamboree Road and Bonita Creek Park.
Eastbluff Park will be completed later this year, pending other park
improvements. The City and the Bluffs Homeowners Association have
worked hard to get the association ready for the reclaimed water. They were
cited for 40 violations of cross connections by the County, which could have
resulted in the residents getting reclaimed water in their pipes. As of
September loth all of the violations were corrected and the association is
ready to receive the Green Acres water.
In response to questions raised by Council Member Ridgeway, Public Works
Director Webb explained that the City really hasn't spent $4 million. The $4
million was contributed by the OCWD to provide the transmission main into
the City of Newport Beach. Newport Beach has spent close to $1 million.
The City is the provider of water to the citizens of Newport and it is the
City's responsibility to get it to them. The two country clubs represent the
greatest expenditure from the City side since two pump stations had to be
constructed to provide additional pressure to get the water into the golf
course areas. This was part of an agreement that the City entered into with
the country clubs at the time the City was negotiating the end -user
agreements and discussing the Intertie project. The City obligated itself to
provide the initial infrastructure to allow them to be able to take the water.
Mr. Webb clarified that the country clubs did not pay for the pump stations
• since the City made the determination that from a conservation effort that
the City needed to try to get it going. The country clubs spent well over $1
million each to convert their facilities.
Council Member Debay further noted that there was also the political issue
of IRWD putting their reclaimed water into the bay. She said the City did
more than their share in order to circumvent that.
Mr. Webb noted that the end -user agreement with the Bluffs Homeowners
Association indicated that the City would provide, if necessary, a loan which
would allow them to complete their work and would be paid back over a ten -
year period. At the time the agreement was made there were two options.
One option was to borrow the money from the IRWD and then lend it to the
Bluffs, and the other was to lend it directly to the Bluffs at the going interest
rate as determined by the City's Administrative Services Department. The
City was short on funds because of the completion of the Groundwater
Development Project, therefore the loan from IRWD was considered. At the
next Council meeting, he indicated that staff will be asking Council to
consider consummation of the loan and will be recommending that the City's
water funds be utilized. The City's reserves are up, there are sufficient
funds to handle this and the City has an obligation to go forward with this.
Council Member Ridgeway noted that reclaimed water is more expensive
than purified water and asked by what percent it is more than the water
from the groundwater system.
• Mr. Sinacori said that it costs in the neighborhood of $600 -$700 per acre -foot
to produce the reclaimed water. The district subsidizes the City, so it costs
the City roughly the same to purchase the reclaimed water, as it would be to
Volume 52 - Page 676
0
City of Newport Beach
Study Session Minutes
September 13, 1999
produce it from its wells.
In response to Council Member Glover, Mr. Webb indicated that the Bluffs
have re -done their system and are now seeking a $145,000 loan. In response
to her question about whether the City has to have certain findings to make
this loan, Mr. Webb indicated that the City has had a number of situations
(assessment districts) where the City has worked out a loan. He said that to
the best of his knowledge the City does not have to have any specific legal
findings, however that will be clarified before it is brought forward on
September 27th.
3. BALBOA PENINSULA PARKING MANAGEMENT PLAN.
Assistant City Manager Sharon Wood noted that this plan has been worked
on for quite some time. She indicated that the parking management plan
was the #1 priority identified for further work by the Council when the
Balboa Peninsula Planning Advisory Committee (BPPAC) report and the
Balboa Peninsula Planning Study were brought to them. At that time the
Council also talked about doing extensive public outreach efforts as
peninsula revitalization issues were worked on. She indicated that there
have been numerous public workshops.
Gary Hamrick, Meyer, Mohaddes Associates, Inc., noted that there are 16
options available as part of the plan. In terms of the overall scope of work,
Mr. Hamrick indicated that the major tasks included a very comprehensive
inventory of parking (where is parking located, what type of parking is it,
what are the fees, what are the time limits, is it public or private). Written
surveys of businesses and residents were conducted to find out what people
had to say and a series of three public workshops were held throughout the
process which led up to discussions of the options available. Personal
interviews were conducted with key stakeholders, including commercial and
residential representatives, and utilization and duration surveys were
conducted in order to provide a technical analysis of what the actual
problems are (how long do people stay in the meters, how long do they stay
in non - metered spaces, how busy is it and is it really a problem in some
areas versus others). They looked at other beach city programs, and a land
use and parking code model analysis was provided to determine the actual
land use on the peninsula and if the parking is adequate and if not, who is
using the parking. Since the peninsula is so large and varied, it was split up
into four study areas for purposes of starting to quantify and identify the
individual issues so that the local issues could be identified. He noted that
every single parking space throughout the entire peninsula was surveyed in
the field and charted on maps and graphs in order to determine where the
parking supply is compared to the parking demand. He noted that they did
not count private garages, but every commercial private parking space and
every single public space was inventoried. Referring to a graphic, he
indicated that they actually measured the number of on- street parking
spaces and looked at the types of meters and the location. All of the public
parking lots were inventoried (metered and ticketed lots) to look at the types
• of meters and the location, In terms of the inventory, there are about 10,500
total spaces on the peninsula. Almost 3 /4ths of them are publicly owned and
operated spaces and 30% are private commercial spaces in private lots. In
terms of the public spaces, 40% are 6 -hour meters, 38% are located in the
Volume 52 - Page 677
INDEX
Balboa Peninsula
Parking Management
(85)
City of Newport Beach
Study Session Minutes
September 13, 1999
• Balboa Pier lots and the remainder are scattered and are meters with varied
duration - 20 minute, 30 minute, one, two and 12 hours. Twenty -seven
percent of all the public spaces are currently blue posts. He noted that the
largest proportions of the spaces are on- street non - metered and mostly in the
residential areas. The next largest proportion is the private commercial at
just over 3,000 and then the on- street metered along the medians at Balboa
Boulevard and other locations. Using graphics to illustrate, he explained the
different types of parking available and noted that it is very unusual for a
beach area to have that many 6 -hour long -term meters. In response to
Council Member Glover, Mr. Hamrick explained that the blue meters are
meters that the City has designated so that residents, business people and
even non - residents can purchase permits in order to park at those meters
without actually feeding the meter. Mr. Hamrick stated that they also
inventoried the meter fees throughout the entire peninsula and referred to a
graphic to illustrate the distribution of the current meter fees in terms of
cost per hour. He noted that in the McFadden -Lido area essentially the
meters are $0.25 (blue) with some beginnings of the higher costs ($0.50 and
$1.00 as you start to go south). Around Newport Pier the parking is all $1.00
and $1.00 per hour throughout the whole of the Balboa Boulevard median
and then once you get to Central Balboa there is a mixture of fees ($0.25,
$0.50 and some $1.00). He explained that the City actually took aerial
photographs of the peninsula on a time series throughout the day on a
typical summer weekend day and a weekday to find out how the parking is
used in the early morning, mid - afternoon, and late afternoon, in order to
• look at the patterns. The graphic shows the weekday for the first part of the
study area (West Newport residential, Lido, City Plaza area, Cannery
Village, McFadden Square) and the dark lines represent those streets where
there was 85% or greater utilization of parking. Typically when parking is
designed, capacity is looked at as about 85 -90% of the total supply. Anything
over 85% or 90% is considered to be effectively fully utilized and the point at
which you would look for some type of improvement. He noted that in this
particular example, there is about 50% - 65% overall utilization, indicating
that there isn't a tremendous problem during the day in this area during the
summertime period. He said they weren't able to determine who was
parking in each space, but looked at the trends of how many leave and how
many arrive. He indicated that in a residential area you tend to see very
high utilization in the late evening or early morning. Looking at a similar
graphic for Sunday at 11:00 a.m., 2:00 p.m. and 5:00 p.m., the survey showed
at or over the 85% threshold at 2:00 p.m. and at 5:00 p.m. Every single
street is fully occupied, which is because of the people who live there as well
as the beach goers and commercial related employee parking. He referred to
another graphic which showed the peak parking occupancy overall for the
Tuesday and the Sunday that were surveyed, showing that even on Tuesday
the public lots are 80% occupied. The on- street parking is lower at 55 %,
which indicates that the residents are going to work and there isn't as large
of a beach crowd on weekdays. The private lots are 54% used, which is very
typical even in the most highly utilized parking areas. Overall he said there
is still about 40% available on Tuesday, however on Sunday the public lots
are well over 90% full, so essentially there is very little or no parking
• remaining and even the on- street parking is nearly 90% full at the peak time
on Sunday, which indicates problems for the residents who live on those
streets (residential non - metered streets). He noted that the private lots are
not very heavily utilized overall.
Volume 52 - Page 678
INDEX
•
Ll
City of Newport Beach
Study Session Minutes
September 13, 1999
The other element of the technical analysis involved parking duration or
turnover (how long do people stay in the spaces once they go there). In the
Newport Pier area they found that in the 1 -hour meters, 65% or more stay
more than one hour by either putting more money into the meter at the end
of the hour or they get a ticket. It was lower in the Balboa Pier area,
however still almost one -third stay longer than one hour. For the 6 -hour
meters, 77% in the Newport Pier area are staying less than four hours, so
they are not fully utilizing those 6 -hour spaces. In the Balboa Pier area, 85%
are staying less than four hours. What this indicates is that there are very
short -term meters where people want to stay longer and very long -term
meters that aren't being used for six hours. Previous studies have shown
that people normally come to the beach and stay from 2 — 4 hours. In
response to Mayor Pro Tem Thomson's questions, Mr. Hamrick reported that
the City has actually done some investigation into the time limits and his
firm looked at this in detail with respect to the validation issue and other
issues for the Balboa Pier lot and found a large number coming into the pier
lot stayed 1— 2 hours. He noted that the 1 -hour meters tend to be right next
to the commercial businesses, which is appropriate, and in other
communities 2 -hour meters in the beach area are the most common. He said
it is very rare to have 6 -hour meters unless it is like the Balboa Pier lot and
it is a ticket situation. Referring to another graphic, he indicated that it
refers to the final major part of the analysis, which shows what the land uses
are that actually utilize the parking, or who demands the parking
(beachgoers, restaurant, or retail). Unfortunately, he said they couldn't
quantify visitors and beachgoers coming in because there is no way to do
that except by counting them on the beach. He said they can quantify the
demand for all of the land uses on the peninsula. The graphic shows which
of the actual buildings (the commercial land on the peninsula), require the
most parking. It shows that restaurants require about one -third of the total
parking supply (the largest component), followed by commercial retail (all
the stores & shops), followed by office. In the two categories (restaurant and
shops), it is well over 50 %. Commercial vessels (Catalina charters, fishing
charters) are at 7 %. He noted that the City code requires parking for
restaurants, offices and all of these land uses, however there is no code
requirement for parking for beachgoers, which creates a major problem with
an area like the peninsula. He said there is almost an infinite demand for
beach parking. To summarize the overall key findings, he said that
essentially all public parking is utilized on summer weekends, on- street
parking is quite well used year round (based on conversations and older
studies), private parking tends to be under - utilized, meter time limits often
exceed or don't correlate to the amount of time that people want to stay in
the location they are visiting, meter fees are generally low compared to other
beach cities ($1.00- 1.50/hour), parking intrusion in residential areas was
identified as the major residential concern, and restaurants generate about
113 of the commercial demand followed by retail, office and commercial
vessels. In response to questions raised by Council Member Adams, Mr.
Hamrick noted that residential on- street parking was not taken into
consideration since in theory residents should have their own parking on -site
in a driveway or garage. He indicated that they can generate that
information by looking at the number of housing units to figure out the
theoretical demand. As part of previous studies a number of goals were
brought forth and presented to the public in the workshops. The public was
Volume 52 - Page 679
INDEX
City of Newport Beach
Study Session Minutes
September 13, 1999
INDEX
• asked to prioritize the goals. As a result, protecting residential parking
came out very high, somewhat mixed was encouraging business patronage,
parking aesthetics was somewhat mixed, improve linkages to public
transportation was mixed, reduce summer roadway congestion was a high
priority, improving intersection visibility was a relatively high priority,
enhancing pedestrian accessibility was quite mixed, enhancing bicycle travel
was overall a lower priority, and generating reasonable revenues was a
somewhat lower priority. At the workshop, a couple of priorities were added
by those in attendance: 1) acquire more property to provide additional
parking, which received a mixed high -low priority; and 2) don't change
anything. He explained that all of this technical background information led
up to the development of a series of options for parking management. They
are presented as options rather than as a prioritized set of recommendations,
so that the community and the Council can jointly discuss and decide which
ones are appropriate. He said that staff has reviewed all of the options that
his firm presented and put them into three categories: 1) approve options for
priority implementation; 2) approve options for later implementation
following staff preparation; 3) approve options for further staff review and
development; and 4) one item not to be pursued.
In terms of the West Newport residential, Lido, City plaza, Cannery Village,
and McFadden Square area some of the major options put forth for
consideration include phasing out the $0.25 per hour meter fees and phasing
it in up to $1.00 per hour. He noted that many of the options can only be
• implemented following review and approval by the Coastal Commission
through a coastal permit. He explained the processes that can be used to
obtain Coastal Commission approval and noted that as far as fees the
Commission does not have any written guidelines about the raising of fees,
however they have some unwritten rules that they follow. He noted that one
of the ideas for this particular area is to unify and bring the parking fees
closer to the market price that other beach cities charge in order to serve the
population appropriately. One of the other elements recommended for this
area is remote parking with a shuttle system, which is an important aspect
especially if residential permit parking is considered. Another
recommendation is to modify around the Newport Pier area some of the
meter time limits to make them reflect how the meters are being used, which
would take Coastal Commission approval. Also, changing some of the 1 -hour
meters to 2 -hour meters is an option.
In the Central Balboa commercial area, some of the recommendations
include changing 1 -hour meters to 2 -hours to provide better utilization by
customers, changing all the meter fees to $1.00, consideration of a valet
parking operation to serve the businesses as a group, implementing a bus
layover area for private buses, implementation of a validation system for the
large Balboa lot to encourage business use of the lots, and to look at a
reserved parking system for the charter and sport- fishing vessel operations.
Mr. Hamrick summarized the options (not in the order as recommended by
staff).
• Option 1 — Increase meter fees in Central Balboa to $1.001hour, and in
Lido /Cannery Village to $0.50/hour to be phased in over time so there is
never more than a $0.25 /hour increase in any one given year.
Volume 52 - Page 680
•
u
1]
City of Newport Beach
Study Session Minutes
September 13, 1999
Option 2 — Modify meter time limits to most effectively utilize spaces
Option 3 — Extending meter time limit in commercial areas of the peninsula
to 8 P.M.
Option 4 — Implement a "Business Parking Permit" program to allow owners
and employees of businesses on the peninsula to park for extended periods at
selected meters.
Option 5 — Create Visitor Parking Information Guide/Map.
Option 6 —Implement trial period shared valet parking program during peak
season.
Option 7 — Implement a shared use parking program.
Option 8 — Pursue implementation of resident permit parking on affected
streets on an as- needed basis.
Option 9 — Implement bus layover area for private buses.
Option 10 — Work with operators to develop charter /sport fishing vessel
parking permit system to allow charter boat and sport fishing passengers to
park all day in designated areas.
Option 11 — Chalk mark tires for purposes of ticketing overtime vehicles at
meters.
Option 12 — Conduct regular (quarterly or bi- annual) monitoring of lot
utilization and land uses.
Option 13 — Add parking off - peninsula with peak season shuttle system
Option 14 — Install an interactive, real time signage program to provide
parking information.
Option 15 — Post signs restricting vehicles over six feet in height and /or add
standard 10 to 15 foot red curb sections at selected intersections along Bay
Avenue and Balboa Boulevard.
Option 16 — Balboa Pier lot validation program
Council Member Ridgeway concurred with Council Member Adams and said
that the hypothetical demand for the residential on- street parking is needed
since in Central Balboa there is clearly a conflict of goals between residents
and commercial businesses. He said that what is missing in the report and
professional analysis is the conflict in Central Balboa from about 18th Street
down to Medina.
Council Member Adams said that he feels that the real parking demand by
land use should be reviewed not necessarily using the code demand, but
taking into consideration the time of day, as well as the residential demand
Volume 52 - Page 681
INDEX
•
City of Newport Beach
Study Session Minutes
September 13, 1999
during those times of day.
INDEX
Council Member Glover stated that she feels somehow the City needs to get
a better analysis of the number of beachgoers coming to the peninsula. She
noted that through her experience in Laguna Beach as a business owner,
increasing fees is better for businesses because of the parking turnover.
In response to Council Member Adams, Assistant City Manager Wood
indicated that as part of the further analysis for implementation, staff will
provide net cost and revenue estimates for each of the options.
Council Member Ridgeway, as District 1 representative on the Council,
indicated that he thinks many of the options are excellent, globally they will
help the peninsula and he is very supportive of many of the
recommendations.
Mayor Pro Tem Thomson explained that the Council will discuss this more
at a future evening meeting and more of the refined options with cost
estimates will be laid out for consideration. He encouraged staff to provide
the cost estimate (raw data) as soon as possible to assist them in evaluating
the options. He voiced concern about the number of visitors to the peninsula
versus the number of parking spaces and said that maybe code enforcement
can look at the number of garages in that area that are used for purposes
other than parking.
• Council Member Debay reported that she recently toured a facility for sale
on Superior that has a parking structure on an adjacent lot with a large
surface parking area around the office building. She said she has been
encouraging the broker to let the City know when a buyer does appear on
the scene to see if maybe the City might be able to participate in that
property in some way or another regarding the parking structure.
Council Member Ridgeway noted that if the parking on the peninsula were
doubled in the summertime it would be used. He said he thinks the City
needs to manage what it has and pointed out that Mr. Hamrick has advised
that off -site or remote parking areas don't work.
Tom Hyans, President of Central Newport Beach Community Association,
distributed copies of comments on the 16 options, and noted that they
participated in all three workshops and would like to continue to participate
in the future. He said that when the implementation plans are put together
it should be done at a PROP meeting or in study session rather than being
done before a full Council so there can be some discussion. He said that the
residential area between the two piers along Balboa Boulevard is primarily
non -owner occupied duplexes. As far as meter feeding, he said it is his
experience that the shorter duration meters tend to be $0.25/hour and the
longer duration meters (i.e. 6- hours) tend to be $1.00/hour and at least
around McFadden the cheap meters are the ones being fed.
• Bob Rubien, Crab Cooker, said that he hopes the City opposes any measure
that makes the community less accessible to those who are not fortunate
enough to be able to live in Newport Beach. Regarding the residential
permit program, he said he couldn't imagine how it could be administered in
Volume 52 - Page 682
•
•
•
City of Newport Beach
Study Session Minutes
September 13, 1999
any way that would not accomplish anything but bitterness. He said he
favors leaving things alone until the City can provide more parking. He said
the extension of the meters until 8:00 p.m. has been reviewed previously,
would not provide any benefit and would force people to go to the residential
areas to park since there are no meters. Other measures should be
exhausted before going to this extreme. He spoke in support of changing the
meter rates to $1.00/hour but not waiting a few years to do it. In reference
to the anti - feeding of the meters he pointed out this proposal would basically
eliminate the tradition of the family outing at the beach.
Bob Black, Balboa Merchants & Owners Association, stated that the Board
has not addressed these items yet, but will be doing so shortly. He said he
thinks many of the ideas look very good and questioned whether there was
anything in the report about the metered areas on A & B Streets. Council
Member Ridgeway explained that those streets are addressed in the Balboa
Pier parking lot redesign report and Ron Baers is doing some design work to
address the issues.
Stuart McKenzie, 1205 West Bay, noted in reference to comments made
about the utilization of garages, that many years ago (in the 60's) the City
checked every garage on the peninsula, however it didn't accomplish
anything. The garages were cleaned out for the inspection and the next day
the owners utilized them for different purposes. He stated that there are
many curbs on the peninsula that are painted red that don't need to be
painted. He questioned why the 10t1i Street beach is painted all red when
there could be parking spaces there. Many years ago the Police Department
let the residents park red along side each curb and there is nothing in the
code that allows this. He also noted that on the weekends cars are parked in
front of the school in the loading zone and by code it isn't allowed, however it
should be allowed.
Chuck Remley, 101 E. Balboa Blvd., said that the house he lives in is 100
years old and there is no garage and adjacent houses also have no garages.
As part of the argument for a residential parking permit, he stated that he
owns a business and every year buys a permit so he can park at the blue
meters. He said there are a lot of people in Central Balboa that don't have
parking spaces for their cars. He said there is a rental property around the
corner from him with 4 -5 bedrooms with a two -car garage and when it is
rented for the week there are more than two cars that arrive and it impacts
the parking.
Council Member Ridgeway pointed out that the City has summer rentals of
one - bedroom units and when they are rented 5 -7 cars show up during those
periods.
Following discussion about the timing of this issue, it was determined that
this item would be brought back to Council at a regular meeting for
discussion, debate and action after it has gone back to PROP.
4. BALBOA PIER PARKING LOT REDESIGN.
Motion by Council Member Ridgeway to continue this item to
September 27, 1999.
Volume 52 - Page 683
INDEX
C- 3209(A)
Balboa Pier
Parking Lot
Redesign (38)
•
•
City of Newport Beach
Study Session Minutes
September 13, 1999
In response to questions about timing, Public Works Director Webb indicated
that this item will require Coastal Commission approval which takes about
three months, therefore it would really be pushing it to get something in
place by next summer.
Without objection, the motion carried by the following roll call vote:
Ayes: Adams, Glover, Thomson, Debay, Ridgeway, Noyes
Noes: None
Abstain: None
Absent: Mayor O'Neil
PUBLIC COMMENTS - None
ADJOURNMENT - 6:00 p.m.
The agenda for the Study Session was posted on September 8, 1999, at
3:40 pan. on the City Hall Bulletin Board located outside of the City of
Newport Beach Administration Building.
0t/ •G��
Recording Secretary
�J(AUB�vne, �!l. 4Jar�r��
City Clerk
,d.- J. 6>,Lay
Mayor
Volume 52 - Page 684
INDEX